Update Routing data after change in Work Center

Hello All,
I have just modified the Costing Data for 100 Work Centers CR02, setting a new "Activity Type" and "Activity Unit".  But the Routing Data CA02 does not get updated correspondingly.  I would like to ask is there any standard program which can help me to do the mass processing as to update the data to the corresponding routing?
Thanks.

1) You can change as per Mr Anupam sharma Said
or
2) YOU can also Update the data IN CA85N
In selection criteria enter the respective work center and Plant
and In new Value Give
Same work center, Plant,  activity value , Unit  and activity type
execute
select the all the work center  and then click mass change
Edited by: Sundaresan . E. V on Nov 12, 2010 10:25 AM

Similar Messages

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Automatic change of Work Center during Confirmation.

    Happy New Year to all!
    Just want to ask if anyone of you encountered the scenario during confirmation in which the backflushed work center was changed. The user claims that they did not do any changes during confirmation nor did they change manually the order itself. The confirmation happened last December and they only noticed it this month when they were checking the reports.
    I did not configure their system so that they can change the Work Center during confirmation. By default, the work center is grayed out during confirmation.
    Hope to hear from some of you soon!
    Thanks and regards,
    jLmendoza
    Edited by: John Luis Mendoza on Jan 4, 2011 3:15 AM

    Dear
    If your production order operations are re-scheuled and dispatched after Capacity Avalaiblity check in cm21/cm22/cm31 etc  , then during the dispatch of operation ,  you have option to change Work Cnetre , time , date based on the selection option in Startgy profile (CM31/CM21-Enter the WORK CENTRE /Order )  and check wether work centre is changed.
    One more option may be in Order Change in CO02-Operation Overview -Operation -Work centre -Here user may change the Work Centre .
    If you have Order Change management active then you can trace the same .
    Refer : Production order change history
    Otherwise , there is not such confirguration in SPRO where work centre can be changed automatrically during confirmaiton because it will grade out based on the ste of confirmaiton default screen in OP00.
    Hope it clarifies
    Regards
    JH

  • TS1717 I fixed it by starting up Quicktime, which then started to update itself. After that ITunes worked again.

    I fixed it by starting up Quicktime, which then started to update itself. After that ITunes worked again.
    Also Apple Software Update suddently worked again

    had a lot of trouble with this too. I had tried everything, from the internet time zone changing, restarting computers, physical time zone changing, firewalls, all that, and nothing worked.
    but i just tried this and it worked.
    1. in iTunes, go to Store, then go to authorize computer
    2. sign in with your AppleID, and authorize your computer to purchase iTunes stuff.
    that's it.
    I scoured the internet and found nothing that said that had that as a solution.
    hope it helps

  • Changing operations work center during creation of  PM order

    Hi all,
    I am looking for BADI or EXIT in order to change operationS work center which created from maintenance calls.
    Does anyone know such possibility?
    Assaf

    Assaf,
    Have a look at BADI IWO1_TL_INTEGRATION2.
    Also see [OSS Note 925072|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=925072]
    Which system are you running?
    PeteA

  • Change in Work center

    Hi SAP Friends,
    I want to do some tick marks in capacity field of work center in one work center as well similar tick mark at other work center also.
    Please Tell how to do in one time?
    Plaese Reply.
    Chandra.

    Hi,
    First in T. Code : OP36, you need to define the Default Capacity.
    Enter your plant and Capacity catgort for e.g : "001".
    Define the default values carefully.
    Then Secondly, in T. Code : OP42, you need to define the Default Work center.
    With thses two settings every time you will get the work center with filled in fields and you can modify at any point in time.
    But, to change the Work center Capcity details, I guess there is no Mass Maintenance Transaction..
    Regards,
    Siva

  • IW41: automatic update of activity type when changing the work center?

