We are using SAP BO XI R3 version in our project TEST windows 2003 server.
we have designed the universe in TEST BO Server and it's working great.
Now, we would like to move/migrate the universe created in TEST Server to the PROD server.
please let me know the migration steps [step by step procedure - documents] in getting the universe available in PROD server as well.
Note: We are using SAP BO XI R2 version in PROD server & XI R3 in TEST Server respectively in separate physical machine .
Regards,
Karthik

Thanks for your support Henry. I agree with your point.
I have 1 quick question: if we copy the .unv file from TEST BO R3 server and paste the same .unv file to PROD BO R2 server, will it be available for importing in PROD BO R2 Server [to do modification in connection settings (connection to pointing PROD DB)]?
If yes, we can copy [not export (no use of tool)] manually the .unv file from TEST R3 server and paste it manually in PROD R2 Machine under universes folder and make any modification like changing the connections....etc.,
Please let me know if this approach works fine with no issues. Because its going to be done in PROD.
Many Thanks,
Karthik.

Similar Messages

  • Migration procedure from Forte 30M to UDS 5.0.x

    Is there any documment that describes the migration procedure from Forte 30M Conductor 10M to UDS 5.0.xIS 3.0.x
    thanks in advance,
    Lorenzo.

    There is one for migrating for Forte 3.x to UDS 5.01. Your SUN rep is the best source to provide you that information. I have no information about Conductor but I will see if I can find any.

  • How to migrate Planning from Production to Disaster-Recovery server?

    We are using Planning 11.1.1.3 Oracle repository. Presently our DR Planning Application name is different than production's name, and the DR's Windows server names are different from Production's. Otherwise, all other configuration the same.
    How do we migrate Planning from Production to Disaster-Recovery server? We stopped Planning on DR server. Then we exported production planning Oracle repository and imported it to DR Planning. We restarted DR's Planning. DR planning seems to be running fine, but I am afraid to click "Refresh Planning" on DR Planning - it might update Production server. So how can I be sure DR and Production planning are disconnected ?
    Is there anything we need to do? This method seems to be faster than migrating with LCM.
    Edited by: Essbase Fan on Oct 18, 2010 10:11 AM

    You are definitely go about it the correct way, if you are migrating the whole planning application I have to agree it is a safer and quicker route.
    The connection information to essbase is stored in the planning system database/schema so as long as you have not migrated that then you should be good to refresh.
    To put your mind at rest, log into the planning application and edit the datasource associated with the application then you will see where the essbase server is it is going to refresh.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Essbase migration procedure from Unix to NT

    Does anyone have a procedure to migrate essbase from unix to wondows NT? I know that is a procedure in installation guide Ch.10, but I think it is just for the NT to NT..

    we did this last year. export the data from the databases to a text file, use level 0 if you only load at level 0.after installing essbase on nt, add the same name apps and dbs in nt, connect to the unix & nt servers in appman, copy the outlines/dbs from unix to nt. load the data from your exports.copy all the object files eg .csc, .rpt, etc from the unix server, reset all server, app and db settings, including cfg file and recalc.we recreated security ids, groups and filters

  • Migrating data from Oracle 9i to SQL Server 2005

    I am new to both. I need to first migrate data from oracle to sql server. After this I need to create a daily nightly batch process to insert new records from oracle to sql server into that table.
    As my knowledge in SQL server is zero. Can somebody help me how I can accomplish this.
    Somebody told me that I can use sql server import/export to do initial data dump into sql server and after that I can create a link in in oracle to do new iserts for new records. does any one have some example on this. I will really apprecite this if someone can give me step by step example. Thanks

    I have been to SQL Server training, but my SQL server databases are off the shelf system, so I don't have to muck with them. Anyway, Sql Server is just MS Access on steroids, so some of the same concepts apply. You need to create an external table links to oracle. The following tidbits I found by googling might help you.
    http://www.sqlmag.com/Article/ArticleID/22264/sql_server_22264.html
    http://www.lazydba.com/sql/1__152.html
    http://www.sswug.org/see/35034
    http://decipherinfosys.wordpress.com/2007/07/16/linked-servers-in-sql-server/
    Some of the above require subscriptions (free and or paid). Hope this helps.

  • Migrating PS from test to production server

    Hi,
    I'm going on a evaluation test for PS. It's installed and configured on a temporary server (the test server) and working fine. The next step is to have this working on the "real" environment, it means in the production server.
    What will happen with the documents I've already applied a policy? Can i use this documents with the new installation? Will the documents be managed with the new server?
    Thanks, regards.

