Unit Costs in Easy Cost Planning: Work Breakdown Structure - Program and Project Management - SAP Library
To add a comment, please log in or register on the top of this page and choose Reply. Please write your comment in English.
You can also go back to the SAP help page.
Hi,
I am sending only answers.If wrong pls correct me.
1.A,C
2.C
3.A,B,D,E
4.ACE
5.ABCD
6.B
7.BE
8.ALL
9.ABC
10.ABCDE
11.A
12.ABCD
13.E
14.BC
15.ALL
16.ABC
17.ACD
18.AC
19.B
20.ACDE
21.DE
22.B
23.ABCD
24.CD
25.C
26.BDE
27.BCE
28.C
29.CDE
30.BCDE
31.BDE
32.A
33.B
34.ALL
35.ABC
36.ALL
37.ABC
38.A
39.ACDE
40.AB
41.ABE
42.CD
43.ABCE
44.CD
45.ACDE
46.BD
47.AC
48.CD
I have sent answers for the questions.If any answer is wrong pls correct me.
Assign points if useful
Regards,
S.VINAYA KUMAR
Similar Messages
-
Resource Breakdown structure role in Project Cost Allocation.
Dear Experts,
What is the role of resource breakdown structure while running project cost allocations? Is it possible that targets in the allocation process gets the cost allocated to the resources in RBS which is same for source as well as target projects?Hi
The resource breakdown structure (RBS) is used in the system to summarize the amounts from the lowest level leaf to the grouping / parent levels.
You can use a summarized amount of certain node on the RBS, per your source project, as the source amount that will be allocated.
On the target projects the allocation transactions are created as expenditure items. Those expenditure items will be on target project and task, using the expenditure type and expenditure organization you have setup for the allocation rule.
Dina -
I need an advice regarding my site Work Breakdown Structure.
Hi,
I need an advice on how to design my work breakdown structure?!
I have my WBS divided to Phases and each phase divided to task, there is no details in task(i.e. no lowest tasks under each task).
So may i design my WBS structure as follow:-
Project
Phases "top task"
Task under phases "Lowest task"
Please advice, Thanks in advance.Hi
The structure you have described in a valid one.
The level of granularity of a WBS depends on the practicality of planning and collecting accurate cost for each one of the individual tasks. This may also depend on the company culture, the team discipline, and customer or management control requirements.
Dina -
Work breakdown structure (WBS) - Element
Hi Friends,
can anyone explain me about <b>work breakdown structure (WMS)</b> , how it is used and where it is used and tables involved in it .
Please let me know .
Thanks in Advance.
Regards,
Roberts.KI can tell you a little about it, I ran into it some time ago on a brief project. The WBS elements are part of a project management system spans several modules in SAP. The basic idea is that a project may be broken down into many components and sub projects spread out over the entire enterprise. A project add new construction to a building for example will have a budget, construction costs, finance costs, etc. and involve resources and time from many different departments within the enterprise.
The WBS elements are the means by which activities these projects and their associated costs are connected to particular components of the project and to the project as a whole.
At least that's what I remember from 4 years ago. -
I am in need of project costing and project billing and project management setup documents with screen shoot? Can anyone help me?
I have no clue about recovering the info, but when you say you save you should always use Save As. That clears unneeded info from the file. With the file size you have, that may be an important need.
-
Standard Objects for Work Breakdown Structure Element (WBS Element)
In 0FI_GL_4 , there are two fields :
Component | Component Type | Data Type | Length | Short Description
PROJK | PS_PSP_PNR | NUMC | 8 Work Breakdown Structure Element (WBS Element)
PS_POSID | PS_POSID | CHAR | 24 Work Breakdown Structure Element (WBS Element)
For "PS_POSID", there is a standard Object "0WBS_ELEMT" to be matched.
But ,Which object to match the "PROJK " ? Is that "0WBS_ELM_EX" ?Hi,
The object 0WBS_ELEMT_EX is actually for a different puspose.
Check this. http://help.sap.com/saphelp_em70/helpdata/en/d7/22417391807646910d01ee241628e1/content.htm
So for PROJK, i'd advise you to check what kind of output you get for this field in RSA3 and then go from there.
If you already know what it means, you can try to find a similar object in the content, otherwise just create one with similar element type.
-RMP -
Does Planning work in Windows 7 and IE8?
Hi,
Does Planning work in Windows 7 and IE8?
I saw John Booth's bug fix for IE8, so I guess IE8 works with Planning, workplace, HSS, FR websites.
Thanks in advance.thanks John.
from Knowledge Base (not doc)
When Will Hyperion EPM Support Windows 7 and Internet Explorer 8 (IE 8)?
Oracle/Hyperion plans support for these platform components with the following releases:
• Release 11.1.2, new install only.
• Release 9.3.1.5, which is a patchset for release 9.3.1.
• Release 11.1.1.4, which is a patchset for release 11.1.1.3.
Existing customers on releases 9.3.1 and 11.1.1.3 may apply the specified patch set. No major upgrade is required.
Tech support thinks that April is when they will release patch of Planning to work in Windows 7 and IE8.
Since 9.3.1, Smartview works with Office 2007
Oh, BTW, I filed a bug:
In planning 11.1.1.3, a user that is not provisioned to run HBR can still run HBR in Planning form.
Also, this bug: hidden rows in Planning forms will show in Smartview.
Edited by: Essbase Fan on Mar 3, 2010 3:31 PM
Edited by: Essbase Fan on Mar 3, 2010 3:34 PM -
Every time I TRY to start firefox 18-19 I get an error message : "Firefox has stopped working" - "close the program and check online for a solution" - or - "close the program" this happens TWICE every time I try to start firefox. Eventually after a random number of tries firefox will start normaly. I am useing firefox 19.0.2 now bit I belive it started when I upgraded to firefox 18 but am not sure, it might have been when I upgraded to firefox 19 ... but it has been happening for a very long time and I cannot find any helpfule solutions online.
I have tried a Clean reinstall but it did not help.Hello,
'''Try Firefox Safe Mode''' to see if the problem goes away. Safe Mode is a troubleshooting mode, which disables most add-ons.
''(If you're not using it, switch to the Default theme.)''
* You can open Firefox 4.0+ in Safe Mode by holding the '''Shift''' key when you open the Firefox desktop or Start menu shortcut.
* Or open the Help menu and click on the '''Restart with Add-ons Disabled...''' menu item while Firefox is running.
''Once you get the pop-up, just select "'Start in Safe Mode"''
'''''If the issue is not present in Firefox Safe Mode''''', your problem is probably caused by an extension, and you need to figure out which one. Please follow the [[Troubleshooting extensions and themes]] article for that.
''To exit the Firefox Safe Mode, just close Firefox and wait a few seconds before opening Firefox for normal use again.''
''When you figure out what's causing your issues, please let us know. It might help other users who have the same problem.''
Thank you. -
Every time I TRY to start firefox 18-19 I get an error message : "Firefox has stopped working" - "close the program and check online for a solution" - or - "close the program" this happens TWICE every time I try to start firefox. Eventually after a random number of tries firefox will start normaly. I am useing firefox 19.0.2 now bit I belive it started when I upgraded to firefox 18 but am not sure, it might have been when I upgraded to firefox 19 ... but it has been happening for a very long time and I cannot find any helpfule solutions online.
Certain Firefox problems can be solved by performing a ''Clean reinstall''. This means you remove Firefox program files and then reinstall Firefox. Please follow these steps:
'''Note:''' You might want to print these steps or view them in another browser.
#Download the latest Desktop version of Firefox from http://www.mozilla.org and save the setup file to your computer.
#After the download finishes, close all Firefox windows (click Exit from the Firefox or File menu).
#Delete the Firefox installation folder, which is located in one of these locations, by default:
#*'''Windows:'''
#**C:\Program Files\Mozilla Firefox
#**C:\Program Files (x86)\Mozilla Firefox
#*'''Mac:''' Delete Firefox from the Applications folder.
#*'''Linux:''' If you installed Firefox with the distro-based package manager, you should use the same way to uninstall it - see [[Installing Firefox on Linux]]. If you downloaded and installed the binary package from the [http://www.mozilla.org/firefox#desktop Firefox download page], simply remove the folder ''firefox'' in your home directory.
#Now, go ahead and reinstall Firefox:
##Double-click the downloaded installation file and go through the steps of the installation wizard.
##Once the wizard is finished, choose to directly open Firefox after clicking the Finish button.
Please report back to see if this helped you! -
My laptop had some work done on it and now my iTunes library is gone. My Nano 4 has all of my music on it and I want to sync what I have back into my iTune library. Anyone know how?
If you purchased all of the songs through itunes store, please follow these steps:
1. Open up Itunes and Click on Itunes Store
2. Once you're in the Itunes Store look to right side of the screen and you should see the word "purchased". Click purchased and you'll be sent to a purchase screen.
3. Click on "All Songs" and then it will show all the songs you've downloaded. From there you just hit the button that looks like a cloud with an arrow on it, and it will download all the songs all over again.
If you didn't purchase them through Itunes, then you'll have to download software that will strip the songs from your iPod onto your computer. And here is a guide about how to copy iPod music. Hope it helps. Feel free to email me if you need further help. -
AFAB - PRPS Relation (Network Relations - Work Breakdown Structure)
Hi Experts.
How can i find the relation between these two tables : AFAB-PRPS, i need to know wich Work Breajdown Structure are direct retaled with the Network relations in PS. Andy Ideas?, tnxs for your hlp.AD03OBJTV - Plan data handling WBS objects, type and version
This is the table through which objnr is linked from AFAB.
AFAB & PRPS objnr is the field through which they are linked.
does this help you ? or else we can discuss more.
award points if it helps. -
Process: od_main [382]
Path: /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/od_main
Identifier: od_main
Version: ???
