Unlinear axis in graphs

Hi,
I'm wondering if there is a way to have the Y-axis unlinear in a graph?
// Erik Swenson

"Erik Swenson" wrote:
>>Hi,>>I'm wondering if there is a way to have the Y-axis unlinear in a graph?>>//
Erik Swenson
Hi
Absolutely! in X/Y & Waveform Graph you can
change the X&Y scale, by selecting the formatting X or Y and change the mapping
mode.

Similar Messages

  • Date on X axis in graph

    In which type of graph I could get date on X axis in graph other than line and bar. My graph has date in x axis and aggregate in y axis and a bubble in z axis which graph will support it.

    this is to john
    when drag and drop gantt>resource utilzation
    i try use some date to display gantt but throws error.
    so my question.? can we use date in gantt>resource utilzation.
    if i remove date. it looks fine.

  • Re: How to have more than one vertical axis in graphs...

    As a matter of fact, there is a library of dual-Y-axis controls, developed
    by National Instruments, but for some reason it did not make it into the
    official release. I've been using it under v.5.01 quite successfully. The
    only problem with it is that if you try to edit it using control editor, LV
    crashes (under v.5.1 and WinNT 4).
    -- Sergey Liberman
    -- Don't use Reply button! Thank you.

    I'm running into the same problem... can somewhere give me a pointer
    to where I might find a library like this? I have done the "put
    the y-axis on the right side of the second graph" and it works pretty
    well, but I'd like to see how other people might do it.
    Hopefully the LabView folk will also implement a scrollbar for X-Y plots
    (like they have for the charts) sometime... sometimes strip charts aren't
    sampled evenly.
    Andrew Berkley
    Physics Department
    University of Maryland
    RE:
    >> As a matter of fact, there is a library of dual-Y-axis controls, developed
    >> by National Instruments, but for some reason it did not make it into the
    >> official release...

  • Y2 axis in graph is only numeric, iwant to put a date column

    Hi,
    I want to create a report in report 10g have a graph (chart), i want it to be like this :
    X2 axis : Sequance id (Number Column)
    Y2 axis : End-date , Start date (Date Column)
    But when i create it , there is no possible to put a date colunm in Y2 axis.
    So, plz is there any way to in Y2 axis a date column ??
    Plz is there away to put a date column in Y2 axis in Report 10g ???

    Any help ?

  • Dynamicly set y axis on graph with 0 always being in center

    i have a report that i want to dynamicly set the y axis as the values change from contract to contract. but i want to maintain that 0 will always be in the center of the graph.
    if i use the auto range and auto scale it shifts 0 away from the center.
    any ideas?

    Don't use auto range?
    Sorry, I don't mean to be a smart-alec, but Crystal's charts are not very flexable. I understand they are working on it.
    Debi

  • Reverse y axis in graph

    How do I reverse the plot on a graph without using negative numbers?

    Jerry,
    I'm plotting data points, not a function so the Grapher.app isn't much help to me, but thanks for telling me about it (might be useful later). Having the y axis reversed isn't as important to me as having the x and y axis crossing at zero. I don't mind having the downward values as minus (as is normal), but now if I plot it the x and y axis don't cross at zero!! Surely this is a basic feature that should be available?
    If possible maybe you could let me know of any other tricks or overrides that might be useful?
    Badunit,
    Thanks for your suggestion, I already tried that method, and as I said before my main problem is the x and y axis not crossing at zero (I'm studying engineering so they are very fussy about these details, and personally I'm a bit of a perfectionist), also manually putting in the x axis for 50+ graphs (all with varying scales) is something I'd rather avoid!

  • Size  marker  and time axis scatter graph

    1.Can we increase default size of marker in scatter graph?
    2.Also, for the time axis can we format the date to be able to show (mm/dd/yyyy) for all the values on axis rather than just the first one ?

    Hello,
    I still didn't find a solution.
    I can show the data in the bar graph or in line graph, but not in scatter graph. In the scatter graph, there could be set for x and y axis just number values.
    But is it really not possible to create the graph with time x-axis and number(or string) y-axis?
    Has our customer so special requirement? Or is there no answer because it's so easy?
    In the previous post, I've forgotten to write that my version is 11.1.2.1.0.
    Regards,
    Qjeta

  • Can't Title 2nd Axis on Graph

    Post Author: jlspublic
    CA Forum: General
    I have a graph with two Y axes.  On the Chart Options dialog, Titles tab, whatever I enter in the Data2 Title box is discarded when I click OK.  Based on posts to the old Forums, this appears to be a bug that has been around since at least 2002.  Anyone have any idea how to get this to work properly?  Any workarounds?  I am using CR XI Developer (version 11.5.0.313).-JLS

    first create the directory ocfs in /mnt and then mount, it will get mounted
    give the following command after having created the directory
    mount -t ocfs2 -o datavolume,nointr /dev/sdb1 /mnt/ocfs
    it will work defenitely!

