Up gradation Issues from 11.1.2.1 to 11.1.2.2 especially for SSL envrionmen

Hi All,
We are going for an up gradation from Hyperion 11.1.2.1 to Hyperion 11.1.2.2. All the products configured with SSL. I would like to know whether is there an impact in SSL configuration or not.
Products Installed in Hyperion 11.1.2.1 in Distributed Environment
Hyperion Planning
HFM
FR
Thanks

If you are configuring EPM System products for SSL, the configuration sequence and selections that you make during configuration depend on the type of SSL implementation you choose.
http://docs.oracle.com/cd/E17236_01/epm.1112/epm_security_1112200.pdf

Similar Messages

  • Cannot send email from my iPhone or iPad. The server rejects a recepient for no apparent reason.  The recipient is not new.  This issue happens on reply or reply to all or froward; not a new email. What is happening?

    Cannot send email from my iPhone or iPad. The server rejects a recepient for no apparent reason.  The recipient is not new.  This issue happens on reply or reply to all or froward; not a new email to the same recepient. What is happening?

    I talked with a tech today and he said I cloud is having problems which should be resolved shortly.
    In the mean time I used the .me smtp server settings which allowed me to send mail.

  • How can I get back old issues from my TIME app?

    Hi, I hope someone can help me.  I've been trying to get help for a month now.  I had purchased several issues from TIME app but when I just got my ipad 2, I couldn't get the issues back.  I used the same ID and password.  I decided to try buying a new issue and when I did, I had an email from itunes warning me that it was not my usual ID.  I am very confused.  I wrote to TIME and they say I should contact itunes.  I have spent hours trying to contact itunes for help.  They seem uncontactable.  Can someone please tell me if I can somehow get my old issues back?
    Karen

    If they were not backed up or part of photostream, then no, you cannot.

  • Since i got the new Iphone 4s it constantly drops calls. Apple have replaced the phone with another new iphone 4s but i am still having the same problem. I have checked with vodapohe that there is no issue from there end, given a new sim, still drops out

    Since i got the new Iphone 4s it constantly drops calls. Apple have replaced the phone with another new iphone 4s but i am still having the same problem. I have checked with vodapohe that there is no issue from there end, given a new sim, still drops out

    Have a look at this it might help
    http://support.apple.com/kb/TS4148

  • Goods Issue from ECP with Batch Management

    Hi experts,
    I would like to make a Goods Issue from Execution Services in Easy Cost Planning. But the material has Batch Management active and I am not able to inform the batch.
    I know I can make the same movement from MB1B but I would like to do it from the Easy Cost Planning environment.
    Is it possible?
    Thanks

    mforman wrote:
    We already have the batch and deactivating batch management has no sense.
    > We need to be able to inform the batch when we are making the goods issue from the Execution Services.
    Dear,
    I think you can solve this through your Characteristics in the Costing Model. In the Characteristic Edit Screen, Goto Values tab, Select your material and click on Object Dependecies Button, see if you can use or create a new Dependency for your material for picking or suggesting batch number.
    Hope this helps...
    Thanks,
    Ranganatha. Patnala
    Edited by: Ranganatha Rao.P on Oct 14, 2011 2:59 PM

  • How to do Goods Issue from Sales Order Stock?

    Dear All,
    we are doing a trading Scenario & based on customer requirement we procure the goods from our vendor & we receive it to Sales Order(special) Stock. Now what are the settings to be done in the Sales/Shipping so that when we do a delivery for our customer the Stock is Issued from our Un-res Sales Order Stock & not from un-res stock ?
    Hope its clear.
    Regards,

