Update Material Availability Date for Sales Order having a Delivery

Dear Gurus,
We have a bit out of the way scenario. There is a o/b delivery already added to a shipment. And then we receive a IDOC from external MES System (i.e. Production) with new material availability date. This new material availability date is updated on Sales Order. In short the order is delayed.
Current Solution:
In this case the user has to remove the delivery from the shipment manually. then the IDOC deletes the  delivery and the updates the sales order with new date followed by creation of new delivery.
The business expects to updated the Sales Order material availability date without changing Shipment / delivery. Any solution?
Current solution has to be changed as for Shipment purpose changes are made to delivery which are lost when the delivery is deleted.
Edited by: abhishek singh on Feb 3, 2012 10:21 AM

hi
in this case you have to adopt the business process change.
you have to update the EDI first and then you create delivery.

Similar Messages

  • Material Availability Date of Sales Order

    An issue 1  :
    There is material which is GATP relevant and stock is available in APO and R3.When GATP check is performed MAD Date is shown as Current Day +1,where as it should be Current Day only.And this issue happens on Friday only i.e GATP returns Current day as MAD day on other than friday.
    An  issue 2 :
    There are Sales Order already created for a material sat mat1 with availability check code  "ZF" in MRP3 tab of material master.The MAD has already been calculated with existing settings through GATP functionality.
    What is required that change the availability check code in MRP3 tab of material master to "ZB" and re-check the availability of the already created sales orders in R3.
    But what we understand since Sales Order already created for Availability check code "ZF",new changed "ZB" will not impact the ATP check.
    An issue 3 ;
    What are the settings influence the calulations of MAD in APO and R3.
    Is there any way this can be achieved.
    Manish

    Manish,
    First, you will always get better responses in this forum if you enter one issue per post.  Many people are unwilling to respond to a multi-question posting.
    Issue 1.  There are dozens of factors that can contribute to a Material Availability date in APO. Are you using RBA?  Allocation? ATP against a forecast? CTP?  Transportation Scheduling? etc etc etc......
    The most likely reason is that you have an issue with with valid workdays in one of the calendars that affect your GATP check.  
    Issue 2 - This is mostly an R/3 issue.  The practice you call out (change the MM ATP checking group and re-atp the order) is only supported by SAP in a limited way.  The easiest way I have found to do this is to open the sales order, remove the plant from the item, and then save the order.  Make your changes to the MM.  Wait until the MM changes get to SCM.  Now, re-open the sales order, and re-enter the plant.  If you are lucky, the sales order will re-read the updated MM data, and re-atp the order in SCM using the updated SCM data.  Now, re-save the sales order.
    By the way, don't think that you can now blithely change the ATP checking group in R/3 back to the old value.  You will face additional problems in delivering and shipping the order later. The process I described should only be used to correct an existing MM error.
    Also, be aware that any ATP checking group beginning with a 'Z' has been customized for your company.  You should contact the local SD expert to see what changes your company had made for these ZD and ZB groups.
    Issue 3 - GATP is a large module in SCM.  There are many types of checks.  Each one has it's own items that can affect MAD (generation of MAD is the prime output of GATP).  I couldn't possibly cover them all in a single posting.  The standard SAP overview class for GATP is 3 days, and this class doesn't go into much detail.  I strongly recommend that you consult with your local GATP functional expert, or consider hiring an expert GATP consultant if you wish to proceed with your development of APO GATP.
    Good luck!
    Regards,
    DB49.

