Unable to see planned order in APO

Dear Experts,
I'm creating a Project manufacturing order in ERP. After that I do MRP run in SCM7.0. When I check in Product View (transaction /SAPAPO/RRP3), I do not see any planned order, though I can see orders in ERP (Tcode-md04).
I guess transfer of network to APO is not happening.
Same problem arises when I schedule a dummy project in ERP and after I do MRP run in SCM7.0, I do not see any planned order in planning board.
The MRP run in SCM7.0 shows no error and no warnings and everything appear in green.
I was able to see planned orders in APO before there was system upgrade from SCM 4.2 to SCM 7.0.
Please provide some clue to solve this problem.
Regards,
Jyoti

Hi Jyoti,
There will be an "Iterate" button on the left hand corner in the result display of CCR.  Please click on this button so that these errors will get iterated and goes to the respective distinations.  After this, you go to smq1 and smq2 trasnaction codes of R/3 and clear all the queues.  Similarly you clear the queues in smq1 and smq2 transaction codes of APO.  Afterwards, check whether you are able to see the planned order.
Please confirm
Regards
R. Senthil mareeswaran.

Similar Messages

  • How to see planned orders for P3 mrp type products in APO?

    Dear experts,
    I have materials with P3 MRP type (not planned in APO but in R/3 using MRP)
    I have active integration models with P3 and X0 mrp type products for planned orders
    however I can not see in APO product view the planned orders for P3 materials,
    is this normal or should I see those planned orders in APO?
    Thanks for your answer,
    best regards
    Elynn

    Hi,
    The following prerequisites must be met so that planned orders can be transferred from SAP R/3 to SAP APO
    and vice versa:
    1.The material masters must be transferred to SAP APO.
    2. PPMs must exist for planning in SAP APO.
    3. The relevant integration models must be active.
    4. An active integration model for planned orders must exist in SAP R/3.
    5.An active integration model must also exist for materials, so that the components of the planned order are transferred.
    6.The relevant distribution definitions must be maintained in SAP APO, so that planning results can be
       transferred from SAP APO to SAP R/3.
    Thanks,
    nandha

  • Correlation of reservation with Planned order in APO.

    Hi,
    In R/3 in COGI we see reservations. my issue is I want to know for which planned orders in APO these reservations are.
    In the product view in APO we can see some reservations (PRDRES(W) - correct me if I am wrong). How to correlate these reservations with planned orders. I am looking in PP/DS module of APO.
    Thanks a lot in advance,
    Prabhat

    Hi Prashant,
                      You are correct and if product is showing the reservation then it is mean for all order in product view.
    You can check the Production Planning Table inside PPDS for wider view of reservation and orders.
    /n/sapapo/ppt1
    Check the SAP Note: SAP note 439596
    SAP Link is also useful:
    http://help.sap.com/saphelp_scm50/helpdata/en/64/dca63be2bc331be10000000a114084/content.htm
    http://help.sap.com/saphelp_scm50/helpdata/en/c1/147a375f0dbc7fe10000009b38f8cf/frameset.htm
    Let me know if it is sufficient.
    Regards,
    Vishal

  • How to delete Planned Order in APO

    Hi,
    How can I delete planned orders in APO? I already tried //RLCDELETE but it says "Order not in live cash" but I can see the order in //RRP3.
    Let me know if you know another TCODE for this.
    Thanks
    David

    Hello David -
    Please use /SAPAPO/DELETE_PP_ORDER to delete planned orders.
    thanks
    Varun

  • Read the characteristics of a planned order in APO

    how can we read the characteristics of a planned order in APO.What Function Module can be used for this?
    how can we manually schedule the order activities based on the characteristics. Can we use the function module 
    /SAPAPO/OM_ACT_SCHEDULE by copying and making some changes in it for this purpose?