Code Type: X86-64 (Native)
Parent Process: csh [371]
User ID: 501
Date/Time: 2014-06-03 08:52:27.444 -0400
OS Version: Mac OS X 10.8.5 (12F45)
Report Version: 10
Interval Since Last Report: 78232 sec
Crashes Since Last Report: 2
Per-App Crashes Since Last Report: 2
Anonymous UUID: FD76F103-7047-5D18-8418-FD506E8ED700
Crashed Thread: 0 Dispatch queue: com.apple.main-thread
Exception Type: EXC_BAD_ACCESS (SIGSEGV)
Exception Codes: KERN_INVALID_ADDRESS at 0x0000000000000000
VM Regions Near 0:
-->
__TEXT 0000000100000000-0000000100012000 [ 72K] r-x/rwx SM=COW /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/od_main
Thread 0 Crashed:: Dispatch queue: com.apple.main-thread
0 libuiWellAttrib.dylib 0x0000000100275aee ValueSeriesGetAll<float>::doWork(long long, long long, int) + 366
1 libBasic.dylib 0x0000000103fe5b14 ParallelTaskRunner::doRun() + 36
2 libBasic.dylib 0x0000000103feada7 Threads::WorkManager::executeWork(Threads::Work*, int, int, bool) + 727
3 libBasic.dylib 0x0000000103fe530a ParallelTask::executeParallel(bool) + 954
4 libAttributeEngine.dylib 0x00000001033052e7 Attrib::Data2DArray::Data2DArray(Attrib::Data2DHolder const&) + 951
5 libAttributeEngine.dylib 0x000000010330d9a6 Attrib::Flat2DDHDataPack::Flat2DDHDataPack(Attrib::DescID, Attrib::Data2DHolder const&, bool, int) + 278
6 libuiAttributes.dylib 0x00000001000f7a32 uiAttribPartServer::create2DOutput(CubeSampling const&, LineKey const&, TaskRunner&) + 1058
7 libuiODMain.dylib 0x00000001004eb570 uiOD2DLineSetAttribItem::displayStoredData(char const*, int, uiTaskRunner&) + 2096
8 libuiODMain.dylib 0x00000001004ecb7a uiOD2DLineSetTreeItem::selectNewAttribute(char const*) + 458
9 libuiODMain.dylib 0x00000001004ed0a2 uiOD2DLineSetTreeItem::selectAddLines() + 258
10 libuiODMain.dylib 0x00000001004f0209 uiODSeis2DParentTreeItem::showSubMenu() + 393
11 libuiODMain.dylib 0x00000001004f0b52 uiODSeis2DParentTreeItem::anyButtonClick(uiTreeViewItem*) + 66
12 libuiTools.dylib 0x0000000102011e97 uiTreeItem::anyButtonClick(uiTreeViewItem*) + 87
13 libuiTools.dylib 0x000000010201212d uiTreeTopItem::anyButtonClickCB(CallBacker*) + 61
14 libBasic.dylib 0x0000000103f687c9 CallBackSet::doCall(CallBacker*, bool const*, CallBacker*) + 393
15 libuiBase.dylib 0x00000001021bdaad i_treeVwMessenger::itemClicked(QTreeWidgetItem*, int) + 397
16 libuiBase.dylib 0x00000001021bd480 i_treeVwMessenger::qt_static_metacall(QObject*, QMetaObject::Call, int, void**) + 1024
17 libQtCore.4.dylib 0x0000000104210803 QMetaObject::activate(QObject*, QMetaObject const*, int, void**) + 2291
18 libQtGui.4.dylib 0x000000010292b88c QTreeWidget::itemClicked(QTreeWidgetItem*, int) + 60
19 libQtCore.4.dylib 0x0000000104210803 QMetaObject::activate(QObject*, QMetaObject const*, int, void**) + 2291
20 libQtGui.4.dylib 0x00000001028a5359 QAbstractItemView::clicked(QModelIndex const&) + 41
21 libQtGui.4.dylib 0x00000001028b5e52 QAbstractItemView::mouseReleaseEvent(QMouseEvent*) + 290
22 libuiBase.dylib 0x00000001021af3aa uiTreeViewBody::mouseReleaseEvent(QMouseEvent*) + 58
23 libQtGui.4.dylib 0x00000001023a5508 QWidget::event(QEvent*) + 3304
24 libQtGui.4.dylib 0x000000010278b00c QFrame::event(QEvent*) + 44
25 libQtGui.4.dylib 0x000000010281ace7 QAbstractScrollArea::viewportEvent(QEvent*) + 23
26 libQtGui.4.dylib 0x00000001028b2b88 QAbstractItemView::viewportEvent(QEvent*) + 1256
27 libQtGui.4.dylib 0x00000001028f7b1b QTreeView::viewportEvent(QEvent*) + 299
28 libQtGui.4.dylib 0x000000010281ddd0 QAbstractScrollAreaFilter::eventFilter(QObject*, QEvent*) + 48
29 libQtCore.4.dylib 0x00000001041fab27 QCoreApplicationPrivate::sendThroughObjectEventFilters(QObject*, QEvent*) + 151
30 libQtGui.4.dylib 0x000000010234e9ae QApplicationPrivate::notify_helper(QObject*, QEvent*) + 142
31 libQtGui.4.dylib 0x0000000102354d78 QApplication::notify(QObject*, QEvent*) + 2712
32 libQtCore.4.dylib 0x00000001041faa4c QCoreApplication::notifyInternal(QObject*, QEvent*) + 124
33 libQtGui.4.dylib 0x0000000102353da0 QApplicationPrivate::sendMouseEvent(QWidget*, QMouseEvent*, QWidget*, QWidget*, QWidget**, QPointer<QWidget>&, bool) + 336
34 libQtGui.4.dylib 0x00000001022ff3d0 qt_mac_handleMouseEvent(NSEvent*, QEvent::Type, Qt::MouseButton, QWidget*, bool) + 736
35 com.apple.AppKit 0x00007fff867325d6 -[NSWindow sendEvent:] + 7053
36 libQtGui.4.dylib 0x00000001022f4237 -[QCocoaWindow sendEvent:] + 87
37 com.apple.AppKit 0x00007fff8672e644 -[NSApplication sendEvent:] + 5761
38 libQtGui.4.dylib 0x00000001022f9734 -[QNSApplication sendEvent:] + 84
39 com.apple.AppKit 0x00007fff8664421a -[NSApplication run] + 636
40 libQtGui.4.dylib 0x0000000102304946 QEventDispatcherMac::processEvents(QFlags<QEventLoop::ProcessEventsFlag>) + 1734
41 libQtCore.4.dylib 0x00000001041f99f4 QEventLoop::processEvents(QFlags<QEventLoop::ProcessEventsFlag>) + 68
42 libQtCore.4.dylib 0x00000001041f9c65 QEventLoop::exec(QFlags<QEventLoop::ProcessEventsFlag>) + 325
43 libQtCore.4.dylib 0x00000001041fe977 QCoreApplication::exec() + 183
44 libuiCoin.dylib 0x00000001005eba53 uicMain::exec() + 35
45 libuiODMain.dylib 0x00000001004a1ca9 uiODMain::go() + 169
46 libuiODMain.dylib 0x00000001004a4a7a ODMain(int, char**) + 458
47 od_main 0x0000000100011bbd main + 125
48 od_main 0x0000000100011af4 start + 52
Thread 1:: Dispatch queue: com.apple.libdispatch-manager
0 libsystem_kernel.dylib 0x00007fff90ae5d16 kevent + 10
1 libdispatch.dylib 0x00007fff8c6e9dea _dispatch_mgr_invoke + 883
2 libdispatch.dylib 0x00007fff8c6e99ee _dispatch_mgr_thread + 54
Thread 2:
0 libsystem_kernel.dylib 0x00007fff90ae50fa __psynch_cvwait + 10
1 libsystem_c.dylib 0x00007fff8c335fb9 _pthread_cond_wait + 869
2 libQtCore.4.dylib 0x00000001040e1fe0 QWaitCondition::wait(QMutex*, unsigned long) + 288
3 libSoQt.20.dylib 0x000000010131c4f9 SoQtSignalThread::run() + 57
4 libQtCore.4.dylib 0x00000001040e153a QThreadPrivate::start(void*) + 298
5 libsystem_c.dylib 0x00007fff8c331772 _pthread_start + 327
6 libsystem_c.dylib 0x00007fff8c31e1a1 thread_start + 13
Thread 3:
0 libsystem_kernel.dylib 0x00007fff90ae50fa __psynch_cvwait + 10
1 libsystem_c.dylib 0x00007fff8c335fb9 _pthread_cond_wait + 869
2 libQtCore.4.dylib 0x00000001040e1fe0 QWaitCondition::wait(QMutex*, unsigned long) + 288
3 libBasic.dylib 0x0000000103feb9a3 Threads::WorkThread::doWork(CallBacker*) + 979
4 libQtCore.4.dylib 0x00000001040e153a QThreadPrivate::start(void*) + 298
5 libsystem_c.dylib 0x00007fff8c331772 _pthread_start + 327
6 libsystem_c.dylib 0x00007fff8c31e1a1 thread_start + 13
Thread 4:
0 libsystem_kernel.dylib 0x00007fff90ae50fa __psynch_cvwait + 10
1 libsystem_c.dylib 0x00007fff8c335fb9 _pthread_cond_wait + 869
2 libQtCore.4.dylib 0x00000001040e1fe0 QWaitCondition::wait(QMutex*, unsigned long) + 288
3 libBasic.dylib 0x0000000103feb9a3 Threads::WorkThread::doWork(CallBacker*) + 979
4 libQtCore.4.dylib 0x00000001040e153a QThreadPrivate::start(void*) + 298
5 libsystem_c.dylib 0x00007fff8c331772 _pthread_start + 327
6 libsystem_c.dylib 0x00007fff8c31e1a1 thread_start + 13
Thread 5:
0 libsystem_kernel.dylib 0x00007fff90ae50fa __psynch_cvwait + 10
1 libsystem_c.dylib 0x00007fff8c335fb9 _pthread_cond_wait + 869
2 libQtCore.4.dylib 0x00000001040e1fe0 QWaitCondition::wait(QMutex*, unsigned long) + 288
3 libBasic.dylib 0x0000000103feb9a3 Threads::WorkThread::doWork(CallBacker*) + 979
4 libQtCore.4.dylib 0x00000001040e153a QThreadPrivate::start(void*) + 298
