Hi,
I'm doing miscellaneous issue on an item. but while doing the entry, the unit price column is disabled from entering the value. What could have gone wrong? But for some items the field was enabled to enter the unit price value. Both the items are having same templete and costing is also same(Average).
How can the unit price column can be enabled for the item?
Thank you
Regards
BKR.

Hi,
To solve this you must update your studio. In lower studio versions (PlanViz) does not allow "unknown" XML tags sent by higher version servers. A fix for this issue was made so that PlanViz parser can simply skip unknown tags.
Please go to version 74, if possible.
Regards,
Michael

Similar Messages

  • How to change the g/l a/c being used while doing goods issue using migo

    when I pass a migo entry whilie purchasing material
         , the entry goes through stock
         stock (230000 a/c no)    150        dr
          GR/IR (150000 a/c)      150        cr
    when I issue material after reservation for which again migo is done
        entry is
          repairs to plant and mach (4800569 a/c)   175
                    stock (230000 a/c no)           175
    The stock a/c is debited and credited due to t.code obyc where for inventory posting I have assigned a/c 2300000 for valuation class assigned to material.
    now I want to have a/c no  4800689 in place of 4800569. how can i change that.
    that is when I issue material from stock this should be debited to 4800689 instead of 4800569. please provide t.code to change the gl from 4800689 from 4800569
    full points will be awarded

    continuing my issue is it possible to that we donot have to change the gbb and vbr and still we can have the desired results.
    that is we are able to use different gl for debit while doing goods issue from a single stocked material
    or we want to have this result
    1.          repairs to p&m    1000    dr
                         stock of cement  a/c           1000    cr
    2.          repairs  to building    2000   dr
                          stock of cement  a/c            2000   cr.
    3.             construction     3500     dr
                                 stock  of cement     3500     cr
    we donot want to change the GBB and VBR every time    or change the GL a/c while doing reservation.
    is there any third option where we get the desired result without changing or entering the g/l manually
    if there is please let me know the t.codes

  • User exit while doing Goods Issue

    Dear Guru's,
    I have the below requirement from my client,
    They want an warning msg from the system while doing Goods issue, if the stock of certain material is goes below min stock level, so i spoke to my abaper to create user exit, but he is asking for some programs from MM side related MIGO. What programs we need to give him ? is that right ? pls suggest
    Edited by: channabasappa kallapur on Jan 21, 2009 5:29 PM

    I don't believe you need a user exit for this .. USE OMCM and configure the availability check against the appropriate movement type

  • Issue while doing goods issue

    Daear All,
    while doing goods issue getting the error message : Acct. 200510 for trans./event key BSX, postable directly.
    the same in goods receipt also.
    please help me on this.
    Best Regards,
    Venkat.

    In FS00 ,Please TICK 'post automatically only' for the GL 200510.
    Regards
    jabeen

  • How to Hide/show the columns data while doing Drill down or drill up

    Hi ,
    How to Hide/show the columns data while doing Drill down or drill up in webi report .
    Does it possible BO 3.1 version ?
    Please suggest me on this.
    Thanks & Regards
    Venkat

    While that is not there yet, you can make use of the show when empty yes/no in combination with alerters.
    So I have an alerter applied to every cell of the table.
    When a condition is true (say I drilled down) I just put = "" in every cell, emptying the table,
    because its now empty and doesn't need to show, it wont.
    For the detail table I use the opposite, so when you drilled down it becomes visible...
    Hope this helps all that do not have 40 yet
    Good luck,
    Marianne

  • System is not converting unit of measure ment while doing cost estimation.

    Hi All,
    System is not converting unit of measure ment while doing cost estimation.
    Now i am explaining system setting. based on this kindly help me.
    Our Base Unit of Measure Measuremnt in Material Master is M2 (meter square) and We have maintained Unit conversion in Master as  1 PC is <=>2.5 M2.
    We are running costing for 1 M2.
    Producion we are doing in Peaces (PC) .  and i maintained Std Value for for Machin and Labour for PC only. and we maintained charge quantity in phases also.
    While running cost estimation system is not converting std value of machin & labour into M2.instead it is showing full machin and labour time and value.
    System showing PC value for M2 Cost estimate.
    Can any one let me know where i am missing.
    Thanks in Advance.
    Regards,
    Sahil

    Hi,
    as per your explanation: 1 PC (piece) = 2,5 sqm (m2), standard values for "labour / machine" maintained per PC.
    I guess within T-code CUNI, the unit PC does not allow any decimal places (means there can be only 1 piece, 2 pieces, 2 pieces but not 1 and a half pieces, 2,63 pieces,...)
    Now if you are running plan cost estimate for quantity 1 sqm (m2) SAP picks the "labour / machine" values for 1 PC (and not for 1 / 2,5 = 0,4 pieces) as decimal places for unit pieces are not allowed so its up-rounding.
    Run cost estimate for 10 sqm (m2) which should be 4 PC and the result should be fine.
    Best regards, Christian

  • While doing consignment issue..

