Updating the Inspection Plans

Hi,
I want to update Quality Inspection Plan header fields: ( PLKO TABLE Fileds) Dynamic Modification level and Modification rule . Is there any BAPI or FM to update the QIP header fields.
Please suggest for a way to achieve this.

Hi,
we dont have values maintained for CWBQM transaction .So I am looking for a way to achieve the update of QIP programatically and I checked the BAPI "BAPI_INSPECTIONPLAN_CREATE" .It is not useful for updation of Inspection plan.
Please suggest for a way to achieve this Programmatically.

Similar Messages

  • Master data changes not updated in Inspection Plan- QP01

    Hi
    We created all the QM master data . After that we did some changes in inspection chars and in the sampling master data.but the values are not reflecting in the Inspection plan . How to update the changes in the inspection plan. We are trying to find indIvidual as well as Mass update
    Any input will he highly appreciated
    Thanks
    JJ

    Dear JJ
    Another easy method will be maintaining MIC as referenced mic. instead of maintaining it as complete copy model you can make it referenced. any changes in the mic can be updated automaticalyin the inspection plan using the referenced functionality.
    The issue being wherever the mic goes will be changed,
    Regards
    gajesh

  • Error while creating the Inspection plan by T.C QP01

    Hello Friends,
    In QP01, When i am trying to create a inspection plan system throwing the error message "The inspection plan identifier exists already. Enter another."
    Message no. QP054
    But in QP02, When i checked  for that material, Plant, Group Number, Group counter, Usage, Status, i didn't find the entry over there.
    Actually my requirement is to create a inspection plan for a material and plant combination with speicfic Usage as 61(customer requirement and status 4) but when i am trying to create that system throwing the error message explained above.
    Thanks and Regards,
    Jitendra Chauhan.
    Edited by: jitendra chauhan on Jun 1, 2010 4:28 PM

    Hello Friends,
    Thanks for your valuable answers.
    I checked in table MAPL, for a particular material, Plant, Group Number and Group Counter, there is no entry.
    Where as in table PLKO, for a particular Group Number and Group Counter, entry is there. Actually this Inspection Plan Group Number and Group Counter is assigned to multiple materials through Material Assignment. If i delete the entry for this in table PLKO, than for all rest of the materials also entry will be deleted.
    Hence how to resolve this?
    Actually for other material number, same plant, same group number and same group counter, entry exist. So can i simply go in the inspection plan of other material,same plant,same group number,same group counter and than inside the material assignment to assign the required  material code, plant and the group counter number?
    Looking ahead for valuable inputs from the genius.
    Thanks and Regards,
    Jitendra
    Edited by: jitendra chauhan on Jun 2, 2010 8:09 AM

  • FM/BAPI for changing the inspection plan

    Hi,
    I need to change the inspection plan.
    Can anyone suggest any FM or BAPI please.
    When I am trying to use BAPI  BAPI_INSPECTIONPLAN_CREATE for this purpose,
    I am getting the below mentioned errors:
    E  BAPI                001
    A CPCL               006 Task list Q Q0000171 1 already exists
    A CPCC_DT         210 For further processing, the routing entry is missing
    Thanks in advance.

    Hi,
    Could you please help me with the fields that need to filled for this purpose ?
    I am currently filling the TASK and INSCHARACTERISTIC structures with the following fields filled:
    TASK:
    TASK_LIST_GROUP
    GROUP_COUNTER
    VALID_FROM
    VALID_TO_DATE
    TASK_LIST_USAGE
    PLANT
    TASK_LIST_STATUS
    TASK_MEASURE_UNIT
    LOT_SIZE_FROM
    LOT_SIZE_TO
    INSPCHARACTERISTIC:
    TASK_LIST_GROUP
    GROUP_COUNTER
    ACTIVITY
    INSPCHAR
    QUANTITATIVE_IND
    MSTR_CHAR
    PMSTR_CHAR
    CHA_MASTER_IMPORT_MODUS
    CHAR_DESCR
    UP_TOL_LMT_IND
    LW_TOL_LMT_IND
    TARGET_VAL_CHECK_IND
    TARGET_VAL
    UP_TOL_LMT
    LW_TOL_LMT
    But still I am getting the error mentioned above(previous message).
    Thanks
    Shilpika

