Upgradation project to ECC 6

Hi all
Can anyone please provide some guidance, if possible also send some documentation, which I can follow to work on a upgradation project.
Currently system is 4.7, and they want to upgrade to ECC 6.
What are the steps involved, what would be my role as FICO consultant, in such upgradation, because i have never worked on a upgradation project.
Any input will be highly appreciated.
Krishna

http://solutionbrowser.erp.sap.fmpmedia.com/
http://service.sap.com/releasenotes
http://service.sap.com/upgrade
http://www.sap.com/solutions/business-suite/erp/pdf/BWP_ERP2006_Upgrade.pdf
https://websmp104.sap-ag.de/instguides
SAP Business Suite App->SAP ERP -> SAP ERP 6.0

Similar Messages

  • New Development project  in the middle of  ECC EHP7 upgrade project

    Hi All,
    We are performing ECC EHP7 upgrade project in our project system landscape and i have already started Dev system upgrade.Suddenly our development team wants to perform new project  which required to install add-on product from third party application. Installing new add-on will require us to regenerate stack.xml file right? if that is the case  do we need to perform re upgrade to Dev right?. As per my knowledge this is not recommended to perform parallel project with upgrade project.
    Is there any  best practice or recommended method to perform multiple projects with upgrade project at the same time.
    Thanks,
    Raghu

    Hi Raghu,
    First here i would like to suggest you & your development team i.e during an upgrade project dual maintenance is required as per SUM guide,as per SUM guide you need to maintain parallel systems to perform regular activities, for same you could refer SUM guides and follow the standard procedures.
    Installing new add-on will require us to regenerate stack.xml file right?
    Yes you need to regenerate the stack.xml file .
    if that is the case  do we need to perform re upgrade to Dev right?
    If you are under upgrade phase no need to perform re upgrade,required add on can be installed after completion of an upgrade as per availability for EHP7.
    Try to avoid perform multiple projects with upgrade project .
    Regards,
    Gaurav

  • 4.6 C to ECC 6.0 Upgrade Project Timeline Sheet in MPP format

    Dear all,
    We are now proposing our customer for the 4.6c to ECC 6.0 Upgrade.
    Our customer is currently in 4.6c/oracle 9i/HPUX 11 i. He wants to move to ECC 6.0.
    If you have the project timeline for the above Technical Upgrade, can you pl send it to me.
    If you don't have in MPP format atleast send me the Work Breakdown structure with timelines.
    I shall modity the same to our customer and submit
    Thanks & Regards
    Senthil
    [email protected]

    Preparation Phase* 6 days
    Kick Off Meeting 1 day
    Upgrade Project Procedures Preparation 1 day
    Prepare Upgrade Project Plan 1 day
    Technical Requirements Assessment 3 days
    Assess Training needs of Key-users & End-users 1 day
    Prepare Detailed Basis Activity List for DEV, QA & PRD 1 day
    Business Blueprint Phase 6 days
    Develop System Landscape Upgrade Plan 1 day
    Functional Requirement Checklist 1 day
    ABAP Development check list 1 day
    Develop detailed Training Procedures & Documentation for Key Users & End Users 1 day
    Identify Testing Scope & Scenarios 1 day
    Identify Authorizations Conversion to Roles for SAP ECC 6.0 2 days
    Develop Documents as per Basis Activity List 1 day
    Develop Authorization Matrix for Activity Groups to Roles Conversion 2 days
    Prepare Upgrade Deliverables Checklist 1 day
    Realization Phase 28 days
    Installation of Solution Manager 3.2 System 1 day
    Creation of New Development System for Upgrade Project (Homogenous System Copy - PRD) 2 days
    Upgrade to AIX & Oracle 10g, SAP ECC 6.0 on New Development Server 3 days
    Upgrade Frontend Software 4 days
    Perform SPAU & SPDD Corrections 5 days
    Perform ABAP Development & Corrections 10 days Perform Authorizations Conversions and corrections after upgrade 8 days
    Perform Upgrade Testing for each Application Module 7 days
    Perform Unit & Integration Testing 6 days
    Perform Training to Key Users & End Users (Generic & Specific) 3 days
    Upgrade to AIX, Oracle 10g, SAP ECC 6.0 on Quality System 1 day
    Homogenous System Copy of PRD to New Quality & Upgrade to AIX, Oracle 10g & SAP ECC 6.0 2 days Perform Testing in Quality System 3 days
    Testing by end users on Quality System 1 day
    Production Realization & Go-Live Phase 6 days
    Upgrade to Production System Operating System to AIX (after close of business hours - 23:00) 1 day
    Oracle Upgrade to 10g (after close of business hours - 23:00) 1 day
    SAP Release Upgrade to ECC 6.0(Downtime Minimized - Downtime occurs in non-business hours) 2 days
    User Acceptance Testing 1 day
    Production System Go-Live 1 day
    Post Go-Live Support 14 days
    Post Go-Live Support 14 days Note: This is high level plan subject to change during Business Blue Print Phase 0 days
    This is taken from a post in Ittoolbox, May be this is generic. Hope you can tailor this to meet your requirements.

