UPGRADE STEPS FROM ECC 5.0 TO ECC 6.00

Hi,
Can anyone of you help me in the upgrade steps (Process) from ECC 5.0 to ECC 6.0.
Thanks in Advance.
Ram

Hello Ramesh ,
Apart from this also download and have a look on look the Upgrade guide .
URL to Download :
www.thespot4sap.com/upgrade_guide_v2.pdf
Regards ,
Santosh Karadkar

Similar Messages

  • Upgrade steps from 10.1.2.0.2 to 10.1.4.0.

    Suggest the upgrade steps from 10.1.2.0.2 to 10.1.4.0.1.
    IS there any patch need to be apply for this upgrade or we need to do new installation for it.
    Platform is AIX
    Thanks in advance.

    Refer doc below:
    http://docs.oracle.com/cd/B28196_01/upgrade.1014/b28235/im_upgrade_1014.htm#BABBAHGJ
    regards,
    GP

  • UPgrade qs from 4.6 c to ECC 6.0

    My client is looking to move from 4.6C to ECC 6.0.
    Now, it is using BAs as the legal entities instead of compay codes, its also using Internal Orders to capture all the revenue and cost centers for expenses as well as balance sheet items (changing the Field Status Grp and using cost elements with category 90 and supressing the warning).
    In the "to be" world they would like to be with Company Code as legal entity and use Profit centers for B/s Items, and use Internal orders sparingly - only where it should be used.
    I believe the most appropriate scenario is to have a reimplementation with the correct config.
    According to another consultant, they can do a technical upgrade and simply do a "reorg" (whatever that means) in the upgraded ECC system to move from BAs to Company Codes and the new config.
    To me this sounds a little too fantastic. Any thoughts?

    Hi All,
    We are in the process of upgrading our system from 4.6 c to ECC 6.0.
    During the configuration phase i want to select Manual Selection of Parameters,
    once we do that i will be asked for number of R3 Trans ,R3 Load, Maximum Uptime ,
    Batch process. I understand that these vary accordingly as per the server configuration.
    I want to calculate the number of proceses for my system.
    Regards,
    Ershad Ahmed.

  • ABAP Upgrading steps from 4.6 to ECC 6.

    Hi Experts,
    Could you please let me know the steps to upgrade from 4.6 to ECC 6?
    As an abapers what are the steps need to take care during upgradation.
    Please give me the step by step approach.
    Thanks
    Kaki

    Hi,
    First you need to take inventory of all Z developments ( Reports, FM's....)
    Find out the Impacted FM's and programs....!!!
    check for all the cloned programs/Includes...
    check if the system is unicode enabled.
    SPAU corrections
    SPDD corrections
    If System if Unicode ( correct unicode errors )
    correct the obsolete FM's and obsolete declarations.
    Correction for errors at time of testing.....SAP notes will help a lot in correcting many errors..
    post go live support ....!!!
    Few important points :-
    FM “LIST_TO_SPOOL” not in ECC6.0.  use FM is “LIST_TO_ASCII”.
    Table TVARV has become obsolete. New table TVARVC has been introduced. We copied data from TVARV to TVARVC. ( check SAP note for Details )
    Took back up of data in table T512W to T512B .Data can be restored after upgrade using the report “RPU12W0C”. ( check SAP note for Details )
    FMs like “WS_UPLOAD” and “WS_DOWNLOAD” are obsolete now. The new FMs are “GUI_UPLOAD” and “GUI_DOWNLOAD”.
    New Debugger is introduced.....Debugging is easy and user friendly.
    u'll have to change few BDC screen numbers.....whose Screen numbers are changed in ECC...( u'll come accross this errors in Unit testing)
    let me know.......if you need any more information....As you start working on the Upgrade...!!!!
    Regards,
    Nikhil

  • Question r12 upgrade steps from 12.1.1 to 12.1.3 and customization of forms

    I have upgraded from 10.5.10.2 to 12.1.1 and able to start application, log in to r12 and run concurrent programs etc.
    I am confused about the next steps moving to 12.1.3.
    Can you please confirm the following steps are right ?
    1)-apply patch Patch 9239089. (R12.AD.B.DELTA.3 (R12.AD.B.DELTA.3)
    2)- 11gCS and FNDCPASS User Exit Merge Consolidation Patch, Patch 12964564
    3) - Apply patch 9239090 .
    Post-Install Steps
    a) Patch 9817770:R12.ATG_PF.B (POST-R12.ATG_PF.B.DELTA.3 CONSOLIDATED PATCH).
    b) Patch 9966055:R12.FND.B
    I have one more question, to upgrade the customize form to 10.1.3, do