5 libsystem_c.dylib 0x00007fff8c331772 _pthread_start + 327
6 libsystem_c.dylib 0x00007fff8c31e1a1 thread_start + 13
Thread 6:
0 libsystem_kernel.dylib 0x00007fff90ae50fa __psynch_cvwait + 10
1 libsystem_c.dylib 0x00007fff8c335fb9 _pthread_cond_wait + 869
2 libQtCore.4.dylib 0x00000001040e1fe0 QWaitCondition::wait(QMutex*, unsigned long) + 288
3 libBasic.dylib 0x0000000103feb9a3 Threads::WorkThread::doWork(CallBacker*) + 979
4 libQtCore.4.dylib 0x00000001040e153a QThreadPrivate::start(void*) + 298
5 libsystem_c.dylib 0x00007fff8c331772 _pthread_start + 327
6 libsystem_c.dylib 0x00007fff8c31e1a1 thread_start + 13
Thread 7:
0 libsystem_kernel.dylib 0x00007fff90ae50fa __psynch_cvwait + 10
1 libsystem_c.dylib 0x00007fff8c335fb9 _pthread_cond_wait + 869
2 libQtCore.4.dylib 0x00000001040e1fe0 QWaitCondition::wait(QMutex*, unsigned long) + 288
3 libBasic.dylib 0x0000000103feb9a3 Threads::WorkThread::doWork(CallBacker*) + 979
4 libQtCore.4.dylib 0x00000001040e153a QThreadPrivate::start(void*) + 298
5 libsystem_c.dylib 0x00007fff8c331772 _pthread_start + 327
6 libsystem_c.dylib 0x00007fff8c31e1a1 thread_start + 13
Thread 8:
0 libuiWellAttrib.dylib 0x0000000100275aee ValueSeriesGetAll<float>::doWork(long long, long long, int) + 366
1 libBasic.dylib 0x0000000103fe5b14 ParallelTaskRunner::doRun() + 36
2 libBasic.dylib 0x0000000103feba5d Threads::WorkThread::doWork(CallBacker*) + 1165
3 libQtCore.4.dylib 0x00000001040e153a QThreadPrivate::start(void*) + 298
4 libsystem_c.dylib 0x00007fff8c331772 _pthread_start + 327
5 libsystem_c.dylib 0x00007fff8c31e1a1 thread_start + 13
Thread 9:
0 libuiWellAttrib.dylib 0x0000000100275aee ValueSeriesGetAll<float>::doWork(long long, long long, int) + 366
1 libBasic.dylib 0x0000000103fe5b14 ParallelTaskRunner::doRun() + 36
2 libBasic.dylib 0x0000000103feba5d Threads::WorkThread::doWork(CallBacker*) + 1165
3 libQtCore.4.dylib 0x00000001040e153a QThreadPrivate::start(void*) + 298
4 libsystem_c.dylib 0x00007fff8c331772 _pthread_start + 327
5 libsystem_c.dylib 0x00007fff8c31e1a1 thread_start + 13
Thread 10:
0 libuiWellAttrib.dylib 0x0000000100275aee ValueSeriesGetAll<float>::doWork(long long, long long, int) + 366
1 libBasic.dylib 0x0000000103fe5b14 ParallelTaskRunner::doRun() + 36
2 libBasic.dylib 0x0000000103feba5d Threads::WorkThread::doWork(CallBacker*) + 1165
3 libQtCore.4.dylib 0x00000001040e153a QThreadPrivate::start(void*) + 298
4 libsystem_c.dylib 0x00007fff8c331772 _pthread_start + 327
5 libsystem_c.dylib 0x00007fff8c31e1a1 thread_start + 13
Thread 11:
0 libsystem_kernel.dylib 0x00007fff90ae5322 __select + 10
1 libQtCore.4.dylib 0x00000001041cea60 QProcessManager::run() + 96
2 libQtCore.4.dylib 0x00000001040e153a QThreadPrivate::start(void*) + 298
3 libsystem_c.dylib 0x00007fff8c331772 _pthread_start + 327
4 libsystem_c.dylib 0x00007fff8c31e1a1 thread_start + 13
Thread 12:: com.apple.CFSocket.private
0 libsystem_kernel.dylib 0x00007fff90ae5322 __select + 10
1 com.apple.CoreFoundation 0x00007fff871a9f46 __CFSocketManager + 1302
2 libsystem_c.dylib 0x00007fff8c331772 _pthread_start + 327
3 libsystem_c.dylib 0x00007fff8c31e1a1 thread_start + 13
Thread 13:
0 libsystem_kernel.dylib 0x00007fff90ae56d6 __workq_kernreturn + 10
1 libsystem_c.dylib 0x00007fff8c333f1c _pthread_workq_return + 25
2 libsystem_c.dylib 0x00007fff8c333ce3 _pthread_wqthread + 412
3 libsystem_c.dylib 0x00007fff8c31e191 start_wqthread + 13
Thread 14:
0 libsystem_kernel.dylib 0x00007fff90ae56d6 __workq_kernreturn + 10
1 libsystem_c.dylib 0x00007fff8c333f1c _pthread_workq_return + 25
2 libsystem_c.dylib 0x00007fff8c333ce3 _pthread_wqthread + 412
3 libsystem_c.dylib 0x00007fff8c31e191 start_wqthread + 13
Thread 0 crashed with X86 Thread State (64-bit):
rax: 0x000000010705fe00 rbx: 0x0000000000000000 rcx: 0x0000000000000000 rdx: 0x0000000000001388
rdi: 0x0000000000000000 rsi: 0x0000000000000ea7 rbp: 0x00007fff5fbfc1a0 rsp: 0x00007fff5fbfc170
r8: 0x0000000000002060 r9: 0x00007fff5fbfc010 r10: 0x0000000000000000 r11: 0x0000000000000246
r12: 0x000000010705fe00 r13: 0x00007fff5fbfc4d0 r14: 0x0000000000001388 r15: 0x0000000000000ea7
rip: 0x0000000100275aee rfl: 0x0000000000010246 cr2: 0x0000000000000000
Logical CPU: 2
Binary Images:
0x100000000 - 0x100011ff7 +od_main (???) <0A8B5BB8-1DE6-B190-BA0D-91BB8F76DD23> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/od_main
0x100014000 - 0x10007ffff +libuiVis.dylib (0) <260B345A-ABA2-96AA-823E-20504AEDBF9F> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiVis.dylib
0x1000b5000 - 0x1001a9fff +libuiAttributes.dylib (0) <FBD83D94-EAC8-8591-7763-0B3D97C3BB1C> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiAttributes.dylib
0x10021b000 - 0x100234ff7 +libuiNLA.dylib (0) <3D827C5F-BBEE-5069-7AC2-90EA95F31DED> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiNLA.dylib
0x100241000 - 0x100308fff +libuiWellAttrib.dylib (0) <99B02428-E333-F691-1619-0828C10599FA> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiWellAttrib.dylib
0x10036f000 - 0x1003c7fff +libuiEMAttrib.dylib (0) <2F823DCE-FA63-C21F-D1C3-C83FC337AAAF> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiEMAttrib.dylib
0x1003f5000 - 0x10042eff7 +libuiViewer2D.dylib (0) <66AD5111-1A37-2D6E-38A9-03EFBCAB6B4D> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiViewer2D.dylib
0x10044d000 - 0x100551fff +libuiODMain.dylib (0) <7494D433-98CE-71CF-3A3B-9587DA9EB594> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiODMain.dylib
0x1005de000 - 0x1005ffff7 +libuiCoin.dylib (0) <9B1CDA09-B674-B9CB-5E28-D4AFADB689D4> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiCoin.dylib
0x100615000 - 0x10075efff +libvisSurvey.dylib (0) <C9824125-33C2-4418-988F-A0C2CBB021F7> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libvisSurvey.dylib
0x100810000 - 0x100926fff +libvisBase.dylib (0) <24DFC965-2C6F-69E5-EA17-3E5D2F5BE011> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libvisBase.dylib
0x1009b6000 - 0x100a5dfe6 +libSoOD.dylib (0) <F327CBB2-12DC-9D5F-1272-F3A40F12CB23> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libSoOD.dylib
0x100adb000 - 0x101056ff3 +libCoin.60.dylib (62.3) /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libCoin.60.dylib
0x10131a000 - 0x10137cfff +libSoQt.20.dylib (26) /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libSoQt.20.dylib
0x1013bf000 - 0x101496ff3 +libQtOpenGL.4.dylib (4.8.3) <EB53E318-3A02-053A-20EE-36233B72CA9B> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libQtOpenGL.4.dylib
0x1014e4000 - 0x1015a6fff +libuiWell.dylib (0) <801818DE-ED0F-5AA1-0A0E-3CA349DBCB93> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiWell.dylib
0x101608000 - 0x10167dff7 +libWellAttrib.dylib (0) <5DE629F6-8648-DE35-8D53-B3AB18F51984> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libWellAttrib.dylib
0x1016ba000 - 0x101724ff7 +libWell.dylib (0) <0AEFBAE1-8490-1572-AE19-DB80C5388F44> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libWell.dylib
0x10175a000 - 0x10181fff7 +libuiEarthModel.dylib (0) <64859449-5A2D-276E-8107-630CAC1FBC4C> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiEarthModel.dylib
0x101888000 - 0x1018ecfff +libuiStrat.dylib (0) <82AB9934-6CF2-8FAA-384D-75496ED3A20B> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiStrat.dylib
0x101924000 - 0x101966fff +libStrat.dylib (0) <0962711F-F035-7F62-726D-2B466C82EC99> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libStrat.dylib
