Unconfirmrd material in MD04

Dear Friends...
When I create a Sales Order   the Item in schedule line does not get confirmed
due to a delivery block, but shows up in MD04.
Ideally does unconfirmed material  show up in MD04 or does it not.
Thanks Ravi

hi
IMG
 Sales and Distribution
 Basic functions
 Availability check and Transfer of Requirements
 Transfer of requirements
 Block quantity confirmation in delivery blocks
 Deliveries: Blocking reasons/Criteria
When requirements transferred to MRP, the confirmed quantity is also reserved for confirmed sales documents. If the transactions are blocked for delivery the required stock will be blocked. So it cannot be used elsewhere in the system. To prevent this, we can block the TORs for delivery block in this step.
In this case the order quantity will still be transferred to MRP as a requirement. But it will not be reserved. We can see this one by going to change mode of the sales document in the schedule lines that specifies zero (0) or confirmed quantity.
When the block is removed the availability check is automatically carried out by the system, and also we may push back the material staging date by number of days.
NOTE: We can carryout availability check at anytime in spite of these blocks if transaction permits. Then system creates a temporary schedule lines with confirmed quantities, which are then removed when the document is saved.
REGARDS

Similar Messages

  • PLanned order and PO item for a same material in MD04

    A material with Procurement key as F.
    In MD04, There is a planned order for 8657 nos. for a material..
    below that there is a Dep Req XXXX
    Below that there is a purchase order for 8657 Nos.again.
    My question is if there is a open PO for the material,then why is the planned order created for the material.
    The PO reads as
    04/05/2012-POitem--- 4500016092/00050 04/09/2012 15----
    8657
    THe Planned order reads as PLdOrd----0000478483/stpo--
    8657
    Please help me out..

    In MD04,planned order and dependent requirement dates are 2/4/2012
    whereas the PO date is 5/4/2012.
    Inside the planned order the order finish date is 30/3/2012
    and inside the PO the delivery date is 2/4/2012..
    Its bit confusing..can you help in this..
    ANd for your information,the Planned order is now not found in MD04,it was there yesterday..

  • MD04 is showing material for whih nothing is pending

    hello Experts,
    I have a Material in MD04 for which scheduling agreement was created for XXXXX vendor, now when I see in sceduling agreement for both the material it is showing zero qty pending (open target qty).
    When there is no open target qty for both the material it should not get displayed in MD04.
    Why is it so?
    thanks for ans. in advance

    Hi,
    I encounter this issue before & This is sap bug , please check in OSS.
    There's some OSS note example.
    SAP Note 19854 - Reservations with quantity 0 displayed in MD04
    TQ.

  • What is the process flow in MRP - MD61+MD01,MD02+MD04+COR7

    Hi experts,
    I need one clarification for Material requirment planning ( MRP - Process industries )
    My company is newly implemented in SAP so i want some clarification in MRP side.  My company flow is 3 rd level converted of FG.
    1 st level - Raw paint - Samifinished
    2 nd level - Tin condition - Samifinished
    3 rd level - Case condition - FG
    I have raised PIR in MD61 at FG code, after MRP Run planded order created at three level ( 1 st, 2nd, 3rd - level)
    But what is the t.code used is correct recording MRP Run - MD01( Plant level ) OR MD02 ( Single item)
    what is the t.code used for over all requirment Bill of material list ( ROH & VERP)at plant based recording purchase the material.
    Kindly pls explain the flow for PIR > MRP RUN>STOCK RECUIRMENT LIST> PLANNED ORDER TO PROCESS ORDER>
    Thanks,
    Umapathy