    959660 wrote:
    I have upgraded from 10.5.10.2 to 12.1.1 and able to start application, log in to r12 and run concurrent programs etc.
    I am confused about the next steps moving to 12.1.3.
    Can you please confirm the following steps are right ?
    1)-apply patch Patch 9239089. (R12.AD.B.DELTA.3 (R12.AD.B.DELTA.3)
    2)- 11gCS and FNDCPASS User Exit Merge Consolidation Patch, Patch 12964564
    3) - Apply patch 9239090 .
    Post-Install Steps
    a) Patch 9817770:R12.ATG_PF.B (POST-R12.ATG_PF.B.DELTA.3 CONSOLIDATED PATCH).
    b) Patch 9966055:R12.FND.B
    Please follow the steps in (Oracle E-Business Suite Release 12.1.3 Readme (Note 1080973.1)).
    Oracle E-Business Suite Release 12.1.3 Now Available
    https://blogs.oracle.com/stevenChan/entry/ebs_1213_available
    Thanks,
    Hussein

  • Database upgradation steps from Oracle Database 10g EE to 11g R2

    If any document/Steps available for the upgradation of database from Oracle Database 10g EE to 11g R2 please provide us.
    Thank you.

    Please refer to this document for a step by step guide:
    http://www.oracleflash.com/34/Upgrade-Oracle-10g-Release-2-to-Oracle-11g-Release-2.html

  • Upgrade steps from 11.2.0.1 to 11.2.0.2

    Hi,
    I have 11.2.0.1 database. Now i want to apply patch for 11.2.0.1.
    I am installing 11.2.0.2 in separate home,not on 11.2.0.1.If i have installed the 11.2.0.2 , now 11.2.0.2 will be our new oracle home, right?. My previous/existing 11.2.0.1 database does not know the new version of 11.2.0.2,right?.
    To upgrade my 11.2.0.1 database to newly installed 11.2.0.2 oracle, what steps i have to follow?.
    Is it like, startup upgrade the database and running the catupgrd.sql?.
    Pls. suggest me how can i upgrade my database 11.2.0.1 to new home 11.2.0.2?.
    Thanks in advance.
    Sunand

    sunandkumar wrote:
    Hi,
    I have 11.2.0.1 database. Now i want to apply patch for 11.2.0.1.
    I am installing 11.2.0.2 in separate home,not on 11.2.0.1.If i have installed the 11.2.0.2 , now 11.2.0.2 will be our new oracle home, right?. My previous/existing 11.2.0.1 database does not know the new version of 11.2.0.2,right?.
    To upgrade my 11.2.0.1 database to newly installed 11.2.0.2 oracle, what steps i have to follow?.
    Is it like, startup upgrade the database and running the catupgrd.sql?.
    Pls. suggest me how can i upgrade my database 11.2.0.1 to new home 11.2.0.2?.
    You just need to copy pfile/spfile to 11.2.0.2 home and then follow the 11.2.0.2 patch readme file for upgrade.
    It will be startup upgrade and then catupgrd.sql ..
    Regards
    Rajesh

  • Upgradation Steps from OBIEE 11.1.1.3 to 11.1.1.6

    Hi friends,
    Im following the below link for upgrading my obiee 11.1.1.3 to 11.1.1.5
    http://docs.oracle.com/cd/E23943_01/bi.1111/e16452/bi_plan.htm#BABECJJH
    In that they asked to follow the following 11 steps to accomplish, and those are
    "Perform General Pre-Patching Tasks"
    "Download the Installer"
    "Applying the Latest Oracle Fusion Middleware Patch Set"
    "Start the Installer"
    "Verifying the Schema Version Number After Update"
    "Upgrading System Components"
    "Updating Fusion Middleware Shared Libraries"
    "Updating Configurations and Stores"
    "Starting and Stopping Oracle Business Intelligence"
    "Updating Oracle Real-Time Decisions"
    "Signing In to Oracle BI Enterprise Edition"In that while performing the first task *"Perform General Pre-Patching Tasks"*
    They asked to follow the following pre-requisition
    Section 3.5.1, "Reviewing System Requirement, Certification and Interoperability Information"
    Section 3.5.2, "Stopping the Servers and Processes"
    Section 3.5.3, "Backing Up Your Middleware Home, Domain Home and Oracle Instances"
    Section 3.5.4, "Backing Up Your Database and Database Schemas"
    Section 3.5.5, "Backing Up Additional Configuration Information"
    Section 3.5.6, "Patching Oracle WebLogic Server"
    Section 3.5.7, "Renaming the emCCR File for Silent Patching"In the above sections, i have a doubt in the Section 3.5.5, "Backing Up Additional Configuration Information"
    They mentioned to *"Back Up Configurations and Stores"*
    I can find the configuration file in the following location
    Configuration Files
    DOMAIN_HOME/config/jms
    If a JMS uses file-system accessible stores, the default file-system store is either in a user-configured location that is specified in config.xml, or in the following location:
    DOMAIN_HOME/servers/server_name/data/store/default
    But my question is where does the Stores file is found inorder to take the back up.
    Thanks in advance.
    Brgds,
    Mini