  • Upgrade Project - 4.7 to ECC 6.0

    Hello Gurus,
    I am HR Functional consultant and assigned to work on upgrade project (4.7 to ECC 6.0) for the first time. I am new to this environment. Can any one help me with suitable documents to start with. My mail id: [email protected]
    Points assured..
    Thanks in advance
    Regards
    kasi

    Dear kasi raj,
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh
    P.S. you can send me a mail at my mail id [email protected] for any specific details

  • Data transfer form 4.7 to ECC 6.0 in upgradation project. How to do?

    Hi Experts,
       The client is going for an up-gradation from 4.7 to ECC 6.0. The entire data needs to be transferred from 4.7 to ECC 6.0. What is the best possible way to do this?
    Please advise.
    Regards,
    Tomesh

    Hi ,
    Going for an up-gradation from 4.7 to ECC 6.0. The data needs gets migrated from 4.7 to ECC 6.0.
    SAP normally has defined better SAP functionalities in the new system .
    In any upgrade project use Tcode SPDD. In this all the dictionary objects u2013 data elements, database tables and structures in the version 4.7 are compared with the upcoming new system.
    All you need to do is the check whether the new change is suitable or not.You can make the modifications and then you need to make the migration of data, which can be automate.
    the links for your reference.
    Link:[https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/304b9de6-f84f-2b10-94af-e5ff7461c18c]
    link:[http://solutionbrowser.erp.sap.fmpmedia.com/Default.aspx]
    Thanks & Regards,
    link:[Lakshmi Narayana]

  • How To Use SPDD and SPAU Transaction in An Upgrade Project

    Hi Friends,
    I will be working in an upgrade project very soon. this is my first experience for Upgrade project. Though I know these two transaction are used for Upgrade.
    Can anyone give me a step by step document for using these two transactions and other relevant information.
    Also, I have one query where do we use these transactions : On the old system e.g. R/3 4.7 or ECC 6.0
    Thanks,
    Pradeep
    <REMOVED BY MODERATOR - REQUEST OR OFFER POINTS ARE FORBIDDEN>
    Edited by: Alvaro Tejada Galindo on Dec 23, 2008 10:39 AM

    Hi Pradeep,
    For SPDD see this link
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/2e/6d66587d9011d396b60000e82de14a/frameset.htm
    For SPAU
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/c8/61ec66e33611d1954b0000e82de14a/frameset.htm
    Why you need this Adjustments
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/60/d6ba7bceda11d1953a0000e82de14a/frameset.htm
    You use the transactions in the new system.
    Regards

  • Text Determination Error in Upgrade Project

    Hi All,
    I am working on Upgrade Project from 4.6C to ECC 6
    I encountered the error like the Text Determination is missing in all the Documents like Sales Order, Delviery and Billing Documents in ECC6.
    But the same is appearing in 4.6 C.
    I am getting the error " Error in Text Formating ".
    Message No.VX201.
    Could you please give your valuable inputs on this.