  • Material Availability Report for Sales Order

    Hi,
    Is there any report which gives me for a sale order line item which is either pending or not yet picked in delivery, but for which stock is not available. If such report is not available then what to we do for getting the same?
    Regards,
    Ajit

    Hi ajit
    In VA05 itself you can see Ordered  qty, Open order qty and confirmed quantity , Delivered qty , Delivered  date  .Even  Laxmipathi also said same thing and  i also agree with his words.
    Regards
    Srinath

  • Problem in updating the partners data for sales order

    hi all..
    am using bapi_salesorder_createfromdat2 to create salesorder..
    in the bapi am passing the partners data as follows..
    partner-partn_role = 'ZD'.
    partner-partn_numb  = <cust.no.>
    partner-itm_number = <item no.>
    after that..,the sales order is created succesfully .but now the problem is the partner data as shown above is not updated successfully in the item level details of sales order..
    is there any way to fix it ?
    please help me with the possible alternatives.
    thanks in advance
    suresh

    Hi Suresh,
    *Fill partner
    wa_order_partnr-partn_role = 'AH'.
    wa_order_partnr-partn_numb = '0000100001'.
    "wa_order_partnr-itm_number  = '000010'.
    INSERT wa_order_partnr INTO TABLE tab_order_partnr.
    wa_order_partnr-partn_role = 'WE'.
    wa_order_partnr-partn_numb = '0000100001'.
    "wa_order_partnr-itm_number  = '000010'.
    INSERT wa_order_partnr INTO TABLE tab_order_partnr.
    Is it a standard partner function or custom one.Check with german key words llike AH,WE.
    Regards,
    Madhu.

  • Difference in Material availability date for ECC ATP check & for APO ATP check in the same order

    Hi Gurus,
    I have a question: on what basis material availability date is calculated in forward scheduling?
    Eg:
    For a customer GR hours are maintained in unloading point calendar in customer master and Customers are not CIF'ed across to APO.
    GR hours are maintained for weekdays from 8:00 to 12:00 & 1:00 to 6:00.
    In a sales order with two line items with Requested date today & plenty of stock on hand for two products( ECC & APO) where line 10 (product 1) triggers ECC ATP check & line 20 (product 2) triggers APO ATP check at same location (loc1).
    RDD is today, material availability date for ECC ATP check (line 10) is today (working as expected) but where as the material availability date for APO ATP check (line 20)is pushed to next day by which for the same customer there are different delivery dates. And two delivery notes will be created & truck will be on road at different times for the same customer which is unacceptable.
    What am I missing here to get the material availability date as today for forward scheduling? Please guide me on this.
    Thanks,
    Nihar

    Hi Nihar
    Though the logic you mentioned makes sense. I am confused here with the data you have provided:
    UTC day
    UTC time
    CET day
    CET time
    UTC+6 day
    UTC+6 time
    RDD
    30/04
    17:24
    30/04
    7:24
    30/04
    23:24
    MAD
    30/04
    17:24
    30/04
    7:24
    30/04
    23:24
    Lod/GI
    02/05
    17:24
    02/05
    7:24
    02/05
    23:24
    Del
    12/05
    17:24
    12/05
    7:24
    12/05
    23:24
    Del
    13/05
    1:00
    13/05
    3:00
    13/05
    8:00
    Load/GI
    05/05
    1:00
    05/05
    3:00
    05/05
    8:00
    MAD
    02/05
    1:00
    02/05
    3:00
    02/05
    8:00
    In the first row, the difference in RDD in UTC and UTC+6 is 6 hours. However, in the last three rows I can see the difference between UTC time and UTC+6 time is 7 hours. Would you know the reason to this? Also, in the first four rows, CET time = 7:24 which should had been 19:24. Please correct me if I am missing something here.
    Thanks,
    Parth Soneji

  • Error reading material cost estimate for sales order (KE292)

    Dear All,
    I have an issue with billing. we are posting july month transactions, the material cost is maintained through MR21. When releasing billing document for accounting we are getting error message like"Error reading the material cost estimate for sales order "11"
    Message no. KE292
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate item 000010 of sales order 11 by reading the corresponding product cost estimate.
    However, no product cost estimate could be found for this sales order item.
    The system accessed product costing for product AMLFP011011XX00P using costing key YB3 as defined in the
    CO-PA Customizing settings.
    System Response
    The system cannot process the document any further.
    Procedure
    Check your Customizing settings."
    We cross checked with other client as a current date and we ran cost estimate through CK40N with same material. and we posted entries. Here it is working fine. but in above process it is not working. Can you pls guide me where i missed.
    Regards,
    Nagaraju,

