Hi all, we're triyng to update field plant for RFQ (Request For Quotation)  that was created with reference to a RFP.
We tryed updating T162 via SPRO to allow this, but was unsuccessfull.
Does anybody know how to do this without an ABAPER?. Were running ECC 6.0
THANKS IN ADVANCE.
Edited by: Juan Manuel Caballero on Sep 9, 2011 9:11 PM

Hi Juan,
I don't think this is possible. You see, only the "new design" transactions (ending with xxxxN) allow changing of plant. The old transactions simply don't have provision for this, since such change requires very sophisticated checks and follow-on updates.
Unfortunately there's no "new design" transaction for RFQ's as yet. You will have to create a new RFQ.
BR
Raf

Similar Messages

  • Need no document flow update for sales order create with reference

    Dear All.
    We would like to have the ability to create a sales order with reference to another sales order, and have the document flow of the sales order not updated.
    Unlike the case of a standard create with reference where the documents are linked, in this case there is no relationship between the documents.  The first document is just acting like a template for the remaining documents, to save time during order entry.
    We have turned off update of document flow at the line item level.
    But I don't see a way for us to turn this off at the header (document level).  So wondering if there's another way to turn this off, or possibly through user-exit or VOFM requirement?
    Has anyone else done this?
    I think that CRM has this functionality, but we're still entering orders through ERP-SD.
    Many Thanks!

    Hello Colleague;
    The issue you have reported is SAP standard.  The checkbox "Update Document Flow" (V_TVCPAAP-UPFLU) controls document flow at item level.  If this checkbox is set to blank, there will be no document flow at item level.
    However, the document flow cannot be completely turned off - if the 'update document flow' indicator is blank, you will still see an entry in the document flow, but there will be no update to table VBFA (Sales Document Flow) and the document flow of the predecessor will not be updated at item level (no record in VBFA at item level).                                                                               
    The reason is that the system checks VBAP (Sales Document: Item Data) for fields VGBEL (Document number of the reference document) and VGPOS (Item number of the reference item) for values.  You will always have document flow information on header and item level in the successor because it stores this information in table VBAP.                                                                               
    Related with this issue, you can find a Note 53383 for your review.
    I hope it can clarify the case.
    Regards
    Ruy Castro

  • Error  : Sales order 'create with Reference' to the contract

    We have made a value contract. Now we are trying to make a Sales order 'create with Reference' to the contract.
    when we do that, we am getting error 'copying material in any value contract item is not permitted'
    Any help or directions would be greatly appreciated . We are on Ecc 6.0
    Rohit

    As of now my value contract has just one material. so i dont need assortment module settings. right?
    in VTAA settings are as follows
    Target type: OR  
    Source type: ZK1
    there is only on item category
    Target item category: TAN   
    Source item category: WKN
    Copying requirement : 301
    update doc flow : 2
    pricing type : C
    cont item copy mode : A
    DataT am using 151,102,002
    There are no schedule line.
    Rohit
    Edited by: rohit kumar on May 15, 2008 7:36 PM

  • POs created with reference to PRs

    Dear All
    I want PR item valuation price is to be copied in to the PO item as net price, when this PO item is being created with reference to a PR item.
    This is required for both materials PR items and Service PR items
    Presently for material PRs, system is coping the prices from material master, whereas for services no prices are copied as I am not following any service master.
    I want prices directly from PR item. Is this possible in SAP (ECC 6.0)?
    Thank you

    1. Go to SPRO > MM > Purchasing > Authorization Management > Define Function Authorizations for Buyers > Function Authorizations: Purchase Order > Here "New Entries" and define Function Authorization Key as "01" and give description.
    OR use T. Code - OMET
    Here under "General parameters" subscreen, cctivate "Adopt PO Price" indicator and select "Enter conditions"
    In "Possible ref. objects", select "W/o reference" otherwise reference documents (for e.g. PR, RFQ, etc...) for PO creation will become mandatory.
    2. Now go to SU01 > Enter User ID > Parameters Tab > Here for Parameter ID EFB i.e. Function Authorization: Purchase Order, maintain value "01" and check in PO, PR will become mandatory for that user.
    3. Now during creation of PR in ME51N, under "Valuation" Tab, you will get option for PO Price Adoption as Net or Gross. Select as per your requirement and it will copy Price to PO.