    Hi,
    Check the settings again in 6.0. Follow the path IMG-sales and distBasic Func--Text Control. It may that while migrating the data certain tax type is found missing in the new system.
    Regards,
    Saurabh

  • Cutover Activities for Upgrade Project

    Experts
    What are the cutover support activities for the administration of the ECC 6.0 (SAP) upgrade project. Also please do let me know how to prepare cutover strategy , and how do we develp cutover plans.
    Regards,
    Mahesh

    Hi,
    Check this thread.
    CutOver activities in BI7.0 while doing  production upgrade BI7.0 FromBW3.x
    Regards.

  • NWDI in upgrade project - Recommendations

    Dear All,
    We are upgrading ECC and Portal. Earlier client doesn't have NWDI.
    Now we are using NWDI, so the customer wants the below recommendations.
    1. Provide a recommendation for use of NWDI within the Upgrade project.
    2. Provide a recommendation for possible ongoing / expanded usage of NWDI at the project.
    Please provide your suggestions.
    Thanks.

    Hi,
    1. If you are implementing ESS/MSS you can upgrade the components using NWDI.
    In general for deploying components you either use JSPM or SDM to deploy. And NWDI uses the same method to deploy the components.
    It's upto you to use NWDI or to deploy them directly.
    Recommendation would be if implementing ESS/MSS you can use NWDI. If you are not modifying the standard SAP Delivered component then you can deploy the components directly.
    2. It depends on what all things are you planning to implement.
    Hope this helps.
    Cheers-
    Pramod

  • Role of ABAP Consultant in an Upgrade Project

    Hi Friends,
    I'm an ABAP consultant, I've worked on Implementation Projects till now. Last one was on ECC 6.0.
    I have been assigned to an upgrade project (from 4.6 to ECC 6.0).
    So can anybody let me know what is the role and what are the responsibilites of an ABAP consultant in an Upgrade Project?

    Hi,
    Role of technical consultant:
    1) Code fixes and bugs for upgrade objects
    2) SPAU / SPDD corrections
    3) removal of obselete statements by checking through the code inspector or EPC
    4) replacing the BDC on enjoy transactions with BAPI
    5) replacing the call transaction on obselet transactions with the corresponding new transactions.
    Few of them are listed above..
    Reward if useful
    Regards
    Shiva

  • Role of a functional consultant in an upgrade project

    Hello friends,
    My client is planning for an upgrade of 4.7 to ECC 6.0.
    Could you pls give me some info regarding the Role of a functional consultant in an upgrade project.
    Naveen

    The role of a functional consultant in an Upgrade depends on the scope of the project.
    whether it is a Technical Upgrade or a Functional Upgrade.
    Following would be some of responsibilities -
    Coordinate with Client  Business/Functional Team to identify critical business processes, understand the functionality of the custom developments
    Overall Test Planning, Preparation of Test Plans, test scripts and executing Unit and Integration testing
    Providing clarifications for functional related issues during UAT
    It is is functional upgrade analyze which custom functionalities can be retired and which can be brought back to standard.
    Prepare a POC on the recommended new functionalities on how these would be useful for the Client.
    Training the Client super users
    Preparing training documents
    Analyzing the obsolete transacations and modifying the documents with the new transactions
    Hope this helps you.

  • Upgrade projects and Compare and ajust func.???

    Hi All.
    I am trying setting up a demo of the benefits using SolMan for upgrade projects with Compare and Adjust functionality.
    I am following a guide with the following steps:
    1. Create an Implementation project with some processes from BPR (Using SAP R/3 Enterprise 4.7 as logical component).
    2. Model (change) the processes to simulate that a not fully SAP std. process is used at this compagny.
    3. Copy the implementation project to an Upgrade Project (with option "Adjust target project to original of the source project".
    4. Adding logical component SAP R/3 ECC 6.0 to the system landscape.
    5. Executing transaction SA_PROJECT_UPGRADE for the Upgrade project.
    Now, when I go to the project, I see no marking of changes anywhere...
    Could this be because I am using the wrong processes in my Implementation project from BPR?
    Does anyone have a good example of processes that can be good to demo this?
    Thanks in advance!
    /Per