    Hi,
    When the Costing Key is assigned to the material types in the COPA customizing, then system expects Cost estimation when billing is released to Accounts.
    If you dont run cost estimation but update the material master through MR21, system will not accept as in the Costing key configuration you must have selected the Current Standard price field for the valuation.
    Hence, try to run cost estimation and then do releasing.
    Thanks & Regards
    Ravi Kumar

  • MRP is not considering material availability dates for sorting customer ord

    Hello Experts,
    MRP is not considering material availability dates for sorting customer order/ sales order in sequence (thatu2019s is oldest from newest in order) in MD04.
    Please suggest.
    Thanks,
    Om

    Om,
    No.  Aside from my obvious desire to preserve my privacy, it would be a disservice to the other forum members.  No-one else but you and I would understand your problem, and no-one else but you would be able to benefit from any solutions. 
    There are dozens of free public portals suitable for posting pictures on the internet.  I suggest that you use one.
    Best Regards,
    DB49

  • To automatically update material availability information in service orders

    u2022     Develop a utility/program for customer support to automatically update material availability information in service orders using IW32 and IW72 Tcodes.

    hi answered
    Edited by: raghu k on Jan 11, 2011 5:29 PM

  • How to see archive data for Sales order

    Hi all,
            I am working on PS , network is created with sales order 10911. the components are added while sales order created, but after that someone deletes the sales order, because now it is showing oder does not found, where i get the entreis for sales order.
    Regards,
    Khushi.

    Hi Khushi,
    To see the archived data for sales order , go to transaction code SARA.
    Choose object name as SD_VBAK.Click READ.
    It will show a screen giving a name of program and option to execute in background or foreground.
    It will help you to get information about archived sales order data.
    Hope it helps you.
    Thanks,
    Sarita singh Rathour
    Edited by: Sarita Rathour on Aug 28, 2009 7:46 AM

  • Upload the data for sales order using BAPI

    hi experts,
    how to upload the data for sales order using BAPI.
    what is the FM?
    it would be much helpful if i have the sample code as i am very new to BAPI.
    thanks and Regards
    Shyam

    Hi  Shyam
    Its very useful for u
    BAPISDORDER_GETDETAILEDLIST
    BAPI_ACC_SALES_ORDER_CHECK
    BAPI_ACC_SALES_ORDER_POST
    BAPI_ACC_SALES_QUOTA_CHECK
    BAPI_ACC_SALES_QUOTA_POST
    Reward all the helpful answers..
    With Regards
    Navin Khedikar

  • Material availability  check for production order

    Hello,
    Is there any functional module to check the material availability of production order. So that it can be used in developments.
    Regards,
    Ganesh

    Hi,
    Following are the available Function Modules for avaibility checks in Production orders,
    BAPI_PRODORD_CHECK_MAT_AVAIL -  BAPI: Execute Material Availability Check for Production Orders
    And for Process Orders,
    BAPI_PROCORD_CHECK_MAT_AVAIL - BAPI: Execute Material Availability Check for Process Orders
    Regards,
    Dhaval

  • How to get the pricing hierarchy based on the delivery date for sales order

    Hi,
    How to get the pricing hierarchy based on the delivery date for sales order other than system date.
    My requirement is to get the Pricing hierarchy based on the delivery date other than system date.
    Waiting for kind response.
    Best Regards,
    BDP

    HI Sai,
    please refer teh document already how to write FM based extration on generic extractors.
    and here  the logic to find the latest records values:-
    -> get the data in an internal table
    ->Sort the internal table data based from date descending
    -> Using READ statement , we can read the first record of the table which is nothign but your latest record.
    Regards.
    Sakthi