  • How to draw x y axis bar graph wih report in output

    Hi Experts
    I have seen most of the thread rgarding Graphs.but my requirement is not meeting with them
    i am creating  simple report in which in output 1st showing consolidate data for material in a table
    and below them i want to show graph for material .
    i dont want to open graph in diffrent window.
    Thanks

    solved

  • How to display no. of seconds in HH:MM:SS format on Y-Axis in Line Graph

    Hi All,
    I have two columns as No. of Seconds and Date.
    I want to create a Line Graph with Date on Horizontal Axis (X - Axis) and, on Vertical Axis (Y - Axis) I want to represent the No. of Seconds as HH:MM:SS format.
    For example, If the DB returns No. of Seconds as 93, I want to get it on Vertical Axis as 00:01:33 (00 hours, 01 Minute, 33 seconds), If it is 145 seconds , I want to get it as 00:02:25....etc.
    Can anyone please help me on this ?

    Srini VEERAVALLI I already used this code and I'm getting HH:MM:SS format in Table View, but my requirement is I need to represent the HH:MM:SS format on Vertical Axis in Graph View. In Graph View by default it's considering No. of Seconds only.....
    Srini VEERAVALLI, is your full name is Srinivas Veeravalli ?

  • How to set the 4th Y axis color for a line graph

    Hello experts,
    I have developed a multiple y axis line graph using oracle reports 10g.
    It has got 1 x axis and 4 axes. I am able to set the color of the the first three y axes
    but the reports designer automatically assigns yellow color to the 4th axis.
    I mean there is no option in the graph wizard for changing the 4th color)
    How to change the color of this 4th y axis to a desired color?
    Cheers
    Sri

    Assuming you mean that your graph has 4 series, not 4 Y axes, you might try something like this:
    1. Save a backup copy of your current report in case the changes you are about to make don't work out and you want to revert to the backup copy.
    2. Using the Property Inspector, display the current value of the Graph Settings property for your graph. The value of the property should be something like:
    <rw:graph id...
    </rw:graph>3. Look for a <SeriesItems> tag and a matching </SeriesItems> tag in the property value. If you don't find them, add the following two lines immediately before the </Graph> tag.
    <SeriesItems>
    </SeriesItems>4. Between the <SeriesItems> tag and the matching </SeriesItems> tag, add (or update) a <Series> tag for each series that you want to specify the color for. For example, to specify the color of the fourth series as red, you would use a <Series> tag like this:
    <Series id="3" color="#ff0000"/>Note that the id numbers start at 0 for the first series, 1 for the second, and so on. The color value is a hexadecimal number specifying the RGB value of the color.
    You can also use the <Series> tag to specify other features like the marker shape.
    For more information on what you can do using the Graph Settings property, see this FAQ and Technical Note.
    Hope this helps.

  • Graph / Chart show system time in X-Axis.

    I try to plot the temperature graph/ chart with respect to my system time. The problem is that the if i select the relative time it starts from 00:00 and if i select absolute time it always starts from 05:00 in 24Hrs.
    I need X-Axis Chart/Graph show my system time and in Y- Axis it show the Temperature value which is received from serial port.
    Attachments:
    Temperature Recorder.vi ‏100 KB

    First I am very thankful to you for your kind cooperation. As I am beginner
    my questions may be the unintelligent.
    I have tried it and now the system time shows in graph. I have also a time
    sync problem. After initializing graph with the time being the value of time
    does not match with system time. Some time it is faster with respect
    to system clock and some time it is slower with respect to system clock. I
    observed it is slow when the data of graph is 1 byte long and when the data is
    2 or 3 bytes long it goes fast.
    The another problem is the chart Y-Axis Interpret HEX value (00 to FF) means 0-255
    points only. My data is ASCII string with 4 characters like ‘9562’. Every character
    will show the weightage as shown in attached file. I want to use the same ASCII
    string to the input of graph for single point. Instead of HEX value (00 to FF).
    And the another help from your side can you send me the book name or softcopy of LAB
    View tutorial (Easy understandable).
    Regards,
    Azhar
    Attachments:
    data.JPG ‏79 KB