  • Fetching the Inspection plan from OEM/owning Plant while doing GR in MIGO

    Hi,
    I have a scenario-
    a) I am doing a Goods Recipt against a purchase order for a plant(suppose Plant A).
    b) I have to fetch the Inspection Plan from the Owning OEM(suppose Plant B) of the material.
    At present we are maintaining the inspection plan for Plant A & B separately, which is not in synchronization.
    Can anyone suggest any BADI or user exit that can be enhanced to deal with this scenario?
    Thanks in Advance.
    Priyabrata

    continuing my issue is it possible to that we donot have to change the gbb and vbr and still we can have the desired results.
    that is we are able to use different gl for debit while doing goods issue from a single stocked material
    or we want to have this result
    1.          repairs to p&m    1000    dr
                         stock of cement  a/c           1000    cr
    2.          repairs  to building    2000   dr
                          stock of cement  a/c            2000   cr.
    3.             construction     3500     dr
                                 stock  of cement     3500     cr
    we donot want to change the GBB and VBR every time    or change the GL a/c while doing reservation.
    is there any third option where we get the desired result without changing or entering the g/l manually
    if there is please let me know the t.codes

  • How to set up the inspection plan for the material in super BOM

    Hello,
    how to get the accurate inspection plan of the IQC for the material which was class item in a super BOM?
    I've gotten the characteristic value from the sales order, and get the PO after MPR. The problem is how to specify the target value and the range of inspection characteristic in inspection plan, because the value is temporary?
    Thanks!
    Lin

    Hello,
    I think you need to create MIC which linked with the configuration characteristic, and specify "inspection by configuration" for the inspection type.
    then the configuration value in the sales order can be transfered to the inspection lot when production released or goods receipts if you use inspection type 03 or 04. that means the value range for the MIC will be determined dynamically for each sales order.
    Regards, Winnie

  • I updated the photography plan to full creative cloud suite but can't access any of the full creative cloud apps

    I had a prepaid photography plan for a couple of months and then decided to upgrade to the full creative cloud suite because I needed more apps. However, I just updated today and I still don't see all of the apps. I changed my card from one I had used previously to a different one, so I'm not sure if that has anything to do with it not working yet.

    I see some of the apps
    This is my current view of the Creative Cloud program.
    For some reason Premiere CS6 was available but I cannot find the app anywhere on my computer after downloading. It says it is functioning in creative cloud but I cannot find it. So I tried to uninstall it, but it's not working. Audition CS6 was able to download from the Creative Cloud without any issues but shouldn't it be CC not CS6? Also I need After Effects as well but I can't find that. The InDesign CS6 was a physical disc copy I had from before with a license.

  • Change Inspection Plan

    Hello everyone,
    I have a problem, I change a control indicators of characteristic in the inspection plan, but it doesn't take effect.
    whether I need to set other setting? Thanks in advance.
    zhigang
    Edited by: zhigang lu on Oct 16, 2009 5:29 AM

    Hi,
    Please also check under QM client settings in SPRO to ensure that the "replace master inspection characteristics" box is ticked as this will allow changes in the MIC to update the references in the inspection plan. Also check the QM settings at plant level if you have ticked master inspection characteristics with history then if you do a change in the MIC it will create a new version and not update the inspection plans. If this is ticked you will have to manually go into the inspection plan and assign the new MIC version.
    Regards,
    Roderick

  • SAP QM Default Inspection Plan for all Inspection Lots created in the Plant

    Scenario: We have a Proto type plant in which Daily 15 to 20 materials are created every day. We have only one inspection plan for all the materials.
    Problem: We don't want to do material assignment in the Inspection Plant header every time a new material is created
    Requirement: Is there any way to default the inspection plan for all the inspection lots created in the Plant by Standard Configuration or User Exit.
    Your answers will be much appreciated and rewarded.
    Thanks in advance,
    Thiyagu

    Hi,
    In our case Creation of Inspection lots are controlled by QM View of Material Master. Our problem is to find alternative for assignment of New Materials in the Plan header in Tcode QP02, as we have only ONE INSPECTION PLAN. So our expection is all QM Inspection Lot created in the Plant should always get assigned to the SINGLE INSPECTION PLAN, with out doing any assignment of material in the Plan.
    Thanks,
    Thiyagu.