    Dear All,
    Anyone can tell me when i am doing consignment issue the picking tab is in display mode(Greyed Out). By which so..

    Hi Ashima
    During Consignment Fill-up, Picked goods are shifted to the customer premises.
    When you are doing the Consignment Issue, you are delivering goods from this stock.
    Here you need not create a picking again for the already picked goods. For picking,we create a Transfer order and goods movement takes place in the Warehouse.
    While issuing goods from my Consignment stock, why should goods movement take place in my original warehouse, which may be at a distant place.
    I hope , you understand, it is not relevant.That is why you will find it greyed out.

  • Unit of measure differs while doing the vendor returns

    Hi All,
       While doing the vendor returns even if I mention the order unit(PO) for return qty,In vendor returns printout it is showing Baseuint of measure,pls let me know problem would be functional side or print programe side
    Regards
    Raj

    Thanks,
    Edited by: Hari Raj on Apr 12, 2008 1:21 PM

  • Batch Determination while doing goods issue 201

    Hi MM Experts
    i have setup batch determination , and assign procedure to movement type 201 also copleted reamaining activity
    now when i am doing godds issue batch is not coming automatically.
    please help me out to complete process
    Regards
    anubhav
    Edited by: anubhav parashar on Jan 21, 2011 3:24 PM

    hi ravi
    i have created an class and charateristic ERSDA (Creation date) , also i have created 2 batches , also characteristic assigned to short rule also , now i want whoever batch created 1st should come at the time of issue

  • Root column disabled while Assigning XSD- In Syndicator

    Hi,
    I am not able to assign the XSD against the Remote system in the Syndicator.
    While assigning the XSD through
                  Syndicator==> File==>
                                                    Destination Properties
    While assigning the XSD against the Remotesystem,Root Textbox is disabled and OK button alsio disabled...
    Please provide your suggestions
    Best Regards
    Devaraj PK

    Hi Devraj,
    Root column dissabled when your XSD is not proper.
    In Syndicator go to file->Destination Properties
    Here select XML Schema if you have made an entry of an XSD in XML Schema table in Console or you can select XML Schema File if you want to pick your XSD from a particular location.Now if the XSD is proper then only the Root Column will be enabled which contains the root node available in
    XSD so please check for the Same.
    Reward if Helpful,
    Regards,
    Vinay Yadav

  • Error while doing goods issue of finished goods

    Dear All,
            When I try to issue fineshed good to project using transaction code MIGO, I get the following error:
    "WBS element xxxx does not exist" and  the message line shows " Variant xxxxx is deleted."
    Kindly help me in solving this problem.
    Regards,
    Shynu John

    I am not sure why it has happened ?  May be some inconsistency, but if you wanted to check than change the date of project and try to reverse the GI.  The the project date is not having any direct linkage with WBS posting.
    With regards
    Nitin P.

  • Error while doing Good Issue for Production Order using BAPI

    Hi All,
    I am facing an error like 'u2018Content of order 1011907: MDT218AJ10 transferred to interface (IMSEG): T-86410-71".
    I have written the code as below. Please let me know what is missing when using the BAPI 'BAPI_GOODSMVT_CREATE'. What is the cause of this error ?
    *Action in Transaction (GM_CODE)
    *GM Code for Goods Issue for Production Order is 03
      gs_gmcode-gm_code = '03'.
    *Header Data
    *Posting date
      gs_header-pstng_date = sy-datum.
    *Document date
      gs_header-doc_date   = sy-datum.
    *Item Data
    *Material
      gs_item-material  = zptp_s_rf_migo_261-matnr1.
    *Movement Type
      gs_item-move_type = '261'.
    *Movement Indicator
      gs_item-mvt_ind   = 'F'.
    *Stock Type
      gs_item-stck_type = 'F'.
    *Plant
      gs_item-plant     = gv_plant.
    *Storage Location
      gs_item-stge_loc  = gv_str_loc.
    *Quantity
      gs_item-entry_qnt = zptp_s_rf_migo_261-menge2.
    *Unit
      gs_item-entry_uom = gv_uom.
    *ISO code for unit of measurement
      gs_item-entry_uom_iso = gv_uom.
    *Order Number
      CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
        EXPORTING
          input  = zptp_s_rf_migo_261-aufnr
        IMPORTING
          output = gs_item-orderid.
    *Reservation Number
      gs_item-reserv_no = gv_resv_num.
    *Reservation Item
      gs_item-res_item = gv_resv_itm.
    *Reservation Type
      gs_item-res_type = gv_resv_type.
      APPEND gs_item TO gt_item.
    Calling BAPI_GOODSMVT_CREATE to create the Material Document Number
      CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
        EXPORTING
          goodsmvt_header       = gs_header
          goodsmvt_code         = gs_gmcode
        IMPORTING
          goodsmvt_headret      = gs_headret
        TABLES
          goodsmvt_item         = gt_item
          goodsmvt_serialnumber = gt_serial
          return                = gt_return.
    Thanks in Advance.

