Upgrade SAP R/3 to ECC 6.0 , Java Stack Upgrade

Hi Experts
We are doing R/3 upgrade to ECC 6.0, we have done technical upgrade,Now we are planning to do Functional Upgrade. like
1. Java Stack
2. Integrated Planning
3.BI Accelarator
4.Data Transfer process
5.Web Reporting Portal
5.New BI content
6.Visual composer
7. Adminstration cockpit
8.New Authorization concept
9.Management Dashboards
Report Designer   Etc Etc
At this moment I need to know at what stage we can go for java stack upgrade and what is the pre-requistes for that.
Please give me any links.docs or any previous thread which talk abt java stack will be helpful .
Thanks
Kiran

hope u have posted the same thread
Adding java stack In separate system
Ramesh

Similar Messages

  • Does anybody know benefices of upgrading SAP ERP from version ECC 6.0 EHP 7 to ECC 6.06 EHP 10?

    An upgrade of ERP SAP from version  ECC 6.0 EHP 7 to ECC 6.06 EHP 10 is being planned in the company I work for. However, I don´t know what the benefices are to   implement this upgrade so I wonder if someone knows benefices of upgrading SAP ERP from version ECC 6.0 EHP 7 to ECC 6.06 EHP 10?
    Regards, Alejandro

    Hi _Miguel
    I am going from ECC 6.0 to ECC 6.06. However, I don´t know what the benefices are to   implement this upgrade so I wonder if someone knows benefices of upgrading SAP ERP from version 6.0 to 6.06
    regards, Alejandro

  • SAP BW 7.4 on HANA ABAP & JAVA stack

    Hello,
    We have requirement for SAP BW 7.4 on HANA ABAP & JAVA stack integration.
    Please clarify the doubts.
    1. Is there any possibility to install ABAP & JAVA stack same SID?
    2. If install different with SIDs, How can we do integration? Any restriction is there to integrate?
    3. Can we use same HDB SID for both ABAP & JAVA stack?
    4.We plan to configure the JAVA stack as UME data source from ABAP stack, Is it good practice?
    Any one share the better ideas & solutions for this issue.
    Regards,
    V Srinivasan

    Hi Experts,
    Great for viewers.
    But still expecting some ideas above questions kindly answer.
    Also i got some important points.
    Java Stack for BW on HANA
    At least any one answer the purpose of BW Java Stack.
    Regards,
    V Srinivasan

  • Impact of upgrading SAP 4.6C to ECC6.0 to Java application

    Hi,
    Currently, my Java application is:
    1. using SAP 4.6C as backend
    2. using Java 1.4
    3. using SAP Enterprise Connector in SAP Netweaver Developer Studio 7.0.15 to generate the BAPI proxies
    4. using JCo 2.1.8
    If now the backend SAP system is going to be upgraded from 4.6C to ECC6.0, will there be any changes required on my Java application i.e.
    1. Is the BAPI proxies generation process with SAP Enterprise Connector remain unchanged?
    2. Are the BAPI structures remain the same that do not require any Java code change when calling BAPI?
    3. Is the JCo version remains unchanged?
    4. Is there any Java code changes required?
    Thanks!

    Hi,
    1. Is the BAPI proxies generation process with SAP Enterprise Connector remain unchanged?
    Yes. No change required except minor changes.
    2. Are the BAPI structures remain the same that do not require any Java code change when calling BAPI?
    Well you will have to check if the BAPI import/export/tables/changing parameters have undergone any change. If not then no change required.
    3. Is the JCo version remains unchanged?
    Yes. This shouldnt be an issue.
    4. Is there any Java code changes required?
    Well if your 4.6c system was non-unicode, ECC 6.0 would be unicode. So the RFC where you would have mentioned that a Unicode(java) system is interacting with Non-unicode(4.6c) system will require a change. This is applicable to both RFC's in SAP & Java.
    Thanks,
    Best regards,
    Prashant

  • R/3 upgrade from 4.7 to ECC 6.0 and BW upgrade from 3.5 to 7.0

    Is there a reason to upgrade Solution Manager from 3.2 to 4.0 when upgrading R/3 from 4.7 to ECC 6.0 and BW upgrade from 3.5 to 7.0?
    And when in current situation Unicode UTF8 is used, could that give problems during / after the upgrade?