    Hi,
    i just application/policy file only...for your refer u can find the path under
    D:\Oracle\Middleware\user_projects\domains\bifoundation_domain\config\fmwconfig
    system-jazn-data.xml
    jps-config.xml file
    Upgrade 11.1.1.5 to 11.1.1.6
    http://gerardnico.com/wiki/dat/obiee/patch_11g_111160
    Note:
    I have upgraded obiee11.1.1.5.0 to obiee11.1.1.6.0 version its working fine....i just took back up of entire obiee.then downloaded obiee11.1.1.6.0 version then installed software only installed after that upgraded MDS/DEV_BIPLATFORM schema finally upgraded upgradenonj2eeapp file and got woring now.
    Thanks
    Deva

  • Upgradation from ECC 5.0 to ECC 6.0

    Hi Friends,
    As an SD Consultant what would be the roles and responsibilities in the upgradation projects(from 4.6C/4.7E/ECC 5.0 to ECC 6.0)
    with regards

    HELLO,
    Search the form you will get few links.
    Also many companies have gone technical upgradation , but not functional upgradation.
    Thanks
    RK

  • BI 7.0: Source System upgrade from R/3 Enterprise to ECC 6.0

    Background:
    I am relatively new to BW team and will be going through my 1st source system upgrade.
    We currently have BI 7.0 SPS 17 connected to source system R/3 Enterprise EP1.
    We are upgrading to the source system to ECC 6.0.
    In Development and QA Environments:
    we will have access to both old (R/3 Enterpirse) and the new (ECC 6.0) source systems.
    We have a opportunity to compare the BW Objects, data flow and data loading from
    both source systems.
    In Production, however, we will just upgrade over 3 days downtime.
    One Question that comes to mind in this regard...
    What sort of things, we should be checking for before and after upgrade in Dev/QA and in Prod environments and what tools are available that can help the analysis and validation process ?
    Some of the suggestions that were given to me include following points.
    Before Upgrade:
    1 Check data, taking pre images of it for testing with post upgrade.
    2. Perform proper analysis of Source system related BW objects.
      - A complete listing of actively used Datasources,.. etc.
    3. Make delta queues empty,
    Make sure that all existing deltas are loaded into BW.The last request delta must not deliver any data and must be green in the monitor.
    4. Stop Process chains from BI (remove from schedule) and collection runs from R/3 side
    After Upgrade:
    1 After the OLTP upgrade, refer to note 458305 and other notes that are relevant to the actual upgrade
    (depending on the R/3 system release / R/3 plug-in to BI plug-in compatibility).
    2. Check logical system connections. Transactions SMQS, RSMO and SM59, If no access, then we can use Program RSRFCPIN_NEW for RFC Test.
    3. Check and/or Activate control parameters for data transfer. SBIW ---> General Settings --->
    Maintain Control Parameters for Data Transfer
    http://help.sap.com/saphelp_nw70/helpdata/EN/51/85d6cf842825469a51b9a666442339/frameset.htm
    4. Check for Changes to extract structures in LBWE Customizing Cockpit 
        - OSS Notes 328181, 396647, 380078 and 762951
    5. Check if all the required transfer structures are active. See OSS Note 324520 for mass activation.
    7. Check if all Source system related BW Objects are active - Transfer rules, Communication rules, update rules,DTPs,..etc. 
    Below is a link for some useful programs in this regard.
    https://www.sdn.sap.com/irj/scn/wiki?path=/pages/viewpage.action&pageid=35458
    6. Test all important datasources using RSA3 and check for OLTP Datasources changes .
    As soon as BW notices that the time stamp at the DataSource in the OLTP is newer than the one in the transfer structure, it requests replication of the DataSource and activation of the transfer structure. Transfer the relevant DataSources only if required, and transfer only the ones that have changed (RSA5 -> Delta).
    7. Create Data flow objects (trnasfer rules, infopackages, trnasformations, DTPs) for the Replicate
    new/changed datasources,if needed. 
    8. Check all CMOD enhancements.
    If we are using a customer exit with the extractor in the OLTP, see Note 393492.
    7. Check for unicode (all custom programs or Function Modules for DataSources)
    5.  Check all the queues in RSA7, start delta runs and test data consistency.
    For delta problems:In the BW system, start the 'RSSM_OLTP_INIT_DELTA_UPDATE' program for the DataSource and the source (OLTP) system for which the init selections are then transferred from BW into the ROOSPRMSC and ROOSPRMSF tables in the source system so that the delta can continue.
    9. Take back up of data posted during upgrade for contingency planing.
    10. Run the entire set of process chains once if possible and let it pick up no data or the usual master data.
    Since we have lot of experts in this forum, who have probably gone through such scenario many times, i wanted to request you to Please Please advise if i have stated anything incorrectly or if i am missing additional steps, OSS Notes, important details...

