Unable to make entries for objects with no master data in IP

Hi All,
In BPS, when created a layout, which contains characteristics, in whose properties 'Master Data' is not checked, we could enter the new values for them directly in the layout.
In IP, we could not do the same with the 'New Lines" option set on Analysis Item in the WAD for the characteristics whose master data property is not checked.
We have a layout, where, some characteristics are having master data checked, and some other characteristics where master data is not checked.
With the 'New Lines' option set on Analysis Item in the WAD for the characteristics whose master data property is not checked, when data entered, the error message is appearing saying that the data is not valid.
This is so quite simple in BPS. I think, I might be missing something in IP on how to achieve this.
Thanks in Advance,
Best Regards,
- Shashi

Hi,
In IP it's integerated that if you will not maintain master data you may not be able to plan for new value of characteristic.It's the normal behavior of system.
Cna check the link below:-
Master data planning in BI
Hope it may be helpful

Similar Messages

  • I'm unable to make payment for creative cloud monthly plan. It says there is some problem processing the payment. I tried with three different cards. Still not working

    I'm unable to make payment for creative cloud monthly plan. It says there is some problem processing the payment. I tried with three different cards. Still not working

    "Some problem" is really not much information
    Some links that may help
    Change/Verify Account https://forums.adobe.com/thread/1465499 may help
    -http://helpx.adobe.com/x-productkb/policy-pricing/change-country-associated-with-adobe-id. html
    -Credit card https://helpx.adobe.com/utilities/credit-card.html
    -ID support http://helpx.adobe.com/x-productkb/global/service-c1.html
    -wrong email https://forums.adobe.com/thread/1446019

  • How to make entry for transit loss in the system

    Hello to all,
    I am having an issue with one subCon material.
    Suppose,
    Material A is the product required of 3000 MT Qty.
    SubCon vendor have sent that qty, but there is a transit loss of 500 MT.
    How to make entry for this transit loss in the system.
    regards,
    Anisha

    correct me if i am wrong-
    ur scenario is
    for making material A ,
    3000 MT of material B required.
    but for producing A vendor uses 3500MT of B
    solution : if this ia the case then u can overwrite the value of B at GRN from 3000MT to 3500MT.
    OR
    ur scenario is -
    u require material A of 3000MT
    vendor sends u 3000MT
    but actualy u recieve 2500MT
    and u have to pay for 3000MT as per bill
    solution : if this is ur scenario then.
    prerequisite-activate direct posting to G/L and material at MIRO
    Path - SPRO->MM->LIV->activate direct posting to G/L and material at MIRO.
    now procedure is -
    step 1) do GR for 2500MT
    step2) in LIV pay to vendor for 3000MT for that put 500 qty in material tab and the relavent amount.
    in this way loss in transite will be book on inventory.
    regards,
    sujit

  • I am unable to use services for objects  while creating a PO

    Hi All,
    I am unable to use services for objects  while creating a PO ie in me21n / Me22n .
    Our client wants to attach some doucument along with the PO, we want to use services for object for this. I use this services for objects in admin level , but unable to use this at user level. 
    System gives the following message
    No service available
    Message no. SGOS_MSG002
    Regards
    Gsg

    Hi,
    Refer the following OSS notes 552127, 598073
    For getting Object for services icon in ME21N and ME51N refer OSS note 913251

  • Class not registered. Looking for object with CLSID:

    Hi,
    I had create a custom project system with the help of https://msdn.microsoft.com/en-us/library/vstudio/cc512961.aspx. And which is working fine that I can create a project with extension of .myproj in the VS Experimental Instance window. But when I go for
    the properties in the created project, (Solution Explorer: Right click on the project folder and select properties) it will show an exception that "Class not registered. Looking for object with CLSID:{00000-00-00-000000}" How can I provide Properties
    window for this project system or can I modify the Properties window for any other default VS project system? Please help me.