    Hello ALex,
    There is not a must to upgrade also your solman 3.2 when you upgrade your satellites, only consider if you need the solman diagnostic or not and also that the new functionality in solman 4.0.
    Which system is unicode, the satellite?
    There is also not problems having a non-unicode solman with unicode satellites and the other, having a unicode-solman "linked" to unicode-satellites.
    Hope this helps,
    Dolores

  • For an SAP enterprise(4.7), how to add java stack during upgrade to ECC6.0?

    Source release:  an R/3 4.7 32bit
    Target release: ECC6.0 64bit (abap+java)
    My plan is to go over the following upgrade steps:
    4.7 32bit-> ECC abap only 32bit ->ECC abap 64bit -> install java stack.
    Is this the best way?
    Thanks a lot!

    Hi,
    Its always best to go to the enhanced and latest version.
    _+4.7 32bit-> ECC abap only 32bit ->ECC abap 64bit -> install java stack.+_
    the above step will increase only only the cost.
    If ur going for just practice purpose, then no issues u can go for it.
    But its always good to go for
    4.7------> Ecc(ABAP + JAVA) together.
    coming to 32bit and 64 bit. Some constraints are there. If u look at Ecc 6- SR3, it will only support 64 bit.
    Look at all those sections and go for upgrade.
    Regards,
    Ravi

  • Error while upgrading EP 7.0 SP6 to SP9 (in java stack)

    Dear All,
    We have EP 7.0 with SP 6 , OS = Win2k3 SP2, DB = Oracle 10.2 g.
    Upgrading it to Sp9 , we have downloaded dumps from service marketplace.
    Kernel & ABAP stack upgradation have been completed and the system is showing it clearly from status menubar.
    Now we are trying to upgrade JAVA stack from JSPM .At first we selected all the compnents to upgrade from level 6.0(6.2/6.3) to 9.00 but only sap.com/SAP_JAVASL comp got deployed.Other compnents were taking huge amount of time and in the status bar jmon process ids are only increasing one by one. (at one time it reaches to 50000 approx)
    So, we abort the process and tried to deploy one by one , in that case some components got deployed , these are sap.com/BASETABLES,sap.com/CORE_TOOLS,sap.com/JLOGVIEW.
    When we tried to deploy sap.com/SAP-JEE ,  it got deployed with warning (ultimately not happened) and dispatcher was in ACTIVE state(yellow) instead of running.So we abort the process and restart the cluster as well as reboot the system.This makes running the dispatcher.
    Then we tried to deploy sap.com/SAP-JEECOR . It was also taking huge time. So we abort this process also.But now we are facing some problem that is dispatcher is not up.We restart the cluster and reboot the system still the problem persists.
    note:There is no space problem
    **)disp+work.exe's status is Active instead of running
    **)Both msg_server & igsdw.exe are running
    **)From portal it is showing dispatcher is running but no server connected
    **)In JSPM log file one error msg is comming :
    service com.sap.security.core.ume.service ================= ERROR =================
    Core service com.sap.security.core.ume.service failed. J2EE Engine cannot be started.
    java.lang.AbstractMethodError: com.sap.security.core.server.ume.service.UMEServiceFrame.useTxManager()Z
    So how should we proceed as no further deployment is  possible as it needs dispatcher to be up.
    Any help will be highly appreciated in this regards.
    Regards,
    Souren

    Its a network issue

  • Error during Java Stack upgrade with SAPINST Tool for Netweaver 04

    Hi,
    I have updated all the ABAP stack support packages fine. But when i try to upgrade the Java Stack for the BW server using the SAPINST tool, i received an error in the 17th step "Starting J2EE Engine".
    The error log says:
    CJS-20057 Starting Java engine DVEBMGS05 of SAP system <SID> failed:
    after 165 seconds the state of the engine changed from &quot;Starting&quot; to &quot;Stopped&quot;.
    Please help.
    Thanks
    Vijay

    Hi Vijay,
    Please check the link for some initial troubleshooting:
    http://help.sap.com/saphelp_nw70/helpdata/en/69/430841a6e1ef6fe10000000a1550b0/frameset.htm
    Regards,
    Siddhesh

  • SAP BEx Query as a Web Service - JAVA Stack needed?

