Upgrade myself in PLM-Project Systems

Dear Gurus
I am very new to SAP PS and just got certified. I have joined an organization and implementation is going to start next month. Can anybody guide me how to utilize this time in between to upgrade my knowledge in SAP PS and also can anyone suggest me where to find list of T Codes in SAP PS
Thanks in advance
Best Regards
Abhijit Sen

Hi Abhijit,
First of all Heartiest Congrats on getting certified in Project Systems.Even I have got certified in SAP PS very recently.
About your querry to utilise your time to upgrade knowlege in SAP PS,I would suggest you to watch Product Lifecycle forum on sdn.sap.com regularly and also you can post as well as answer querries.This will definitely enhance your knowledge repository.
Pease refer following links
http://www.sapprojectsystem.com/
http://help.sap.com/saphelp_46c/helpdata/en/04/926eae46f311d189470000e829fbbd/frameset.htm
About T-codes,send me your mail id. I will send you list of T Codes in SAP PS.
Regards
Tushar
P.S. Do reward points if you find answer useful.It keeps motivation alive.

Similar Messages

  • WBS Elements not getting created in ECC Project System from CRM 7.0

    Dear all,
    We are trying to integrate SAP CRM 7.0 with SAP ECC-PS module. The objective is to bring in the marketing plan and elements data from the CRM system, and to create the corresponding WBS in project system. We have done most of the configuration as recommended by SAP in both the systems, and we see that the BDOCS are getting generated and sent to the ECC system. The following steps have been successfully completed:
    1.       Set up the RFC connections between the two systems
    2.       Selected the connection type as Middleware in CRM system.
    3.       Installed the cProject Add on in CRM box.
    4.       Created a project scenario (with project and network profiles) in the PS system and assigned the same in the CRM system.
    5.       The Project Scenario in PS config has the same name as the Project Type in CRM config.
    6.       Created and released the campaign ids being created in the CRM system.
    As already mentioned, we can see that the BDOCS are coming to the ECC system and are getting stored in BDOC_TRACK table. However the issue is that the corresponding WBS elements are not getting generated in the ECC system. Is there anything that that we are missing in the ECC box which would trigger the WBS element creation?
    Request you all to share your inputs which would be immensely beneficial for us in achieving this integration.
    Thanks and Kind Regards,
    Aditya Shrivastava

    Hello Aditya,
    We too are facing this issue.. if you have resolved the issue could you please let us know the solution ?
    Some inputs related to our system,
    We have upgrade from CRM 4.0 to CRM 7.0 SP07 and R/3 backend system is on 4.7 SP27, earlier we have completed the upgrade on sandbox without any issues which was upgrade to CRM 7.0 SP04 but with SP07 we are facing the problem of WBS Element not getting created in R/3.
    Your help is highly appreciated.
    Thanks & Regards,
    Sumukh Kapoor.

  • Creating Project Profile in SAP R/3 Project System

    Hi All
    While creating a project definition in Project System in SAP R/3, it is the mandatory to select a Project Profile from a pick list. How can I create a new project profile for myself?
    Thanks
    Sheenam

    It is mandatory to select a Project Profile while creating a Project Definition. Project Profile can be created using OPSA transaction.
    regards
    Shravan

  • In sap plm projects

    hi guru.
    in sap plm projects is this necessary , to generate the reports,scripts.
    what is exactly sap plm projects,give some idea briefly.because just recently
    i got offer for working in sap plm development projects.
    help me.
    thanks& regards
    subhasis

    Hi Subhasis,
    Are you a Technical/Functional i.e. ABAP/Functional please let me know?
    If you are a Technical (ABAP) then you no need to worry about your work in PLM
    your work remains same as of ABAP. i.e. you will be working on Function Modules, User Exits, Field Exits, Report Design, Scripts & enhancements etc.
    The Objects/Area which you will be dealing are : Document Managment System (DMS), Engineering Change Management (ECM), & CAD Integration yes i forget to mentioned you will be working on "Interfaces" too. and rest in PS or CProjects & CFolders based on the Scenarios/Requirements of your Project.
    If you are a Functional:
    Then working in PLM is still easy if you have a experience of working in SAP,
    First part of your PLM is PDM (Product Data Managment) which deals with
    DMS, ECM, CAD Integration, Material Master, BOM etc
    Basically you have to integrate all these objects or business objects precicely speaking to all the modules of the SAP R/3.
    Welcome to the board.
    If you have any specific questions, you can write at SDN, SDN team will help you at maximum, no need to worry.
    Best Regards
    Rehman
    <b>Mark Useful Answers</b>

