Upgrade 46C to ECC 6.0 with CU&UC

hi,
For the CU&UC, do i need first to upgrade to web as 6.20 and the upgrade to ECC 6.0.
If somebody know what to do?
thaks,
Sergio

Hi,
CU&UC as name itself suggest that it is a combine Upgrade & Unicode conversion that menas we need to Upgrade the system from 4.6C to ECC 600 and then do the Unicode conversion.
The broad level steps will be
Upgrade Preparation
Unicode Conversion Preparation
Upgarede execution
Unicode Conversion
Post Upgrade & Unicode Migration activities.
The Manual for Combined Upgrade & Unicode conversion is available on service marketplace, use the same for more details
Hope this will help you, do revert if yoiu need any more details on the same.
Best Regards,
Sachin.

Similar Messages

  • CA-JVA on  the upgrade 46C to ECC 6.0 (with HR module)

    Hi experts,
    We have now finished the upgarde but ne things make me feel not good:
    In SAP  Note 316815 - CA-JVA: Upgr. R/3 Enterprise / ECC- data transfer AFVC->AFVU
    I think the transfer of those tables has not been worked fine.
    And it seems that the implementation of this note does not woks at all. I mean to transfer of the Tables (AFVC to AFVU and VSAFVC_CN to VSAFVU_CN) before the upgrade and transfer them back after the upgrade.
    Currently we have now both systems running: The Source system (the production system where the data comes from with release 4.6C) and the pilot system which has been upgraded in release ECC 6.0 (with source system data).
    Is there any possibily to recover this step without to repeat the all upgrade (after a DB copy of course)?
    Maybe export those tables?
    Thanks in advance
    HanseAtik

    I have to close it.. without answer from anyone...

  • Upgrade 46C to ECC 6 0 - Preparation steps

    1. Before the Upgrade is started what are the PRE - Upgrade steps  related to security?
    for example should any tables be dwn loaded ? etc etc..I will be doing the upgrade in two weeks just wanted to prepare the the docs as well as the system before.
    I hope to give a ths forum a complete security upgrade seanario.
    Thanks

    Hello George,
    Please use the following link to know more about the upgrade 46C to ECC6.0
    http://www.sap.com/community/showdetail.epx?itemID=10015
    Hope it helps.
    Cheers,
    Satish.

  • Upgrade 46C to ECC 6 0 STEP BY STEP ---Developing

    Now the upgrade has reached the "POST Upgrade Steps" which means Its open to the SECURITY ( Authorizations ) to come in.
    1. First I have doing the SU25.
    Question -->Do I need to run (1) on SU25 .
    Answer:NO this is only for IInstallation of PFCG. for upgrading to higher releases only Steps 2 down are needed.
    Please correct me if I am wrong or have additional information which you want to share

    > The only way they are going to see what changes have been made is from the change logs for the roles.  You can look at tables which show differences in the proposal values but they are worthless unless they map 100% to the only changes shown in the roles.
    I think this is what GG is looking for, but as you mention there are both system and audit skill pre-requisites.
    The auditor needs to know and have confidendence in the before concept if roles are to be upgraded via SU25.
    The auditor needs to have knowledge about the release being upgraded to, and which changes would be required (and opportunities made use of to use new features... potentially also redesigning existing roles in new ones...)
    And then map the expected changes (that is their job) to the actual ones (the tools which Alex has mentioned).
    My recommendation would be to use the "you navigate, I drive" approach before giving the auditor access to do a comparison and get lost on their own, potentially.
    That way you know what the auditor is capable of, and the auditor has a better understanding of your upgrade strategy.
    For major release upgrades, redesigning role concepts are an opportunity which should not be missed, and I think a reasonable and skilled auditor should understand that.
    > A potential alternative would be to set up an RFC connection to the system which your pre-upgrade roles were backed up to and then run a comparison between each role in the backup and the current system.
    That could be usefull as well for a snapshot of expected changes between the "real roles" and the upgraded roles in a sandbox, all else (and coding) assumed the same between the release upgrades (which is of course not the case...) It would be helpfull to find transactions for which the coding has officially changed or are now officially the leading transactions for the proposal indicators.
    I have not tried that either - but I think it would be usefull information for the functional folks and developers (including role developers).
    Cheers,
    Julius