    Dear all,
    I want to use the Web Service for calling a BEx Query in SAP BW 7.02.
    Do anybody know if a JAVA Stack is needed to get that Web Servcie working?
    Thank you very much for your help!
    Dieter

    Hi,
    i use Query As Werservice in xcelsuis so, wthen i click on  prview button, a prompt is displayed and i can choose either Entreprise or SAP connxion .
    i choosed SAP connexion and used SAP formated login like BI7~001/USERNAME
    And i also tested the webservice with soapUI. The result is the same... i can't see data with SAP connexion.
    thanks.

  • BI7 dual stack upgrade using 'resource minimised' method

    Hi
    I am upgrading a Windows 2003/MS SQL 2005 sandpit NW04 BI 350 dual stack (ABAPJAVA) to BI7 (NW04S ABAPJAVA) as a test before working on our actual landscape, I have started the ABAP upgrade and chose the 'resource minimised' method as downtime isn't an issue on the sandpit, I then started the upgrade on the Java stack, but then noticed in the documentation it states you should use 'downtime minimised' for a dual stack upgrade? the ABAP prepare recognised I had a dual stack and said it would be synchronised but never complained about the resource minimised choice ? the phases have been waiting for synchronisation so far without a problem.
    Is this a problem? I can reset the upgrade, but its quite far through, so would rather not !
    Thanks,
    Paul.

    Hello Paul
    As you said, SAP state that you must perform a dual stack upgrade using strategy downtime - minimised. I had a problem when I used resource minimised but if your upgrade is running then donu2019t terminate it. If it works, thatu2019s great.
    What I normally do is run strategy downtime minimised with an import time of zero hours.
    Thank You
    Anwar

  • How to create multiple files with Receiver File Adapter in SAP PI 7.31 Java Stack

    Dear Friends,
    I am using Sender JDBC Adapter and Receiver File Adapter in Integration Flow in SAP PI 7.3 EHP 1 SP08 Java Stack environment. The requirement is that we need to create multiple files based on the row count in jdbc resultset. If there are 5 rows in resultset, we need to create 5 XML files with one row elements in one file. Similarly if there are 10 rows, we need to create 10 XML files.
    So how can we create multiple files in this scenario. I tried placing a for loop in the Java Mapping as below in the transform method:
    DynamicConfiguration conf = arg0.getDynamicConfiguration();
    StringBuffer sbFileData = new StringBuffer();
    for (int i =0; i < record.size(); i++ {
         . // Create XML for each row and Marshal the object into to the String Buffer
         String strFileName = "DC_" + new SimpleDateFormat("ddMMyyyyHHmm").format(new java.util.Date())+"_"+i+".xml";
         conf.put(KEY_FILENAME, strFileName);
         arg1.getOutputPayload().getOutputStream().write(sbFileData.toString().getBytes("UTF-8"));
         arg1.getOutputPayload().getOutputStream().flush();
    So here I'm flushing the OutputStream for each record. But it's not creating the multiple file, instead it creates only one file will all record XMLs appended to each other.
    Please let me know if I missing something or need to do some thing else.
    Regards,
    Shreyansh Shah

    Hi
    You can easily achieve this using graphical mapping.  Create your target message type like below
    MT_Target
      Details  0 to 1
          Data  0 to 1
    Source sample structure
    <resultset>
    <row>
    <column-name>column-value</ column-name>
    </row>
    Then do the message mapping like below
    map <row> with  MT_Target
    contant ----> Deatils
    column-name ------>Data
    In the signature tab of message mapping, choose the occurrence of your target message type as
    0 to unbounded.
    This will generate multiple files from multiple rows.
    Let me know if you have any doubt.