  • ABAPER for the project system

    Dear Friends  ,
    i am ABAPER having 3 years of experience . Major developments are related to the MM SD  HCM PP etc . Module
    i am working in the user company  .
    Now there is a offer from another user company  who is offering me a job of ABAPER specifically for the Project SYSTEM  , plus onsite (Germeny ) for interaction with the Functional Consultant .
    Now dear Gurus please suggest , Is is rite to shift myself specifically for the PS System  or shall i go for other company like HCL , IBM who is offering me less pacakage as compare to above user company .
    Dear Gurus , u'r Response will be appreciated and will also be rewarded .

    Hi Sharma,
    adding to Vetri,
    I hope so this is not right place to discuss about careers.
    And one more thing try to avoid Company names
    Coming to your career path as you have good exposure with various modules, deffinetly it will be good if you work with PS Consultant.
    Packages is totally personal.
    Try to post same thread in
    SAP Community Network Forums » Community Discussions » Career Center
    Regards
    Guruprasad

  • Project System Understanding

    Hello experts,
    I am new in SAP. I have read a lot of documents related to project system.
    Still I am having a problem. Now i have to handle a client but i don't know what they want form my side.
    I came to that new project is a capital investment project. 
    Can you please tell me what i have to do over there ?
    Thanks
    Kushal
    Edited by: Kushal29 on Apr 17, 2010 12:35 PM

    Kushal, If you have been given opportunity to maintain particular customers landscape.
    You can have a discussion with your customer as to what level of support htey are looking from you as Basis standpoint.
    Based on that you can define your Service Level Agreement.
    I would advice to proceed with :
    1. Login to SAP system goto stms and have an idea of system landscape and change flow.
    2. Have a look where is your database installed and SAP is installed.
    3. To perform maintenance you would need to have SAP , DB and Operating system access.(you may request this to your customer)
    4. Once you have undersatanding of SAP system you can look for Kernel and Support Pack upgrades.
    I hope it helps you.
    Regards, Amber S | ITL

  • Do we have a separate forum for SAP Project Systems?

    hi
    do we have a separate forum for SAP Project Systems?
    regards
    kish

    hi all
    i got the answer
    its the PLM forum ie. product life cycle management
    Expert Forums  » SAP Solutions  » Product Lifecycle Management (PLM)
    cheers
    kish

  • Project system (user field key)

    HI ALL
    Can i add user field TAB at Project Defination level. if yes then how.....
    Thanks
    shabbir