    Hi mathikp,
    I don't think you did something wrong while creating the project, but instead it could be the issue of environment, I would suggest you to validate following things:
    1, Try to create another blank app to see if the exception still thrown.
    2, Run with an administrator privilege to check if you can get the project work..
    I would not consider its as a coding issue but try to fix Visual Studio probably helps.
    --James
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Goods Receipt entry for items with serial number

    Hi All,
    When I try to create a Goods receipt entry, for items with serial number, i'm always getting the following error message.
    [OSRI] , 'The selected quantity of serial/batch numbers is greater than the quantity in row Id'
    The following is the code that I'm using
    Dim oInvetoryGenEntry As SAPbobsCOM.Documents
    Dim oSerialNumber As SAPbobsCOM.SerialNumbers
    Dim ErrCode As Long
    Dim ErrMsg As String
    Dim ret As Long
    Set oInvetoryGenEntry = oCmp.GetBusinessObject(oInventoryGenEntry)
    Set oSerialNumber = oInvetoryGenEntry.Lines.SerialNumbers
    oInvetoryGenEntry.DocDate = Now
    oInvetoryGenEntry.DocRate = 1
    oInvetoryGenEntry.TaxDate = Now
    oInvetoryGenEntry.PaymentGroupCode = "3"
    oInvetoryGenEntry.Comments = "GRN Entry11"
    oInvetoryGenEntry.Lines.ItemCode = "A00004"
    oInvetoryGenEntry.Lines.Price = 100
    oInvetoryGenEntry.Lines.Quantity = 1
    oSerialNumber.SystemSerialNumber = 55555
    oSerialNumber.InternalSerialNumber = "2354"
    oSerialNumber.BatchID = "bt1"
    oSerialNumber.Add
    ret = oInvetoryGenEntry.Add
    If ret <> 0 Then
            oCmp.GetLastError ErrCode, ErrMsg
            MsgBox ErrCode & " " & ErrMsg
        Else
            MsgBox "GRN Entry made."
        End If
    It would be wonderful if anyone help me out to trace the exact reason for this issue.
    Thanks
    John

    Hi John I'm almost sure that your working with SDK 6.5 with SP1 or lower, visit this address
    https://www.sdn.sap.com/sdn/collaboration.sdn?node=linkFnode6-1&contenttype=url&content=https://DI: Add more than one serial numbers in Invoice
    Maybe you can find your answer if you can fix it let me Know my email address is [email protected] because i had the same problem.
    Regards

  • Please put a cost object with valid JV data for GL accoutnt (line 001)

    Dear All,
    When the user is trying to post ASKBN, They are getting an error saying "Please put a cost object with valid JV data for GL accoutnt (line 001)"
    So we tried to look up the error, and the WBS, Cost center, profit center and JVA details are all available in place. Still cant understand why this error comes. And why the system is asking to put JV details when they are available.
    On checking, WBS has an AUC and AUC has the cost center which has the JV details and PC details. So I think everything is in place.
    Can someone help please and let us know if we are missing anything else that needs to be checked ?
    Thanks,
    Hari Dharen

    Dear Hari Dharen,
    if something else in missung you'll get a error message if you run ASKBN in testmodus.
    regards Bernhard
    Edited by: Bernhard Kirchner on Oct 5, 2010 8:55 AM

  • TS4079 Siri used to work fine when making mobile calls in Ecuador until yesterday, when the administration of Ecuador added an aditional number in all mobile numbers existing in Ecuador. Since then Siri is unable to make any mobile calls with any new numb

    Siri used to work fine when making mobile calls in Ecuador until yesterday, when the administration of Ecuador added an aditional number in all mobile numbers existing in Ecuador. Since then Siri is unable to make any mobile calls with any new number.Help
    I`ve tried restarting, rebooting, nothing works.
    The interesting thing is that SIRI can call to previous mobile numbers (without the new digit) obviously not connecting , and, can call to any other numbers as an office or home number. So the problem is the new digit in the mobile number

    Ecuador has added an extra digit to mobile phone numbers but apple wont accept 10 digit phone numbers so we cant use facetime or apple IM or verify our new phone numbers. ( and Siri won't work either!) I have contacted apple support online but can't request a call back as the apple system says our new phone numbers are invalid. I am going to phone them tomorrow and you should complain too at http://www.apple.com/support/contact/.  . The more people that bring this to their attention the faster it will get fixed

