Upgrade from 11.5.10.2 to 12.1.3-Recommended Values for "Number of Workers"

Hi,
Please find below our configuration (PRODUCTION Machines) :
- AppsTier (1 Node) :
- O.S : Linux RedHat 5 (64 Bits)
- 16 CPU
- 4 Processors QuadCore
- Total Memory : 18 Gb
- DBTier (1 Node) :
- O.S : HP-UX Itanium (64 Bits) - 11.31
- 4 Processors QuadCore
- Total Memory : 128 GB
During the Upgrade from 11.5.10.2 to Release 12.1.3 , what are the recommended values for "Number of Workers" regarding this configuration ?
Regards,

Hi;
Please review:
How to Set Contingent Worker Numbering Within the Employee Numbering Sequence [ID 290750.1]
How Does Adpatch Determine The Number Of Workers To Recommend? [ID 800024.1]
How To Select Number of Workers Based on Number of CPUs When Running ADPATCH [ID 226191.1]
Regard
Helios

Similar Messages

  • If I upgrade from CS5.5 to CS6 will I have to pay again for upgrading to CSCC?

    If I upgrade from CS5.5 to CS6 will I have to pay again for upgrading to CSCC?
    I have CS5.5 and my current clients have CS6.
    If I upgrade to CSCC will I have any trouble saving back my files to CS6? Are there any know issues that occur when saving back to CS6 or earlier?

    Why would you update to CS6 when you can go directly to CC.  And while you wouldn't pay another upgrade amount you would have to pay the monthly subscription whether you upgrade to CS6 or not.
    And you shouldn't have problems saving your files in a form that is readable by CS6.  You wouldn't be able to make further adjustments on items that are not in CS6 ie. Shake reduction, however the adjustments you make in CC will be visible.

  • TS4268 I upgraded from the 4s to the 5s on Tuesday and requested my O2 number be carried over to my new EE contract. Everything has been carried over fine but i have been unable to switch on Imessage and Facetime, Error message shows 'Waiting for Activati

    I upgraded from the 4s to the 5s on Tuesday and requested my O2 number be carried over to my new EE contract. Everything has been carried over fine but i have been unable to switch on Imessage and Facetime, Error message shows 'Waiting for Activation' I've done the the resets and followed the instructions from the Apple Help page but still can't get it to switch on??

    If you say you have done everything in this article: http://support.apple.com/kb/ts4268, then you should probably contact your carrier for their advice.

  • Upgraded from Elements 9 to 12 and the Adobe site says my serial number is invalid. [was:Pardner 1]

    I just upgraded from elements 9 to 12 and the Adobe site says my serial number is invalid. I copied right off my old box.

    double check that you have the correct number:  http://helpx.adobe.com/x-productkb/global/find-serial-number.html
    if you're certain you do, contact adobe support:  http://www.adobe.com/support/chat/ivrchat.html

  • I have an iPad 2 and is it worth upgrading from iOS 5.1 to 6.0 and should I wait for further stable updates ?

    I have an iPad 2 and is it worth upgrading from iOS 5.1 to 6.0 And should I wait for further stable updates?  As I have there are app compatibility and security issues on ios 6.

    Most users haven't had problems with iOS 6, however, some have. I'm still using iOS 5.1.1 on my iPad 2. There is a beta version iOS 6.1 being tested. Don't know when it will be released. When it is released, I'll update.
     Cheers, Tom

  • Is there any way to still upgrade from final cut 5 to final cut 7 using my original serial number?

    Hi there,
    I had my macbook pro 15inch(2010 model) stolen a week ago. I was running on Snow Leopard, and I used Final Cut 5.
    I am a bit out of touch with how much the technology and upgrades have changed (don't chastise me for it!), and have discovered that any new laptop I buy will come with the Mavericks operating system, which obviously won't allow my FCP5 to run.
    I have also been told that I can't simply upgrade to a newer version of FCP, but that I would have to purchase the entire suite again, and that would mean purchasing FCPX, which I would prefer not to buy because of all the changes that it brought to the program.
    First of all, is it standard procedure to have to purchase entire suites all over again once each new version is brought out? I was under the impression that once purchased, you could upgrade, seeing as you had made the commitment of spending the money in the first place. Apologies if this is a terribly daft question, but I would appreciate the assistance!
    Secondly, if I don't want to upgrade to FCPX, does anyone know if there is a way to still upgrade to FCP7, either by purchasing it or updating it using my serial number details from FCP5? I bought it legitimately and I'm trying to find out if there is a way to avoid spending thousands all over again!
    Your help would be appreciated:)