    Hi,
    To proceed further you should firm confirm that below master data properly maintained in your system,
    - Create BOM - CS01
    - Create Resource - CRC1
    - Create Master Recipe - C201
    Now your business process starts with the requirements created in the system e.g. by MD61 in your case
    Now you can run the MRP by MDBT/MD01/MD02 for your case. It is suggested to go with MD02 for better understanding on MRP behavior for single FG material.
    Now You can analyze the MRP result for single FG material in MD04 transaction wherein you will get the planned order created through MRP run and also the order report for planning of below level components of BOM
    Then you can further proceed for Production Execution with the help of below transactional steps:-
    - COR1 - Create Process Order Manual
    - COR7 - Convert Plan Order to Process Order
    - COR6N/CORZ/CORR - Order Confirmation
    - CORS - Cancel Confirmation
    - CORT - Display Confirmation
    - CO53 - Control Recipe Monitor (Optional)
    - CO55/CO60 - Maintain PI Sheet (Optional)
    - CO54 - Process Massage Monitor (Optional)
    - MB31 - Goods Receipt For Order
    - COIK / MB1A / MIGO :- Goods Issue
    - KKS1/KKS2 - Calculate Varience
    - CO88 - Actual settlement
    - COOISPI - Order Information System
    You can see the all PR created through MRP in ME5A transaction by selecting the Creation Indicator as B for MRP as shown in below screen,    
    And for rest of analysis you can use COOISPI report.
    Regards,
    Narresh

  • Collective Display of Material excluded form MRP

    Experts,
    I am looking for a T-code or report which displays the demands for materials which are set to a specific Sloc & excluded from MRP. I can see the demands for a single material in MD04 but I am looking for a way for a collective display e.g. grouped by MRP Ctr or Sloc.
    Thanks in advance
    Jörg

    Hi dear,
    U can make use of Transaction code MM60.
    After entering plant execute report in the displayed report you can see MRP type column.
    Items excluded from MRP will have MRP type as ND (No planning)

  • Reservation in MD04 -reg

    Hi ,
    For a material in MD04 , reservation created is being shown but not considered while calculating the available quantity
    reservation is craeted for the movement type 201  for the material for tomorrow date (28.04.2010) .
    its shown along with other  elements in MD04
    but at arriving the final available quantity  the reservation's qty is not considered
    what could be the reasons? are reservations of 201 movemet are not considered ?
    regards,
    Madhu Kiran

    hi,
    i am talking about the available stock showing in MD04
    if that tick is ticked then you mean to say the reservation quantity also takes part in the calculation of available quantity shown in MD04 ?
    In which checking rule i have to check ?
    i have to see for that material in the plant which availability check is asssigned  and then checking rule and check ?
    pl guide
    regards,
    Madhu Kiran
    Edited by: madhu kiran on Apr 28, 2010 2:27 PM

  • Error MSG '01/07/1900 date lies before start of factory calendar' in MD04

    Hi all,
    I have this error message when enter a particular material in MD04.  I know our factory calendar does not start in 1900, can anyone tell me how to clear this message?  I suspect there is a bogus data somewhere.  Can anyone help me how to fix it?
    Thanks,
    Lin-Lin

    Hi,
    For this particular material, there must be Orders which are created with this date.
    That is the reason, immediately after you input the material details an Press enter, in MD04 this  message will appaer.
    So, Check all the Orders (Better to check all the Receipts and Requiremnts as well) and Change the Date to current..
    One more information is this must be a for ecample a firmed Order like Production Order or a Firmed Planned Order etc..
    Check and revert for further discussion..
    Regards,
    Siva

  • Dependent reservation doesn't create - MD04

    Hi SAP gurus,
    I have problem with view of dependent reservation material in MD04. I have production order, production order is realesed. For this order I need for example 4pcs of carton. Problem is, that I can´t see this request in MD04.
    Thanks
    Lukas

    Hi,
    thanks for your raction. I try to specify problem better.
    I have production order for material 4-000-653, one of the compoment is 1-002-095. This component is for a lot of materials. When I look at MD04 for this component I can´t see any reservation to material 4-000-653, but I can see reservation of this component for another materials.
    Lukas

  • What is the way of find the sub part no(material no) of the main part no

    Hi,
    in md04 how can i get the link(field)of the main material no with the sub material no. I need the field which links its.