    Thanks Rav for your detailed post and very helpful contribution by posting all the information you had regarding the upgrade.
    We have similar scenario -
    We are upgrading our source system from 4.7 to ECC 6.0. We have our BI system with BI 7.0 at support pack 19 (SAPKW70019).
    Our strategy in ECC deployment  ->
    In development we copied our old DEV 4.7 system DXX to new ECC system DXY (new system ID).
    In production we are going to use same system PRXX upgraded from 4.7 to ECC.
    Now we are in testing phase of ECC with all interfaces like BI in Dev.
    My questions are below ->
    How can we change/transfer mapping of all our datasources in Dev BW system BID to new ECC dev system DXY (Eg. Logical system LOGDXY0040) from Old dev system DXX (Eg. Logical system LOGDXX0040). We donot want to create new datasources or change all transfer rules/Infosources for old BW3.x solutions on our BI.
    Also in new ECC sourcesystem copy  we see all datasources in Red in RSA7 transaction. Do we need to initialize again all the datasources from our BW BID system.
    Is there any easy way for above scenario ?
    Please let me know if you have any further helpful information during your ECC 6.0 upgrade connecting to BI 7.0 system.
    I have found some other links which have some pieces of information regarding the topic -
    Upgrade R/3 4.6C to ECC 6.0 already in BI 7.0
    http://sap.ittoolbox.com/groups/technical-functional/sap-bw/sap-r3-migration-and-sap-bw-version-1744205
    BI 7.0: Source System upgrade  from R/3 Enterprise to ECC 6.0
    Re: ECC 6.0 Upgrade
    Re: Impact of ECC 6.0 upgrade on BI/BW Environment.
    ECC 5.0 to ECC 6.0 upgrade
    Thanks
    Prasanth

  • Upgrade project : from SAP R/3 4.6C to ECC 6.0 by using SAP Data Services

    Hi All,
    My client is upgrading from SAP R/3 4.6C to ECC 6.0
    We are planning to use SAP Data Services(Data Integrator) in the upgrade plan from SAP R/3 4.6C to ECC 6.0 for Data Migration.
    we have no idea whether we can use this SAP Data Services(Data Integrator) in SAP upgrade data migration.
    The bottom line is we have to make use this Data Services (Data Integrator) product in our upgrade plan for Data Migration.
    Please tell us if anybody already used it such kind of scenario in a data migration project with Data Services(Data Integrator).
    If we can use Data Service(Data Integrator) what are the pros and cons in using this Data Services(Data Integrator).
    Thank You,
    Ashok

    My opinion is you would want to utilize SAP tools to port the data - our SAP BASIS administrator is out this week but we can provide exact tool names when he returns.  ELM (External List Management), IDOC are some of the tools.
    You could use DS/DI to export, cleanse, deduplicate the records prior to importing with SAP tools if that is your end goal.
    We also offer a data quality tool that extends DS/DI to cleanse/deduplicate name/address records as they are entered into the system.  It also comes with batch tools to cleanse/dedup the entire systems name/address information.  See Data Quality Management for SAP for further details.