    Hello colleagues,
    when doing a time confirmation with IW41, we have following problem:
    In the PM order the operations are assigned to a neutral executing work center, as it not known which individual technician is completing the operation later on.
    Now when the individual technician is entering the time confirmation with IW41, system is proposing the work center indicated in the operation from the PM order, then technician is overwriting the work center proposal with his own individual work center ID (and pressing Enter), but the activity type is not getting updated automatically. So the technician must jump to field "activity type" and choose the correct activity type.
    Is there any solution (hopefully with user exits!) to have the field "activity type" automatically updated with the one indicated in the work center, which was entered manually?
    Thanks for your ideas!
    Regards,
    Patrick

    Hi Maheswaran,
    yes, as usual all PM work centers have only 1 activity type assigned in the costing tab.
    We also checked the settings of the activity type (KL03), but we just found one difference: the price indicator was set on 3 "Determined manually" - we've changed to 1 "Plan price, automatically based on activity" (..same setting as for the act. type of the work center with working update of act.type).
    We tested already all possible constellations and scenarios, but we have not found any good reason for the behaviour.
    Thanks for your efforts so far!
    Patrick

  • Mass update/change of Work center

    Hi
    I need to change the 'Factory calendar' to 'FO' and 'Set up Formula' to blank for about 500 work centers.
    Is there any transaction avaliable to update new values for work centers, in mass change ?
    Please help me.

    Dear,
    Please try with  CA85 or go with BDC.
    Please refer this links as reference ,
    [Mass Replace Work Center |http://www.sap-img.com/production/guide-to-mass-replace-work-center.htm]
    Regards,
    R.Brahmankar

  • How to execute Update Module FM after final commit work for a T-code.

    Hello Folks,
    I have a bit complex issue with my current object.
    We have modified MM41/MM42 transactions and added a subscreen to fulfill the requirement.
    We have designed the subscreen and embedded the same to MM41/MM42 through SPRO configuration.
    Now for update business logic,i am trying to execute one Function module(Update Module) in update Task...so that it will be executed once after the final commit work will be done for MM41/MM42.
    But its not executing.
    To fulfill my requirement i need to execute the FM only after Final Commit work for MM41/MM42.
    Please suggest in this regard.
    Even i can see few BADI's which are triggering through MM01/MM02 but not through MM41/MM42.
    BADI_ARTICLE_REF_RT
    BADI_MATERIAL_CHECK
    BADI_MAT_F_SPEC_SEL
    Code with which i am trying is given below.
    After PAI event of the subscreen---
    1:        MODULE USER_COMMAND_9001.
    2:       MODULE user_command_9001 INPUT.
                        PERFORM sub_save_mara ON COMMIT.
              ENDMODULE.
    3:       FORM sub_save_mara.
                         CALL FUNCTION 'ZMMUPDATE_MARA_APPEND_STRUCT' "IN UPDATE TASK
                                        EXPORTING
                                                 materialno = gv_matnr
                                                 appendmara = ty_zzmara.
             ENDFORM.                    "sub_save_mara
    4:                FUNCTION zmmupdate_mara_append_struct.
                      ""Update Function Module:
                       ""Local Interface:
                      *"  IMPORTING
                   *"     VALUE(MATERIALNO) TYPE  MATNR
                   *"     VALUE(APPENDMARA) TYPE  ZZMARA
    Data Declaration for Local use
      DATA : w_mara TYPE mara.
    Selecting the latest values for the material.
      SELECT SINGLE * FROM mara INTO w_mara WHERE matnr = materialno.
      IF sy-subrc = 0.
      Move the ZZMARA values to structure MARA
        MOVE-CORRESPONDING appendmara TO w_mara.
      Update the values in table MARA.
        MODIFY mara FROM w_mara.
      ENDIF.
    ENDFUNCTION.
    Kindly suggest.Thanks in advance.
    Regards
    Ansumesh

    Hi..
    The code given by me will work fine provided the Final commit should happen.
    Because to execute FM with update task,final commit work should happen which is mandatory and after that it will call the update task.
    In my case final commit work was not happeneing because..SAP standard program was not able to detect wether there is any change in my sub-screen or not as the standard program & my custom program,subscreens are different.
    As it was not able to detect the change,so final commit was not happening and hence update task also.
    To provide the reference of change in my subscreen to standard program ,i set a flag as per the change in the subscreen
    And exported the same to memory.
    Then Implemented one enhacement spot in MATERIAL_CHANGE_CHECK_RETAIL Fm where i have Imported the flag value.
    Based on my custom flag value,i have set one standard flag FLG_AENDERUNG_GES which tells SAP standard program for MM42 wether any change has happened or not.
    The above solved my purpose.
    Regards
    Ansumesh

  • Mass change of work center in production order

    Dear All,
    Is it possible to mass change work center in production order, i.e. i have around 100 production order of which i have to change the work ceter assigned in particular operation .
    Thanks and regards
    Manish