  • Scheduling agreement created with reference to contract-Issue

    Hi all,
               I had posted a query as how to update net price in the contract/scheduling agreement if the condition price is updated through inbound Idocs.I got the correct answer  as you need to run the report RM06ENP0/RM06ENP1 as per note 685117.
    But now I am having a different issue;the scenario is like: A scheduling agreement is created with reference to contract.So the SA is linked to contract now.I am now going to change the condition price of SA through Inbound Idoc.After the updation ,the condition price gets changed in all cases.
    In one server,I found that the net price gets updated and the link btn contract and SA is broken without running the report RM06ENP1(Ideal situation,this is what I want).In other server ,I found the net price is not getting updated,ie the link is not broken even after running the report RM06ENP1.
    Can anybody tell me why the second situation is happening?

    Hi,
    i have done ur scenario. According to ur scenario, quantity contract is created for 100 units may be kg, pc etc.. Then scheduling agreement is created with reference to that contract but for 200 units may be kg, pc etc.. Scheduling agreement is created without getting any error or warning message.
    In the Next step, i.e. maintain delivery schedule( Tcode: ME38). U get the ERROR message as Scheduling agreement document number xxxxx is does not exist after entering scheduling agreement number in the initial screen of ME38.
    if this information is useful for u, reward me according to ur usage.
    bye
    Narasimha Rao Gunda

  • How to differentiate the Purch Orders created with reference to in table

    Hi all
      how to differentiate the Purch Orders which are created with reference to Purch requsitions, contract, manual by copying inforecord in the table EKKO/EKPO? Is there any Field Indicators?
    Rgds
    Ramesh

    Hi Ramesh,
    Go through  EKPO there is a Table BANFN it will update when you create a PO with reference to PR
    Do se11 > Table EKPO> CtrlShiftF10 > Assign any of PO no. in the EBELN > Execute > you will find BANFN table
    it indicates Purchase Requisition Number. it will update when you create PO with reference to PR.
    Regards,
    Vraj

  • High level contract and orders created with reference

    Dear All,
    The client is an integrated flat steel manufacturer. They have entered into quantity contract with high level products like for example Hot rolled coils + Cold rolled coils + Heat Treated plates 5000 T per month. There is no clear cut quantity breakup of each product. On monthly basis customer releases purchase orders with exact grade and dimensions. The requirement is to capture contact for 5000T and create orders with reference to the contract with necessary completion rule. Since exact break up of the high level products is not known controlling of order quantity to 5000T will involve lot of manual intervention. I was thinking in the contract we have high level material "X with 5000T and orders created with reference with actual materials like Hot rolled coils, Cold rolled coils and exact dimension/grade mentioned. Is this possible to have different materials in contract and order with enhancement?
    Any other idea of fulfilling the requirements is welcome.
    Thanks,

    Hi Ramesh,
    Go through  EKPO there is a Table BANFN it will update when you create a PO with reference to PR
    Do se11 > Table EKPO> CtrlShiftF10 > Assign any of PO no. in the EBELN > Execute > you will find BANFN table
    it indicates Purchase Requisition Number. it will update when you create PO with reference to PR.
    Regards,
    Vraj

  • Create with reference where original document is incomplete

    Hi Guys
    We use variant configuration as part of our sales order process. Within the VC we have 'discontinued' validation i.e. a component of the configuration may be discontinued and therefore unavailable. In this case, we would want to lock the configuration, reject the order item and create a new order item for a different component. We do not wish to delete the order item because of the effect this has on BI sales reporting.
    However, if we later wish to create another document (such as a FOC replacement) with reference to this document we receive an error message to the effect that the document being referenced is incomplete and cannot be used as a reference.
    Does anyone know of a way of being able to copy complete items only during create with reference or being able to set the status of an incomplete ('being processed') item to complete.