  • Upgrade from 46C to ECC 6

    Hello:
    We are planning to begin technical upgrade in SAP, from 46C to ECC 6.0.
    I have the next landscape:
    -Current SAP (CS): SAP 46C with Oracle 8.1.7 and Solaris 8
    -New Server (NS): Without SAP, 40% more of capacity, with Oracle 10.2 and Solaris 10 already installed.
    We want to install SAP ECC 6.0 in NS and get the data from CS.
    Which is the best and easy way to do this? SAP manuals are quite generic. I have two ideas but I would like your comments:
    1st way
    1. Homogeneous copy of CS
    2. I install ECC 6.0 in NS with the option to import data generated in 1. (is this possible??)
    3. Finish installation and aditional configurations. I begin to test.
    2nd way
    1. Homogeneous copy of CS
    2. I install 4.6C in NS with the option to import data generated in step 1. (Not sure if 4.6C will accept Solaris 10 and Oracle 10.2).
    3. I suppose I don't need to reconfigure after installation and import.
    4. I do necessary tests. At this point I would have 46C on the new versions of Solaris and Oracle.
    5. I begin the SAP upgrade to ECC 6.0 in NS
    6. .... The remaining processes indicated by SAP
    Thanks for your attention.

    > -Current SAP (CS): SAP 46C with Oracle 8.1.7 and Solaris 8
    > -New Server (NS): Without SAP, 40% more of capacity, with Oracle 10.2 and Solaris 10 already installed.
    The database software is usually installed during the run of sapinst/R3setup, not before. You may run into problems if you pre-install Oracle (environment, necessary database options not set etc.)
    The easiest way would be do to a system copy.
    I would then
    - install the latest Oracle instantclient
    - install the latest kernel 46D_EX2 kernel
    Markus

  • Error in upgrade from 46c to ecc 6.0

    hi experts,
    we are facing an error at the time of upgrade from 46c to ecc 6.0 in the phase JOB_RSUPGAIMEXE.
    did anyone face this error anytime during upgrade on windows plotform?
    Please let us know your comments..
    regards
    raghu

    Hello,
    Can you please look in the /put/log directory and copy the error from the appropriate log file. You should find a log file with a name similar the to upgrade phase that is causing the error.
    Thanks
    N.P.C

  • Performance issue after Upgrade from 4.7 to ECC 6.0 with a select query

    Hi All,
    There is a Performance issue after Upgrade from 4.7 to ECC 6.0 with a select query in a report painter.
    This query is working fine when executed in 4.7 system where as it is running for more time in ECC6.0.
    Select query is on the table COSP.
    SELECT (FIELD_LIST)
            INTO CORRESPONDING FIELDS OF TABLE I_COSP PACKAGE SIZE 1000
            FROM  COSP CLIENT SPECIFIED
            WHERE GJAHR IN SELR_GJAHR
              AND KSTAR IN SELR_KSTAR
              AND LEDNR EQ '00'
              AND OBJNR IN SELR_OBJNR
              AND PERBL IN SELR_PERBL
              AND VERSN IN SELR_VERSN
              AND WRTTP IN SELR_WRTTP
              AND MANDT IN MANDTTAB
            GROUP BY (GROUP_LIST).
       LOOP AT I_COSP      .
         COSP                           = I_COSP      .
         PERFORM PCOSP       USING I_COSP-_COUNTER.
         CLEAR: $RWTAB, COSP                          .
         CLEAR CCR1S                         .
       ENDLOOP.
    ENDSELECT.
    I have checked with the table indexes, they were same as in 4.7 system.
    What can be the reson for the difference in execution time. How can this be reduced without adjusting the select query.
    Thanks in advance for the responses.
    Regards,
    Dedeepya.

    Hi,
    ohhhhh....... lots of problems in select query......this is not the way you should write it.
    Some generic comments:
    1. never use SELECT
                       endselect.
       SELECT
      into table
       for all entries in table
      where.
       use perform statment after this selection.
    2. Do not use into corresponding fields. use exact structure type.
    3. use proper sequence of fields in the where condition so that it helps table go according to indexes.
        e.g in your case
              sequence should be
    LEDNR
    OBJNR
    GJAHR
    WRTTP
    VERSN
    KSTAR
    HRKFT
    VRGNG
    VBUND
    PARGB
    BEKNZ
    TWAER
    PERBL
    sequence should be same as defined in table.
    Always keep select query as simple as possible and perform all other calculations etc. afterwords.
    I hope it helps.
    Regards,
    Pranaya

  • Short dump in MIGO and VL02N when upgrading from 46C to ECC 6.0

    Hello,
    We are doing an upgrade from R/3 46C to ECC 6.0 and we face a shortdump in trx MIGO (upon saving the document).
    DBIF_RSQL_INVALID_REQUEST
    a BKPF_INSERT in program SAPLF005
    The same shortdump happens when doing a Goods Issue on the SD side.
    Looking at the program, this is not modyfied so I guess it is a standard SAP error.
    OSS however, up to know did not respond to my message and there does not seem to be a SAP Note on this issue!
    Anyone had this problem before. How did they solve it.
    Thanks for any reply,
    Aart

