Unit of measure for stock , Goods issue , Purchase.
Dear All Experts,
How we can maintain different unit of measure for Stock, Goods Issue, Purchase?
Regards,
Sandeep.
Hi,
The UOM qualifies the quantity you enter on the
purchase order line. This will default in if you entered an item number, if not enter
a UOM of your choice using the List of Values.
Please Refer the following links...hope it helps you....
http://help.sap.com/saphelp_45b/helpdata/en/c6/f83bb94afa11d182b90000e829fbfe/content.htm
http://www.admin.cam.ac.uk/offices/finance/training/manuals/inv_training_stores_user.pdf
Regards,
Udaya.
Similar Messages
-
Unit of measure for Stock and Non-stock Item in CJ20N
When I attach Material to an activity (item Category N Non-stock item) in Project Builder (CJ20N), It is peaking its Base unit of Measure as unit. Now when I try to change it, it is showing an error
Item category N: Only base unit of measure M allowed
Message no. CO344
But for the same material if I change the item Category to L Stock item, then it allows me to change the unit.
Please guide me regarding this Behavior. Is there any customization, by doing which it will allow me do the same for Non-stock Item or It is not Possible.firstly I am assuming that the activity is internal processing type - doesn't matter really
now to attach a material select actvity and from the template area click and drag material which will open the material detail screen in the work area
because it is a non stock item I am assuming text description - in the requirements qty you enter the qty and next to it the units - changeable
if you choose a material number maintained as material master then obviously the unit will be from the material master.
If you are using an externally processing activity then in config check OPUU for the network type and see if order unit has been populated - that might be the problem -
IS-Retail:how to maintain different unit of measures for a article
hi experts,
can anyone tell me how we maintain different unit of measures for sales and purchasing for a article.base unit of measure,order unit,var unit.Hope for a good answer.
RegardsHi,
Go to MM42, select basic data view
In,Units of measure/ EANs /dimensions sub tab
there u can see four radio buttons
B.Un Unit of measure is base unit (used internally only)
O.Un Unit of measure is the order unit - Purchasing
D/L.Un Unit of measure is delivery unit/issue unit - Logistics
S.Un Unit of measure is the sales unit - Sales
for eg:
First line enter EA (each) or PC (piece) in Auom for a material and enter 1 in Number and select radio button for B.Un
Second line enter CT (carton) in Auom and enter 10 in Number and select radio button for O.UN (when you creating a PO it UOB automatically picks as CT)
Third line enter PALin Auom and enter 50 in Number and select radio button for D/l .UN (when u creating a delivery UOB picks as PAL ie pallets)
Fourth line enter EA or PC and enter 1 in Number and select radio button for S.UN (when u creating a Sales order UOB picks as EA or PC as u defined)
Mohan -
Need Multiple Units of Measure for a given material due to multiple vendors
Hello,
We have a requirement where we must have multiple units of measue (each, box, case, pallet) for a given material.
Background:
We have multiple vendors for one SAP material number. We need to store 4 levels of units of measure for each vendor+material combination.
Unit of Meaure levels
1. Each
2. Innerpack (ex: 12 each = 1 innerpack)
3. Box (ex: 36 eaches = 1 box)
4. Pallet (ex: 100 eaches = 1 pallet)
Standard SAP allows in MM01 additional data --> Units of Measure only 1 Ea, Box, Plt, etc.
Our requirement is to allow multiple Units of Measure due to multiple vendors providing the same material.
So, our unique combination is by a Material+Vendor.
We are considering adding the vendor name and vendor number to the material master --> additional data --> Units of Measure tab.
Does this seem like a good solution? What impacts do you foresee with approach?
Any alternatve solutions?
We thought we could enhance the purchasing info records to allow multiple units of measure too but then we need to also add many fields to hold the weight, lenght, height, width, volume, country of origin, etc.
Please recommend a best practice or solution to handle this requirement.
Thanks in advance!!!Hi,
Maintain the alternative units in Material Master in Additional Data -> Units of Measure section with proper conversion factors.
Create individual info-records i.e. per mtl-vendor combination & in the info-record maintain the order unit, along with other details as required.
Now when you create a PO, the details will be read from the info-record. To test the same, create them in your sandbox & see if it meets your requirement.
Hope the above clarifies your query.
