Hi all,
      After Setting up CHARM,created a Transport request,while releasing it thru CHARM gives error:"Release of system Q11 Could not be determined"
rgds,
rajesh
Message was edited by: rajesh
        Rajesh M

Dear Rajesh,
1.Did you released the Task of the request in satellite system?
2.What error you get when you check inside the task list of that correction.
Please give inputs,which will help us in solving the issue faster.
Thanks and Regards,
Avinash.

Similar Messages

  • Unable to release transport request because of control program tp

    I have create a customized transaction type as a copy of urgent correction SDHF. I am not able to release the transport requests using the action in the toolbox 'Release Transport Request' and I obtain the following error in the log:
    could not start transport control program tp
    But if I directly execute the task 'Release Transport Request' in the task list, it works.
    Another strange thing is that at the beginning both ways worked, but after some days I started to have this problem.
    Thanks
    Antonello

    I did not find any note about this error.
    Someone can help me?
    Thanks.
    Antonello

  • Unable to release transport request for modified Planning book from Dev Sys

    Hi All
    can someone advice on this:
    We have included a new key figure to our existing Planning book, which is already defined in Planning Area. This key figure is just getting shipping data for comparison and is not having any impact on macros also. We inserted key figure and set the attributes as output only and all looks good in Development system. But when we created transportation request and trying to release request it is giving error "Test Call of transport control program (tp) ended with return code 0208" Message no: TK094
    can any one advice on this
    KV

    Hello,
    Please check with Basis team. I think this is not related to planning book that you are trying to export. A look in the message text gives the following:
    Check the following points:
    Feasibility of the transport control program tp
    Parameter settings in the transport profile
    Availability of the transport directory and the subdirectories (cofiles, data, log, sapnames, bin)
    Write authorization for the subdirectories
    Write authorization for the files of the subdirectories cofiles, data, log, sapnames
    Release the request again when the error has been removed.
    Hope this helps.
    Warm regds,
    Ashutosh

  • Unable to release transport request

    I tried to release a request, but when I execute se10, below will have information stated "global information cannot be read", then when I need to release the main request, it will give me the message "Cannot access file
    swisapfs01\sapmnt\trans\tmp\DEVE900004.DEV
    Message no. PU814
    Diagnosis
    Access to the file
    swisapfs01\sapmnt\trans\tmp\DEVE900004.DEV is not permitted.
    The operating system registered the following errors:
    Permission denied"
    I already granted necessary authorization, anything that had been missed out?

    Hi,
    You need to login to SAP system.
    Type transaction code AL11. A list of parameters will be displayed.
    Locate the following parameters DIR_TRANS and DIR_PUT
    Against those parameters some values must be placed which will tell you whats your trans directory and put directory.
    Hope this helps.
    Regards,
    Deepak Kori

  • Urgent Correction: Release transport request (transport is red)

    Hello!
    Has some one experience to solve the problem bellow:
    By an urgent correction it is not possible to release transport. In the field "Task" I can see a red point that not allow to proceed.
    If I release the transport manually in the satelite syytem, without CharM, my import runs with error:
    AGR_1016 table class is 'C'. Entries are only imported to client '000'.
    AGR_1016B table class is 'C'. Entries are only imported to client '000'.
    AGR_PROF table class is 'C'. Entries are only imported to client '000'.
    AGR_USERT table class is 'C'. Entries are only imported to client '000'.
    AGR_TIMEB table class is 'C'. Entries are only imported to client '000'.
    Main import
    End date and time : 20071115141115
    Ended with return code:  ===> 8 <===
    The question is:
    I would like to copy some existing role to  cutomer's namespace Z... save the rolle and transport the role via CharM.
    Is it usual to get the error I get?
    Thank you very much!
    regards
    Thom

    Hi Liza:
    You cannot delete released transport requests.
    Don't import them into QAS or PROD.
    If you already imported them, then your only option is to delete the Objects manually in DEV, capture the deletes in a new request and transport th enew one.
    As you know if you released a request, you can ignore it without moving it anywhere.
    Ram Chamarty
    Message was edited by: Ram Chamarty

  • CHaRM-Handling old transport request before CHARM was activated.

    Hi All,
    Recently i just activated CHARM in solman-SM1 for new a project implementation. This CHARM was setup in in such a way that it tie to one of the local IMG project EPROJ in developmemnt-DEV.  Now i have one concern and that is those transport requests where created before i activated CHARM.
    These old transport requests were crerated directly in DEV without project assigned. Therefore, we tried to assign IMG project EPROJ (the same IMG project setup in CHARM) into those old transport request manually.
    Problem : When i tried to perform released step in CHARM tasklist it says that "No transport request found"
    Question : How do i make CHARM to pickup those old transport requests?
    Really appreciate your feedback as there are a lots of old transport request which needed.
    Thank you.