0x10198a000 - 0x1019a3ffb +libEMAttrib.dylib (0) <562B18A7-0BF2-CD40-3A86-2C70FD2EC822> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libEMAttrib.dylib
0x1019b2000 - 0x101a0afff +libuiMPE.dylib (0) <978DFCD3-4BD7-EBC3-9C8F-6B6C0BC25DA1> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiMPE.dylib
0x101a3b000 - 0x101a9bfff +libuiPreStackProcessing.dylib (0) <2F6138D2-C776-EBB2-E2A7-804AE735BA71> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiPreStackProcessing.dylib
0x101ad6000 - 0x101af5fff +libuiVolumeProcessing.dylib (0) <6BB5B66E-5799-73A2-8BE6-4B871D7F9AA9> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiVolumeProcessing.dylib
0x101b08000 - 0x101b26fff +libuiVelocity.dylib (0) <FAB1DA04-991F-BFEC-49E1-1F3226FEC72C> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiVelocity.dylib
0x101b38000 - 0x101c50fff +libuiSeis.dylib (0) <DD1CC784-D5FC-7CD2-51E2-1868F5CD27D9> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiSeis.dylib
0x101ce1000 - 0x101e31fff +libuiIo.dylib (0) <5582A698-BD19-5CCA-18B3-179F3C861650> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiIo.dylib
0x101ed4000 - 0x101f26fff +libuiFlatView.dylib (0) <95297FB1-D488-22CE-A5FA-914032D298FD> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiFlatView.dylib
0x101f54000 - 0x10207cfff +libuiTools.dylib (0) <2E44A398-5710-F9F2-4776-28136CE88956> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiTools.dylib
0x102118000 - 0x102210feb +libuiBase.dylib (0) <022CDF94-452F-79BD-ED1B-F965378AD119> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiBase.dylib
0x1022c4000 - 0x102c64ff3 +libQtGui.4.dylib (4.8.3) <3A9C6E5F-5D25-DB46-77D8-4B98CA748ADD> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libQtGui.4.dylib
0x102f9d000 - 0x102faafff +libUsage.dylib (0) <58DE666C-19DF-5D9C-3A2E-17AB121DEF5C> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libUsage.dylib
0x102fb2000 - 0x102ffffff +libVolumeProcessing.dylib (0) <9BBACD0C-CFBC-9C43-D28D-2629AA1C7819> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libVolumeProcessing.dylib
0x10302a000 - 0x1030b8fef +libAttributes.dylib (0) <35617985-1B7D-B4F1-A5F3-3577C6CB8C59> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libAttributes.dylib
0x1030fc000 - 0x10318cfff +libPreStackProcessing.dylib (0) <4C6B886C-C71D-93E4-BD3A-B65AD06B541F> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libPreStackProcessing.dylib
0x1031da000 - 0x103226ff7 +libVelocity.dylib (0) <C2703A30-552A-727D-A516-6F63682827A9> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libVelocity.dylib
0x10324e000 - 0x1032bbfff +libMPEEngine.dylib (0) <BB48111D-167C-4276-AA08-5EFC0D2F9E9A> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libMPEEngine.dylib
0x1032f3000 - 0x1033a4ff3 +libAttributeEngine.dylib (0) <C61084C8-72E6-ED60-9415-6204194107E6> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libAttributeEngine.dylib
0x1033fa000 - 0x103408ff7 +libNLA.dylib (0) <1B40644C-EA20-2098-F5DC-6851CB4E43B2> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libNLA.dylib
0x103410000 - 0x103563fff +libSeis.dylib (0) <68AE7B2B-A8C8-C102-B782-BCC48A6426B2> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libSeis.dylib
0x103603000 - 0x103620fff +libMMProc.dylib (0) <B90092F8-0F65-7569-3FD0-B4323BAA4DC8> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libMMProc.dylib
0x10362f000 - 0x103657ff3 +libNetwork.dylib (0) <294B7D3E-C94C-33BF-640E-74A5951A1B09> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libNetwork.dylib
0x10366e000 - 0x10378aff3 +libQtNetwork.4.dylib (4.8.3) <975D0600-A373-1EE7-D9CC-DF08B503A190> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libQtNetwork.4.dylib
0x103802000 - 0x103943fff +libEarthModel.dylib (0) <7AA7B3D8-F4F2-981D-F5B5-49DC18AB1985> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libEarthModel.dylib
0x1039e1000 - 0x103aa5ff6 +libGeometry.dylib (0) <767A41BE-3561-03B0-B6C3-8A2A7B8B5E6D> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libGeometry.dylib
0x103b01000 - 0x103c8afeb +libGeneral.dylib (0) <6476AA1F-ADC2-7D96-1854-D99529E97062> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libGeneral.dylib
0x103d45000 - 0x103eaefe3 +libAlgo.dylib (0) <F1D8E2D1-26F8-7F76-40E6-3745E6328567> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libAlgo.dylib
0x103f47000 - 0x104045fef +libBasic.dylib (0) <DE0F0BA4-E91F-B48D-607A-061F2228E960> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libBasic.dylib
0x1040b9000 - 0x104353fe7 +libQtCore.4.dylib (4.8.3) <E7323E19-56E2-E69F-2EF2-C512D345F7E0> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libQtCore.4.dylib
0x10440a000 - 0x10440ffff com.apple.agl (3.2.1 - AGL-3.2.1) <1A57AE22-37F6-3A2E-8098-183B280EEEA9> /System/Library/Frameworks/AGL.framework/Versions/A/AGL
0x104783000 - 0x1047c0fff +libAnnotations.dylib (0) <01033604-EAE4-B341-74B8-FA208B942025> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libAnnotations.dylib
0x1047e6000 - 0x1047f9fff +libuidGBCommon.dylib (0) <5CF2FF77-660A-FE97-F4D4-0D11063AF93D> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuidGBCommon.dylib
0x105506000 - 0x10551dff7 +libCmdDriver.dylib (0) <3AFE8FCC-E941-AADC-7D55-9B9EBAD059DE> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libCmdDriver.dylib
0x105525000 - 0x10553efff +libGoogleTranslate.dylib (0) <54664E23-4350-54A3-7267-6ED1CBDBF048> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libGoogleTranslate.dylib
0x105546000 - 0x10556bfff +libCCB.dylib (0) <8412C338-195F-68A3-5334-B6DC8B85D610> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libCCB.dylib
0x105580000 - 0x1055b9fff +libuiCCB.dylib (0) <93A14B57-11F6-95EB-5BB1-3F26E86A28DF> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiCCB.dylib
0x1055d4000 - 0x1055e0ff7 +libuidGBPreStack.dylib (0) <856BEB4A-FB74-4690-73E4-9818EF95163C> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuidGBPreStack.dylib
0x105700000 - 0x10571ffff +libdGBPreStack.dylib (0) <E6D024F9-BCAA-56CC-E8DD-3771EFEEB491> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libdGBPreStack.dylib
0x105732000 - 0x10574cff7 +libdGBMPEEngine.dylib (0) <E7D3B7CD-C6BB-76A2-9EAA-35020727A270> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libdGBMPEEngine.dylib
0x10575b000 - 0x1057affff +libDipSteer.dylib (0) <03EFA1C6-D438-3891-7CF7-BBA4668E450C> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libDipSteer.dylib
0x1057db000 - 0x1057f6ff7 +libuiExpAttribs.dylib (0) <029DE890-45E6-2784-AC22-9CB5BF91C186> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiExpAttribs.dylib
0x106a00000 - 0x106b6dfff +libuiCmdDriver.dylib (0) <9D8CC059-BA8A-E0D5-6495-87DE4E91DB77> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiCmdDriver.dylib
0x106bdb000 - 0x106db8feb +libdGBCommon.dylib (0) <6D941184-39A6-DDC0-4063-C55115684E63> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libdGBCommon.dylib
0x106e65000 - 0x106e9efff +libuiDipSteer.dylib (0) <82E18616-4318-8E9F-0A9D-BF907ED1DE3F> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiDipSteer.dylib
0x106ebb000 - 0x106eddfff +libExpAttribs.dylib (0) <4E199F80-8F05-C559-C48E-14C0BEF29696> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libExpAttribs.dylib
0x106ef1000 - 0x106f28fff +libFaultAutoExtractor.dylib (0) <25F91F34-EE16-282A-2D02-D6E9556007F7> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libFaultAutoExtractor.dylib