    "Incomplete" and "being processed" are two different things. If document is "incomplete", there are some fields that are required and must be filled in before the document may be processed any further. As correctly pointed out above, such fields will appear in the incompletion log.
    There is no way to work around the incompletion procedure. If you need to make the field required only in certain situations, you might want to take it out of the incompletion procedure and add a user exit instead.
    If an order is displayed as "being processed", this means that one of the statuses (see Status tab on header and item level) is "partially processed". Normally setting the rejection reason updates the overall item's status (not to be confused with the header's status) to "complete", but I've heard of some cases when for some reason this does not happen. Unfortunately, I don't recall if there was any solution.
    Hope this helps.

  • Order - create with reference - more information in Item selection ??

    Hi all:
      We are using "Copy control " from Quotation to Sales order..., it works OK.
      But we are facing a problem now... The user used to copy all Quotation as 1 SO and now they need to choose the specific items.
      So, they using  VA01 -> Create with reference -> Item selection ->  "Then Choose items"
       But the screen only has information about  "Item/Material No./Material description and Open quantiry"... not enought for user, they need more info like Plant, batch ... to choose the item....  any setting can make it??
      I have tried "Table setting" and IMG but found nothing !!
      I know we can copy all first and remove it, but is there any way we can choose them from "Item selection"...
      Thanks..

    Hi Amit
    Thanks your answer and which enhancement do you recommand ??
    if there is "easy" enhancement can do it, we might do it otherwise we will use "Copying requirements" only...
    Thanks again

  • Error while posting a sales order created with reference from contract for

    Hi,
    I am posting a sales document( Type: WA)  created with reference from contract document(  type wk2) for delivery.  The item category in the sales order of the Item is WAN. On posting this document for delivery I am getting the error as "Item category WAN is not defined".  Please help me out how to resolve this issue.
    Thanks
    Jayant

    Hi Jayant,
    I think its value contract releated error,
    You suppose to check material item category group through T.code-MM02 into sales2 tab and maintain VCIT,
    and do item category assignment through T.code- VOV4.
    plz.maintain like that,
    WK2 -          -VCIT-         -           - WAN(contract item category),
    wk2  -          -        -VCTR-          - WAN((contract item category),
    you should also maintain same against your standard Sales Document type and for Standard Item category into VOV4,
    WA(standard docu.type) -VCIT-                             -                -TAN(your standard docu.type item category),
    WA(standard docu.type) -         -VCTR(item usage)-              -TAN(your standard docu.type item category),

  • Sales Order CReated with Reference

    Hi,
    I created a sales order with reference to an existing order. I created delivery based on the new order that was created with reference. HOwever, if i try to get the sales order number of my delivery, the sales order that i am getting is the sales order number that was referenced. How will I retreived the new sales order number from VBFA?
    Thanks,
    Louisse

    Hello,
             We can follow the below Procedure to get the Sales Order Number from VBFA Table.
    1. Input the Delivery in VBELN field to get VBELV (Sales Order)
        Number with VBTYP_V = 'C' (Order). 
    2. Now, if the Sales Order which is fetched is the one which is
        referenced, then Input the Sales Order Number again in the
        VBFA Table into the Field VBELV and fetch the Sales Order
        Number (New) in the VBELN Field with VBTYP_N = 'C'.
    3. You should be able to satisfy your requirement.
    Hope it was clear.
    Thanks and Regards,
    Venkat Phani Prasad Konduri

  • Change of Sold to Party in Sales order created with Reference to Contract

    Dear Gurus
    I want to change the sold to party in Sales Order created with reference to contract.
    When I create a Sales order with reference to contract the system copies all the partner functions- Sold to, Ship to, Bill to and Payer alongwith other data.
    However Sold to is marked as "Grey" and not changable, rest of the partners can be changed.
    There is no subsiquent document created with reference to this Sales Order.
    Please advice.
    Thanks a lot.
    Regards
    Raghu

    Hi ,
    Please follow the below mentioned step.
    1) Create a partner function letts say Authorized SP .
    2) Assign all the possible authorised  SP (customer) in the contract.
    3) When you create sales order with reff to Contract. Put the customer for whom you wish to create a sales order in release partner tab.
    Hop this will resolve our problem
    Regards,
    Krishna O

  • Remove Header text from a sales order, created with reference to quotation

    Hi all,
    I have a sales order(in VA01) which is created with reference to quotation (in VA21).
    If header text (Notes for logistics, Note for responsible person, Header text Doc & Declaration) in texts tab is maintained in the quotation they are getting copied in Sales Order which is NOT the requirement.
    I need suggestions on how to disable the text that is getting copied.
    Any pointers would be of great help.
    Regards,
    Vamsee Priya.

