Upgrade ebooks/material required

Dear All,
I am an Oracle 8 OCP and want to upgrade using following path.
8 to 9i 1Z0-035
9i to 11g. 1Z0-055
Please help me in this regard if anybody have please let me to know.
Thanks
Aqeel Nawaz

http://tahiti.oracle.com (e.g. New Features guides)
http://www.oracle.com/technetwork/indexes/downloads/index.html
edelivery.oracle.com (for older releases i.e. 9.2)
Edited by: orafad on Oct 4, 2011 2:46 PM

Similar Messages

  • Creating a planned order with error "Material requires configuration"

    Dear All,
    I am facing a problem for creation of a planned order with error "Material requires configuration".
    To follow the note 180317, I change Account Assignment Category to "U" (Unknown).
    However, the system still does display the same error.
    Could you please help provide possible solution for this?
    Regards,
    Phong

    See also the following blog post:
    Configurable planned order for material variants: Exception "53: No BOM explosion due to missing configuration"
    BR
    Caetano

  • Creation Indicator in PR: B Material Requirement planning

    Hi All,
    I am facing an unusal scenario.
    User is claming that PR is getting generated for a material after running the MRP, even there is enough stock.
    I checked material &  I found that MRP type is ND, there is no entry in the planning file for this material.MRP list & stock requirement list of this material is showing nothing. So there is no way that PR will be created automatically via MRP run for this material.
    When I checked one PR for this material, Plant & storage location, creation indicator is showing as B Material Requirement planning.
    Could you please help me that why creation indicator is showing as B>
    I further checked these PRs are created long back when MRP type was V1. Later they changed it to ND.
    How to delete MRP generated PR manually when PO has been created for these PR.
    Regards
    Shilpi
    Edited by: sapmm1234 on Dec 14, 2011 6:10 PM

    As you said; the PR was created long ago by MRP, when it was not ND.
    If it was already converted into a PO, there's no need to delete it, right? If not, just delete it manually.
    In the future, when you change MRP type from a valid type to ND, always remember to do 2 additional things, as the system will not do them automatically:
    1- delete the MRP list
    2- delete any planning elements if they exist, like planned orders and MRP generated PRs.

  • Budget is prepared by respective department on basis of material required

    Hello All
    I had a doubts and need help
    If budget is prepared by respective department on basis of material required in the next year. Then how in sap we will able to track in sap.
    Budget can be plan on fund center and commitment item, when client make budget on basis of material and services required then how commitments will be created
    Thanks in advance
    alok

    Hi,
    FM budget objects are indeed fund centres, funds, commitment items, etc. If your client prepares the budget on different level, it has to be mapped to FM objects either inside SAP (via FMDEIRVE startegy) or outside SAP.
    Regards,
    Eli

  • Periodic material requirment in project

    Hello Guru's,
    I need your help in my project requirment :- We are working for construction project were we have an activity for concrete work.
    now total work involved in this activity is 120m3 and the duration is 12 months. So period wise 10m3 work i am going to execute.
    To execut this 10m3 of work I need 5kg of cement per month.
    So total material required to execute the 120m3 of work in 60kg.
    Now my requirment is when I create activity in proj for concrete work, i attach cement as material to this activity and generate the reservation. Against this reservation through MRP material is procured and issused to proj. (this is the process)
    While attaching material I need to specify 60kg but system should generate 10kg of reservation every month is this possible???
    if so how or suggest me to map this process.
    Thanks in advance,
    Tushar

    Hi,
      If I need to cretate  periodic requirements for a material which is converted into a PR then do I need to assign the material perio-wise?
      what i was thinking if there is any means of triggering a PR for the overall quantity and then splitting the quantity period-wise in the PR.My MM person says no functionality of this kind is available.
      Would the best way-out be to create a manual PR and put the periodic requirements line-item wise?
      Thanks and Regards

  • Raw Material Requirement

    Guru
    My Client Wants material requirement plan for finished product
    For Example
    One plate of Size 1000 MM X1000 X 500mm in this sheet He wants the three type finished goods of  X, Y & Z of different
    How to Configure where & is their any cusomation required for this requirement.
    pl advise me for this senior
    Thanks in Advance
    Sudhir

    Dear Sudhir,
    Generally the sheet metals or raw materials which are to be represented in different sized section using one material code will
    be represented as a variable size item R as the itel category while maintaining the BOM for X,Y,Z.
    When creating the BOM of X,Y,Z include this sheet metal with item category as R and quantity as 1 ea or 2 ea as required.
    For this formula's will be maintained.
    Check these links also,
    Variable size Item
    Regards
    Mangalraj.S

  • What is Material Requirement Planning

    what is Material Requirement Planning since i am a beginner in Supply chain management

    Material Requiremnts plan and master schedule (MRP) answers two quisitions:
    1. How mauch you need to supply (Make/Buy).
    2. How much resource Hours needed to produce.
    MRP is an unconstrained, and infinite planning engine. this means, if you have a demand (Sales order/Forecast), the planning engine recommend actions to be done based on demand due date only regardless of capacity or material availability, and it gives you exception messages to take action; as a planner; regarding anything that may violate satisfying the demand in that due dates.
    Best regards,
    Mostafa

  • Is it possible that we generate material requirement in MRP at company code level?

    We want to generate material requirement in MRP at company code level, what is the possibility or any work around.
    Thanx in Advance.