    Hi kamlesh ,
    If you intend to see the BOM components ( sub materials )for the main material in MD04 then -
    - In MD04 screen , goto to "<b>Environment</b>" in top menubar and select option "<b>Product Structure</b>"
    - In the next displayed screen you can expand the available BOMs to view the components details.
    Regards,
    Nilesh

  • Requriemertns getting pooled on one date in MD04

    Hi Gurus,
    Can anybody please help me in understanding this and also fix the problem. The requiremetns on one of the material in MD04 shows all the way from 2/16 to 5/31 but are added together and show up as one big lump sum requirement on 2/25/11 for example. Meaning to say anything that we need to build around April Mid, SAP is saying that we have to build it now only. Why is this happening. What are the factors that could be causing this and how to fix this. Please let us start the discussion and i can provide what MRP type is being used, planning time fence (i do not know what this means), lot size procedure, etc etc then we can look at the variables that affect this.
    Also please expalin what relation does MD61 and MF50 have with MD04.
    Thanks
    Anusha

    Can you elaborate the probem?  Give some figure to understand more.
    What are the requirement you mention, Planned independent requirement (PIR), or dependent requirements?  What do you mean by requirement from 2/16 to 5/31 but requirement is shown as lump sum in 2/25? 
    If you mean for dependent requirement from planned order or production order that produce from 2/16 to 5/31, then consider using distribution key in component BOM.
    MD61 is to create PIR.  You can enter monthly, weekly, or daily.  It will display in MD04 as Ind.Req (minus; therefore requirement).  MF50 will show the stock situation and capacity load . Normally it show the data almost the same with MD04.  You can enter the planned order in MF50. 
    Hope it helps.

  • MD04 Purchase Requisition generation

    For particular material i want to trigger Purchase
    requisition in MD04.
    For this i  have maintained following settings.
    1. Purchase info record.
    2. Source list for material, Where start and end date is entered properly with MRP '1'.
    3. Sourcelist and automatic PO  is checked in MMR.
    4. Automatic PO is Checked in VMR.
    Problem:    Not able to generate PR for that material in MD04.
    Please let me know what i have missed in the above settings.....

    Dear Kunalc,
    Either there must be some demand for this material/dependent requirements for this particular material,then after running MRP
    through MD02/MD03 the system creates PR,and the same can be checked in MD04.It's not possible to create Purchase Req
    from T.code MD04,it's only to check the stock/requirements.
    Regards
    Mangalraj.S

  • Report for Planned vs Purchase Order(Qty and rate)

    Hi
    I have the following issue. My client is raising Purchasing requisition and Purchase Orders in Me51N and ME21n respectively. The Project Structure is used only to plan the quantities and rates whereas no PR is released from it. But the components are attached. Now if i make use of the code CN52N, i am getting the planned quantity and unit rate for the planned value whereas no Purchase requisition number or purchase order number is updated in it.
    My requirement is that both planned quantity, rate along with Purchase order quantity and rate should be available in a report.
    1. Is there any setting that we can make so that the details are updated in cn52N (or)
    2. is there any other report with those details (or)
    3. Should that be achived only through ABAP.
    Please suggest.
    Raghav

    There are a few reports that you can use to display STO requisitions and orders, by supplying plant, material, or MD04 like was mentioned.
    The only thing that you don't have in a report is the link to the production order. In SAP in a MTS situation there's no fixed link (pegging) between the requirement (STO) and the supply (prod Ord).
    You can view the pegging dynamically, for example in MD04.
    Edited by: Mario Adler on Oct 27, 2011 12:13 PM