  • Replacing DSO with InfoObject for storing time-dependent master data

    Hi Gurus,
    currently I am storing time-dependent contract items in a DSO. The posting items are enriched with this master data as well as some other transaction data into another consolidated DSO, which includes the time-dependency (valid from & valid to) as well for better performance. But this means that we will have a large number of records, because 1 new posting item could end up with few posting items more due to the versions of contract item.
    Since there are many posting items (>50 millions yearly, daily peak 1-2 million) and the complexity with delta management, I am considering whether to use an InfoObject for storing the contract items. The number of contract items are not many, about 300,000 after migration and about 10,000 each month.
    Hence, I would like to ask whether this approach is feasible? Is there a size limit for a master data InfoObject?
    Thanks in advance.
    Regards,
    Meng

    hi,
    The Time dependent MD object will create the same number of records for the contract item (maybe more) as each contract item will have different record for different time frame.
    this can be better explained with example.
    let us say you have 1 contract item with 2 entries one valid from 2007-2008 and the other from 2008 onwards.
    In DSO this will create 2 records, in time dependent MD object it would also create 2 records.
    In the infopackage for the MD you would need to provide the interval (time range) for the MD.
    if you provide it as 2007 till 2999 then two records will be created one with 2007-08 and other valid from 2008-999.
    However as there would be other contract items which would have lower date say 2006 then this contract item would create 3 rows, 1 row for 2006-07 with blank values, 2nd for 2007-08 and 3rd for 2008-999. This way it has more number of records than the DSO.
    In case of MD object you may not be able to delete data as well in future if the object is used in some other place.
    There will be many pros and cons of the approach you are thinking and you would have to weigh them and decide.
    regards,
    Arvind.

  • Unable to make recovery disk on in pavellion g62016 .dat file is missing in recovery drive

    unable to make recovery disk on in pavellion g62016 .dat file is missing in recovery drive
    can i use the .dat file of another same notebook
    what is significance of ,dat file

    Hello shail11. I understand that you're having some problems creating a recovery disc. Is this correct?
    You can not use another .dat file.  The recovery media is specific to a certain notebook, so using another computer's files will not work.   If you're running into issues making a recovery media you could attempt to perform the recovery from the BIOS. Here is a document which outlines the process.  ALL data not backed up before performing the recovery will be lost.
    Let me know if this helps; have a great weekend!
    Please click the white star under my name to give me Kudos as a way to say "Thanks!"
    Click the "Accept as Solution" button if I resolve your issue.

  • I do not have master card,visa card to make my apple ID,tell me how can I make my apple ID with out master card and visa card

    I do not have master card,visa card to make my apple ID,tell me how can I make my apple ID with out master card and visa card

    It will if you follow, exactly, the instructions on the page that lllaass included in the post above yours : Create an iTunes Store, App Store, or iBooks Store account without a credit card or other payment method

  • Issue with 0hrposition master data

    We are extracting data from SAP using 0HRPOSITION_ATTR datasource. I noticed that data is not maintained correctly in master data tables in BW and giving us incorrect results in reporting. Consider below mentioned scenario:
    Position A created as vacant on 04/01/2006 with start date (BEGDA/ Valid from) as 04/01/2006 and End date (ENDDA/ Valid to) as 12/31/9999 and is vacant. Below mentioned entry is shown under maintain master data for 0HRPOSITION in BW:
    Position Valid To Valid From Position Vacant
    A 03/31/2006 01/01/1000
    A 12/31/9999 04/01/2006 X
    Position A is now delimited on 09/15/2006 as it’s no more required. In SAP, position has record only from 04/01/2006 till 09/15/2006 as vacant. When record is extracted in BW, it creates below mentioned entry in master data table.
    Position Valid To Valid From Position Vacant
    A 03/31/2006 01/01/1000
    A 09/15/2006 04/01/2006 X
    <b>A 12/31/9999 09/16/2006 X</b>
    Entry 09/16- 12/31 is incorrect as position doesn’t exist for this duration. If we report on 0HRPOSTION with key date as 09/30/2006, it shows position A as vacant though position no longer exists.
    Has anyone come across this situation. any help is greatly appreciated.
    Kamal
    P.S: Milind Rane...I was searching through the forums and came across your post.I would appreciate if you could let me know how you solved this issue...
    Message was edited by:
            Kamal K

    HI KK
    I have a similar issue. Can you please let me know how this Issue with 0HRPOSITION_ATTR extractor was resolved. In my case i have incorrect data in BW when reporting is done. THrough the extractor untill the PSA i have the correct records coming  but in the master data 0HRPOSITION i have incorrect records.
    Please help.
    Thanks
    Hari
    Message was edited by:
            SAPCOOL