    Hi Sam,
    Thanks a lot for the reply.
    Sorry for not explaining the scenario in the begining.
    See I have to configure a trading Scenario with some changes from the std.
    As in trading Process there are 3 entities.
    1. Customer - X
    2. Company - Y (Who performs trading)
    3. Vendor - Z
    Following is the breif requirment.
    Company Y generated an inquiry in system for an item with respect to customers RFQ. Now since Y doesnt manufacture the product(item) it creates a PR in background with respect to inquiry.
    Based on this PR, Y procures & receives the good into Un-restricted Sales Order Stock (with ref Inquiry doc no:).
    Now based on price Quoted by Z, Y will create a Quotation with ref to inquiry & finally a SO for Customer - X with ref to the Quotation.
    Now at the time of delivery (creatd with ref SO) system is not able to issue the goods from the sales order stock since the stock is stored with ref to inquiry no: & delivery is with ref to SO.
    So I am planning to simulate a cycle by creating a delivery & PGI with ref to Inquiry.
    If you can suggest a way out, it will be highly appreciable.
    Hope its clear.
    Regards,

  • Issue from Production !!!!!!!!!!!!!!

    Hi Everyone !!!!!!
    Actually i had made Production Order Form in which i can populate all the Production order with respect to BOM (Bill of Material).
    Now i want to Populate Specific Production Order Number  another form which is "Issued for Prouction " Basically Now i want to developed another form which can be worked Like Issue from Production Screen.
    For this i have to use Production Order Object in SAP based....
    Could anybody have sample code for this .......that would be really helpful for me,
    The Main Problem is that i do not know how it will start ? how can i get the Production Order as well as their Item List.....and how can i issued Production Order in Issue from Production Form.....
    could you guide me that where should i have to start ........
    Thanks
    Regards..
    Rizwan

    hello
    Check the following thread:
    Regards
    János

  • Connectivity issues from Oracle to Sybase

    Friends.
    I have connectivity issue from Oracle 9.2.0.1 to Sybase 12.5 ASE .I am connecting through the database link in oracle to access the tables.
    The error message i am getting :
    select count(*) from TEST_TABLE@IND_TEST;
    ERROR at line 1:
    ORA-28500: connection from ORACLE to a non-Oracle system returned this message:
    523 80
    ORA-02063: preceding 2 lines from IND_TEST
    Please guide me how to solve this error message. is it version incompatible now?
    Thanks
    Rocky

    Hi,
    You are now making the connection to the Sybase database but there is a problem with the user and password used in the database link.
    Sybase is case sensitive for names so you need to surround the user/password in double quotes to make sure they are passed to Sybase in the correct case -
    create database link ind_test connect to "sybuser" identified by "sybpass" using 'tnsnames_ora_entry' ;
    where sybuser is the userid as created in Sybase with the password sybpass.
    If they were setup in Sybase in mixed case then it would be -
    create database link ind_test connect to "Sybuser" identified by "Sybpass" using 'tnsnames_ora_entry' ;
    Regards,
    Mike
    Edited by: mkirtley on Sep 27, 2011 12:55 PM

  • Material Issued from other Plants

    Hi All,
    I have 2 question here.
    I have created a STPO with delivery date say 12.09.2009 from my plant ABC to the Plant XYZ and 140 qty, For this XYZ plant has issued material on 15.09.2009 around 100 qty.,
    Now I am looking for the report ME2W to find out what are all the materials has supplied by other plant till 14.09.2009.
    but as per the report ME2W it is having I/P option as delivery date, so if i put delivery date between 01.09.2009 to 14.09.2009, it is showing  all the material which is issued on after 14.09.2009 also as i have put the delivery date and also it is checking as per delivery date.
    Question:
    1. How to get these reports ie., materials issued as per issued date or posting date not as per delivery date or not as per material code---- any transaction available for this.
    2. one more i come across here in STPO is that, if i create 100 qty of PO but it is allowing to issue more than the PO qty, say if i create Po with 100 Qty but other plant can issue more than 100 ie.,>100.
    Is thr any settings available to make such the system should not allow to issue more than the PO qty.
    Please help me out on this.
    Regards,
    Nagaraj S
    Edited by: Nagaraj  S on Oct 1, 2009 2:52 PM