0x106f47000 - 0x106f5fff7 +libuiFaultAutoExtractor.dylib (0) <361B1809-7436-17BE-0FB0-4FEA9B167412> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiFaultAutoExtractor.dylib
0x106f68000 - 0x106f7bfff +libGapDecon.dylib (0) <71CF83C3-5F58-55C2-1BB4-E362D020709B> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libGapDecon.dylib
0x106f87000 - 0x106faffff +libuiGapDecon.dylib (0) <E52AE581-D9BD-3CA8-2738-70F01C6DF796> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiGapDecon.dylib
0x106fc3000 - 0x106feaff7 +libuiGoogleIO.dylib (0) <E3449587-E41C-CC75-334A-49EA462F3654> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiGoogleIO.dylib
0x108a25000 - 0x108a60fff +libGMT.dylib (0) <994C0724-CD97-6ECB-A493-D23D25855408> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libGMT.dylib
0x108a7e000 - 0x108abdfff +libuiGMT.dylib (0) <08114FB2-ED80-4972-B0C8-632B561244F9> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiGMT.dylib
0x108adb000 - 0x108af7ff7 +libHorizonAttrib.dylib (0) <B63415DA-6E3D-7E98-32C9-930C2F5C2DA6> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libHorizonAttrib.dylib
0x108b07000 - 0x108b44fff +libuiHorizonAttrib.dylib (0) <00AADEB7-2ACE-F543-8F2A-51CEC51B59A4> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiHorizonAttrib.dylib
0x108b66000 - 0x108cbffff +libHorizonCube.dylib (0) <56934A6F-A9DC-ADD7-AB01-E95BAB70D317> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libHorizonCube.dylib
0x108d62000 - 0x108e7afff +libuiHorizonCube.dylib (0) <D0B75323-239F-1383-3162-E47FD573F23A> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiHorizonCube.dylib
0x108f0a000 - 0x108f48fff +libuiHorizonCubeSlider.dylib (0) <9FE8EE49-1DAA-5B03-473B-BA5F8BC25175> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiHorizonCubeSlider.dylib
0x108f69000 - 0x108f82ff7 +libuiImpGPR.dylib (0) <60D20774-014E-149A-E973-C803510290E2> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiImpGPR.dylib
0x108f8b000 - 0x108fb1fff +libMadagascar.dylib (0) <0F56C1B2-5546-60CB-0A5A-ACD46A63F14F> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libMadagascar.dylib
0x108fc6000 - 0x108fe6ff7 +libuiMadagascar.dylib (0) <D0C830CA-D5B6-3943-0CD9-2DC1BC7BD0C4> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiMadagascar.dylib
0x108ff3000 - 0x10906cff1 +libNNMod.dylib (0) <847CEEDD-0BBD-2241-40C3-48451B6A9B27> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libNNMod.dylib
0x1090a4000 - 0x10910fff7 +libuiNNMod.dylib (0) <E52515C8-9D40-6991-3A6D-5F9E3B890135> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiNNMod.dylib
0x109149000 - 0x109176fff +libuiPreStackViewer.dylib (0) <653E82F2-1ED5-E33C-E4DD-DEB129324D5F> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiPreStackViewer.dylib
0x10918c000 - 0x1091defff +libSSIS.dylib (0) <D08B37E2-AE2F-4D6D-3ECD-9E62B1E2E95B> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libSSIS.dylib
0x109209000 - 0x10928efff +libuiSSIS.dylib (0) <9AFDA621-3A42-00BB-7ECE-49CDF5C354A1> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiSSIS.dylib
0x1092d3000 - 0x10936afff +libSynthRock.dylib (0) <B26AFC2A-D0A1-F3A7-C79E-0805CAA16106> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libSynthRock.dylib
0x1093bc000 - 0x109452fff +libuiSynthRock.dylib (0) <17F4A269-B5CE-BF78-E5C2-15001E8CB161> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiSynthRock.dylib
0x1094a4000 - 0x1094c0fff +libTextureAttrib.dylib (0) <141F4676-BF02-910A-60DB-A783858111D2> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libTextureAttrib.dylib
0x1094d1000 - 0x1094f0ff7 +libuiTextureAttrib.dylib (0) <BC1C1EC6-26C2-6519-575C-D5380D7334BD> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiTextureAttrib.dylib
0x109500000 - 0x109583fff +libVMB.dylib (0) <CAB6DE58-0108-8ADA-8737-E66E38E3A2FD> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libVMB.dylib
0x1095c1000 - 0x10966cfff +libuiVMB.dylib (0) <81913264-0B40-7F79-AB1D-61CB84C80A45> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiVMB.dylib
0x1096c4000 - 0x1096deffb +libVoxelConnectivityFilter.dylib (0) <A047C626-856F-1472-5AD0-6BEFCB4475E9> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libVoxelConnectivityFilter.dylib
0x1096e9000 - 0x109702fff +libuiVoxelConnectivityFilter.dylib (0) <7F87B419-6698-2060-6D93-6574D0ED0F3A> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiVoxelConnectivityFilter.dylib
0x10970b000 - 0x10972fff7 +libWellCorr.dylib (0) <4F434418-6B2C-9B86-F89E-1B0F115DA8D7> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libWellCorr.dylib
0x109743000 - 0x1097b7fff +libuiWellCorr.dylib (0) <0AF6F339-EFF7-85BB-D142-78A3661E5854> /Applications/OpendTect/OpendTect 4.6.0.app/bin/mac/Release/libuiWellCorr.dylib
0x1098c3000 - 0x10997cff7 ColorSyncDeprecated.dylib (400) <7CE58F6E-D2C8-39FB-8EE0-28CC6EC6D04F> /System/Library/Frameworks/ApplicationServices.framework/Versions/A/Frameworks/ ColorSync.framework/Versions/A/Resources/ColorSyncDeprecated.dylib
0x10d30f000 - 0x10d314fff com.apple.IOAccelerator (74.15 - 74.15) <D8C40179-4A29-3401-9B35-6E61EA278D41> /System/Library/PrivateFrameworks/IOAccelerator.framework/Versions/A/IOAccelera tor
0x10dae8000 - 0x10daf4fff libGPUSupportMercury.dylib (8.10.1) <1DE2D7F9-C031-3BBF-BD5F-4E1208B6F296> /System/Library/PrivateFrameworks/GPUSupport.framework/Versions/A/Libraries/lib GPUSupportMercury.dylib
0x10dc4e000 - 0x10de0cfff GLEngine (8.10.1) <1BD4D913-CE6C-3389-B4E1-FC7352E4C23F> /System/Library/Frameworks/OpenGL.framework/Resources/GLEngine.bundle/GLEngine
0x10de43000 - 0x10dfb3fff libGLProgrammability.dylib (8.10.1) <3E488CEF-5751-3073-B8EE-0B4CA39CB6AB> /System/Library/Frameworks/OpenGL.framework/Versions/A/Libraries/libGLProgramma bility.dylib
0x10dfeb000 - 0x10dff4fe7 libcldcpuengine.dylib (2.2.16) <B6E3B14B-1EAC-3FDD-8AED-87231A033BED> /System/Library/Frameworks/OpenCL.framework/Versions/A/Libraries/libcldcpuengin e.dylib
0x10e100000 - 0x10e3c9fe7 com.apple.AMDRadeonX3000GLDriver (1.8.19 - 1.0.8) <7C205F2A-F942-3D2D-A5D6-C5C8DADD81E4> /System/Library/Extensions/AMDRadeonX3000GLDriver.bundle/Contents/MacOS/AMDRade onX3000GLDriver
0x10e427000 - 0x10e452fff GLRendererFloat (8.10.1) <055EC8E7-2D7E-370C-96AD-DBEEDB106927> /System/Library/Frameworks/OpenGL.framework/Resources/GLRendererFloat.bundle/GL RendererFloat
0x7fff6a7db000 - 0x7fff6a80f93f dyld (210.2.3) <A40597AA-5529-3337-8C09-D8A014EB1578> /usr/lib/dyld
0x7fff8477b000 - 0x7fff84789fff com.apple.Librarian (1.1 - 1) <5AC28666-7642-395F-A923-C6F8A274BBBD> /System/Library/PrivateFrameworks/Librarian.framework/Versions/A/Librarian
0x7fff8478b000 - 0x7fff8511b627 com.apple.CoreGraphics (1.600.0 - 333.1) <C085C074-7260-3C3D-90C6-A65D3CB2BD41> /System/Library/Frameworks/ApplicationServices.framework/Versions/A/Frameworks/ CoreGraphics.framework/Versions/A/CoreGraphics
0x7fff8511c000 - 0x7fff851c2ff7 com.apple.CoreServices.OSServices (557.6 - 557.6) <E91B0882-E75C-30E9-8DCD-7A0EEE4405CC> /System/Library/Frameworks/CoreServices.framework/Versions/A/Frameworks/OSServi ces.framework/Versions/A/OSServices
0x7fff851fe000 - 0x7fff85204ff7 libunwind.dylib (35.1) <21703D36-2DAB-3D8B-8442-EAAB23C060D3> /usr/lib/system/libunwind.dylib
0x7fff85212000 - 0x7fff85267ff7 libTIFF.dylib (851) <7706BB07-E7E8-38BE-A5F0-D8B63E3B9283> /System/Library/Frameworks/ImageIO.framework/Versions/A/Resources/libTIFF.dylib
0x7fff85268000 - 0x7fff8526dfff libcompiler_rt.dylib (30) <08F8731D-5961-39F1-AD00-4590321D24A9> /usr/lib/system/libcompiler_rt.dylib