  • Upgrading SAP ESS and MSS after HR upgrade in ECC 6.0

    Hello
    I am new to SAP netweaver.
    Our landscape has an ECC 6.0 system integrated with EP 7.0.
    We recently upgraded our SAP HR from 600(SP 48) to 600(SP61) and EA HR component from 603(SP 22) to 603( SP 35).
    After the upgrade we came to know that the portal users are facing some issues with Etime application on portal, i did a bit of searching and found that we have to upgrade SAP ESS, MSS and ERP5COM components. (http://wiki.sdn.sap.com/wiki/display/ERPHCM/HOWTOGETRIDOFSPSTACKMISMATCHISSUES)
    My questions are:
    1) Can we directly apply SP's for ESS, MSS and other components as i cannot find any prerequisites required to be met before they have to applied?
    2)If we have ESS SP 04 and the required version is ESS SP07, can we directly apply SP 07 or we have to first apply in a sequence SP05, SP06 and then move to SP07?
    Thanks a lot!
    Varun

    Hello,
    1) If a developer modified the ESS/MSS package, you need to ask the developer before you apply the patches. In this case, you find the "local version is modified" text in the corresponding package.
    2) Java Patches are cumulative, which means that higher Patch contains all corrections of lower Patches.([SAP Note 1249886|https://service.sap.com/sap/support/notes/1249886])
    Laszlo

  • Upgrade SAP from ECC 6.0 EHP4 to ECC 6.0 EHP7

    Dear all,
    We are using ECC 6 ERP 4 SP5 with oracle 10.2g and Netweaver 7.0 EHP1.
    Other system release
    CRM 7.0 SP5 & CRM JAVA Release – NW 701 SP3
    BI Release – NW 701 SP5 BI CONT 7.04 & BI JAVA Release – NW 701 SP3
    We are planning to upgrade ECC 6 ERP4 SP5 to ERP 6 ERP7 SP1, Could you please suggest for compatibility version for CRM & BI with ECC6 EHP7
    And any document for EHP7 up gradation procedure and what is the impact or change made in system after upgrade from EHP4 to EHP7
    Regards,
    Ajay

    Hello
    The nightmare is going on... this point has been discussed a year ago (Re: Comapatability between EHP7 and SAP Netweaver BI 7.0 EHP1) and the conclusion was that you only need to upgrade HUB satellite systems... and a BW system is not an HUB.
    The only possible issue would be if the java stack of the BW system is used directly by the ECC system.
    Did not find any information on the necessity to upgrade the CRM, so I think you should keep it as it is.
    This are even getting worst because sometime sap support (OSS) are not able to provide clear answers (Interoperability btw ERP 6.0 EhP7 and SAP NW/BW 7.0)
    Best regards
    Strategy beyond SAP Business Suite 7 Innovations 2011 - Landscape Governance - SCN Wiki
    1388258 - Version Interoperability within the SAP Business Suite
    In order to use the new JAVA EE 5 capabilities and benefit from the improvements of SAP NW 7.3 the version interoperability range has been moved upwards for SAP Business Suite core applications with Release to Customer (RTC) from 2013 onwards.
    This means that SAP NetWeaver Systems 7.30 or higher are required if SAP Business Suite applications are based on or operating with those central Systems (Enterprise Portal, Business Warehouse, Process Integration).
    Customers wishing to utilize SAP Business Suite applications with RTC from 2013 onwards, that require one of these central SAP NetWeaver Systems, will have to upgrade their central NetWeaver Systems to 7.30 or higher before upgrading e.g. to SAP Enhancement Package 7 for SAP ERP 6.0.

  • Error while upgrading SAP R/3 Enterprise 4.7 to SAP ECC 5.0

    Dear SAP,
    We are on the process of upgrading SAP R/3 Enterprise 4.7 with Ext:110 to SAP ECC 5.0.But during the VERSCHK_INI phase an error is been thrown showing that
    "The start release configuration :
    SAP_ABA  :620
    SAP_APPL :470
    SAP_BASIS :620
    SAP_HR:470.....is not supported "
    At this stage we decided to continue with this by ignoring the VERSCHK_INI phase,but it gave us a warning that to continue with the next phase(TOOLVERSIOn_INI phase) we require a password.
    we searched in several documents even in the documents along with the cd but was not able to find a password for this or a solution for the error in phase VERSCHK_INI.
    I request team SAP to help us in this regard.Expecting your reply ASAP.
    Thanks and  Regards
    Anantha Raman E.