    It been a while, but I believe you just need the serial number of FC 5 for the FCS 3 installer. If I were you, I would verify that over at the Final Cut Studio forum before purchasing the update disks.
    I just checked Amazon and there is a $600 difference in the update and full versions; they list (one) unopened upgrade boxed set at $795 while an unopened set of the full version currently is proced at $1295 (a $300 premium over the price Apple used to charge!).
    Something you might want to ponder: the question of how much to invest in a suite of software that is no longer being supported by Apple. Even though I'm able to run FCP 7 and its related  apps largely without issues on Mavericks, who knows how long or well that will work in the future?
    Also, if you're at all curious about whether the changes you mentioned in FCP X are value-added or not, you can always download the trial version and find out first hand. If you do, invest a little time with some of a few tutoirals offered by by a variety of highly regarded FCP X intructors. You might be pleasantly surprised.
    Good luck.
    Russ

  • I recently upgraded from Snow Leopard to Lion and now some CDs I use for school do not work.  Can I create a partition to run both Snow Leopard and LIon or does it only work to run windows?  How do I do this?

    Getting a new CD from publisher is not an option as they would want me to pay for a new one and they are pricey.  If possible I would prefer to keep my upgrade to lion but would go back to leopard if there's no other option.

    You can add another partition on which you can install Snow Leopard. If you do, however, you cannot use Boot Camp Assistant to install Windows. Just so you know.
    To resize the drive do the following:
    1. Restart the computer and after the chime press and hold down the COMMAND and R keys until the menu screen appears. Alternatively, restart the computer and after the chime press and hold down the OPTION key until the boot manager screen appears. Select the Recovery HD and click on the downward pointing arrow button.
    After the main menu appears select Disk Utility and click on the Continue button. Select the hard drive's main entry then click on the Partition tab in the DU main window.
    2. You should see the graphical sizing window showing the existing partitions. A portion may appear as a blue rectangle representing the used space on a partition.
    3. In the lower right corner of the sizing rectangle for each partition is a resizing gadget. Select it with the mouse and move the bottom of the rectangle upwards until you have reduced the existing partition enough to create the desired new volume's size. The space below the resized partition will appear gray. Click on the Apply button and wait until the process has completed.  (Note: You can only make a partition smaller in order to create new free space.)
    4. Click on the [+] button below the sizing window to add a new partition in the gray space you freed up. Give the new volume a name, if you wish, then click on the Apply button. Wait until the process has completed.
    You should now have a new volume on the drive.
    It would be wise to have a backup of your current system as resizing is not necessarily free of risk for data loss.  Your drive must have sufficient contiguous free space for this process to work.
    Boot from your Snow Leopard DVD and install on the volume you just created. Be sure you set the new partition as the target for your Snow Leopard system.

  • After upgrade from 4.6c to ECC6.0 F4 Help is not coming for few date fields

    Hi Friends
    Just now we have completed upgrade project from 4.6c to ECC6.0.
    After upgrade F4 help is not working for some date fields.
    For example its working in MB11,Its not working in va01,vf01 like that.
    In abap side we checked ...not able to find any issues in coding level, because its a standard SAP code.
    So if any solution is there to correct this issue.Kindly help me to resolve this asap.
    Thanks
    Gowrishankar
    Edited by: gowrishankar p on Nov 17, 2009 7:25 AM

    Hi
        Please refer to the SAP note 1278056 and 1278115 - PDS Display: F4-characteristic values are not selectable.  Hope this will resolve your issue.
    Regards,
    JB

  • Upgrading from Exchange 2003 Bridgehead servers to Exchange 2010 Transport Hub servers for routing SMTP only

    Our company moved from on-premises Exchange 2003 to Office365 and only have 4 Exchange 2003 servers on-prem that we use for Routing email from application servers to Office365. We need to migrate these servers to Exchange 2010 then to Exchange 2013 and
    only route email only. Is it possible to upgrade to Exchange 2010 by installing the transport Hub & Mailbox server options only? Our OAB and EWS services come from the CAS servers located on Office365 so we should not need a CAS server to set up Transport
    rules or route mail would we? Any assistance with this would be greatly appreciated! - Thanks, DWB
    Dave

    Since it is not internet facing we will not have to worry about configuring an Internet Domain Name when installing the first server, correct? in my planning I was going to
    install the Exchange 2010 CAS/Mailbox/Transport Hub roles on one server, then upgrade it to Exchange 2013. Once this is completed I'll then install the 2 mailbox role servers in one Datacenter, and 3 more in our DRP DC. If something happens to the
    primary Datacenter I would want it to fail over to the other site. For this I would have to install another CAS/mailbox server in the secondary DC. Would this plan sound about right? Since we moved to Office365 in 2010 I have not had a chance to deal with
    actual servers except for the Exchange 2003 servers we still have on-premises. Each of these are located in 4 Regional offices along with single Windows 2008 R2 servers using only the IIS SMTP service for routing mail from on-prem application servers
    and print/scanners which email back to the users. The plan is to move to a routing system which will provide both MTA and redundancy if one has an issue.
    Dave

  • Upgraded from 6014 card to a 6221. The vi's written for the 6014 don't work.