    Posted in another forum

  • Upgrade from 46c to ECC 6.0 new components support package

    dear experts,
    we have upgraded our test system from 46C to ECC 6.0
    before upgrade in 46C we have support packages components
    SAP_BASIS 46C
    SAP_ABAP 46C
    SAP_APPL 46C
    SAP_HR
    PI 2003_1_46C
    SAP_NOTES 46C
    ST-A/PI 01B_R3_46C
    ST-PI 2005_1_46C
    after upgrade to ECC 6.0 we found
    SAP_ABA 700 0006
    SAP_BASIS 700 0006
    ST-PI 2005_1_700 0001
    PI_BASIS 2005_1_700 0006
    SAP_BW 700 0006
    SAP_AP 700 0003
    SAP_HR 600 0003
    SAP_APPL 600 0003
    EA-IPPE 400 0003
    EA-HR 600 0003
    EA-GLTRADE 600 0003
    EA-PS 600 0003
    EA-RETAIL 600 0003
    EA-FINSERV 600 0003
    EA-DFPS 600 0003
    EA-APPL 600 0003
    FINBASIS 600 0003
    ECC-DIMP 600 0003
    ERECRUIT 600 0003
    FI-CA 600 0003
    FI-CAX 600 0003
    INSURANCE 600 0003
    IS-CWM 600 0003
    IS-H 600 0003
    IS-M 600 0003
    IS-OIL 600 0003
    IS-PS-CA 600 0003
    IS-UT 600 0003
    LSOFE 600 0003
    SEM-BW 600 0003
    we are planning to apply SPS 06. Is it mandatory we have to apply
    all the support packages in SPS 06.
    we are confused as we dont use IS-OIL,EA-,ERECUIT,INSURANCE,FI-
    please suggest which support packages we have apply relating to the
    functionality we have in 46C
    regards
    Raghu

    Hi,
    you have to apply the same type of packages as before.
    All other are included in ECC, but if you don't use the special services and applications (for example IS Oil or stuff like this), there is no need to apply all these packages.
    SAP_ABA 700 0006
    SAP_BASIS 700 0006
    ST-PI 2005_1_700 0001
    PI_BASIS 2005_1_700 0006
    SAP_AP 700 0003
    SAP_HR 600 0003
    SAP_APPL 600 0003
    should be enough
    Regards
    Timm

  • UPGRADE ECC 6.0 with AFS 6.3 from R/3 4.7

    We are now preparing the upgrade of our R/3 server to ECC 6.0 with
    AFS . As per the plan and SAP guide for upgrade we started the prepare
    phase with upgrade master for ERP 6.0 . But in the initial stage i saw
    the page of prepare it showing all the induatry specific components
    like ECC DIMP ,IS_OIL etc . But we want to use AFS 6.3 . So if i
    continue the installation all the industry specific addon installed .
    So why because of the conflict iam should not apply AFS into our
    server .
    So kindly tell me how can i remove ECC DIMP like industry components
    from the prepare phase .

    good

  • Upgrading from 46C to ECC 7.0

    Guys,
    My company is going to upgrade R/3 46C to ECC 7.0 later this year.  From the development (ABAP programs, any ABAP objects) standpoint, any suggestions on preparation, or what can be done in our current 46C environment to ensure a smooth transition from 46C to ECC (unicode, obsolete ABAP syntax, etc)?  Also any idea and recommendation on planning the upgrade, as well as things to watch out for are welcome.
    Thanks,
    Yan.

    First ECC 7.0 does not exist, so you will be upgrading to ECC 6.0.  And yes, you can start by doing a start for any calls to WS_UPLOAD and WS_DOWNLOAD.  You will need to change these calls to call the GUI_UPLOAD or GUI_DOWLOAD function modules.
    Other syntax issues will need to be handled after the upgrade, like using the ECODING extension on all OPEN DATASET statements.
    Regards,
    Rich Heilman

  • /usr/sap/trans (data/cofiles) is empty before upgrading 46C- ECC60

    After homogeneous system copy from a 46C production system (PRO) to an upgrade test server (DES), and after the execution of SE06, the DES import queue is empty (/usr/sap/trans/cofiles and /usr/sap/trans/data directories doe not contain files).
    Some objects were changed in PRO along the years using change requests, and these changes are reflected in DES also, but DES does not have those change requests in the queue. However DES is ready to upggrade.
    I would like to know if I can expect problems during the upgrade of DES, from 46C to ECC 6.0 due to the absence of those change requests. I think the upgrade process could ignore all changes and additions made.
    What do think?
    Thanks for your help.