    Hi Mirza
    This is not possible on the standard system. The highest planning level on MRP is the plant.
    It has been discussed on the following thread, where BAdI MD_CHANGE_MRP_DATA was proposed as a solution, however, the logic to be implemented on this BAdI is very complex:
    MRP Run considering Stocks for Multiple Plants and Requirement maintained for Plant Cluster
    If you want to know more about the BAdIs available on MRP check the following document:
    BAdIs for MRP
    Another alternative is to use flexible planning to plant at company code level, then disaggregate the planning to the plants and transfer the result to demand management and MRP.
    See the following thread for details:
    Flexible planning | SCN
    BR
    Caetano

  • Service Order Material Requirement

    Dear SAP consultants
    Need to check with you guys on this matter.
    I have a service order with list of components. I would like to do an advance shipment and create a quotation from it. Problem is , once the quotation is created the material requirement tab in the service order changes from Immediately to never and the whole line item is greyed out in the service order.
    Is there a way, I can create the quotation without transfering the material requirement to the quotation and allow the service order to still be open ? How can I do this with only 1 quotation type .... the others should work as usual ...
    Any thoughts or suggestions .. please feel free to let me know ..
    Thanks
    Moon

    Hi Paul,
    As you said "
    The requirement date is calculated as follows:                          
    1. The start date (earliest scheduled start) of the operation minus     
    2. The goods receipt processing time of the component and minus or plus 
    3. The lead time offset for the component in the order                  
    The above values (point 2 and 3) can be adjusted to manipulate the      
    delivery date."
    I have checked for stock & non stock item, but this calculation is not working for work orders. only i can change the date with offset. i checked material master record and change the GR processing time and planned delivery time but its not working. Do you have any idea why its not working?
    Thanks.
    Shahyan        

  • Datasource 2LIS_03_S194 (Material Requirement Planning)

    Hello SDN:
    I need to extract data from the datasource 2LIS_03_S194 (Material Requirement Planning) relevant to me. I know this datasource is LIS and to fill it, I need to run a program RMCBMRP2 to fill set up tables, and this doesnot support Delta update.
    I have one doubt, that for future MRP data Loads will I have to execute this Program every time and do full loads..? OR can I schedule a job to do.? If so, how to schedule a job.?
    Please share your experiences with me.
    Thanks in advance,
    Regards,
    Kalyana Pidugu

    Hi Kalyana- I am also using this same datasource and not sure when to run the program RMCBMRP2 in ECC and what parameters (regarding period/dates) to provide in SE38 while running it. If you have found more info on this can you share with me please?
    Thanks
    Naresh

  • Material requirment show iddferent quantity than Bill.

    Hello ,
    I need help on issue, there is one assembly i.e. 4025457 which have child part 4956854. If we look at bill of 4025457 it shows 4956854 need 0.785 LB quantity. But if we generate WIP job for same assembly then in material requirement it showing 0.98125 LB instead of 0.785 LB.
    Analysis –
    1. No Customization to update it at WIP level.
    2. There is no UOM conversion factor.
    3. Usage is 1.
    Please help!
    Mohit

    Hello Mohit,
    check below reasons :
    1. I hope Bill of material for the Item was revised and updated with 0.785 LB but job was created in 10th OCT-2014(earlier) .Are you getting the same issue when your created a new discrete job now ??
    2. Please check bill of material setup separately from bill of materials window once not from intended bill of materials window.
    3. check what was of the BOM defined for 4076782 (Other component in the bill)
    Regards,
    Surya.

  • My upgrade to CS6 requires me to uninstall the beta or trial version; how do I do that?

    My upgrade to CS6 requires me to uninstall the beta or trial version; how do I do that?

    Use the Uninstallers provided to remove the software. Do *NOT* delete the files.

  • Preventive Maintenance Plan Material requirement forecast

    Is there any way I get to know what whether the materials included in Tasklist of maintenance plan are  available or not , Just like forecasting or material requirement planning.
    Regards,

    I dont think this is possible. You may have to extend the standard simulation program for scheduling to include the Components. You will also have to call the material availability check FM to analyse the demand for the required date.
    Even then there is no guarantee for material availability when the Order is actually called.
    Regards
    Narasimhan

  • Sum material require by customer

    Hi all,
        is any way to sum material require by customer in mrp.  i want to see the  sum quantity by customer in MD04.
    THANKS!
    JAMES

    Hello James,
    Your post is not a SAP GUI issue, therefore, you will not get a useful reply.
    Before posting, read the 'Scope of the SAP GUI Forum'  post and see if there is an entry for PP-MRP-BD

  • BI7.0 certification material required

    Hi All,
    Could any one please provide me BI7.0 Dataware housing and Reporting material required for Certification exam.
    It would be really helpful if they are of MCQ type.
    Thanks in advance.
    Rahul

    Hi
    Check out the following links for BW 7.0
    http://help.sap.com/saphelp_nw04s/helpdata/en/a4/1be541f321c717e10000000a155106/frameset.htm
    What's new in SAP NetWeaver 7.0(2004s)? - An introduction to the functionality deltas and major changes
    http://csc-studentweb.lrc.edu/swp/Berg/Articles/NW2004s_what_is_new.ppt
    Almost All BI 7.0 Books and Material.
    This link is very useful
    bw 7.0
    http://it.toolbox.com/blogs/sap-bw/sample-certification-questions-3479
    Hope it helps
    Regards
    gaurav
    Edited by: Gaurav  Paul on Sep 29, 2008 11:01 AM

Maybe you are looking for