    Hi,
    If you use Change Request Management, you should always use Change Request Management means to create transport requests; that is, create transport requests in a change transaction or in the task list.
    Manually registered transport requests can be assigned to a task list only, not to a change transaction.  If you use change transactions ,,,,the system does not take into account transport requests that you added manually.
    This note is what you want
    Note 1150426 - Registering transport requests in ChaRM
    Hope it solve ur problem completely.
    Regards
    Prakhar

  • Releasing transport request taking long time

    Hi All,
    I am releasing transport request in SE09, for releasing child request it was taking long time and for parent request taking much more long time.
    In SM50, i didn't find any processes running.
    Can anyone tell me the solution.
    Thanks & Regards
    Uday

    Hi Uday,
    >> I am releasing transport request in SE09, for releasing child request it was taking long time and for parent request taking much more long time.
    You didn't note what release your are running on, but you can check the note 1541334 - Database connect takes two minutes
    >> In SM50, i didn't find any processes running.
    It is normal, because the system exports the transport request by "tp" command at the OS level, after TMS complete its job on a DIALOG wp.
    Best regards,
    Orkun Gedik

  • Problem of calling BAPI to release transport request

    Dear Friends,
    I want to automatically release Transport Request using BAPI (BAPI_CTREQUEST_RELEASE), but I met a difficult during the process that only TR TYPE 'K'or 'W' can be release using this BAPI, if I create an addon program which TR Type is 'S' (stand for Development/Correction), then this BAPI does not work. 
    BTW, you can refer table E070.
    Could you please kindly give me some idea to solve this problem?
    Thank you in advance.
    Best regards,
    Nick

    Dear Li Nick,
    The reason that you cannot release a request of type 'S' is that type 'S' names a local correction, which cannot not be transported (and therefore of course not released).
    Regards, Tino

  • PROBLEM IN RELEASING TRANSPORT REQUEST THROUGH SE10

    Dear all,
    I am trying to release transport request of development server via. transaction se10.Now my problem is that the child(DEVELOPMENT/CORRECTION) is getting released while the parent request is not getting released.
    I checked everything and its showing 'test call of transport control program ended with return code 0208.' I even checked overview of system,overview of connection type,over view of transport protocol and they are fine.my only doubt is after going to se10 when I click transport proposals its showing "WORK FLOW NOT ACTIVE' .
    Is my problem is because of this. Please help its very urgent as due to this I am not even able to transport any request on production server.
    Helpful contribution will be duly rewarded.
    Thanks & Regards,
    VICKY

    hi
    vicky just went through your Query regarding release
    of requests..first of all U be sure of TMS configuration
    see whether it is consistent or not.then after Refresh
    the system and then come to release of requests.
    its true that we can transport through scc1 but first
    check about STMS configuration and the way you set
    that.
    Regards
    manjula.

  • Is it is possible to delete released transport requests...

    Hi Experts,
    I had created transport request and it is released, moved to quality with errors. I dont know why I am getting errors while transporting the request, Now I am creating another transport request. Is it any possibility to delete released transport request or is there any solution for this. why I am getting errors while transporting from dev to quality.
    Thanks & Regards,
    RAJ

    HI,
    Its not possible to delete the released transport request. You should have to follow transport procedure .
    T-code for Transport Connection- Check in SE09/se10 for creating requests.
    For collecting objects you have go Transport connection without missing the objects.
    SE03 for checking the Request objects.
    Go to transport connection in RSA1 Select u r Data target or report what ever it may be in development sys & select only necessary objectsu2026 click on transport optionu2026u2026it will ask the transport request create new req. go to SE-9 release the objectu2026go to STMS import u2026RELEASE The objects in quality sysu2026same procedure to production sys.
    Thanks
    sudhakar.

  • Releasing transport requests with job roles take forever after upgrading to Netweaver 7

    Dear experts,
    Some time ago we've out SAP ECC 5 system to ECC 6. Since then, it takes a very long time to release transport requests containing job roles.
    For example, a request containing 154 job roles (1 template and 153 derived roles) took 4 hours to release in our DEV system. Before the upgrade this only took a couple of minutes.
    Afterwards, the import in our QAS and PRD system don't take longer than normal.
    Apparently this time is taken by the Export phase:
    Checks at Operating System Level   
    17.04.2014 09:50:03
    (0) Successfully Completed
    Pre-Export Methods                 
    17.04.2014 09:50:37
    (0) Successfully Completed
    Export                             
    17.04.2014 13:51:02
    (0) Successfully Completed
    Does anyone know what causes this and how to solve?
    Kind regards,
    Nicolas

    Hello Nicolas,
    What I understood from your description is that ,it takes very long time to release the job. Once it is released, execution does not take much time.
    To me it seems to be background job/work process issue. Maybe all the background work process are busy to execute current jobs and no free work process available for the jobs which are in the queue. In that case, if possible try to increase number of bg work processes.
    Check for any performance issues during that period. Check if there is any locking issue and jobs are stuck because of that.
    Hope this helps to investigate the issue
    Regards,
    Archana