  • Conditional formatting a graph vertical axis in SSRS 2012 charts

    Hi,
    I have a situation where i want to color the label on vertical axis of graph depending on certain condition. Say when values are positive the color would be Black and when negative color would be Red.
    I tried following condition but its not working.  
    =iif(Fields!MyField.Value < 0 , "Red", "Black")
    I know there are few threads already mentioning that this feature is not supported in SSRS 2008 but just wanted to know if its adddressed in SSRS 2012 or later?
    Thanks and Regards,
    Oliver D'mello

    Hi Oliver,
    According to your description, you want to use an expression to specify different color for Axis Labels based on values in a chart.
    As we tested in our environment, when we apply condition in expression to give dynamic color for Axis Labels, the color setting applies to all labels based on the condition. This issue happens in both SQL Server 2012 and 2014. Please refer to the screenshots
    below:
    In this scenario, I would recommend you submit this issue to the Microsoft Connect at this link
    https://connect.microsoft.com/SQLServer/Feedback. This connect site will serve as a connecting point between you and Microsoft, and ultimately the large community for you and Microsoft
    to interact with. Your feedback enables Microsoft to offer the best software and deliver superior services, meanwhile you can learn more about and contribute to the exciting projects on Microsoft Connect.
    If you have any question, please feel free to ask.
    Best regards,
    Qiuyun Yu

  • Load excel file value to graph problem(about x-axis value)

    Hello,everyone,I have this problem.
    When I load the excel file which I saved before,the waveform came out normally,but the x-axis of graph waveform was not shown the number I want,it shown the number based on the no.of samples.
    What I want is plot the x-axis value based on the rate(pts/s).For this case,rate is 50prs/s,so after calculation...0.02s per reading.totally is 20 seconds.I tried to use XY-Graph,but didn't solve out.
    Jerry
    LV 7.1
    Attachments:
    delete 0 array.vi ‏14 KB
    test3.txt ‏20 KB
    Create Waveform Graph1.vi ‏275 KB

    is it always 0.02s per reading or did you get this figure from some calculation?? in anyway, you just connect that value (the constant 0.02 or calculated amount) to a Property Node... you link the Property Node to Waveform Graph 2... under property choose X-Scale -> Offset and Multiplier -> Multiplier...
    i'm not sure if this is the best method but hope it helps... i've tried it on your code and it works...
    Best Regards,
    JQ
    LV 8.0 user...

  • Axis marker setting of Graph control

    Hi, I want to set specific markers for the axis of graph control,  first, I try to use property node, but  I can't find appropriate property to set marker of axis;
    I am thinking the axis should looks like:
    X  Axis: 0(min), 90, 180, 270, 360;
    Y Axis: 0, 10, 40, 80, 120;
    Z Axis: 0, 5, 10, 25, 50;

    it seems the Increment setting can do that

Maybe you are looking for

  • Using oracle decode function in ssQueryText

    Hi, I am populating the values for ssQueryText, ssSortField etc from the fragment parameters. Then i am using these field values in fragment jsp, put those values in the serverbean and executing the service. I am getting the results, and the results

  • Connecting laptop to WRT350N and wireless security

    Hi, I have the following problem. I need to connect a laptop to WRT350N router. Everything works OK if I do NOT use wireless security. If I use PSK (WAP) then at the Preferred Network screen I set the settings to WAP/PSK and enter the shared key. How

  • Bluetooth usb dongle support

    hi i am new to forum and java I am going to buy bluetooth usb dongle .I want to know that by having 2 dongles can I run my java socket programs to transfer data's or files between two PC's .is there anything like java supported bluetooth usb dongle i

  • Cannot make Continuity phone calls from Mac OS X Yosemite beta 10.10.3

    Hi, I don't remember which beta update it was, but perhaps one or two after the initial beta, Continuity is not working for me any longer. I always receive a "is unavailable" error when trying to make audio calls. I can still send SMS messages from m

  • ActiveSync Failures After Migration to Exchange 2013

    Hi all,  I am having an issue with ActiveSync a single mailbox that has been migrated from Exchange 2007 to 2013. After the mailbox was migrated to 2013 it continued to sync as normal for a week or so. After removing the exchange 2007 server (uninsta