  • Report for planned or prodcution order for production in Alternate plants

    Hai gurus,
    I have two plants - X and Y
    Plant x have finished goods A and B to be produced  and procured from plant - Y
    plant Y have finished goods C and D to be produced  and procured from plant - X
    The production in alternate plant concept is used in plant X  for Product A and B
    The production in alternate plant concept is used in Plant Y for Product C and D.
    Now my requirement is how to get the report for the Purchase order raised by the
    plant X for the Finished product A and B , also how to know the planned order
    and production order with reference to purchase order for Finished product A and B
    under plant - Y
    and VIce versa for the Finished product C and B in plant X and Y
    Waiting for the positive reply.
    Regards,
    Sekar chand

    There are a few reports that you can use to display STO requisitions and orders, by supplying plant, material, or MD04 like was mentioned.
    The only thing that you don't have in a report is the link to the production order. In SAP in a MTS situation there's no fixed link (pegging) between the requirement (STO) and the supply (prod Ord).
    You can view the pegging dynamically, for example in MD04.
    Edited by: Mario Adler on Oct 27, 2011 12:13 PM

  • Av check disabled in issue order and enabled in delivery

    Hi guys,
    we are looking for a solution to deactivate the order av. check in the issue order and activate the av. check in the delivery at creation:
    -requirement class : 0041 -> av. check  enabled
    -vov6 schedule line disabled
    - delivery item category av check enabled.
    with checking group 02 from material master (av. check active)
    -> the av check happens at order level
    with checking group Z. (no check)  the av,. check happens only at time of goods issue
    Does any one have any idea if this is not working for consignment process?
    Thanks a lot in advance
    Dominique

    1) Check the reservations for the material in MD04. The available quantity might have been confirmed for earlier sale orders and hence reserved for those sale orders.
    There are 11,000 cases in unrestricted stock. No reservations for the material.
    2) Check the inhouse production time in MRP2 view of the material master. It should be filled with production lead time.
    Done
    3) In OVZ9, the checkbox "check w/o RLT" is unchecked.
    This is our current setup
    Net, issue is still there.

  • Delivery Proposal is DISABLED in Standard Order Availability Control

    Hi Experts,
    Please help me solve my issue, I almost checked everything under SPRO>SD>BF-->Availability Check, but still cannot resolve my issue.
    Following are the symptoms of the issue that I'm encountering:
    Material cannot be confirmed (even though there are stocks)
    Complete Delivery, Delivery proposal & One time delivery are disabled in Availability Control Screen
    Here are some of the relevant configs which I checked:
    OVZJ entry for sales area is C (Delivery proposal)
    Checking group maintained in Material Master
    Any ideas please? ANy help would be much appreciated!

    1) Check the reservations for the material in MD04. The available quantity might have been confirmed for earlier sale orders and hence reserved for those sale orders.
    There are 11,000 cases in unrestricted stock. No reservations for the material.
    2) Check the inhouse production time in MRP2 view of the material master. It should be filled with production lead time.
    Done
    3) In OVZ9, the checkbox "check w/o RLT" is unchecked.
    This is our current setup
    Net, issue is still there.

Maybe you are looking for

  • Tracking the actual sale order quantity

    Hi Friends, How to track the actual sales order quantity given by the customer. Ex: we assume the customer has placed an order of 100 units and stock is only 90 so we create the sales order for 90 units only. How to find out the difference of 10 unit

  • Is there a way to view the notebook layout view on Word for mac on an iPad?

    Is there a way to view the notebook layout view on Word for mac on an iPad?

  • Logo image not displayed in PDF preview in HFR Studio reports

    Hello All I need to display a logo image on every page of an hfr report. The logo is visible in web-preview and print preview. But when the report is run in PDF preview, logo is not visible. A header text box is also used which visible in all formats

  • How does digital I/O simulation work

    Dug and looked but not finding how the digital I/O simulation of a board really works. (PCI-6229 in V8.0) A simple example works fine (DIs toggle as 8-bit ports count up) but when I try to go across more than one VI level the base VI reports the init

  • How to create package?

    Hi All, I'm new to ABAP and want to create a package for BAPI. While creating package in SE80, I't shows a message "cannot select component". The details i'm filling in the package window creation are as given below: Package:                     <pac