    Hi Nilesh,
    I created a routine in vofm and this solved my problem.
    Now, I'm having a similar problem where I'm creating an Invoice(through transaction VF01) giving the delivery document number and document type (Invoice F2).
    we are maintaining Header text in Order through which the above mentioned delivery document number is created and this header text should get copied in the Invoice.
    For this, I went into Transaction VOTXN, from there selected billing header, from here kept a break point for the routine BEDINGUNG_PRUEFEN_001 through which the text will get copied.
    Now, when I'm creating the Invoice this routine is getting executed, but still the text is not getting copied.
    Any pointers on this would be of great help.
    Also at the end of your previous mail, you are telling about SPRO - text assignment. Can you please let me know how to I should navigate to this text-assignment??
    Thanks and Regards,
    Vamsee Priya.

  • Sales Order Created with reference to Contract - Exchange rate Issue

    When Sales Order created with reference to contract VBKD fields KURSK and KURSK_DAT gets copied from contract and not redetrmined based on pricing date and Exchange rate type. I expected it to be determined based on pricing date is standard. What I am missing, should it be controlled by data transfers
    If Document currency and condition currency are different it cause problems with incorrect condition values are calculated, as KOMP-KURSK are copied from VBKD-KURSK
    Any help or directions would be greatly appreciated . We are on 4.7 ISOIL
    Sincerely Julietta

    Well,
    and if we have the same issue, but we don't have OIL Version, but simple 4.6C, which solution has to be applied then?
    Thank you
    Standa

  • Add pricing condition within order created with reference to SPA

    Hi,
    I have a requirement wherein I need to add a $50 fine to order if the total order weight is below 75 kg.
    Problem I am facing is with orders created with reference to SPA wherin pricing is not calculated but copied from SPA.
    Please help me in solving this issue.
    Also, Please let me know the pricing userexit / BADI for CRM wherein this can be coded.
    Regards,
    Willban
    Edited by: willban_sap on Jul 21, 2010 11:43 AM

    Hi Willban,
    wonder wether you could use any weight dependent (net or gross) group condition with a scale. Delow 75 kg across all grouped items you would charge 50 $ and starting at 75 kg you would charge 0 $. As the scale base should get adjusted with the copy / create with reference step, I see no need for custom code.
    Best Regards,
    Michael

Maybe you are looking for

  • View with selection conditions with system fields.

    Hi Experts, I have a view. Now i want to control the data that is selected using 'Selection Conditions'. here i want to use system field SY-DATUM. My requirement is  i want to control the output like Valid_From_Date GE SY-DATUM and Valid_To_Date    

  • Unable to post multiple files to the same receiver.

    Hi Experts, I am working on a file 2 file scenario.In which one file is divided into three different files and these three files are posted to the same receiver using different communication channels(because for all the files content conversion param

  • I have a new computer and want to sync my Iphone and Ipad2 to the new computer, is there an easy way to do this?

    I have a new computer and want to sync my Iphone and Ipad2 to the new computer (PC) instead of the old one, is there an easy way to do this?

  • How to revert a restore?

    Bought an iPhone 4S to replace an iPhone 4. Did a backup of the iPhone 4 to local laptop via iTunes. Started using the new iPhone 4S, w/o restoring from the backup, thinking most of my contacts would sync via the company Exchange / ActiveSync. Took s

  • Re-create or recover frmcmp.sh file?

    OS: SLES 9 (Linux) Oracle As: 10.1.2.0.2 (Rel 2 for Linux) Is it possible to re-create or recover frmcmp.sh file? Some how my existing frmcmp.sh become corrupted. Its showing my size 0. -rwx------ 1 oracle oinstall 0 2005-09-20 11:38 frmcmp.sh And I