    Hope this helps...
    The following SAP enhancement is available for project definitions in
    the Project System:
    o   CNEX0006    Customer-specific fields in the project definition
    You can use this enhancement to add new customer-specific fields for the
    standard project definition in table PROJ.  To process these fields you
    can create your own screen, which the user can call up when maintaining
    standard project definitions.
    The enhancement CNEX0006 contains the following enhancement components:
    Menu entries:
        SAPLCJGR+CUD Project planning board
        SAPLCJWB+CUD Master data maintenance (CJ06, CJ07, CJ08)
    Function exits:
        EXIT_SAPLCJSS_002 for transferring data to your own program
        EXIT_SAPLCJSS_003 for transferring data from your program to R/3
    Screen areas:
        SAPLCJSS0205_CUSTSCR1_SAPLXCN10600
    Activities
    1.  Create the enhancement.
        To do this, either create a new project or use an existing one.
    2.  Create structure CI_PROJ in ABAP/4-Dictionary (transaction SE11) in
        your own development class.
      3.  Expand structure CI_PROJ to include your own fields.
          Note the following:
          -   You must use the name ranges reserved for customers.
          -   The maximum number of fields in database tables is 255 (in PROJ
              and CI PROJ - for SAP field and user-defined fields together).
              SAP reserves the right to add new fields to table PROJ; if the
              maximum number is reached, your user-defined fields could be
              excluded.
          Activate the structure.
      4.  Maintain the enhancement components:
          -   Assign the function customer fields a name.
          -   Add to the program code for the function exit EXIT_SAPLCJWB_002.
              This function exit transfers SAP data to your part of the
              program.
              To do this, call up the function module and double-click the
              include line.  Create the include module.
              In order to transfer the variables, you must insert a
              Move-corresponding statement in Include ZXCN1V11:
              move-corresponding sap_proj_imp to proj.
              Now define the "projs" data structure as global variable. To do
              this, jump to the main program SAPLXCN1. First, double click
              include LXCN1TOP and then include ZXCN1TOP. Create the object if
              required.
              Include the following tables statement in the source text for
              include ZXCN1TOP.
    tables
              tables proj.
          -   Add to the program code for the function exit EXIT_SAPLCJWB_003.
                This function exit takes the data from your part of the program
                and transfers it to the SAP standard program. Create your own
                corresponding include module.
                In order to transfer the variables, you must insert a
                Move-corresponding statement in Include ZXCN1U12:
                move-corresponding proj to cnci_proj_exp.
            -   Create the screen area.
                Double-click SAPLCJSS0205_CUSTSCR1_SAPLXCN10600 and then choose
                Fullscreen. The screen has been preconfigured by SAP. You can
                delete these fields and add new ones:
                Choose Goto -> Dict./Program fields
                Maintain the table/field name PROJ and select the fields to
                appear on the screen.
                Generate the screen.
            For detailed information, see OSS Note number 86050.
        5.  Activate the project.
            Only once you have activated the project, will your enhancement take
            effect.
        Note for Batch-Input
        For your customer-specific fields to be evaluated in the project
        information system, the structures in the project information system
        must be regenerated. To do this, start program RCNCT001.
        If you want to fill your customer-specific fields later using
        batch-input you must take the screen SAPLCJWB 0205 into consideration.
        Further notes
        Unlike modifications, enhancements are not influenced by a release
        upgrade because they are not part of the original SAP programs, rather,
    they exist in an area reserved for customers.
    You can also find documentation for this enhancement in the enhancement
    transaction.

  • How to create the Custom project System as Web Project

    Hi,
    I have created a custom project system using this walkthrough. But
    this walk through is targeting Visual C# project system. I need to create the Custom project system as Web project and set the start up page as index.html file. How can I achieve this?
    Note: 
    I have got the Custom project system sample from VS2013 SDK samples(https://mpfproj12.codeplex.com/).
    But it demonstrate the Custom console applications only.
    - Abbas K

    Hi,
    So you didn't even follow this walkthrough yet? If you did, how did you do it?
    I failed to create such a web project system because I finally messed up my VS experimental instance. But it's possible to create a custom web project system, by following this walkthrough. Someone else has successfully made it, check this
    link.
    The difference is that you have to use web project type instead of the console application project type. You could copy a web project's .csproj file into the VSPackage project and rename it to xxx.myproj. There's an error in the walkthrough that the AssemblyInfo.cs
    file should be put into Properties folder and set the "Build Action" property to Content, "Include in VSIX" to true.
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Sales order in Project system

    Hi All,
    Can u tell me please how can we create  a sales order,Quotation in projects and what are tcodes for that.
    As i am here involved in Capital projects i dont have any idea of customer projects ican u pleease let me know the customizing part too.
    Assured of rewarsd points
    Thanks in Advance.
    Regards,
    Abraham.S

    Hi,
    to create quote from project system there is quite a bit of PS ( project system ) SD integration is required. i will try my best to deliver with whatever time i have right now.
    1. t-code -CKCM - your will define easy cost planning here whihc will be your pricing factor in in sales order.
    2. ODP1- you define DIP profile here you will also define your costing elements here. this DIP profile is attached to sales doc type. and on main menu you will find button that says quotation. click on that. this willd irectly take you to quote and from there u can take it forward.
    I hope it helps u little. Though i know its not enough.

  • About reversal of Outbound delivery generated from Project system due to sale return

    Hi SAP Expert ,
    We have made delivery from project system using t.code CNS0 and billing document is generated with reference of sales order. Now Goods is return by customer due to some technical reason, We created return sales order with reference of billing document  and Credit memo with reference of Return sales order.
    What is T.code for making return delivery or reversal of  Delivery /PGI generated from Project system in sap r/3 ?
    Pls. suggest to me.
    regards
    VKM

    Hello,
    it depends whether in the billing document the material codes identifies the goods delivered and to be returned or not.
    If it's so, you can create a Return Sales Order with reference to the billing document, create the return delivery, and then the credit memo.
    If it's non so, you can create a Return Sales Order with reference to the billing document (but without copying the material items, and entering manually material code and quantity to be returned), then create the return delivery. Then you can create a Credit memo request with reference to the Billing Document or with reference to the Return Sales Order.
    To create the return delivery, you can run VL01N with reference to the Return Sales Order (just like for outboud deliveries), or from VA02, following the menu path "Sales document --> Deliver".
    Best regards,
    Andrea

  • Sub-contracting through Project system.