    Hi,
    Since you copy your production system to test system then all changes that you have done over the time will be there in the system. Data file and cofile are not required. You can start with your upgrade preparations.
    Thanks
    Sunny

  • What are the major differences b/w R/3 4.7 and ECC 6.0 with SAP BW/BI

    Hi,
    Any one can give an idea about the conversions from SAP R/3 to ECC 6.0 with respective of SAP BI/BW.
    what are the major differences loading the data,delta methods,enhancements,lo's,FI-SL,CO-PA etc.....
    if any one have documents and links please can you share it is very usefull for my client.
    with out knowing i don't want to go forward,i don't misguide my client.
    actually i am working as sap bw/bi consultant,my client is going to upgrade the R/3 4.7 to ECC6.0 and BW 3.5 to BI 7.0.can you help me or guide me .
    Thanks in advance.
    SAP Member......

    Check
    http://service.sap.com/releasenotes
    http://erp.fmpmedia.com/
    Markus

  • IS-Retails on ECC 6.0 with ehp4

    HI,
    I am looking to install IS-Retails on ECC 6.0 with ehp4
    Can any one guide me exact location to find the component and also installation procedure.Thanks
    Best Regards
    Narendar

    Hello,
    Goto Service Market place and goto download page. Then click on Search for Installations and Upgrades under Installations and Upgrades.
    In the search tab fill with EA-RET.
    http://help.sap.com/saphelp_erp2005/helpdata/en/43/6880cbb88f297ee10000000a422035/frameset.htm
    In the above link check under Logistics-general for more details for IS-Retail.
    Regards,
    Yoganand.V

  • ECC 6.0 with NetWeaver Ehp 1 without Ehp 4

    Hello
    Is this combination possible?
    ECC 6.0 with NetWeaver Ehp 1 without Ehp 4
    Thank you very much!

    That combination is not possible.  The information below is taken from http://www.sdn.sap.com/irj/sdn/nw-70ehp1.
    Regards,
    John
    What is the implementation strategy for SAP Business Suite?
    With the unrestricted shipment of enhancement package 1 for SAP NetWeaver 7.0, only implementations within standalone installations of SAP NetWeaver 7.0 are supported (e.g. for BI, EP, etc.).
    For existing installations of SAP Business Suite systems (i.e. SAP ERP 6.0, SAP CRM/SRM/PLM, ...) etc.) that are based on SAP NetWeaver 7.0, the SAP enhancement package 1 for SAP NetWeaver 7.0 shall not be installed separately, as it will result in malfunctioning of the installation procedure and/or the final system state.
    Business Suite 7 (generally available since May 5th, 2009) is technically based on the SAP enhancement package 1 for SAP NetWeaver 7.0. All relevant parts of enhancement package 1 for SAP NetWeaver 7.0 are included in the respective SAP Business Suite 7 installation routines and will be installed automatically underneath the SAP Business Suite systems when an upgrade to SAP Business Suite 7 is performed. More information is available in this overview presentation, more details can be found at the service marketplace quick- link /ERP-EHP (SMP login required).
    General note on the relation of enhancement packages for SAP Busiess Suite and SAP NetWeaver:
    Customers who have implemented certain enhancement packages for SAP Business Suite might have to implement a certain enhancement package for SAP NetWeaver 7.0 as well. Please refer to the respective documentation of the SAP Business Suite for details.

Maybe you are looking for

  • View Objects with Union Queries--trouble with primary keys

    Hi, I'm working with JDev 11.1.1.3 and am trying to do a couple of things (without success--yet). I am trying to create a master-detail relationship that displays the existing data in a set of 3 tables and later I will be creating forms for inserting

  • Can I install 10.8 on a mac book pro purchased with 10.9?

    A few weeks ago I bought a mac book pro with 10.9 preinstalled on it. I wish now to revert to 10.8 to solve some backward compatibility problems. Is that possible? I tried to prepare a bootable USB but unfortunately the mac does not want to boot on i

  • Excise duty not picking when we enter basic price in contract

    Hi Friends, When we are creating contract, we have to manually enter basic price after entering basic price system is not picking Excise duties. But we are doing carry out new pricing that system is picking excise duty. So i need solution from all SD

  • What are .lproj folders

    After I installed iWork, I was appalled to see how huge the apps were (Pages is nearly 900mb, Keynote even bigger). So, I took a peek into Pages (06) by using the Finder's Show Package Contents function to see what was inside of the Pages.app file. I

  • IE6 error in WD Application

    Hi community, In WD application in doInit method check a UME Groups of UserID but when try stop the flow in doModifyView with "IWDConfirmDialog" at create method the browser retutn the following errors with Microsoft Error Popup: "Internet Explorer c