    We recently upgraded the DAQ card from the 6014 to the 6221. The measurement and automation explorer allows us to use the test front panels to use the digital outut lines, but we were unable to use the existing vi's that controlled the digital output line. The error described by LabVIEW is "Error -10401 occurred at DIO Port Config." The error occurs when the DIOPortConfig.vi calls the lvdaq.dll function library using the following path: C:\Program Files\National Instruments\LabVIEW 7.0\vi.lib\Daq\lvdaq.*. The existing programs for the 6014 worked without flaws. We need to know if all of the software that was already written has to be changed in order to work with the new card.

    Hi,
    There are several things which are important:
    It looks like you've used the traditional NI-DAQ VI's to programm the 6014. The problem is that the 6221 is only supported by NI-DAQmx and not by the traditional NI-DAQ driver. This means, that you cannot use the existing application for the 6221.
    The 6014 is supported by Trad. and NI-DAQmx driver, the 6221 only with NI-DAQmx.
    I don't know if you're only using the DIO lines of the 6014 or some AI/AO/CTR lines too, so this are some possible workarounds:
    1. If it's an "easy" application then I would rewrite the VI with NI-DAQmx VI's. You'll find some examples for NI-DAQmx in the LV examples library.
    2. Use the Traditional NI-DAQ Compatibility VIs. With the Traditional NI-DAQ Compatibility VIs, you can run your existing programs written in Traditional NI-DAQ on devices supported only by NI-DAQmx. You'll find them here: Traditional NI-DAQ Compatibility VIs. Please read the description carefully, to see what is supported and what isn't.
    I recommend you option 1, because this is future-proof and you can use the whole functionality of the M-Series board and the easy of programming of the NI-DAQmx driver.
    Regards,
    Luca

  • HT4623 I can not upgrade from 4.3.3 (8J2) towards the newer version of software for my I pad 2 2g

    If anyone know how to upgrade newer or latest software for iPad 2 +2g, need help, thanks

    If you are using IOS 4, you need to connect to iTune (computer) to update software.
    http://support.apple.com/kb/HT4972

  • CUCM, IMP and CUC upgrade from version 9.1.1 (on VMWare) to version 10.5 (on VMWare)

    Hello,
    I have to perform a Refresh Upgrade to 10.5 for a client who has the following UC apps on a virtual environment:
    CUCM version 9.1.1
    IM and Presence version 9.1.1
    CUC (Unity Connection)  version 9.1.1
    A. I see on the CUC Upgrade document below:
    http://www.cisco.com/c/en/us/td/docs/voice_ip_comm/connection/10x/upgrade/guide/10xcucrugx.pdf
    P.39 --> Change Guest Operating System after CUC Upgrade to Red Hat Enterprise Linux 6 (64-bit). But nothing about the Network Adapter.
    B. I see on the CUCM 10.0 Upgrade Guide:
    http://www.cisco.com/c/en/us/td/docs/voice_ip_comm/cucm/upgrade/10_0_1/CUCM_BK_U4214F9D_00_upgrade-guide-cucm-100.pdf
    Page. 44:
    Step 3: Change the configuration of the VM as needed (Guest OS, ...) Step 4: Modify the Network Adapter to use VMXNET 3 Adapter type as steps before the CUCM upgrade.
    My questions would be:
    1. Do I need to change the Network Adapter for CUC as well? If yes, should this be done before upgrade or after?
    2. What would be the implication of not changing the Network Adapter from "Flexible" to VMXNET3?

    Hi csrlime,
    Not sure about future issues by remaining on the flexible adapter but best practice suggests going with what the OVA requires.  I performed a refresh upgrade from 8.5 to 10.5 in a virtualized environment.  For CUCM and CUC I changed the Network Adapter before beginning the upgrade.  The steps I took to make the network adapter change were:
    1.  Download a copy of the vmx file from the server(s) you are upgrading to your local machine.
    2.  Create a back up of that file incase you need to restore it in the future.  From cmd prompt in the same folder as the download .vmx.  copy "<virtual_machine_name>.vmx"
    then run the following from you cmd prompt
    copy "virtual_machine_namet.vmx" temp_file.vmx
    findstr /V /R "^ethernet0.virutalDev.*" temp_file.vmx > "virtual_machine_name.vmx"
    echo ethernet0.virtualDev = "vmxnet3" >> "virtual_machine_name.vmx"
    Upload the edited vmx file to your the datastore which will replace the current.   Then remove the vm from inventory and then add it back.  Check your setting and the network adapter should be changed to vmxnet3 now. 
    Steps are from the Read Me file as an option to change it.  I don't why you can't make this change during a maint window.