    Were you able to find a resolution to this problem. We are also having a similar problem in our prepare phase and cannot find anything to help us as yet.
    Thanks,
    Barry Keating

  • Error in PHASE PREP_EXTRACT/PREIMP: Upgrade SAP R/3 4.7 to SAP ECC 6.0 EHP4

    Hello,
    I'm currently in upgrading a SAP R/3 4.7 system to a SAP ECC 6.0 EHP4.
    Therefore I followed the Upgrade Guide from marketplace - installation- and upgrade guides - SAP ERP - SAP ERP 6.0 - SAP Enhancement Package 4 for SAP ERP 6.0 - Upgrade Guide SAP ERP including EHP4 SR1 - Unix on MaxDB.
    I downloaded media from marketplace/swdc - Installations and Upgrades - SAP Application Components - SAP ERP - SAP ERP ENHANCE PACKAGE - EHP4 FOR SAP ERP 6.0 / NW7.01 - Upgrade.
    I'm starting upgrade with upgrade master DVD 51036889_1 and      51036889_2.
    Now upgrade breaks down in phase PREP_EXTRACT/PREIMP with error:
    Severe error(s) occured in phase PREP_EXTRACT/PREIMP!
    Last error code set: Single errors (code <= 8) found in logfile 'PREIMP.ELG'
    PREIMP.ELG says:
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    R3trans preimport and RETURN CODE in R710VPE.REX
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
    2EETW169 no connect possible: "maybe someone set invalid values for DIR_LIBRARY ('/usr/sap/REX/SYS/exe/run') or dbms_type ('ADA')"
    Kernel is stored in /usr/sap/REX/SYS/exe/run and database is ADA (maxdb).
    File R710VPE.REX says:
    4 EPU201XBEGIN OF SECTION BEING ANALYZED
    4 ETW000 R3trans version 6.13 (release 640 - 17.02.10 - 13:07:00).
    4 ETW000 ===============================================
    4 ETW000
    4 ETW000 date&time   : 07.03.2011 - 15:28:36
    4 ETW000 control file: /usr/sap/REX/upg/abap/tmp/PREIMPTRANS.CTL
    4 ETW000 > import
    4 ETW000 > file='/usr/sap/REX/upg/abap/bin/R710VPE.SAP'
    4 ETW000 > safeandslow=yes
    4 ETW000 > buffersync =yes
    4 ETW000 > commit     =1048576
    4 ETW000 > importtruncated =yes
    4 ETW000 R3trans was called as follows: R3trans -w /usr/sap/REX/upg/abap/tmp/R710VPE.REX -u 1 /usr/sap/REX/upg/abap/tmp/PREIMPTRANS.CTL
    4 ETW000 active unconditional modes: 1
    2EETW169 no connect possible: "maybe someone set invalid values for DIR_LIBRARY ('/usr/sap/REX/SYS/exe/run') or dbms_type ('ADA')"
    4 EPU202XEND OF SECTION BEING ANALYZED
    Can anybody help me out here?
    Regards,
    Julia

    Hello,
    I run 'R3trans -x' command, but there was no problem - connection to database was working.
    Problem was following:
    Before starting the sdt service on host, I set environment variables JAVA_HOME and LD_LIBRARY_PATH for sidadm. That's not neccessary and that was the problem. Without setting these variables it is working now.
    Thanks,
    Julia

Maybe you are looking for

  • My HP Pavillion w/Windows XP will not recognize my new External HDD

     HP Pavillion w/Windows XP Media Center   m7267c Desktop PC Is it necessary to pay a outside Driver manager to restor the ability of my PC to instal Driver Software for devices that the specific Mfg states should already have present on my OS? I purc

  • Oracle 8.1.6 installation on HP

    I am trying to install Oracle 8.1.6 on HP-UX 11.0 using runInstaller. In Configuration tools it is hanging when trying to create database and creating a defunct processes in Unux. It is always showing 1%. Please help... Thanks, Yana

  • Radeon Early KMS Fails with Linux LTS

    Upgraded to linux-lts 3.0.72-1 yesterday. Kernel now hangs for 60 seconds during the KMS switch with the following error messages (with both the main initramfs and the fallback): [ 61.120047] r600_cp: Failed to load firmware "radeon/REDWOOD_pfp.bin"

  • Can the apps on the Adobe Add-on web site be used with PSE 12/13

    Can these add-ons be used with Photoshop Elements 12/13? These programs are not in the list of Adobe programs.

  • Help CFSELECT

    Hi, I am trying to use flash forms to create a drop box(CFSELECT) but I haven't used this before and I am running into problems. I am attaching my code for help. My syntax is probably the problem as I am used to SELECT instead. I will appreciate help