    Given this, I think I would be inclined to set up a virtual server or
    DNS alias for the production server, like
    adobepolicyserver.mycompany.com.
    That way, you can freely move the policy server function around by
    moving the software and changing the alias. If you simply use a name
    assigned to the server for another purpose, you could hit the
    situation where someone else decides that name has to change for
    administrative reasons, or where e.g. there come to be two production
    servers and someone decides Policy Server needs to move to the second
    one to balance the load.
    Aandi Inston

  • Migration Procedure from Essbase 9.3.3 to 11.1.2.1

    Hi,
    Could you please let me know the procedure or steps to Migrate from Essbase 9.3.3 to 11.1.2.1
    Thanks

    Have you done any research like search this forum before posting, migrations have been covered lots of times on here.
    Also if you are talking about upgrading the server components then there is documentation available - http://download.oracle.com/docs/cd/E17236_01/nav/portal_1.htm
    Cheers
    John
    htp://john-goodwin.blogspot.com/

  • Need help migrating users from dead 10.4.0 server to 10.5.8 server

    Hello,
    We have an ancient xserv (G4, SCSI drives I think) that was running 10.4.0 server, serving http, AFP and SMB, and doing the streaming for the college radio station to the internet(qt broadcaster was sending from another machine to this machine).
    Apples recommended process for migration to a new machine is to first upgrade to 10.4.1 before exporting. However, the hard drive on this machine is as ancient as it is and the initial install process failed with an error, leaving the machine unbootable.
    I used CCC to make a copy of the os to an identical drive, but this is not bootable either, nor can I sucessfully upgrade it to another version.
    Is there some way to move all the config to the new server (MacPro running 10.5.8) without exporting from the old server, since this is not possible?
    There are hundreds of users and user websites. I copied the websites over to the user folder and they are accessable but not by the original urls.
    Thanks,
    Joel

    posted in wrong section sorry

  • Migrating BO from Windows 2000 to 2003 Server

    Post Author: Eric Van Steenbergen
    CA Forum: Older Products
    Hello,We're planning migration of our Windows 2000 Server to a Windows 2003 Server. Can anyone advice how to proceed regarding following issues:- repository is running on different server than that on which BO is installed.- authentication is still running on the server where repository was installed at first (later moved to current server).To make it clearer:Server1 = applicationServer2 = repository (authentication)Server3 = database (universe)With migration to the new server (server2 will be replaced) we'll have to change the authentication to point to the database server (universe). What do we have to change at the application level on server1?Any advice is greatly appreciated.Kind regards, Eric Van SteenbergenBTC [email protected] 

    FRM-40039 is a Forms error, and Forms doesnt use ODBC. You'll probably get better help posting in the forum appropriate for that product. Unfortunately I'm not sure exactly what the forum is :(
    Greg

  • Migrating Parties from Covast 2006 to BizTalk Server 2013

    Guys,
    I have around 300 EDI Covast parties setup in Biztalk Server 2006 and now we are upgrading these applications to BizTalk Server 2013. Is there anyway to get these parties migrated to BTS 2013 and create parties/agreements programatically.
    Any help will be greatly appreciated.
    Thanks,
    Sam

    You may have to upgrade to BizTalk 2006 R2 and then use the Party Migration Tool [refer
    http://msdn.microsoft.com/en-us/library/hh183963.aspx] to migrate your parties.
    You can also refer
    http://technet.microsoft.com/library/bb259970(v=bts.80).aspx for 2013 specific Trading Partner Management Activities.
    Regards.

  • Migrating mail from Communigate Pro to OSX Server

    Does anyone by any chance have any experience of this and can advise if there's a way to achieve it other than the obvious (create new mail accounts, get users to drag everything over folder by folder) approach?
    I have a client with Communigate Pro who recently upgraded his OSX server to 10.6 and fancies dumping Communigate and going back to Postfix.

    The power in your computer is fine.  I was just trying to warn you that if any network requests come in the server configuration immediately priorises that higher than interacting with the user sitting that the keyboard.  Apps you are using may stutter until the network request has been answered.  Of course, if you don't have many network users and with a computer that powerful, it probably won't take the server long enough to answer the network request that you notice any problem.
    No webmail portal for mail, and no easy way to add one.  Just mail apps using POP, SMTP, etc..
    Here's the manual for OS X Server if you're interested:
    https://help.apple.com/advancedserveradmin/mac/10.8/

  • How to migrate xml report from test to prod?