  • Asset master data synchronization with HR Master data

    Dear Experts:
                          I am FI consultant and i am doing Research on Synchronization of asset master data with HR master data. Our management wants that if company gives any thing which is regarded as an asset e.g Laptop, expensive tools e.t.c to its employee then beside opening its asset master data in FI it should also be updated in HR Employee master data. For this from FI side there are 3 asset classes for which we want that if any asset is opened in these classes then the data should be updated in HR. I have turned on Personnel number in screen layouts and have fetched this field in asset reports. We want
    1...Asset Description
    2...Cost Center
    to be updated in HR master data. Now my question is that how this can be achieved. Is it possible? What configuration will need to be done for it.
    Regards

    Hi
    FOr assets created in FI and reflect them in HR use the feature ANLAC and it will take care.
    This feature determines whether or not the system checks the fields Asset number in infotype 0040 (Internal Control) and Loan object number  in infotype 0040 (Objects on Loan) against database ANLA.
    R K

  • QM action not allowed for DTP requests in master data and Text tables

    Hi,
    I have a master data object load request which has failed, returned error in st22 and job finished.
    BUT the request has not turned red in the monitor - it's still yellow. That means that I can not delete request nor start new load to infoprovider because it believes a request is still running. But it's not, I've checked both sm37, sm50 etc.
    When trying to manually change QM status to 'red' it says 'QM action not allowed for DTP requests in master data and Text tables'
    How can I force QM status to red so that I can move on?
    Running NW2004s BI (7.0) Patch 15.
    I searched for this question but there is no answer
    Thank you

    Folks
    I know how frustrating this problem is even in netweaver 7.0 environment. I found a solution for this problem atlast and it works but a not direct way of resolving this issue.
    When this request is in yellow status and not able to change / delete the request, its actually in a pseudo status and it is a bug in the program. This request sits in table RSBKREQUEST with processing type as 5 in data elements USTATE, TSTATE and this 5 is actually "Active" status which is obviously wrong.
    All we need is, ask your basis person to change the status to 3 in both these data elements and then it allows to reload the delta. Once the delta is successfully loaded, you can delete the previous bad request even though it is still in yellow. Once the request is deleted, the request status gets updated as "4" in table RSBKREQUEST.
    Hope this helps.
    Thanks

  • Automatic PO creation from PR with no master data

    Dear gurus,
    Is it possible to run ME59- Auto PO creation from approved PR with no master data/source assigned/PIR? Assuming user create adhoc PR.
    Is it possible to run this process successfully if i didn't meet on the criteria below? let say no.1 is not checked?
    1.Material Master purchasing view, check automatic PO check box.
    2. Vendor Master purchasing view, check automatic PO check box.
    3. Maintain Source list for Vendor and Material (transaction ME01) and also see validity period.
    4. Maintain Purchase Info Record (transaction ME11), check info record category (must be standard or pipeline or subcontracting)
    5. Create a Purchase Requisition ( transaction ME51N), during creation select check box of Source Determination.
    6. Use transaction ME59 and execute for purchase requisition for vendor, you will be able to create automatic PO.
    Thanks in advance.

    Hi,
    yes all point should be checked
    check following link
    [http://www.sap-img.com/materials/steps-to-create-auto-po.htm]
    Regards
    Kailas Ugale

Maybe you are looking for

  • My built-in webcam stopped working after installing Windows 7 - HELP!!

    I have an HP Pavilion dv6636nr Entertainment Notebook computer.  It came installed with Windows Vista and I just recently installed Windows 7, 32-bit onto it.  The built-in webcam worked for a short time, but now it doesn't even show up in the device

  • Quick install of RDS "unable to create the session collection"

    Simple as new virtual server, not touched. Had this happen in the past as well. When I attempt to run the Quick Install of RDS I get "unable to create the session collection" on the Session Collection stage. Then when I go to add roles or features th

  • When I START a Query from the WAD....

    Hello Experts, I create a nice Template in WAD 7.0 When I start this, comes first of all a Variable Selection. In TOP of this Selection, I want the Report NAME. How can I do this, and where can I do this... THANK you ALL..

  • Find file doesn't find and doesn't finish

    With no significant events leading to the issue, ⌘F will search but never finds anything and never stops searching. Disk Utility verifies the startup volume, no problems found. Repaired permissions, still Find File will not work. Any suggestions?

  • Question K8N neo2 on-board RAID

    Would the on-board RAID 0 setup be faster then a raid controller card with RAID 0?  This is on a K8N Neo 2 motherboard.