    Hi All.
    I am trying setting up a demo of the benefits using SolMan for upgrade projects with Compare and Adjust functionality.
    I am following a guide with the following steps:
    1. Create an Implementation project with some processes from BPR (Using SAP R/3 Enterprise 4.7 as logical component).
    2. Model (change) the processes to simulate that a not fully SAP std. process is used at this compagny.
    3. Copy the implementation project to an Upgrade Project (with option "Adjust target project to original of the source project".
    4. Adding logical component SAP R/3 ECC 6.0 to the system landscape.
    5. Executing transaction SA_PROJECT_UPGRADE for the Upgrade project.
    Now, when I go to the project, I see no marking of changes anywhere...
    Could this be because I am using the wrong processes in my Implementation project from BPR?
    Does anyone have a good example of processes that can be good to demo this?
    Thanks in advance!
    /Per

  • MM Upgrade Project

    Hi
    What are the roles & responsibilities of MM Consultant in a upgrade project ?
    What are the major functionality difference between SAP 4.7 c & Ecc 6.0 version ?
    Explain me in detail ?
    Thanks & Regards ,
    Mani.

    HI,
    Upgrade is of two types :
    1. technical : in technical upgrade role of funcitonal consultant is to test all the existing functionalities in ECC development (unit testinf)and QA server(UAT )
    Also MM consultatn has to sit with Abaper for some SPAU adn SPDD adjustments.
    2. Fucntional Upgrade: respective consultatn has to identify teh new functions and take it up further with Business for approval and sign off and then implement the new funscitons.
    http://solutionbrowser.erp.sap.fmpmedia.com is the site where in you can get the new  functionalities available in target source.
    Award points if helpful as points collection awards through SAP goes to welfare of some of the poorest regions of the world
    regards

  • Upgrade Project Case Study

    Dear Friends:
    I have to do a case study regarding an upgrade project from 4.7 to Ecc 6.0. Please guide me with suggestion,notes.If you any case study material,Please forward to my e-mail ID:[email protected]
    Thanks&Regards
    MSReddy

    Hello
    I do not have any ready made material on the topic, but could give my views:
    - Presentation to be in PPT format.
    - Features of 4.7 version
    - Features of ECC version
    - Comparitive features / replaced by new functionality
    - Advantages of new version
    - Disadvantages of old version
    - Challenges in new version
    Give all the comparisons, module wise.
    - Options in new versions
    - How the client benefits from the new versions
    - List of decisions to be taken.
    Q &A
    Reg
    *assign points if useful

  • Upgrade project documentation

    Hiii ,
           anybody who has worked on upgrade project, please help me out. I need to know the exact job responsibilities of a SD consultant in upgrade projects. What are the expectations from SD consultant.
    Thanks,
    Chandra

    Dear Chandra,
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional prespective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh
    P.S. you can send me a mail at my mail id [email protected] for any specific details

Maybe you are looking for

  • What settings do y'all use for Memory Usage?

    Application default is 100% and Still Cache is 10%. I have seen diffeent theories on this and put my Apllication down to 80%. Now it seems I am getting an Out Of Memory message when doing haevy duty renders. Ideas? Thanks folks!

  • Discover 3i

    Hai Friends.... When i am connecting to database through Oracle DiscoverViewer(by url http://myhost/servlets/discoservlet) i got some error message saying that, Sesion failed to find locale es-Es I wouid appreciate any help. Cheers sheya

  • Since downloading new version, Printer issue "Can't load library DLBAPRP.Dll, Using Defaults Error:126"

    The printer will not work on some printjobs and I get the message shown in my question. Previous to downloading the new version of Firefox, no problem. And I can print these jobs when I use my internet explorer browser.

  • Is it true that certain music won't play?

    I heard that iPods won't play music that you haven't purchased. Is this true? How can it tell? If I download something from the gnutella network, will that not play on an iPod? thanks!

  • Time Machine and missing space on lacie drive

    I've got time machine all set up, but my backups keep failing. Time machine says that this is because there are only 19.2 GB available of the 149 GB on my external drive. I can only seem to find about 81 GB worth of stuff on my drive. I can't figure