    Hi,
    We are using BIP 10.1.3.2 standalone. I've one simple question for migrating report from test enviornment to production.
    Is there any standard method for migration?
    Like in Discoverer we can simply export report and import it in prod environment.
    Thanks...

    Thanks for your reply. That's one describes for EBS version of BIP. I'm looking for standalone version of BIP enterprise.

  • Migrating users from SBS 2003 to OSX leopard Server

    Hello All,
    We are preparing to migrate away from SBS2003 to an OSX server setup.
    Currently all clients are mac with a few bootcamped PC's onto the macintosh hardware.
    We will be using kerio to migrate the mail off from exchange.
    My question is if there is a way to move the current users home folders on SBS to the mac server ala replication, i heard you could make the mac server a DC and then demote it to standalone ? is this possible or does everything have to be 'built from scratch' im assuming of course EVERYTHING is reliant on OSX leopard servers DNS being setup correctly from the get go.
    Any help / tips/ cavaets / would be a huge help.
    Best

    unanswered

  • Migrating data from oracle to sql server

    I have two databases(Oracle and Sql Server) in my company.
    I want to migrate some data on daily basis from Oracle to Sql Server.
    what are the best methodologies used to perform this task?
    Can we schedule this task on daily basis?
    please help me guys

    Salma,
    First and foremost, you need to understand that there are architectural difference between Oracle and SQL Server (with the major one being the difference between Oracle's PL/SQL and Microsoft's Transact-SQL) thus, it will not be an easy task to migrate data from Oracle Database to SQL Server. As far as the use of tools is concerned, you can utilize the following tools (third party tools not recommended) to achieve this:
    Microsoft SQL Server Migration Assistant (Oracle to SQL)
    http://www.microsoft.com/sqlserver/2005/en/us/migration-oracle.aspx
    Oracle SQL Developer Migration Workbench (SQL to Oracle)
    http://www.oracle.com/technology/tech/migration//workbench/index_sqldev_omwb.html
    But before proceeding with anything, I would recommend you to read through the following post as it lists down the primary compatibility resources and migration guidelines:
    Migrating from Oracle to SQL Server
    http://vyaskn.tripod.com/oracle_sql_server_differences_equivalents.htm
    Hope this helps.
    Regards,
    Naveed.

  • Migration or Deployment from one server to another server!

    Hi All,
    We have a new Business Objects XI R2 SP1 production server installed in a remote location, and my client wants to migrate everything from the old BO Production server to the new server.Is there any way to do? Initially I tried using Import wizard, but it couldn't recognize the port and CMS server (They have 2 different gateways, not in a same network). I tried using BIAR file but while in the creation it doesnot archived the reports and their instances with showing 0 transfered or converted. Appreciated if anyone could give solution to my problem.
    Thanks,
    Kalyan.

    We have a BO XI R2 server running in C:\ drive and the FRS was in E:\ drive and recently we installed a new new server. I have question that when we use Import Wizard, does the FRS folder will copy to the same E:\ drive or it will copy every thing to the C:\  FRS folder.
    When we use import wizard does the users and their privileages setups will also move or we need to again re-create the users and their perivileages.
    kindly please some help!
    thankz,
    Kalyan.

Maybe you are looking for

  • Adobe ends your audio nightmares once and for all!

    Are you plagued occasionally, like me, with less than perfect audio? Fret no more. Adobe has the solution and you don't have to pay a fortune, as the technology is available in their budget Premiere Elements. Take a look at this in-depth tutorial (be

  • Sap pi 7.0

    Hi Experts, I am configuring a scenario in PI 7.0: snd to IP to R3. The mapping has used inside ccBPM. In the map one target field need to populate with receiver system name. So I am using Receiver function(standard function) to populate that. But un

  • Multi-Source Universe - Swapping Connections a disaster-Connection can not be registered

    Dear Experts, 1. What is the best way to swap connections with in an environment? For example, in DEV environment I want to use another environment like integrated environment's DB? I have to change all the table owners manually and if I have derived

  • TREX: indexing problem

    Hi, I'm trying to configure TREX in our portal. I've created an index (search index) and I've assigned data to index (html files and pdf files). When I test the indexing process in the TREX Monitor, I always see that some pdf files aren't indexed. I

  • WLC DHCP question

    Hi all Is it possible to issue a static IP address to a user using the WLC's built-in DHCP server? Each time I connect to a different WLAN and then reconnect to the WLC WLAN, I get a different IP address, even though I've reconnected before the lease