Regards,
Vivek -
Multiple Units of Measurements for a single item
Hi all,
How do I maintain multiple units of measurements for a single Item/ I have a scenario where purchase orders are being made for sand in Metric Tons, Tons, Kgs and Cubit Feets. Each measurement is being used at each construction site of the company but the item is single sand. One more problem is here with the material reconciliation of stock since it is maintained in different units of measurement and conversion from unit to other is problematic.
Thanks
YSvee ReddyHi YSvee Reddy ,
Julie is correct in saying that this feature will be available in version 8.8, currently in Ramp-up.
Please see the [8.8 landing page |https://websmp203.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000705857&_SCENARIO=01100035870000000183&_ADDINC=011000358700001192682007E&]for a link to the 'What's new' document.
You can contact your LPE to discuss participation in Ramp-up.
All the best,
Kerstin -
Report for Units of measurement for Material
Hi
Is there any report to extract the alterante unit of measurements for materials in a plant.
ThanksHi,
Please use the below table,
Related to Materials:
MARA - Material Master: General data
MAKT - Material Master: Description
*MARM - Material Master: Unit of Measure*
MAPE - Material master: Export control file
MARC - Material master: Plant data
MARD - Material master: Storage location
MAST - Material link to BOM
MBEW - Material valuation
MLGN u2013 Material Master: WM Inventory
MLGT u2013 Material Master: WM Inventory type
MDIP - Material: MRP profiles (field contents)
MKOP - Consignment price segment (old versions of SAP)
EBEW - Valuation of sales order stock
QBEW - Valuation of project stock
MVER u2013 Material Master: Consumption <Plant>
DVER u2013 Material Master: Consumption <MRP Area>
MVKE u2013 Material Master: Sales <Sales Org, Distr Ch>
MLAN - Material Master: Tax indicator
MARC - Material Master: Plant data
MAPR u2013 Material Master: Forecast
MARD u2013 Material Master: Storage Location
MCH1 u2013 Material Master: X Plant Batches
MCHA u2013 Material Master: Batches
MCHB u2013 Material Master: Batch Stock
MDMA - MRP Area data
DBVM - MRP Planning File Entry: MRP Area
MOFF - Outstanding Material Master Records (Maintenance status)
MARCH - Material Master C Segment: History
MARDH - Material Master Storage Location Segment: History
MBEWH - Material Valuation: History
MCHBH - Batch Stocks: History
MKOLH - Special Stocks from Vendor: History
MSCAH - Sales Order Stock at Vendor: History
MSKAH - Sales Order Stock: History
MSKUH - Special Stocks at Customer: History
MSLBH - Special Stocks at Vendor: History
MSPRH - Project Stock: History
MSSAH - Total Sales Order Stocks: History
MSSQH - Total Project Stocks: History
Regards,
Mohd Ali. -
Unit of measure for calculation type C must be completed
Hi All
When releasing some contracts in SRM , we are getting the error message as above.
The error message doesn't specify any particular part and the contract has more than 3000 parts.
There are no conditions at header or item level.
There is no Target quantity also. Just a Target value for the contract and prices for individual items are maintained.
We are using extended classic scenario and the contract is manually created in SRM.
I have checked the OSS notes for this error, but they are mostly for contract creation in Bidding and not for a manually created SRM contract.
We checked the UOMs for all the contract parts with the UOMs ( Base and Purchasing) in ECC Material Master and they are OK.
In our scenario , MM changes in ECC are replicated to SRM in real time
Any pointers towards pin pointing the error will be rewarded!
Regards
KedarHi,
We encountered this error message and resolved the problem by applying the following 3 SAP Notes:
a) Note #1022928 - Unit of Measure for Calculation Type C Must Be Completed
(Previously Mentioned)
b) Note #1702484 - Unit of Measure for Calculation Type C Must Be Completed
c) Note #1517648 - Default Conditions Added for Product Category Item Type
Although the contract required is similar to a "Limit" item, but had to be placed for bid, then the RFX PS Item Type was set to "Service" to receive the bid responses. After accepting the bid response, then we created a contract from the bid response. Since it was to be a "Limit" type contract, then we immediately removed the data from the following fields:
Remove the Quantity
Remove the Unit of Measure
Remove the Price
Remove the Price Condition
After removing the values from these fields, then we switched the PS Item Type from "Service" to "Product Category". We added the Guaranteed Minimum and account assignment data to encumber the funds. We were able to "Release" the contract successfully.
Bob Zinsmeister -
Dear Friends,
I have cretaed RFQ for services such as Manpower Hiring where Item category is,"D".Unit of Measure is UT.