  • Mass update the OTL rotation plan for employees

    Hi All,
    I am trying to find a way to mass update the rotation plan for employees .I could not find any API or easy way to do it.
    Do we have any easy way to do it.
    Thanks

    If you cannot find an API, why don't you try one of the data-load tools.
    http://www.dataload.com/
    Cheers,
    Vignesh

  • Creating Inspection plan using BAPI

    HI all,
    I am using the FM 'BAPI_INSPECTIONPLAN_CREATE'. I am unable to update the Inspection characteristics as multiple entries. Its getting updated only the last item.
    Expecting answer from the experts.
    Ravi.

    Hi,
       you can check the BAPI_INSPECTIONPLAN_CREATE for the named purpose, the values you named are in the structure BAPI1191_CHA_C please read the BAPI documentation:
    Functionality
    You can use this function module to create inspection plans and all its subordinate objects.
    You can create a key date view and the complete history of an inspection plan. It is useful to have a history when transferring data from external systems.
    Example
    You want to create an inspection plan with operations and inspection characteristics for key date 01.01.2000. Make an entry in the following tables for each object:
    TASK
    OPERATION
    INSPCHARACTERISTIC
    If you want to assign test equipment to the inspection characteristic in field ITEM_NO_OF_PRODUCTION_RESOURCE, you must have assigned this test equipment in PARAMETER PRODUCTIONRESOURCE.
    Notes
    If no error occurs during the transfer of data, the export parameters GROUP and GROUPCOUNTER contain the key for the task list created. A COMMIT WORK must be executed for writing data to the database.
    All errors that have occured are logged in the export parameter RETURN. If there are inconsistencies, the inspection plan to be created is rejected
    <b>Reward points</b>
    Regards

  • MIC changes in routing/inspection plan

    Hi, we have created qualitative inspection characterisics (without characteristics attribute control indicator) with incomplete copy model type. This is already assigned in inspection plan and in routing. Now our users want to assign characteristics attribute.  We changed the MIC control indicators. this is not reflecting in the routing/inspection plan.
    Could anyone suggest the best way to update the inspection characteristics in inspection plan as well as in routing.

    Dear !!!!
    Please Follow this steps
    1.Check Inspection Setup What u have given
    2.Create a Quality Work center with control Key QM01
    3.Create Master Inspection Characteristic in QS21
    4.Create Quality Plan QP01 make sure your usage type 5 0r 6
    5.Assign inspection characteristics in master inspection whatever u have created in QS21 save
    6.Go to QA32 check with selection by material or by plant
    7.Then go to QE51n and run by selection condition by material or by plant Results recording starts
        Then click on the Inspection lot make the inspection and save it will prompt saying that results save under operation
    9.Then go to Usage decision QA32
    10.Move Material From Quality To Unrestricted.
    Thatu2019s all the Steps
    With Regards
    Pushpalas

  • BAPI or FM to change an inspection Plan

    Hi everyone,
    I have a requirment,when a specification (Recipe managment) is changed ,the data accordingly should be updated in the inspection plan that is linked with that.
    Can you pelase let me if i have any function module or BAPI which can be used to update the existance inspection plan.
    I have a BAPI to create INSPECTION PLAN but i didn't find any bapi to change INSPECTION PALN.
    Thank you in Advance.

    Hello Parankusham,
    Unfortunately, there is no BAPI for changing the please.You can look into the engineering workbench CWBQM and which possibilities it offers you in your case.
    Thanks
    Amber

  • Using inspection plan in multiple plants

    Hi,
    I would like to use one inspection plan in multiple plants. Are there any disadvantages or pitfalls? (besides the fact that if I use workcenters, the same workcenters must exist in all plants using the plan)
    Marcus.