    Hi,
    if there are any orders in your system with characteristics (in planning version 000) then this report will find them:
    report  get_char.
    data:
       ls_genp     type /sapapo/om_gen_params,
       lt_orderid  type /sapapo/om_orderid_tab,
       lt_char     type /sapapo/om_charact_val_tab.
    ls_genp-simversion = '000'.
    call function '/SAPAPO/OM_ORDER_GET_ALL'
      exporting
        is_gen_params = ls_genp
        iv_simsession = ''
      importing
        et_orders     = lt_orderid.
    call function '/SAPAPO/OM_ORDER_GET_DATA'
      exporting
        is_gen_params       = ls_genp
        iv_simsession       = ''
        it_order            = lt_orderid
      importing
        et_charact_val_acts = lt_char.
    Best regards
    Thomas

  • Unable to see planning application and dimension menus under navigate tab

    Dears
    Unable to see planning application and dimension menus under navigate tab in EPM 11.1.1.1 workspace.
    Is there any configuration lost?
    All EPM service have already started.
    Thx
    Hector

    I also don't see the menu under "Consolidation" or "Planning" applications. I can naviaget to these applications from Navigate -> Application ->Consolidation or Planning and I see a box with up arrow and down arrow. If I keep my cursor between these two boxes, or the boundary, sometime I could start my applications in these two modules. I checked context.properties in \Hyperion\home\deployment\Tomcat5\workspace\webapps\workspace\conf folder.
    #Appended properties
    #Sat Jan 17 14:14:43 EST 2009
    Reports=Y
    HFM=Y
    HPSU=Y
    HP=Y
    HPS=Y
    Analyzer=Y
    BPMA=Y
    ChangeManagement=Y
    Subcontext.properties file is as follows:
    Analyzer=WebAnalysis
    Reports=hr
    HMB=metrics
    HPS=HPSWebReports
    HFM=hfm
    HP=HyperionPlanning
    BPMA=awb
    HFM-version=9.3.1
    HP-version=9.3.1
    HPS-version=9.3.1
    HMB-version=9.3.1
    BPMA-version=9.3.1
    # Parameters for all contexts
    #KeepAliveInterval=10
    #SessionTimeout=30
    #logon=bpm.logon
    #startup=cds.mode
    I also removed # character in the last four lines but I cannot see my aplications under "Consolidation" or "Planning.
    This is in Hyperion 9.3.1 environment all my websites are working. Workspace, Shared Services etc. I checked all my servies and they are working ok.
    http://lewisxphub:19000/workspace/index.jsp
    Any Ideas?
    Thanks
    Jay
    Edited by: Keerthi on Jan 29, 2009 4:31 AM

  • Unable to view planned order from exceptional summary window

    Hello All,
    I have ran ASCP plan and it details out the exceptions and recommendations, but I am unable to view planned order from exceptional summary window>recommendations>cilck discrete jobs, no planned orders visible. This issue also shows up for other exceptions, on click of exceptions details it shows up the items but unable to take any actions.
    I have tried by giving large no of days to view recommendations in preference.
    Can someone help me to reslove issue.
    Thanks,
    Edited by: user604737 on Jul 18, 2011 6:09 AM

    We don't have any query built on the exceptional window. As I am able to view below recommendations
    Recommendations
    Discrete Jobs 8
    Purchase Req 27
    When we click on discrete jobs/purchase req, its not showing any planned orders in supply window.
    Can you please let me know, which is the backend table which stores supply information which are displayed in exceptional window.
    Edited by: user604737 on Jul 18, 2011 9:15 AM

  • Unable to release planned order for single line from MRP workbench

    Hi
    We are unable to release planned order for single line from MRP Planner workbench,but Select All For Release is working for all the lines for the item
    User want to release a specific line but no new requisition is generated
    It is highly appreciable if anyone could help to resolve this issue
    Appreciate the Help
    Regards
    VKPK

    It sounds like the release goes through in the workbench but the requisition does not show up in source - is this correct? If so I would check item attributes / flags for purchasing and buy. also have found some items require a purchase price to be populated in master and org