Now I have selected the line item and clicked on Services to enter the details of Manpower such as Welders,Fitters,Carpenter etc. and here Unit of measure is HR (Hours).
Now when I am taking print out of this RFQ.Unit of Meauser for Manpower is UT,it is correct.But unit of Measure for Welders,Fitters,Carpenter etc is STD.Infact it should be HR.
I have checked the table ESLL and value of Unit of Measure here for Welder,Fitters,Carpenter etc and it is STD.
Can anyone explain me why the values are flowing as STD but not as HR?
Thanks in advance.
Regards,
ShrikantHi ,
Check is there any translation happening for your unit mentioned..
http://help.sap.com/saphelp_nw70ehp1/helpdata/en/1c/1b5d427609c153e10000000a1550b0/content.htm
I remember i had this issue once ..
Thanks,
sudhi -
USER-EXIT for post goods issue
Hi all,
after the delivery (VL01n)is created, i have to go for post goods issue.there is a push button named 'post goods issue' in VL02n.
when i will press this button,all my data for this delivery ,should be downloaded to a text file.
for this thing, i want to use a USER-EXIT.can u plz advice me the correct & specific user-exit for this requirement.it is very urgent. i have to it by today.
your help is highly appreaciated.
Regards
pabitraCheck the following
V02V0001 Sales area determination for stock transport order
V02V0002 User exit for storage location determination
V02V0003 User exit for gate + matl staging area determination (h
V02V0004 User Exit for Staging Area Determination (Item)
V50PSTAT Delivery: Item Status Calculation
V50Q0001 Delivery Monitor: User Exits for Filling Display Fields
V50R0001 Collective processing for delivery creation
V50R0002 Collective processing for delivery creation
V50R0004 Calculation of stock for POs for shipping due date list
V50S0001 User Exits for Delivery Processing
V53C0001 Rough workload calculation in time per item
V53C0002 W&S: RWE enhancement - shipping material type/time slot
V53W0001 User exits for creating picking waves
VMDE0001 Shipping Interface: Error Handling - Inbound IDoc
VMDE0002 Shipping Interface: Message PICKSD (Picking, Outbound)
VMDE0003 Shipping Interface: Message SDPICK (Picking, Inbound)
VMDE0004 Shipping Interface: Message SDPACK (Packing, Inbound)
Regards -
Unit of measure for a pallet layer in MATMAS03
Hi all,
maybe ths is not the correct forum where to post this question, if it's out of topic I apologize in advance.
Fast question:
What is LAY? it is alternative unit of measure for pallet layers?
When i receive the IDOC i recieve LR as UOM, what is the relation between LR and LAY?
Thanks & regards
AndreaThese units could have been defined only in your system (I don't see them in ours). If it is so, no one here will be able to answer.
The conversion factors could be in Material Master (MM03), on Basic Data screen click Additional Data button and go to the Units of Measure tab. Also see tables MARM and T006. -
How to update Unit Of Measure for a material in BAPI_SALESORDER_CHANGE
Hi All
How to update Unit Of Measure for a material in BAPI_SALESORDER_CHANGEhi,
in BAPISDITM structure, which is their in orderitemin
update updateflag of BAPISDITMX, which is their in orderiteminx for the same field with update flag = 'U'
kindly try with <b>T_UNIT_ISO</b>
or
<b>TARGET_QU</b>
comeback with u r comment
regards,
pavan
Message was edited by:
pavan kumar pisipati -
Do you have any idea of 'Mass Unit Of Measure for DESADV'?
XI mapping
'Mass unit of measure for DESADV'
What action is supposed to do to for above words?To my understanding DESADV is an Idoc type we use when we deal with deliveries. I presume that the filed Unit of measure is not mapped in this idoc type in your system.
Pls give us more details.
Regards,
Mani. -
Alternative unit of Measure for variant material
Dear All,
Here is an interesting scenario,
There is a naterial Billet with two variant characteristics length and size. and base unit of measure is TON. Now alternative unit of measure is PCS. How can define the conversion factor on the basis of these two variant characteristics.
In normal material (without variant char.)
we can define conversion factor 1PCS= 2TON
For variant material,
For the material Billet with variant charc length and size how can i define conversion
so that system calculates diff. PCS with diff. length and size but material is same. So how can i Do that.
for example for same material Billet but variant char. Length is 6 M and size is 120*120 ,its wt will be 2 TON for 1 PCS.
for the same material Billet with variant char. length 12 M and size 120*120, its wt will be 12TON for 1 PCS.