  • Material available date for a schedule line

    Hi all,
    I got a requirement of manupulating the material availability date in a scheduling agreement (preferably, customer specific).
    For Example : Suppose I  created a scheduling agreement for customer 1 coming under route 1 (and the route1 is defined as a transit time of 1 day ) with the scheduled delivery dates of  12.09.2007 and 14.09.2007; system consider the route value and proposes 11.09.2007 and 13.09.2007 as the material available date for the purpose of MD04, VL10 etc.
    For some customers using the same route no 1, I need an additional day for my preparation, i.e for the above example, I need the system to propose 10.9.2007 and 12.09.2007 as the material availability data for MD04, VL10.
    How to achieve this, I dont find any field in the customer master for this purpose.
    Can some one suggest some solution, it is an urgent requirement.
    Thanks in advance.
    Best Regards
    Ajit Patro

    you have to change either route(CREATE  new route with tranportation lead time) or use another shipping point ( preferable) by  maintaining another shipping condition for these customer ( maintain shipping times), this will solve your pro

  • Update Material Availability dates during order creation

    Hi,
    We have a requirement to update the material availability in the schedule lines of the order when the order is being created.
    We want the update to happen after the sales order is in the Data base. We tried calling a Function module in Update task. The function module is written in the EXIT_SAVE_DOCUMENT form of sales order user exit.
    The FM is getting called on the commit work , but not updating the sales order. We are getting an error " Material availability date should be less than load date". On debugging we noted that the SD_SALES_SCHEDULE_MAINTAIN is called with a load date of 00/00/0000 since the sales order is not in DB.
    Is there a way to call the FM after the sales order is in the database.
    Regards,
    Prabaharan G

    Worked using the enhancement framework development

  • Availability check for sales order stock

    Hi,
    We use sales order stock in sales order which creates purchase requisition automatically.Movement types for GR 101E, for GI 601E. Material master data has on MRP2 view as GR processing time 2 days for example. I create sales order with requested delivery date today.After saving SO, PR is created and I create PO with delivery date today and post goods receipt document for today. System gives as confirmation date today + 2 days. although the material is in stock.
    We use also project stock in sales order which creates purchase requisition automatically.Movement types for GR 101Q, for GI 601Q.I run the same scenario for the same material. As soon as I create the purchase order system confirms the open quantity in sales order for today. (Scope of availability check is the same for both sales orders and includes PO)
    What can be the reason?
    Thanks

    Hi Murat,
    i guess the problem is with the 'Check without RLT' indicator' in Availability check control. For the MTO (checking rule AE) i guess this indicator is not set but for the Project systems (Checking rule PS) this indicator is set. This makes the difference. Do the changes as desired in transaction OVZ9.
    Please check and revert back if you are still facing the same problem.
    regards,
    Kathir

Maybe you are looking for

  • How do I change me edit name in Acrobat 8

    Hi, it's me again.  I got the Adobe Acro 8 up and running well, but  I'm trying to remove my name which is automatically added to any  changes I make.  I followed the manual which says to go to Preferences  and unclick Always Use Log-in name which I

  • How do I import images in slideshow with the caption?

    I imported images in slideshow. but I have to write down in each field the caption of the image. is it possible to import the caption as well? thanks for response

  • ITunes not running

    I have been thru numerous attempts at the new version of iTunes and am getting pretting frustrated. After install last night it seemed to finally work fine so I updated my iPod and got current with my music. I then tried to import a CD and iTunes cou

  • Changing song order in playlist

    There's one playlist where I tried to drag the songs to change the order but it won't let me. All the other playlists it lets me. any ideas?

  • Show User Description in BI Analytics

    Hi, We have recently upgraded to BI 11.1.1.6.6. I have exported-imported the users from Weblogic 10g to 11g. When the users login to BI Analytics, on top-right corner they are seeing their username and not the description (or full name). Any ideas on