  • How do I maintain storage location for Planned Orders in APO

    Dear all,
    Can you help us in maintaining storage location for planned orders in APO. The storage location from material master need to be updated in product master of APO and the same shall be automatically picked from product master during Supply Network Planning run.
    Material master CIF is live.
    We have got the following content error in CIF consistency check. How ever this is nt goging to harm any thing, but we would like to maintain in both R/3 and APO.
    Error:
    Plant and storage location in SAP APO: 2004
    Plant and storage location in SAP R/3: 2004 FGPA
    Thanks in advance
    Ram Mohan Rao Kolanupaka

    Instead of maintaining additional master data, i would rather use CCR user exits to switch off comparison of planned order at storage location level if the APO storage location is blank. This way you would not have to make changes to PPMs everytime a new scale out of the solution happens.
    In SE18 check the user exit /SAPAPO/CIF_DELTA3 (interface RELEVANT_FOR_COMPARE_ORDHEAD)
    If it is not possible to switch off this comparison then I guess changing master data is the next step. Do explore with a developer though about the first option.

  • How could I re-explode planned order in APO?

    Please adivse me how could I re-explode planned order in APO?

    Hi,
    Go to the planned order in the change mode, again adopt the source of supply and save.
    or you can use the PPDS heuristics "SAP_PP_021" New explosion to explode the orders.
    Thanks,
    nandha

  • Deletion of Planned Order in APO PP/DS

    Hi All,
    I have a question on PP/DS ( IS-Auto ). Suppose if we are deleting the planned orders in APO so what will happen to the concerned PDS. I want to preserve the PDS so that we can use them later.
    If we delete the Planned Orders then will the PDS be also deleted ?
    Thanks,
    Prabhat

    Prabhat,
    Think of a PDS the same way you would think of a Production Version in ECC.  It is master data, and one or more of these can be assigned to a Material/Plant combination.
    http://help.sap.com/saphelp_scm70/helpdata/EN/4d/01be3d1abbe913e10000000a114084/frameset.htm
    A Planned order is Transactional data.  Creating/changing/deleting a Planned order has no impact on PDS Master data.  During the creation of a planned order, the system reads the PDS info, and copies selected bits of this master data into the Planned order.  At this point, then, certain parts of the planned order data can be changed.  Such changes generally do not affect the underlying master data.
    http://help.sap.com/saphelp_scm70/helpdata/EN/49/d565caf54535f5e10000000a42189c/frameset.htm
    Best Regards,
    DB49

  • Multi - item planned order in APO

    Hi
    In the MES multiple knife positions are possible in a single pattern. How to create a multi item planned order in APO based on the knife positions in the pattern? When the conversion indicator is set in APO the planend order need to be converted in to multi item production order in R/3. Please help how to configure the same in APO.
    Thanks in advance.
    Regards
    Dhaiva

    Hi,
    Are you using this for trim interface ?
    If yes, you need to use Template PDS/ppm for the same.
    For more info, you can have a look at SAP note 919080.
    Let me know if this info helps
    cheers
    Ram

  • I can't see planned order in Long Term Planning Stock/requirements list.

    Hi
    I am trying to use Long Term Planning in SAP.
    I created scenario dates from 01.03.2011 to 03.09.2011. Between those dates i entered planned independent requirements as 300.
    When i went to Long Term Planning Stock/requirements list, i can see all planned independent requirements but i run Multilevel single-item planning and then when i went to  Long Term Planning Stock/requirements list again, i couldnt see planned order for planned independent requirements.
    So what is the problem? Can anyone help me please?
    Thank you.

    HI
    check the planning scenario in MS31 and the PIR assignment in MS31 also check the plant assignement.
    Check In MD61 you have enter PIRs in simulation version and the same version is to assigned in planning scenario
    Also check T code OPU5 for LTP setting for planned orders
    Regards
    Anupam Sharma
    Edited by: anupam sharma on Sep 3, 2010 2:33 PM

  • How to find out manual deletion of planned orders in APO.