How can i cater this for the same material.Hi Shoaib,
We have faced the similar scenario for steel industry. Based on my experience, it is not possible to define variable values for Alternative UOM conversion with the variant characteristic/configuration, specially if you want SAP to maintain inventory with variable conversion rate.
Use the Batch specific unit of measure for this situation.
1) Create batch specific UOM i.e. Ton_per_pc (TOP) --- User proportional unit conversion
2) Create batch characteristic ton_per_pc and assigned UOm.
3) In material master additonal data select proportion unit and enter the standard conversion rate between ton & pcs.
4) While doing GR - In batch creation you can enter whatever the conversion rate is and Inventory will be updated accordingly.
Regards,
Ravi. -
How to hide/suppress unit of measure for values of columns in structure
hi,
hi i am using following in rows and columns.
Rows:
1. material group
2. structure (key figures)
key figure 1
key figure 2
key figure 3
3. base unit of measure
Columns:
1. structure (time scale)
fiscal period 1
fiscal period 2
fiscal period 3
fiscal period 4
If I run the report I am getting unit of measure for each key figure in each fiscal period. I wan to show unit of measure only once in a base unit of measure (row).
I want to suppress / hide unit of measure in columns (time scale - fiscal period). If I wasn't using strcture, I could have used NODIM in formula. But I dont think that I can use NODIM in strctuere.
Is there any alternative.
pls suggest. Thanks.It seems that i have found the answer. I have checked the query properties --> check the option - Display scaling factors for key figures.
Pls let me know if you have any other alternatives. Thanks. -
Leave unit of measure for calculation type A empty
Hi Gurus,
We are in SRM Extended classic scenario with 5.0 version.
Here in SRM we have Procurement contact with process type Global Outline Agreement (GCTR).
Currently we are facing problem while amending the condition type in the contact line item. When we change the condition type for particular line item then getting error message "Leave Unit of Measure for calculation type A empty. (item 10).
On the line item the condition could look like this
Condition Price Start Date End Date
Price(Contract/Bid) 100 EUR 2010-02-22 2010-12-31
gross surcharge % 5,5 % 2010-02-22 2010-03-31
gross surcharge % 6,5% 2010-04-01 2010-06-30
gross surcharge % 8,5 % 2010-07-01 2010-12-31
when we try to add additional conditon like "gross surcharge %" then we got this error message
Leave unit of measure for calculation type A empty
if I delete all condition "Gross Surcharge%" then the error disapear and then I can try again, sometime we could create those condition without problems but offen we have this error.
Can any one help me to get rid of this error message.
Thanks In Advance,
Jakob Banginitially you could do multiple periods but when you change the condition it is not allowing you.
can you make inactivate that andd new line item and add same item with new condition
(SRM might have limitations)
I tried this works for me
MM 123 -
FIRST :-
price contract bid - 43.99 USD 2010.09.02 to 2010.09.02
Discount (Absolute) - 3 % 2010.09.02 to 2010.09.02
Discount (Absolute) - 5 % 2010.09.03 to 2010.09.03
same GOA edited change version created
price contract bid - 43.99 USD 2010.09.02 to 2010.09.02
Discount (Absolute) - 4 % 2010.09.02 to 2010.09.02
Discount (Absolute) - 5 % 2010.09.03 to 2010.09.03
no erorr for me and GOA released too and reached backend too.
Muthu
Maybe you are looking for
-
Can you switch off continuous play?
I have an iphone 5. When playing songs is it possible to stop it automatically playing the next track?? I don't want to have to put each track into a different playlist. I'd just like to play one and then when it's finished I can then press play on t
-
Syncing iPhone with new MBP and/or iMac
I'm ready to upgrade my white MacBook 13" and I'm a new iPhone user as of Jan'10. My question is will it be painless to connect my iPhone to a new MacBook Pro or iMac and have iTunes recognize it? Would there be any complications maybe? Thank you in
-
After syncing PC-Ipad my Photo's on Ipad2 are out of order. In the Folders/Albums the Photo's are no longer in the order of (EXIF) dates. I have updated Itunes to 10.6.1.7 and IPad2 to 5.1. I have reset the IPad2. I cleaned the Photo-cache and remove
-
Can I download the trial version of windows server 2012 onto a laptop running windows 8.1 and create a dual boot?
-
Return Into. Can I return the old value in an update statement?
Hello - I have an update statement and I need the value of a field, prior to the update. Is it possible to use the Return Into to do this? Or do I have to have a separate select statement prior to the update statement in order to store that value in