    Hi Manish,
    If you have not posted any activity or goods to the production order, then in header click on Functions -> Read PP Master Data.
    The order will now read the routing with the new work centers, provided the same has been changed.
    If you have posted some activities or goods movement done, then its a manual process.
    Hope the above answers your query.
    Regards,
    Vivek
    Added
    If in case you have posted some goods or confirmed some activity, check if you can reverse the same, re-read the routing & then post back the goods.
    Edited by: Vivek on Feb 24, 2009 12:22 PM

  • Update infotype 7 after changing WSR

    Hi
    anyone knows how to update the datas
    in infotype 7, after changing & regenerating WSR?
    thanks
    fafa
    Edited by: fafa mani on Sep 25, 2008 7:13 PM

    LSMW FOR HR
    lsmw
    LSMW??
    Re: lsmw

  • No changes in Update rules even after changes in Communicatin struct

    Hello All,
    I have made changes to a transfer structure i.e. I added a field in the Communication structure and mapped in the transfer structure. I was expecting the update rule to be deactivated after this. But the Update rule is activated. Because of this I am not able to accomodate my new infoObject in the update rule. What might be the problem?
    Regards,
    KP

    Hi KK PP,
                     Update rules are only pertained to Data targets,These helps to map the object to the Infosource using a rule.If you change the transfet structure or communication structure it will not effect update rules.If you add some object to your data target then update rules will be changed.
    Regards
    Karthik

  • Changing default Work Center during CATS time entry

    Hi Folks,
    I am hoping someone here can throw some expert advice.
    Currently during time entry in CATS, we have Work Center coming in from the Work Order. Its getting defaulted without any option to change it. Business here has a need to change it. I have llooked into the CATS profile to see if there is a place that enable the WC to be defaulted.
    In Transaction CAC1, there is a section that shows what fields are being defaulted during CAT2 time entry. However I do not see the Work Center as one of the option there.
    Can any one help?
    In short, where do we disable the defaulting of the WC from the Word Order during time entry?
    Thanks in advance.

    Hi,
    Adding to what Kapil said; if the work centre is a grayed out in time shet screen then you can go to CAC2 transaction and make it editable. By this way users will be able to change the work centre on screen.
    Regards
    Sreekanth

  • User exit/Badi for changing operation work center based on service product

    Hi,
    I have an requirement to change the operation work center based on the service product in IW31/IW32 transaction. I am using the BAdi 'IM_SM_BADI_READT399A' for changing the main work center. It changes all the operation work centers except the first one. But I need to change it all the operations.
    Thanks in Advance.

    I am using the enhancement spot 'IWO1_TL_INTEGRATION2' for changing the first operation work center

  • Activity Type Changes in Work Center

    Hi Experts,
    We now want to change the activity type in a work center, and hope all the routings that have the work center being changed automatically. Currently, the existing routings can not be changed automatically. Is there a way to have all the routings changed as well? 
    Best Regards,
    Helen

    Hi,
    In Costing tab next to the activity you should find a check box for Reference Indicator. If this is ticked, then the changes done in work center will be automatically read into routings.
    If it is not, then you will have to manually change in routings. For individual, you can use CA02, for mass work with CEWB, working area as SAP_OPERATION
    Regards,
    Vivek

Maybe you are looking for

  • FCC Receiver Communication Channel

    HI Experts,                  My scenario was Idoc to File. Issue: In My target structure i have mapped A,B,C,D fields. I want only A,B,C at final structure. I cannot ignore D field in message mapping as i am using that field for file name Substitutio

  • Switch Between Jpanels within a JFrame

    Hi, I am new to this java thing and I need a hand with the following problem I have 3 classes Invaders Game OptionsMenu Basically, you execute the program which executes Invaders, which then creates a JFrame with a border layout and adds the menu bar

  • Re-Calculate PO conditions during MIGO

    We need to re-calculate PO condition base on changed excise duty at the time of MIGO. Is there any function module or user exit  through which we can recalculate PO condition GR ?

  • Deleting Channel Strips

    So some of the channel strips I set up have outlasted their usefulness. Rather than live with them getting in my way every time I go to choose another, can they be deleted? thanks, Jim Power Mac dual 2.0   Mac OS X (10.4.2)   helluva good kisser

  • After upload I get this message:The requested URL  was not found on this se

    After a 'fresh' upload I get this message: The requested URL /terpsichoresmentor/Welcome.html was not found on this server. I tried both Cyberduck and Go Daddy - same result. (I've used Cyberduck in the past successfully) Both Firefox and Safari give