    Dear Vidya Dewangan ,
    I have checked MB5B, it is not for the requirment what i want.
    See this report or MB51 would works with only 2 plants where within which these ST can occur.What in my scenario we have more than 2 plants, See i will clearly expalin the situatin -
    Thr are 3 plants-  Plant A,Plant B, Plant C.
    ST happens b/w A and B, A & C, B& C and Visa versa.
    Now I want to know what are all the ST happens between Plant A and Plant B, where Plant A has supplied some material  to plant B on some day(ie., 351 on posting day),say i dont know material i know only the dates.I cant use MB51, is thr any other report i can get.
    Pls help me out.
    Regards,
    Nagaraj S

  • About goods issue from vendor consignment stock

    Hi, I meet some issue needs your help!
    The outbound delivery needs to post goods issue from vendor consigment stock directly. then how to choose which vendor's
    stock for this delivery base on the actual process?
    thanks
    Best Regards,
    Rory

    Hi
    In R3 it is not possible
    If say material X is 100 units lies in your premises the vendor  consignment stocks (the vendor property lying in your premises ) and out of that 100 units if you are making a sales order and then a goods issue means it is not possible
    To sell that material you need to make it your own stock ( that is transfer from vendor consignment to your own ) as good as buying that stocks and then sell it
    But the same scenario is possible in IS retail
    For this iS retail server is reqd
    In Retail you can play with vendor consignment stocks as much as possible without making our own stocks
    You can search SAP library regarding the settings of the same
    http://help.sap.com/erp2005_ehp_04/helpdata/en/c6/af3c415e5dde2be10000000a1550b0/frameset.htm
    Regards
    Raja

  • CS service order budget can't control goods issue from stock?

    Hi experts,
    I set budget to a service order(CS), it can control Purchase order from service order, however it can't control the good issue from stock(type "L") !  Is it the setting problem? how to deal with it?
    best regards
    lance

    1st
    If you actually bothered to read my post, you would see that I decided to change for the X220 after I saw it in the flesh and realised how much close it was to the X121s dimensions. If lenovo wishes this not to happen very often, they should bother do something about the fact that there is no Lenovo dealership/agent/representative in Oxford.
    2nd.
    If Lenovo lists paypal as payment method, they should honour it. Otherwise, do not list it at all.
    3rd.
    If lenovo says that I can cancel the day I ordered with no implication, they should also honour this. Not ignore my e-mails (contrary to the terms & conditions stated) and ship it so I can perhaps keep it. That's not good business practice. That's playing dumb.
    They had 5 days to cancel, they prefered to wait for the item to be produced/stocked so that they can ship it to a small hamlet in Oxfordshire (half the way around the globe) so I can send it back. So yeah, this little laptop will circumvent the Earth.
    If this is not wasteful, then what is?
    As far as I am concerned, it took me 10 telephone calls and to DR just to get the cancellation e-mail which should be sent immediately.
    If you do not value your time, it is your problem, not mine.
    I will not be buying a Mac either as I do not like the product, but the difference in service couldn't be more stark.
    All the best,
    Sav.

  • One SO but I would like Post Goods Issue from different Storage Locations?

    Dear All,
    Pls help me solve this issue below:
    I have one SO, Item xzy, Qty = 300 but I would like to Post Goods Issue from different Storage Locations (Qty = 100 for each locations)
    E.g I have 3 storage locations: A, B, C and need to assign Post Goods Issue authorizations to 3 users U1, U2, U3:
    - U1 can Post Goods Issue from storage location A only (but cannot from B, C)
    - U2 can Post Goods Issue from storage location B only (but cannot from A, C)
    - U3 can Post Goods Issue from storage location C only (but cannot from A, B)
    How can I assign the Authorization for users?
    How can I create Outbound Delivery:
    a. 1 SO --> 1 outbound delivery --> Post GI 3 times
    b. 1 SO --> 3 outbound delivery --> Post GI
    Thank you very much for your support
    Cao Huy.