  • Error in transporting request through charms

    Dear Experts ,
    recently refreshed my quality systems data with production data ..and finished successfully, but we did not take any screenshots before doing refresh in quality
    my problem is we already configured charms in solution manager to transport requests to production system ...
    now we are  not able to transport request through charms .. because rfc connections are changed in quality ...
    please let me how can i recollect quality rfc connections for charms ...
    i dont have idea about charms configuration to reconfigure in quality.... please help in this
    Regards

    Hi,
    You need to transport the ODS 1st and then the transformation.
    The main reason for most of the transports to fail is:
    1)Transporting each and every object in the same transport request.
    Ideally,
              u2022The Infobjects should be transported first in a separate request.
              u2022Then the Data source and the Info providers (Cube, ODS, Data source and Multiproviders) together in a separate request.
               u2022At the end the transformations and the DTPu2019s in an another separate request.
    If the above mention sequence is followed while transporting the transport failures can be avoided.
    2)Also when a change is made to an ODS (I object added or deleted) it should again be transported along with the transformation but in separate request.
    I.e. the ODS 1st and the transformation.
    hope this helps.
    Regards,
    Mahesh

  • Database tables holding details for a non - released transport request

    Dear All,
    We are implementing SAP ECC 6.0 u2013 ABAP stack, on IBM iSeries / System i, i5/OS V5R4 -
    SAP kernel release 7.00, kernel patch number 173
    Could someone please guide me to the database tables holding the details for a non u2013 released transport request.
    The problem is the following :
    We encountered some data corruption in the database of our development system, so we did a restore from the previous day's backup (RSTLIB  command) for the database library : R3DEVDATA, without restoring the /usr/sap/trans  directory, then we did an APYJRNCHG command for the journal receiver spanning from the previous day's backup until the corruption time (remote journal on a remote system.)
    We are now facing the following conflict :
    One of our programmers is now un-capable of updating an ABAP program, which he previously added in a transport request, which he did not release.
    ( This was done during the day of the data corruption)
    When the programmer is trying to update the ABAP program through the ABAP workbench, he receives the error :
    'Request lock on non u2013 existent task / request DEVK921426'
    No details for the transport request DEVK921426 exist in either of the two directories :
    /usr/sap/trans/data   , /usr/sap/trans/cofiles
    The way I see to solve this conflict (eliminate this lock) is to delete the different entries related to the un-released transport request from the database tables.
    Any clues would be highly appreciated.
    Thank you in advance for your cooperation.
    Best regards.
    Reda Khalifa

    Dear Volker,
    Thank you very much for your interest.
    The transport request of interest did not appear in transaction code SE03
    Eliminating the record from table TLOCK indeed did solve the problem.
    Thank you again.
    Best regards.
    Reda Khalifa

  • Creation date for released transport request

    Hello everybody!
    Does anyone know how to find the CREATION date for a released transport request? I've already checked table E070CREATE and it only has entries for modifiable requests.
    Best regards,
    Luís Andrade.

    I think transport is released date field in E070 is overwritten with the releasing date.

  • Delete Release transport request

    Hi Gurus,
    I need to delete a transport request which is already release. Please let me know what is the best way to do that.
    Thanks
    Liza

    Hi Liza:
    You cannot delete released transport requests.
    Don't import them into QAS or PROD.
    If you already imported them, then your only option is to delete the Objects manually in DEV, capture the deletes in a new request and transport th enew one.
    As you know if you released a request, you can ignore it without moving it anywhere.
    Ram Chamarty
    Message was edited by: Ram Chamarty

Maybe you are looking for

  • New iPod touch does nothing under Windows XP

    I have been bought a new iPod touch to put all my existing CDs onto. We already have iTunes from a previous iPod, and on connecting the touch to the Windows XP machine, all I got was the "install new hardware" screen, asking for a CD, which of course

  • Codec problem with one gateway

    I am having a very strange problem with one of my gateways. No matter how I set up my regions and device pools I continue to have all calls go through this gateway as G729. This would be fine except that I can't do conference calls because of codec m

  • My ipod will not downgrade from 5.0 or 4.3.5 to a 4.3 4.2.1

    my ipod will not downgrade from 5.0 or 4.3.5 to a 4.3 4.2.1 it is a 4G ipod touch im trying to downgrade to a 4.3 or 4.3.3 this ipod model is MC540LL right now i have 5.0 but there was the same problem with downgrade when i had a  4.3.5 firmware

  • Electronic Bank Reconilation Statement (EBRS)

    Hi All,   I have to configure for the Electronic Bank Reconcilation the formats such as AUSZUG.TXT Format or MT940 Format does the bank provide the file in those formats or we have to write a program to convert a text file into the prescribed formats

  • Reg:working without Keyfield in FCC node structures

    Hi All, I have a scenerio of FCC to RFC , where i need to read a Text file and want to post it to R/3 through RFC Recordset Structure : Header,1,Item,*,Trailer,1 Is it possible to read the file without Keyfield vale ? Please give your valuable sugges