    I love to use material specs.  They can be used alone or in conjunction with a plan. 
    There are several reasons why plans must be used in certain situations.
    Dynamic modification is one of the big ones.  You can only use DMR in inspection plans.
    You also need plans to work with PRT assignments.
    Security based on workcenters.  Some plants require that only certain techs or personnel perform certain inspections.  And the people who can do results recording is strictly monitored.  This is especially true for those using SAP in the Pharm and food industries.
    Using calculated characteristics.  These can only be taken advantage of if your use inspection plans.
    Enginerring change management.  Plans can used ECM to track and document changes.  Another big requirment in Pharma and food.
    If a material spec is used it is an all or nothing situation.  In many places, there might be 20 or 30 characteristics on a given material spec.  If you inspect by material spec then all the characteristics in the material spec are copied into the inspection lot.  If you inspect in conjunction with a plan, any characteristics that don't match up with an inspection plan characteristic are appended to the last operation of the plan.
    Since in many places, inspections are done at various stages, or maybe derived from batch derivation, they often want to pick and choose what tests get performed at what inspection.  A good example would be 03 and 04 lots.  Many places might test some characteristics via the 03 inspection that get the tests from the routing/receipe.  If the test is done in a later operation, there may not be any need to repeat the test in the 04 inspection lot.  Using a material spec, they wouldn't have that flexibility.  Anther example are 09 recurring inspections.  Many companies may only inspect a certain subset of characteristics to requalify the material at reinspection.
    Capturing costs for specific testing must use an inspection plan.  (yes, you can use general QM order in the material master if you want, but the operation header of a plan has various values and settings for working with costs)
    And now in 6.0, if you want to use the multiple spec functionality, you have to use inspection plans.
    If you integrate with EH&S and maintain specs in EH&S then EH&S can create and update all the inspection plans as changes are made.  But not material specs.
    I think I hit some of the big reasons,  I'm sure others can probably come up with ones I've missed.
    Craig
    Edited by: Craig Snyder on May 1, 2008 9:35 PM

  • Inspection plan 2985 has been deleted error

    Hi,
    We ahve created a new material and gr made for that materail as it is coming frist time we have created a inspection plan with QP01, but when i done  QA02, chnage inspection lot to calculate the sample quantity system is giving error that   Inspection plan 2985 has been deleted , and we are not getting the sample quantity and also the material is not coming in QE51 to update .
    regards,
    zafar

    Hi Zafar,
    Make sure you have assigned the material to a valid inspection plan in transaction QP02, once the material is assigned to the plan then go to QA02 under the inspection spefication tab click the task list / spec button, this will then automatically assign the inspection plan to the inspection lot. If you have assigned the material to multiple plans for the same usage it will give you a pop up selection of which plan to choose. Once the plan is assigned you will be able to see the inspection lot in transaction QE51N.
    Regards,
    Roderick

Maybe you are looking for

  • ITunes libraries are stored on a hard drive the PC doesn't recognize!

    HELP! Our four iTunes libraries are "backed up" on an external hard drive that our PC (Dell desktop running Windows XP) no longer recognizes. Santa provided iPod Touches for kids but we're all afraid to hook them up to the PC because we don't what wi

  • Maximum RAM which can be fitted?

    I have a Powerbook G4 17 inch, serial number W8*******QRV which currently has 1Gb. of RAM fitted. I have tried to fit 2 x 1Gb. of DDR1 333MHz. PC - 2700 (SODIMM) but have had no success. The laptop does not give memory error beeps, but instead displa

  • Unable to start all 3 instances in RAC

    Hello All, I got the following error while trying to restart a 3 node RAC database. OEM reported two out of three nodes to be down. We also noticed that the cluster_database parameter was set to "False" and the cluster_database_instances integer was

  • Early alarm on my new E66

    Just familiarizing myself with my new E66 (200.21.118). I have always used the alarm devices in my previous phones, but this morning the E66 was kind enough to wake me two hours EARLIER than the setting. It has worked fine the previous 3 days, but ob

  • How is Panorama function accessed in Photoshop Elem 11?

    The documentation and help information shows a panorama function available from the drop-down menu, but there is no option in the software.  Has that feature been dropped from the software?