    Hi Senthils,
    Pls see my comment below:
    For Authorization check for storage Location
    1. GO to the following Menu path
    Spro>Material Management> Inventory manangement and Physical Inventory>Authorization Management>Authorization check for Storage Location.
    Here you have activate authorization tick for storage location and plant combination.
    --> Done
    2. Set authorization for Authorization object MM_MSEG_LGO thro Basis for the combination of movement type and storage location
    for each user.
    --> Done
    There are 3 storage locations(A,B,C) in one outbound delivery, and when user 01 tries to Post GI this outbound, it means that the system will Post GI for all line items in this outbound, but user 01 has not authorization for location B, C.
    How can user 01 Post GI from only location A in this outbound???
    And then user 02 will Post GI from only location B in this outbound,
    user 03 will Post GI from only location C in this outbound.
    Thanks
    Cao Huy

  • DESADV is not generated during Goods issue from VT02N.

    Hello,
    DESADV is generating during goods issue from VL02N.
    But DESADV is not generated during Goods issue from VT02N.
    Any idea what was missing?
    I maintained the variant of RV56ABST for Delivery message with output type LAVA and Medium 6 (EDI).
    Thanks,
    Venkat

    I got reply from SAP. It is as follows:
    Please goto tcode VL10CUC. For Profile 2000, please check whether
    indicator "No OutputDet." is flagged.
    Please unflag that indicator and then retest.
    Please read note 1410599 for more inforamtion.
    Thanks,
    Venkat.

  • Confirmation should not be allowed till materials issued from store

    Hello friends,
    I have a production order in which one material is issued automatically by Backflush function in confirmation and other material is issued manually. I want that confirmation must not be happen till materials are issued from store.
    Waiting for reply!
    Thanks!

    HI
    Check these BAdis for your requirement:
    WORKORDER_GOODSMVT
    RM_BFLUSH_GOODSMVT
    also if working in REM then check REM profile for incorrect goods MVt in OSP2 and in Discrete check OPK4 with your oreder type for termination of incorrect goods MVt
    Check and revert
    Regards
    Anupam Sharma

  • Need Help! have an issue from my auto response email, it showing the "MIME This is a multi-part message in MIME format. " and the signature message disappeared.

    ave an issue from my auto response email, it showing the "MIME This is a multi-part message in MIME format. " and the signature message disappeared and replaced with some unreadable message

    Hi msnyder1112,
    Thank you for posting in MSDN forum.
    Since this issue is related to the VB.NET, so we will move this case to VB forum:
    https://social.msdn.microsoft.com/Forums/vstudio/en-US/home?forum=vbgeneral , you will get better support.
    Thanks for your understanding.
    Best Regards,
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

Maybe you are looking for

  • Dual Boot on 2 SSD`s

    I currently have Windows 8.1 installed on my boot SSD and I have a spare SSD doing nothing. If I install Windows 10 on the spare SSD, will it become the boot SSD?  And can I just unplug the Windows 10 SSD and boot from Windows 8.1 SSD or will a dual

  • Cannot download Acrobat Reader 9 to my new ASUS computer with Windows 7

    I replaced my old "slave" XP system computer with a new ASUS Windows 7 computer. I connect the slave computer (Windows 7 OS) wirelessly through a Linksys router.with my "home" computer (XP OS) and the internet. I get the following error message when

  • Foreign Language Input Help

    I am not too sure if this is the sub forum to express this problem. OK, I bought my phone in Singapore and obviously, the language settings would be in Chinese, English or Malay. What if I want to add another language into my phone, eg: Thai? I was b

  • Trying to record through line in no wo

    Hey, I am using a sound blaster li've sound card and want to record through the line in port on the back. I have bought a convertor which has allowed me to plug my guitar into the line in however when i play nothing comes out and my recording program

  • Path to EPS inbox is wrong

    The path to our EPS inbox shows as the one below which is wrong. lon-web-9\sapmnt\trans\EPS\in DIR_TRANS is set correctly in the parameters and all other paths are looking ok. I can't find anywhere to change this. Can anyone help?