0x7fff8529b000 - 0x7fff852aafff com.apple.opengl (1.8.10 - 1.8.10) <AD49CF56-B7C1-3598-8610-58532FC41345> /System/Library/Frameworks/OpenGL.framework/Versions/A/OpenGL
0x7fff852ab000 - 0x7fff852eaff7 com.apple.QD (3.42.1 - 285.1) <77A20C25-EBB5-341C-A05C-5D458B97AD5C> /System/Library/Frameworks/ApplicationServices.framework/Versions/A/Frameworks/ QD.framework/Versions/A/QD
0x7fff852eb000 - 0x7fff85520ff7 com.apple.CoreData (106.1 - 407.7) <A676E1A4-2144-376B-92B8-B450DD1D78E5> /System/Library/Frameworks/CoreData.framework/Versions/A/CoreData
0x7fff85521000 - 0x7fff85525ff7 com.apple.TCC (1.0 - 1) <F2F3B753-FC73-3543-8BBE-859FDBB4D6A6> /System/Library/PrivateFrameworks/TCC.framework/Versions/A/TCC
0x7fff85526000 - 0x7fff85594ff7 com.apple.framework.IOKit (2.0.1 - 755.42.1) <A90038ED-48F2-3CC9-A042-53A3D7985844> /System/Library/Frameworks/IOKit.framework/Versions/A/IOKit
0x7fff85595000 - 0x7fff856ad92f libobjc.A.dylib (532.2) <90D31928-F48D-3E37-874F-220A51FD9E37> /usr/lib/libobjc.A.dylib
0x7fff85aeb000 - 0x7fff85b26fff com.apple.LDAPFramework (2.4.28 - 194.5) <7E4F2C08-0010-34AE-BC46-149B7EE8A0F5> /System/Library/Frameworks/LDAP.framework/Versions/A/LDAP
0x7fff85b27000 - 0x7fff85b81fff com.apple.print.framework.PrintCore (8.3 - 387.2) <5BA0CBED-4D80-386A-9646-F835C9805B71> /System/Library/Frameworks/ApplicationServices.framework/Versions/A/Frameworks/ PrintCore.framework/Versions/A/PrintCore
0x7fff861a7000 - 0x7fff861ceff7 com.apple.PerformanceAnalysis (1.16 - 16) <E4888388-F41B-313E-9CBB-5807D077BDA9> /System/Library/PrivateFrameworks/PerformanceAnalysis.framework/Versions/A/Perf ormanceAnalysis
0x7fff861d1000 - 0x7fff8624fff7 com.apple.securityfoundation (6.0 - 55115.4) <C5461971-E455-31A6-99B8-AF80C4BC26DD> /System/Library/Frameworks/SecurityFoundation.framework/Versions/A/SecurityFoun dation
0x7fff862b3000 - 0x7fff862e9fff libsystem_info.dylib (406.17) <4FFCA242-7F04-365F-87A6-D4EFB89503C1> /usr/lib/system/libsystem_info.dylib
0x7fff8639d000 - 0x7fff864effff com.apple.audio.toolbox.AudioToolbox (1.9.2 - 1.9.2) <DC5F3D1B-036A-37DE-BC24-7636DC95EA1C> /System/Library/Frameworks/AudioToolbox.framework/Versions/A/AudioToolbox
0x7fff864f0000 - 0x7fff864f7fff libGFXShared.dylib (8.10.1) <B4AB9480-2CDB-34F8-8D6F-F5A2CFC221B0> /System/Library/Frameworks/OpenGL.framework/Versions/A/Libraries/libGFXShared.d ylib
0x7fff864f8000 - 0x7fff87125fff com.apple.AppKit (6.8 - 1187.40) <F12CF463-6F88-32ED-9EBA-0FA2AD3CF576> /System/Library/Frameworks/AppKit.framework/Versions/C/AppKit
0x7fff87126000 - 0x7fff87134ff7 libsystem_network.dylib (77.10) <0D99F24E-56FE-380F-B81B-4A4C630EE587> /usr/lib/system/libsystem_network.dylib
0x7fff87135000 - 0x7fff8731fff7 com.apple.CoreFoundation (6.8 - 744.19) <0F7403CA-2CB8-3D0A-992B-679701DF27CA> /System/Library/Frameworks/CoreFoundation.framework/Versions/A/CoreFoundation
0x7fff87320000 - 0x7fff8734efff com.apple.CoreServicesInternal (154.3 - 154.3) <F4E118E4-E327-3314-83D7-EA20B1717ED0> /System/Library/PrivateFrameworks/CoreServicesInternal.framework/Versions/A/Cor eServicesInternal
0x7fff8734f000 - 0x7fff8740cff7 com.apple.ColorSync (4.8.0 - 4.8.0) <6CE333AE-EDDB-3768-9598-9DB38041DC55> /System/Library/Frameworks/ApplicationServices.framework/Versions/A/Frameworks/ ColorSync.framework/Versions/A/ColorSync
0x7fff8743f000 - 0x7fff87440fff libDiagnosticMessagesClient.dylib (8) <8548E0DC-0D2F-30B6-B045-FE8A038E76D8> /usr/lib/libDiagnosticMessagesClient.dylib
0x7fff87cfd000 - 0x7fff87d66fff libstdc++.6.dylib (56) <EAA2B53E-EADE-39CF-A0EF-FB9D4940672A> /usr/lib/libstdc++.6.dylib
0x7fff87e4f000 - 0x7fff87e99ff7 libGLU.dylib (8.10.1) <6699DEA6-9EEB-3B84-A57F-B25AE44EC584> /System/Library/Frameworks/OpenGL.framework/Versions/A/Libraries/libGLU.dylib
0x7fff87e9a000 - 0x7fff88035fef com.apple.vImage (6.0 - 6.0) <FAE13169-295A-33A5-8E6B-7C2CC1407FA7> /System/Library/Frameworks/Accelerate.framework/Versions/A/Frameworks/vImage.fr amework/Versions/A/vImage
0x7fff88073000 - 0x7fff8807eff7 com.apple.bsd.ServiceManagement (2.0 - 2.0) <C12962D5-85FB-349E-AA56-64F4F487F219> /System/Library/Frameworks/ServiceManagement.framework/Versions/A/ServiceManage ment
0x7fff88362000 - 0x7fff88364fff libCVMSPluginSupport.dylib (8.10.1) <F0239392-E0CB-37D7-BFE2-D6F5D42F9196> /System/Library/Frameworks/OpenGL.framework/Versions/A/Libraries/libCVMSPluginS upport.dylib
0x7fff883f1000 - 0x7fff88408fff com.apple.GenerationalStorage (1.1 - 132.3) <FD4A84B3-13A8-3C60-A59E-25A361447A17> /System/Library/PrivateFrameworks/GenerationalStorage.framework/Versions/A/Gene rationalStorage
0x7fff88667000 - 0x7fff8890bff7 com.apple.CoreImage (8.4.0 - 1.0.1) <CC6DD22B-FFC6-310B-BE13-2397A02C79EF> /System/Library/Frameworks/QuartzCore.framework/Versions/A/Frameworks/CoreImage .framework/Versions/A/CoreImage
0x7fff88912000 - 0x7fff88914fff libquarantine.dylib (52.1) <143B726E-DF47-37A8-90AA-F059CFD1A2E4> /usr/lib/system/libquarantine.dylib
0x7fff88918000 - 0x7fff8893aff7 com.apple.Kerberos (2.0 - 1) <C49B8820-34ED-39D7-A407-A3E854153556> /System/Library/Frameworks/Kerberos.framework/Versions/A/Kerberos
0x7fff8893b000 - 0x7fff8894ffff com.apple.speech.synthesis.framework (4.1.12 - 4.1.12) <94EDF2AB-809C-3D15-BED5-7AD45B2A7C16> /System/Library/Frameworks/ApplicationServices.framework/Versions/A/Frameworks/ SpeechSynthesis.framework/Versions/A/SpeechSynthesis
0x7fff88950000 - 0x7fff88966fff com.apple.MultitouchSupport.framework (237.4 - 237.4) <0F7FEE29-161B-3D8E-BE91-308CBD354461> /System/Library/PrivateFrameworks/MultitouchSupport.framework/Versions/A/Multit ouchSupport
0x7fff88967000 - 0x7fff889a4fef libGLImage.dylib (8.10.1) <91E31B9B-4141-36D5-ABDC-20F1D6D1D0CF> /System/Library/Frameworks/OpenGL.framework/Versions/A/Libraries/libGLImage.dyl ib
0x7fff889a5000 - 0x7fff889a7ff7 libunc.dylib (25) <92805328-CD36-34FF-9436-571AB0485072> /usr/lib/system/libunc.dylib
0x7fff889a8000 - 0x7fff889d3fff libxslt.1.dylib (11.3) <441776B8-9130-3893-956F-39C85FFA644F> /usr/lib/libxslt.1.dylib
0x7fff889d4000 - 0x7fff88a14ff7 com.apple.MediaKit (14 - 687) <8AAA8CC3-3ACD-34A5-9E57-9B24AD8AFD4D> /System/Library/PrivateFrameworks/MediaKit.framework/Versions/A/MediaKit
0x7fff88f69000 - 0x7fff88fb8ff7 libcorecrypto.dylib (106.2) <CE0C29A3-C420-339B-ADAA-52F4683233CC> /usr/lib/system/libcorecrypto.dylib
0x7fff88fe6000 - 0x7fff88ff1fff libsystem_notify.dylib (98.5) <C49275CC-835A-3207-AFBA-8C01374927B6> /usr/lib/system/libsystem_notify.dylib
0x7fff88ffc000 - 0x7fff8900afff libcommonCrypto.dylib (60027) <BAAFE0C9-BB86-3CA7-88C0-E3CBA98DA06F> /usr/lib/system/libcommonCrypto.dylib
0x7fff8900b000 - 0x7fff8903cff7 com.apple.DictionaryServices (1.2 - 184.4) <FB0540FF-5034-3591-A28D-6887FBC220F7> /System/Library/Frameworks/CoreServices.framework/Versions/A/Frameworks/Diction aryServices.framework/Versions/A/DictionaryServices
0x7fff89232000 - 0x7fff89295fff com.apple.audio.CoreAudio (4.1.2 - 4.1.2) <FEAB83AB-1DE5-3813-BA48-7A7F2374CCF0> /System/Library/Frameworks/CoreAudio.framework/Versions/A/CoreAudio
0x7fff89296000 - 0x7fff89296fff libOpenScriptingUtil.dylib (148.3) <F8681222-0969-3B10-8BCE-C55A4B9C520C> /usr/lib/libOpenScriptingUtil.dylib
0x7fff89297000 - 0x7fff892aefff libGL.dylib (8.10.1) <F8BABA3C-7810-3A65-83FC-61945AA50E90> /System/Library/Frameworks/OpenGL.framework/Versions/A/Libraries/libGL.dylib
0x7fff892af000 - 0x7fff8934dff7 com.apple.ink.framework (10.8.2 - 150) <3D8D16A2-7E01-3EA1-B637-83A36D353308> /System/Library/Frameworks/Carbon.framework/Versions/A/Frameworks/Ink.framework /Versions/A/Ink