    hi,
    did you look at message ?
    System says, there are differences between the interface data and the order data. It can be anything. I think you should check
    data in the interface . 
    this is the long explanation of your message :
    Diagnosis
    When calling the function module MB_CREATE_GOODS_MOVEMENT or the BAPI GoodsMovement.CreateFromData (BAPI_GOODSMVT_CREATE) to post a goods receipt for a production order, there are differences between the interface data and the order data.
    Example: The order was created for plant 0001, but plant 0002 is passed on in the interface.
    The system checks this for the material and the order item.
    System response
    Due to this difference, the system cannot post the goods receipt.
    Procedure
    Check the data in the interface (IMSEG-WERKS, IMSEG-AUFNR). If necessary, correct the plant or the order number in the interface.
    << Moderator message - Point begging removed >>
    Edited by: Rob Burbank on Feb 6, 2012 11:24 AM

  • Dump while doing goods issue against order with movement type 261

    Hi Team,
    We are integrating Asset management process along with the goods issue against the order which is created with a business partner for movement type 261.
    when we try to complete the process the system gives us a dump as described below.
    please look through the dump and advice for the same.
    Short text
        The current application triggered a termination with a short dump.
    What happened?
        The current application program detected a situation which really
        should not occur. Therefore, a termination with a short dump was
        triggered on purpose by the key word MESSAGE (type X).
    Error analysis
        Short text of error message:
        System error in the FI/CO interface
        Long text of error message:
         Diagnosis
             Updating of the FI/CO interface was called with object type "MKPF"
             yet the checks were run for object type "AMBU".
         System Response
             Checking and updating must be for the same object type.
         Procedure
             It has to do with a system error from the calling applications.
        Technical information about the message:
        Message class....... "RW"
        Number.............. 103
        Variable 1.......... "MKPF"
        Variable 2.......... "AMBU"
       Variable 3.......... " "
       Variable 4.......... " "
    rigger Location of Runtime Error
       Program                                 SAPLMBWL
       Include                                 LMBWLU21
       Row                                     62
       Module type                             (FUNCTION)
       Module Name                             MB_POST_GOODS_MOVEMENT
    46    IF xmkpf-xabln IS INITIAL.                               "note 434093
    47        CALL FUNCTION 'MB_XAB_NUMBER_GET'.                   "note 434093
    48    ENDIF.                                                   "note 434093
    49
    50 ENHANCEMENT-POINT MB_POST_GOODS_MOVEMENTS_01 SPOTS ES_SAPLMBWL STATIC.
    51
    52 ENHANCEMENT-POINT MB_POST_GOODS_MOVEMENTS_02 SPOTS ES_SAPLMBWL.
    53    CALL FUNCTION 'MB_CREATE_MATERIAL_DOCUMENT_UT'
    54         EXCEPTIONS
    55           error_message = 4.
    56 *  As soon as we have started to put things into UPDATE TASK, we must
    57 *  ensure that errors definitely terminate the transaction.
    58 *  MESSAGE A is not sufficient because it can be catched from
    59 *  external callers which COMMIT WORK afterwards, resulting in
    60 *  incomplete updates. Read note 385830 for the full story.
    61    IF NOT sy-subrc IS INITIAL.
    >>>       MESSAGE ID sy-msgid TYPE x NUMBER sy-msgno WITH            "385830
    63                  sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
    64 *     MESSAGE A263.
    65    ENDIF.
    66 * Optische Archivierung
    67 * Spaete Erfassung mit Barcode
    68 * Redesign of barcode handling -> note 780365
    69   PERFORM barcode_update(sapmm07m) USING xmkpf-mblnr
    70                                          xmkpf-mjahr
    71                                          barcode.
    72
    73   MOVE-CORRESPONDING xmkpf TO emkpf.
    74   CALL FUNCTION 'MB_MOVEMENTS_REFRESH'
    75     EXCEPTIONS
    76       error_message = 4.
    77    MOVE-CORRESPONDING xmkpf TO emkpf.
    ource Code Extract
    ine  SourceCde
      32 *    BKPF as well. There is no other way to forward XBLNR to FI as not
      33 *    every document is posted by MB_CREATE -> a new function module in
      34 *    MBWL for transferring the information, called by FI, meant to load
      35 *    the complete function group for all MBxx postings when this isn't
      36 *    required (Performance). Would be the better way to transport the
      37 *    information after switching off MBxx in later release.
      38 *    corresponding IMPORT ... FROM MEMORY ... can be found in
      39 *    AC_DOCUMENT_POST (FORM FI_DOCUMENT_PREPARE (LFACIF5D))
      40      l_mem_id = 'MKPF-XBLNR'.                                   " 641365
      41      EXPORT xblnr = xblnr_sd TO MEMORY ID l_mem_id.             " 641365
      42    ELSE.                                                        "1245374
      43      l_mem_id = 'MKPF-XBLNR'.                                   "1245374
      44      FREE MEMORY ID l_mem_id.                                   "1245374
      45    ENDIF.