    Planned orders are created on multiple bom levels when we call CTP from GATP for sales orders. For particular sales order there is no planned ordere at lower level. Dependent requirement is there which is uncovered.
    I want to find  somebody has deleted this planned order manually in apo. How to find out the same?
    Regards,
    Santosh

    Hi Santosh,
    If you suspect that the planned order was created but later on deleted manually, there is a cross check you can do to determine that.
    In case of MATP, System uses the higher level Planned Order number to create the Dependent Demand at the lower level and only when this dependent demand is covered by a planned order it assigns the corresponding planned order number to it. So if you see the dependent demand number with same  number as the higher level planned order for which it was created, you can be sure that a planned order was not created to cover the dependent demand that you see uncovered.
    If the dependant demand number is not same as the planned order at higher level, then the planned order to cover the dependent demand was deleted.
    I guess CTP also works the same way. If you're unsure about this, test it out.
    Hope it helps.
    Regards,
    Mohan

  • Unable to see demand history in APO SPP via transaction /SAPAPO/SPPMDH

    Hello
    We are trying to view aggregated sales history data in APO SPP via transaction /SAPAPO/SPPMDH
    We have loaded sales order data from flat file into DSO 9ARAWDAT & infocube 9ADEMAND. We can see the data in the cubes & also via the standard queries attached to 9ADEMAND cube.
    Also we are able to adjust sales order item level data via transaction /SAPAPO/SPPMRD: Adjust Raw Data .
    However we are unable to see any data when we try to adjust aggregated demand history via transaction /SAPAPO/SPPMDH.
    The replenishment indicator is stocked & the forecast periodicity is maintained as well.
    Could you please let us know if anything is missing? Thanks in advance

    Santanu Paul wrote:
    Hello
    >
    > We are trying to view aggregated sales history data in APO SPP via transaction /SAPAPO/SPPMDH
    >
    > We have loaded sales order data from flat file into DSO 9ARAWDAT & infocube 9ADEMAND. We can see the data in the cubes & also via the standard queries attached to 9ADEMAND cube.
    >
    > Also we are able to adjust sales order item level data via transaction /SAPAPO/SPPMRD: Adjust Raw Data .
    >
    > However we are unable to see any data when we try to adjust aggregated demand history via transaction /SAPAPO/SPPMDH.
    >
    > The replenishment indicator is stocked & the forecast periodicity is maintained as well.
    >
    > Could you please let us know if anything is missing? Thanks in advance
    Hello,
    Check this stuff (from help.sap.com) we had a quite similar issue, until we've fixed it:
    For the demand categories we defined to be in your system, you have transferred the DataSources 9ADEM_CAT and 9ADEM_CAT_TXT as well as InfoSources 9ADEM_CAT and 9ADEM_CAT_TXT to the Business intelligence system (BI system) in SAP SCM and activated them. You have transferred the following InfoPackages for these InfoSources:
    ●      Load Master Data from APO
    ●      Load Texts for Demand Categories from APO
    Note
    Each time you change the relevant for forecast indicator of a demand category, you have to reactivate the master data of characteristic 9ADEM_CAT.

Maybe you are looking for

  • How can I get Firefox ver. 29 to work with Silverlight in windows 8.1

    I noticed that this problem doesn't occur in version 28 of Firefox. For some reason when I try to go to Netflix, I can login but I can't play any videos without getting an 2103 error message with Silverlight. I've tried uninstalling and reinstalling

  • Setting Emulator Size in Flash Builder

    I am coding an Ipad app in flash builder 4.5. The emulator is bigger than my screen (it is taller, than my screen), I am on a laptop.  Is there anyway I can adjust the emulator size to fit my screen. Tried dragging on the sides to resize, but that do

  • KP26 Planned Actvity

    Dear All, Can you let me know what is the use of Planned activity / Capacity in KP26  and also Price(fixed) and Variable,etc and how it influence while executing the transaction( Cost Extimation). How the system makes the calculation. explain with an

  • Does Photoshop CS5, 6, or CC allow slicing with layer comps?

    I love the layer comps feature. It's a huge time saver and allows me to keep my files sizes smaller. One thing I just noticed since I normal hand off my PSDs to a developer is that the slices don't save with each layer comp. Is there any way to make

  • I can't see movement in .gif files that should move...

    Maybe I should open them with a different app? (Currently opening with Preview) Thanks