0x7fff8934e000 - 0x7fff89351fff libRadiance.dylib (851) <C317B2C7-CA3A-329F-B6DC-7CC33FE08C81> /System/Library/Frameworks/ImageIO.framework/Versions/A/Resources/libRadiance.d ylib
0x7fff89360000 - 0x7fff893baff7 com.apple.opencl (2.2.19 - 2.2.19) <3C7DFB2C-B3F9-3447-A1FC-EAAA42181A6E> /System/Library/Frameworks/OpenCL.framework/Versions/A/OpenCL
0x7fff893bb000 - 0x7fff893f5ff7 com.apple.GSS (3.0 - 2.0) <423BDFCC-9187-3F3E-ABB0-D280003EB15E> /System/Library/Frameworks/GSS.framework/Versions/A/GSS
0x7fff893f6000 - 0x7fff893f6fff com.apple.Carbon (154 - 155) <372716D2-6FA1-3611-8501-3DD1D4A6E8C8> /System/Library/Frameworks/Carbon.framework/Versions/A/Carbon
0x7fff89420000 - 0x7fff89447fff com.apple.framework.familycontrols (4.1 - 410) <50F5A52C-8FB6-300A-977D-5CFDE4D5796B> /System/Library/PrivateFrameworks/FamilyControls.framework/Versions/A/FamilyCon trols
0x7fff89448000 - 0x7fff89539ff7 com.apple.DiskImagesFramework (10.8.3 - 345) <5C56181F-1E9F-336A-B7BB-620565A8BD6E> /System/Library/PrivateFrameworks/DiskImages.framework/Versions/A/DiskImages
0x7fff8953a000 - 0x7fff89547fff libbz2.1.0.dylib (29) <CE9785E8-B535-3504-B392-82F0064D9AF2> /usr/lib/libbz2.1.0.dylib
0x7fff895e9000 - 0x7fff89900ff7 com.apple.CoreServices.CarbonCore (1037.6 - 1037.6) <1E567A52-677F-3168-979F-5FBB0818D52B> /System/Library/Frameworks/CoreServices.framework/Versions/A/Frameworks/CarbonC ore.framework/Versions/A/CarbonCore
0x7fff89a5e000 - 0x7fff89e7bfff FaceCoreLight (2.4.1) <DDAFFD7A-D312-3407-A010-5AEF3E17831B> /System/Library/PrivateFrameworks/FaceCoreLight.framework/Versions/A/FaceCoreLi ght
0x7fff89e91000 - 0x7fff89ef0fff com.apple.AE (645.6 - 645.6) <44F403C1-660A-3543-AB9C-3902E02F936F> /System/Library/Frameworks/CoreServices.framework/Versions/A/Frameworks/AE.fram ework/Versions/A/AE
0x7fff89f2a000 - 0x7fff89f32fff liblaunch.dylib (442.26.2) <2F71CAF8-6524-329E-AC56-C506658B4C0C> /usr/lib/system/liblaunch.dylib
0x7fff89f33000 - 0x7fff89f3dfff com.apple.speech.recognition.framework (4.1.5 - 4.1.5) <D803919C-3102-3515-A178-61E9C86C46A1> /System/Library/Frameworks/Carbon.framework/Versions/A/Frameworks/SpeechRecogni tion.framework/Versions/A/SpeechRecognition
0x7fff89f3e000 - 0x7fff8a057fff com.apple.ImageIO.framework (3.2.2 - 851) <6552C673-9F29-3B31-A12E-C4391A950965> /System/Library/Frameworks/ImageIO.framework/Versions/A/ImageIO
0x7fff8a058000 - 0x7fff8a132fff com.apple.backup.framework (1.4.3 - 1.4.3) <6B65C44C-7777-3331-AD9D-438D10AAC777> /System/Library/PrivateFrameworks/Backup.framework/Versions/A/Backup
0x7fff8a133000 - 0x7fff8a138fff com.apple.OpenDirectory (10.8 - 151.10) <CF44120B-9B01-32DD-852E-C9C0E1243FC0> /System/Library/Frameworks/OpenDirectory.framework/Versions/A/OpenDirectory
0x7fff8a3e9000 - 0x7fff8a451ff7 libc++.1.dylib (65.1) <20E31B90-19B9-3C2A-A9EB-474E08F9FE05> /usr/lib/libc++.1.dylib
0x7fff8a452000 - 0x7fff8a455ff7 libdyld.dylib (210.2.3) <F59367C9-C110-382B-A695-9035A6DD387E> /usr/lib/system/libdyld.dylib
0x7fff8a456000 - 0x7fff8a727ff7 com.apple.security (7.0 - 55179.13) <F428E306-C407-3B55-BA82-E58755E8A76F> /System/Library/Frameworks/Security.framework/Versions/A/Security
0x7fff8aa64000 - 0x7fff8aa83ff7 com.apple.ChunkingLibrary (2.0 - 133.3) <8BEC9AFB-DCAA-37E8-A5AB-24422B234ECF> /System/Library/PrivateFrameworks/ChunkingLibrary.framework/Versions/A/Chunking Library
0x7fff8aa90000 - 0x7fff8aabeff7 libsystem_m.dylib (3022.6) <B434BE5C-25AB-3EBD-BAA7-5304B34E3441> /usr/lib/system/libsystem_m.dylib
0x7fff8ac19000 - 0x7fff8ac41fff libJPEG.dylib (851) <64A3EB03-34FB-308C-817B-6106D1F4D80F> /System/Library/Frameworks/ImageIO.framework/Versions/A/Resources/libJPEG.dylib
0x7fff8ac42000 - 0x7fff8ac8eff7 libauto.dylib (185.4) <AD5A4CE7-CB53-313C-9FAE-673303CC2D35> /usr/lib/libauto.dylib
0x7fff8ac8f000 - 0x7fff8ac91ff7 com.apple.print.framework.Print (8.0 - 258) <34666CC2-B86D-3313-B3B6-A9977AD593DA> /System/Library/Frameworks/Carbon.framework/Versions/A/Frameworks/Print.framewo rk/Versions/A/Print
0x7fff8ac92000 - 0x7fff8ac9efff libCSync.A.dylib (333.1) <319D3E83-8086-3990-8773-872F2E7C6EB3> /System/Library/Frameworks/ApplicationServices.framework/Versions/A/Frameworks/ CoreGraphics.framework/Versions/A/Resources/libCSync.A.dylib
0x7fff8ac9f000 - 0x7fff8aca1fff com.apple.TrustEvaluationAgent (2.0 - 23) <A97D348B-32BF-3E52-8DF2-59BFAD21E1A3> /System/Library/PrivateFrameworks/TrustEvaluationAgent.framework/Versions/A/Tru stEvaluationAgent
0x7fff8ad14000 - 0x7fff8ad1afff libmacho.dylib (829) <BF332AD9-E89F-387E-92A4-6E1AB74BD4D9> /usr/lib/system/libmacho.dylib
0x7fff8ad1b000 - 0x7fff8ad5ffff libcups.2.dylib (327.7) <9F35B58A-F47E-348A-8E09-E235FA4B9270> /usr/lib/libcups.2.dylib
0x7fff8ad60000 - 0x7fff8ade1fff com.apple.Metadata (10.7.0 - 707.12) <69E3EEF7-8B7B-3652-8320-B8E885370E56> /System/Library/Frameworks/CoreServices.framework/Versions/A/Frameworks/Metadat a.framework/Versions/A/Metadata
0x7fff8ade2000 - 0x7fff8ae7dfff com.apple.CoreSymbolication (3.0 - 117) <7D43ED93-BD81-338C-8076-6A932A1D19E8> /System/Library/PrivateFrameworks/CoreSymbolication.framework/Versions/A/CoreSy mbolication
0x7fff8ae7e000 - 0x7fff8aefeff7 com.apple.ApplicationServices.ATS (332 - 341.1) <39B53565-FA31-3F61-B090-C787C983142E> /System/Library/Frameworks/ApplicationServices.framework/Versions/A/Frameworks/ ATS.framework/Versions/A/ATS
0x7fff8aeff000 - 0x7fff8aeffffd com.apple.audio.units.AudioUnit (1.9.2 - 1.9.2) <6D314680-7409-3BC7-A807-36341411AF9A> /System/Library/Frameworks/AudioUnit.framework/Versions/A/AudioUnit
0x7fff8af02000 - 0x7fff8af21ff7 libresolv.9.dylib (51) <0882DC2D-A892-31FF-AD8C-0BB518C48B23> /usr/lib/libresolv.9.dylib
0x7fff8af22000 - 0x7fff8af65ff7 com.apple.bom (12.0 - 192) <0BF1F2D2-3648-36B7-BE4B-551A0173209B> /System/Library/PrivateFrameworks/Bom.framework/Versions/A/Bom
0x7fff8afbe000 - 0x7fff8afc2fff libpam.2.dylib (20) <C8F45864-5B58-3237-87E1-2C258A1D73B8> /usr/lib/libpam.2.dylib
0x7fff8afd1000 - 0x7fff8afe0ff7 libxar.1.dylib (105) <370ED355-E516-311E-BAFD-D80633A84BE1> /usr/lib/libxar.1.dylib
0x7fff8b23d000 - 0x7fff8b25aff7 com.apple.openscripting (1.3.6 - 148.3) <C008F56A-1E01-3D4C-A9AF-97799D0FAE69> /System/Library/Frameworks/Carbon.framework/Versions/A/Frameworks/OpenScripting .framework/Versions/A/OpenScripting
0x7fff8b25b000 - 0x7fff8b2b2ff7 com.apple.ScalableUserInterface (1.0 - 1) <F1D43DFB-1796-361B-AD4B-39F1EED3BE19> /System/Library/Frameworks/QuartzCore.framework/Versions/A/Frameworks/ScalableU serInterface.framework/Versions/A/ScalableUserInterface
0x7fff8b2b3000 - 0x7fff8b461fff com.apple.QuartzCore (1.8 - 304.3) <F450F2DE-2F24-3557-98B6-310E05DAC17F> /System/Library/Frameworks/QuartzCore.framework/Versions/A/QuartzCore
0x7fff8bd8d000 - 0x7fff8bd98fff com.apple.CommonAuth (3.0 - 2.0) <1CA95702-DDC7-3ADB-891E-7F037ABDDA14> /System/Library/PrivateFrameworks/CommonAuth.framework/Versions/A/CommonAuth
0x7fff8bd99000 - 0x7fff8bd9dfff libGIF.dylib (851) <AD40D084-6E34-38CD-967D-705F94B188DA> /System/Library/Frameworks/ImageIO.framework/Versions/A/Resources/libGIF.dylib
0x7fff8bd9e000 - 0x7fff8c0cefff com.apple.HIToolbox (2.0 - 626.1) <656D08C2-9068-3532-ABDD-32EC5057CCB2> /System/Library/Frameworks/Carbon.framework/Versions/A/Frameworks/HIToolbox.fra mework/Versions/A/HIToolbox