    Hi
    Can some one please help me in understanding how Project system (PS) is supporting sub-contracting scenarios.
    I am looking for activity sub-contracting and also sub-contracting with Project stock materials.
    I am aware of normal sub-contracting through production order and also sub-contracting through MM. I am specifically looking for sub-contracting in PS.
    Thanks and warm regards,
    Jagadeesh

    Hi,
    If requirements for subcontract items (or services) are generated automatically from PS just make sure that the right document category is used (subcontract) then any requisitions or planned orders etc. will have the right category.
    There is no difference between PP, PS and PM effectively, they all use subcontracting in the same way it is just how the requirement is triggered that is slightly different.
    If you need details on how to trigger the right type of requirement through PS then you may need to use one of teh financial forums that cover PS? (is there one?)
    Steve B

  • Changing the data in DataSource in R/3 System for Project System

    Can we change the data of DataSource which is extracted from R/3 sYSTEM for Project System Module?

    Hello Rajesh,
    You can modify it in PSA. Or write the routines or rules logic as per your requirement.
    Could you please elaborate more on what kind of changes you are interested for.
    San.

  • Report Painter Drilldown on Cost Element for Project Systems

    I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.

    Hi Avinash,
    See my replies below.
    1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
    When  you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
    coming to equipment cost - are you capturing using PO through GR?.
    2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
    Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
    When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials  have their own valuation class and have default CEs accordingly. that would not be big issue.
    Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
    The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
    3. I have answered the relevance of Cost relevance check box in above.
    Hope above makes sense.
    Thanks,
    Sudhakar

  • Project System - Report Painter - Cost roll up issue

    Hi,
    We have an issue with the roll up of the costs in Report Painter report in Project Systems. The problem occurs only with those costs which have been settled to an internal order from a WBS element.
    We are using the same cost elements to settle to the Cost Center and Internal order and roll up of the costs work fine for those settled to cost center. But the roll up does not happen for the costs settled to an internal order. Would appreciate if someone can guide on how to fix this issue.
    Raj.

    Here are the values:
    Period/year     000.1900     Remainder 1900     PERIO     Period/year
    Value Type     4     Actual                                                 
    Value Type     10     Statistical Plan                                                 
    Object ind.     P     Project item                                                 
    Object ind.     1     Order plan values: appended, apportioned     9     Order values: not appended, deleted
    Debit type     1     Costs and credit-side payments                                                       
    Thanks for your help.
    Raj/

Maybe you are looking for

  • Ipod charges but isnt recognized by windows or itunes

    Ok so I see this is a huge problem..so here we go again: My shuffle worked before and all of a sudden Windows or Itunes doesnt show that my Ipod Shuffle is connected. When I plug it into my USB port, the status light is amber and thats all that shows

  • How do I limit the number of characters allowed in an input form and then how do I limit the number of lines?

    I'm selling Classified Advertising in a newspaper and I want my visitor to be able to enter their own ads. They need to be limited to 30 characters/line with a limit of 4 lines.  (120 characters total). How can I use html or css to limit the input to

  • Are weak references cleared with soft ones?

    Suppose a program holds both weak and soft references to an object X. Suppose the virtual machine clears all the soft references at once, making X weakly reachable. Is the virtual machine guaranteed to clear all the weak references next before normal

  • Good bye Dail-up! HELLO HIGH SPEED, but...

    Okay, just ordered the at&t/yahoo! dls pro pakage; only problem is I'm clueless on how to connect two computers... A pc in one room and my Mac in another... the package includes a wireless gateway, and I'm not sure what other equipment or devices I n

  • GC CR disk read

    Hi, We are facing the gc cr disk read wait event especially when issuing the following sql statement. select b.tablespace_name||':'||nvl(round(sum(bytes)/1024/1024),0) from dba_free_space a,dba_tablespaces b where a.tablespace_name(+)=b.tablespace_na