  • Steps to upgrade from Weblogic Portal 8.1 to Webcenter Portal 11.1.1.6

    Currently I'm involved in consulting for a client who has Weblogic Portal (WLP) 8.1. I'm trying to find documentation for upgrade from WLP 8.1 to Webcenter 11.1.1.6.
    I found the below link but the starting point for upgrade is Oracle WebCenter 10g (10.1.3)
    http://docs.oracle.com/cd/E23943_01/doc.1111/e22628/wcmap.htm
    I'm not clear if I should migrate from WLP 8.1 to WLP 10.3.x and then to Webcenter or direct migration from WLP 8.1 to Webcenter is possible ?
    Any pointers / links / case study would be helpful.
    Thanks for the helping soul in advance.

    Thank you jiri for the quick response.
    Regarding your comment 'upgrade from WLP 8.1 to WLP 10.3.5 is not for free', I did some search and found that the documentation is available for upgrading from 8.1 to 10.3.4 as below :
    http://docs.oracle.com/cd/E26806_01/wlp.1034/e14253/upgrade_process.htm
    Also when I went to the 10.3.5 documentation library (http://docs.oracle.com/cd/E35968_01/index.htm), I found the below link (where the upgrade process points 8.1 to 10.3.4 instead of 8.1 to *10.3.5*)
    http://docs.oracle.com/cd/E26806_01/wlp.1034/e14253/toc.htm
    My understanding (after reading the documentation + your comment) is that we can upgrade from 8.1 to 10.3.4 but to upgrade to 10.3.5 we need to pay Oracle. Could you point me to a link which has that information ?
    Thank you for your help.

  • Cannot direct upgrade from Photoshop CS2 to CS5 Extended

    Despite the information in various spots on Adobe's website, it appears that it's not possible to simply upgrade from Photoshop CS2 to CS5 Extended. After entering the CS5 serial number, the installer asks for the serial number of a "qualifying product". This includes a dropdown list that only has
    Photoshop CS5
    Photoshop CS4 Extended
    Photoshop CS3 Extended
    Here's the view:
    Entering the CS2 serial number == fail.
    A call to Adobe support get past this issue, basically reading out a challenge/response from the installer to the guy on the phone. But this seems remarkably stupid to me. Was it really more effective to force me (and anyone else following this upgrade path) to call tech support just to install the software I just past $350 for? And if this was the plan, why not SAY SO ON THE ADOBE WEBSITE?!?
    Has anyone else run into this issue? If so, was calling tech support the only way out?

    You are correct in wishing Adobe made it clear that you do need to go through Customer Service to accomplish this.
    Most users make the purchase through Adobe and straighten this out before installing.

  • Universal Worklist UWL not working in NW04s SPS9 after upgrade from NW04

    Hello all,
    this is just a hint in case anyone has the same problem with the UWL.
    It happened to me in 2 cases, that in a Portal 7 SPS9 the UWL only showed a blank page after upgrade from NW04. In NW04 the UWL worked.
    The reason for it was something like a corrupt deployment (but there were no according error messages in any log files). The SAP Support told me to redeploy the UWLJWF*.sca according to note 895523, that worked.
    You can check whether the deployment is the reason of a non-working UWL setting the property "Launch Web Dynpro UI" to 'no'. Then the old HTMLB sources (that should work) are used (But it is not recommended to use the old sources anymore)
    Kind regards
    Andreas

    .. just a hint ..

Maybe you are looking for

  • Touch Screen not working on Brand new iPhone 5...why?

    I bought my iPhone 5 yesterday from Meteor. I had a party to go to last night so I just left the phone to charge and backed up my ld one to iTunes. This morning I plugged the 5 into laptop to start transferring data across. Everything was ok, add to

  • Using Prelude to collaborate

    I have a client who has a full length documentary on bluray that he wants to cut down for other uses without going back to the original edit.  I ripped the M2ts files from the bluray and have made subclips of the entire program with decent notes on e

  • How do I change file type?

    I am trying to upload a video that I edited onto my hard drive in order to share and view it through different players.  My problem is that after I upload the video, the players do not recognize the file type.  How do I change the file type in order

  • Is there a way to view Photos on a map as one could in iPhoto?

    Is there an option to view all photos on a map as one could in both iPhoto and Aperture?

  • Deserialise a JavaBean using a modified version of its class

    Hi, When I serialize an object, then modify its class (add a new field), then unserialize this object. It takes into account the new field and set it to null even if I haven't serialized this object again using it's modified class. How does the java.