0x7fff8c12a000 - 0x7fff8c12afff com.apple.ApplicationServices (45 - 45) <A3ABF20B-ED3A-32B5-830E-B37831A45A80> /System/Library/Frameworks/ApplicationServices.framework/Versions/A/Application Services
0x7fff8c12f000 - 0x7fff8c130ff7 libremovefile.dylib (23.2) <6763BC8E-18B8-3AD9-8FFA-B43713A7264F> /usr/lib/system/libremovefile.dylib
0x7fff8c131000 - 0x7fff8c135fff libCoreVMClient.dylib (32.5) <DB009CD4-BB0E-3331-BBB4-A118781D193F> /System/Library/Frameworks/OpenGL.framework/Versions/A/Libraries/libCoreVMClien t.dylib
0x7fff8c136000 - 0x7fff8c241fff libFontParser.dylib (84.6) <96C42E49-79A6-3475-B5E4-6A782599A6DA> /System/Library/Frameworks/ApplicationServices.framework/Versions/A/Frameworks/ ATS.framework/Versions/A/Resources/libFontParser.dylib
0x7fff8c271000 - 0x7fff8c2aaff7 libssl.0.9.8.dylib (47.2) <46DF85DC-18FB-3108-91F6-52AE3EBF2347> /usr/lib/libssl.0.9.8.dylib
0x7fff8c2ab000 - 0x7fff8c2acfff libsystem_blocks.dylib (59) <D92DCBC3-541C-37BD-AADE-ACC75A0C59C8> /usr/lib/system/libsystem_blocks.dylib
0x7fff8c2b1000 - 0x7fff8c2baff7 com.apple.CommerceCore (1.0 - 26.2) <AF35874A-6FA7-328E-BE30-8BBEF0B741A8> /System/Library/PrivateFrameworks/CommerceKit.framework/Versions/A/Frameworks/C ommerceCore.framework/Versions/A/CommerceCore
0x7fff8c307000 - 0x7fff8c31cfff com.apple.ImageCapture (8.0 - 8.0) <17A45CE6-7DA3-36A5-B7EF-72BC136981AE> /System/Library/Frameworks/Carbon.framework/Versions/A/Frameworks/ImageCapture. framework/Versions/A/ImageCapture
0x7fff8c31d000 - 0x7fff8c3e9ff7 libsystem_c.dylib (825.40.1) <543B05AE-CFA5-3EFE-8E58-77225411BA6B> /usr/lib/system/libsystem_c.dylib
0x7fff8c579000 - 0x7fff8c57dff7 com.apple.CommonPanels (1.2.5 - 94) <AAC003DE-2D6E-38B7-B66B-1F3DA91E7245> /System/Library/Frameworks/Carbon.framework/Versions/A/Frameworks/CommonPanels. framework/Versions/A/CommonPanels
0x7fff8c590000 - 0x7fff8c591ff7 libdnsinfo.dylib (453.19) <14202FFB-C3CA-3FCC-94B0-14611BF8692D> /usr/lib/system/libdnsinfo.dylib
0x7fff8c5fb000 - 0x7fff8c5fcff7 libsystem_sandbox.dylib (220.3) <B739DA63-B675-387A-AD84-412A651143C0> /usr/lib/system/libsystem_sandbox.dylib
0x7fff8c680000 - 0x7fff8c6cfff7 libFontRegistry.dylib (100) <2E03D7DA-9B8F-31BB-8FB5-3D3B6272127F> /System/Library/Frameworks/ApplicationServices.framework/Versions/A/Frameworks/ ATS.framework/Versions/A/Resources/libFontRegistry.dylib
0x7fff8c6d1000 - 0x7fff8c6d8fff com.apple.NetFS (5.0 - 4.0) <82E24B9A-7742-3DA3-9E99-ED267D98C05E> /System/Library/Frameworks/NetFS.framework/VeDear Jody..jone5
Good for you that can't update your iphone because I did it and my iphone dosen't work for example I can't download any app like Wecaht or Twitter..
Goodluck
Atousa -
I upgraded from 1 to 4 but I need a 2 or 3 to work with certain programs and plugins
I have Version 4 but I absolutely need 2 or 3 to work with SEO Quake and No Follow Plugin
I lost my bookmark tags too
Any help would be greatly appreciated
Thank you.....I have a new MacThose are Extensions as Plugins refer to say Java, Flash and such.
The SEO Quake is said to be compatible with Firefox 4.0 according to https://addons.mozilla.org/en-US/firefox/addon/seoquake-seo-extension/
Not sure what No Follow extension you are referring to as NoDoFollow is said to be compatible with Firefox 3.6.* https://addons.mozilla.org/en-US/firefox/addon/nodofollow/ but the author has not updated it since 2008.
If you must downgrade then try Firefox 3.6.16 which is found at http://www.mozilla.com/en-US/firefox/all-older.html -
Table EKKN-PS_PSP_PNR [Work breakdown structure element]
Hi,
-> Go to EKKN Table
-> Select one EBENL on the selection screen, execute
-> Menu - Settings - List format - Choose fields
-> Select EBELN, EBELP, PS_PSP_PNR fields
-> Check the Value on the PS_PSP_PNR, it would be some thing like 00000010, etc
-> Double click on the List
-> Please, check once again PS_PSP_PNR values, it would be appearing as 971020005.01
-> My requirement is to collect the PS_PSP_PNR value from EKKN table and
-> Need to collect the PSPHI value from the PRPS table for the above PS_PSP_PNR value
-> I have debugged the program, During the runtime, the PS_PSP_PNR field holds the value 00000010 and in the List it's displaying the value 971020005.01
Please, pass your comments.
Thanks,
KalyanHi,
In PS (project systems) system creates internal number(OBJNR) for WBS element.
you can see the internal number for WBS element in PRPS table.
WBS element and Object number fields are same.
PSPHI fields is project number.
Now goto PRPS table, enter WBS element press execute. choose details button get the PSPHI value.
Goto PROJ table enter value in PSPID field and execute you will project ID details.
Under project definition we create WBS elements
Regards,
Chandra -
How to upload WBS(Work Breakdown Structure Element) in FB03
Hello,
In Financial Accounting, the data to be transferred to the SAP system is prepared in a sequential file.Data from final internal table(isegtab) is transfered to the file(fileout).
We need to upload WBS but the isegtab uses structure bbseg.We cannot find wbs element in bbseg .
abap code
DATA : BEGIN OF isegtab OCCURS 0 .
INCLUDE STRUCTURE bbseg .
DATA : END OF isegtab .
TRANSFER isegtab TO fileout .
SUBMIT rfbibl00 WITH ds_name = fileout "Submit the prepared file
WITH fl_check = c_no " to the SAP screen for
WITH os_xon = c_no " upload.
WITH callmode = c_b
WITH max_comm = '1000'
WITH pa_xprot = c_9
AND RETURN .
Kindly susggest us a solution ASAP.Use the field BBSEG-PROJK, it's the WBS number in external formay (Batch-Input format) (ie PRPS-POSID)
Look in (old) [Batch Input Documents|http://help.sap.com/saphelp_45b/helpdata/en/35/a47e63763e0392e10000009b38f9b7/content.htm] for :
Structure BBSEG also contains the fields for one-time data and the data for the coding block. The screen for one-time data is displayed if you have to post to a one-time account or if an alternative payee is to be specified in the document. The data for the coding block in batch input is generally displayed on a separate screen. Here, you should note the following name differences:
COBL-KDAUF = BBSEG-VBEL2 Sales order number
COBL-KDPOS = BBSEG-POSN2
Item in sales order
COBL-RMVCT = BBSEG-BEWAR Transaction type
COBL-PS_PSP_PNR = BBSEG-PROJK Project account assignment
COBL-PPRCTR = BBSEG-PPRCT Partner profit center
COBL-KDEIN = BBSEG-ETEN2 Schedule line in sales order
Regards,
Raymond
Maybe you are looking for
-
I open new tabs from a lot of links that are in lists. In Firefox the link would be surrounded by dots when I opened the new tab which made it easy to know where I was in the list if I had to get up or even look away from the screen. This is gone in
-
ThinkPad 410 service complaint
I have a thinkpad 410i that we purchased for my wife for Christmas last year. This is the fourth thinkpad model I have had experience using (I have had a T40, T60 and currently have a T420 through work) and have always found the equipment to be top
-
Encore 2.0 IS OUT!!!
Is you haven't seen it yet, Adobe has posted the latest versions of Encore, Premiere Pro, and Audition on this site. Check out the production bundle.
-
How Do We set Custom EQ settings in iTunes
I see the presets in get info eq pull down on a song - but how do I create my own EQ on a song?
-
10.6.8 macbook pro was using it perfectly fine the day before shut down pc as usual.wake up try to connect to internet find out no air port card installed tried a few resets from site not having any luck.