    Couple of notes are mentioned (385830, 780365 etc) and check whether these notes are applied.  If so, check with the ABAPer and go through the source code corrections explained in the respective notes.
    You may also go through the following notes
    1)  Note 386656 - FBV4: RW103 'System error in the FI/CO interface'
    2)  Note 388316 - RW103 "System error in the FI/CO interface"
    3) Note 543463 - Inconsistent Posting in budgetary ledger and/or RW102/RW103
    thanks
    G. Lakshmipathi

  • Order Type wise GL Account While doing Good Issue.

    Dear All,
    Good Day,
    We have Different types of Plant Maintenance Order , now when we do Goods Issue against the order we need specific GL Account based on Order type.
    Example: Preventive Order should need XXXX GL Account
                   Corrective Order Should need YYYY GL Account.
    thanks in advance.
    Best Regards,
    KSK

    hi
    when any material is issued against the order the G/L account will capture according the valuation class specified in the material master record and the corresponding cost element assigned to the valuation class.
    once you get the material and after the work is completed you can settle the cost to the G/L account provided the settlement profile allows that.here you can maintain different settlement profile to the each order type
    regards
    thyagarajan

  • Costing for Miscellaneous issue transaction for project

    We have a different requirement from the business
    ours is R&D and we are using Oracle projects to track our projects costing and billing
    we procure some material from outside supplier and it will get costed to the project but when any engineer want to use the material they want to reduce the material from the inventory by they dont want the cost to get reduced from the project
    usually engineers take the material by doing miscellaneous issue for some testing and they never get in to the project again it will be treated as samples
    currently when i do the miscellaneous issue it reduces the inventory from project and also the cost will get reduced.
    Can someone help me out since it is very critical for us to acheive this,
    Regards
    Lavanya

    D
    Dear Lavanya,
    The material should be first reeived to Inventort then transferred to projects
    Ex        100 Quantity is Received @ 10 Each - Inventory Material value will be 1000   Unit Price 10
    Now     10 Quantity is Issued(Samples) @ 0 each -       Inventory material Value will be 1000   Unit Price  11.11
    Now Transfer the remaining quantity to Projects i,e 90 quantity, & inventory material value will be 1000, unit price will be 11.11 (Use Project related Misc Transaction for Project Issues)
    Even though material is issued with 0 unit price A/c entries will be generated
    Dr. Given A/c
    Cr. Inventory material value A/c
    Here first the material is directly received into Inventory (Not related to projects organization) Miscellaneous Issue (For samples) is done with 0 unit cost after that The material is transferred to projects (Project Issues)
    For Miscellaneous Issue (Samples Issue) a Personalization is need to done such that the Unit price will be freeze to 0.
    Regards
    Shaan

Maybe you are looking for

  • How to bind "Image Field" object on a database

    Hi to all I inserted into a dynamic PDF (Livecycle ES3 trial) an image field, but I don't understand how I can to bind a JPG into a database. In (F5) preview... I'm able to open a image file on filesystem and visualize it on PDF form... but then? How

  • Yosemite update left me with white screen.  How do I recover?

    Yosemite update from App Store has left me with a white screen and I can do nothing!  How do I recover or complete installation?

  • 'Skip when shuffling' using Apple TV

    Listening to iTunes on the MAC, I can 'skip when shuffling' but when listening to iTunes using Apple TV, all the songs play. How do I 'skip when shuffling' while listening through Apple TV?

  • Creating PDF the same size as the original

    I have a TIF created in Photoshop CS2 and I'm trying to create a PDF that's the same size as the original (3 x 2 inches). What is the secret? I'm pretty sure I've done this before, but I can't figure out what to select for Paper Size to make this hap

  • Why has my iTunes account been disabled and why has support failed to reenable it?

    On April 17, 2011, I discovered that my iTunes account had been disabled when I tried to update apps that I had purchased. Repeated emails to iTunes support have failed to reenable the account, and now several of my apps are unusable because I cannot