  • Upgrade CFM from Sap R/3 Enterprise (4.7) Sap to ECC 6.00

    Hello,
    We are in a project of upgrade Sap from Sap R/3 Enterprise (4.7) to Sap ECC 6.00. Our question is particularly for CFM component migration/upgrade.
    As we checked we have activate the extension set:
    EA-FIN: Financials Extension
    EA-FS: Financial Services
    According with the Component Version Data the extension set EA-FINSERV has the release 2.00. However, in order to execute the CFM migration with transaction TPM_MIGRATION we are not sure if our CFM installation is on release 1.00 or 2.00.
    In the other OSS note 858966 mentions the following conditions to start points migration:
    1. The start release of the upgrade is SAP R/3 Enterprise 4.70 with SAP
    R/3 Enterprise extension set 1.10 or earlier.
    2. The target release of the upgrade is SAP R/3 Enterprise 4.70 with SAP
    R/3 Enterprise extension set 2.00 or higher.
    Do you know a transaction o report Sap which provides this information?
    Thank in advance.
    Sergio

    Within SAP, select System -> Status...  In the pop-up box, click the details button in the SAP System data section and you'll get another pop-up with system component information.  It's been a couple of years since I did the Treasury migration for our upgrade from 4.7 to 6.0, but I believe the component you're looking for is EA-FIN.  The Release column will have either 110 (for extension set 1.10) or 200 for (2.00).
    Regards,
    Shannon

  • Best Practice in Upgrade from ECC 5.0 to ECC 6.0

    Dear All,
    Can someone help in looking for Best practice in Upgrade from ECC 5.0 To ECC 6.0 Project from Functional FI and CO Side.
    Thanks

    Moved to a different forum.

  • Issues during technical upgrade from  version 4.6C to ECC 6.0

    Dear All,
    We have done a technical upgrade from version 4.6C to ECC 6.0 and encountered following issues -
    In the t-code ABZE (acquisition with in house production) there is a check-box for reversal posting on screen with version 4.6C. However, this field is missing in ECC 6.0. Why so?
    In the report s_alr_87012327, there is a field "only with creation block" in version 4.6C. However, this field is missing in ECC 6.0. Why so?
    Request to kindly suggest the alternative to carry out the same in ECC 6.0.
    Thanks in advance.
    Regards,
    Dhawal

    Hi Akshya,
    Please find answers below.
    1) 4.6c is NON-UNICODE system, Can I upgrade it into ECC 6.0 UNICODE system?
    Yes you can.
    If you are on a single code page system then you can give a gap between your uprade and unicode conversion. There is no problem with the singlecode upgrade and conversion.
    But if your system is MDMP then you will have to do the CUUC method that is both upgrade and unicode conversion together. Though you can give a gap and sign an disclaimer with SAP it is still not recomended way.
    2) 4.6c does not have any ITS system installed. If we upgrade it to ECC6.0 ABAP only, then Can I activate WAS internal ITS?
    Yes you can activate it.
    3) 4.6c does not have any JAVA stack. When I upgrade it to ECC 6.0, can I upgrade it to dual stack (ABAP+JAVA)? If yes, then how?
    After the upgrade and unicode conversion you can install the java stack.
    Regards,
    Ravi.

  • ECC Upgrade from ECC 5.0 to ECC 6.0 EHP4 - impact on XI 3.0

    Hi,
    We are palnning for upgrade our ECC System from ECC 5.0 to ECC 6.0 EHP4. We do not have any plan of upgrade on XI, which is on XI 3.0.
    After ECC upgrade please provide the impact on XI 3.0 ?
    Will XI 3.0 able to work with ECC 6.0 without any change or any change is required in the XI configuration level, please specify?
    Thanks.

    >>Will XI 3.0 able to work with ECC 6.0 without any change or any change is required in the XI configuration level, please specify?
    As far as I know, no change is required in XI configuration.
    Regards,
    Praveen Gujjeti.

Maybe you are looking for

  • How does Business content work with BI 7 and R/3 4.6 as backend?

    Dear Bwers, We have BI 7.0 with source system as R/3 4.6. I have the following questions: 1. I want to know how to install new BI 7.0 datastructures from business content when the datasources from R/3 are in the old version? 2. Is Business Content up

  • Some pictures in slideshow are pixilated

    I'm making a slideshow in Aperture (3.2.2) on my iMac (3.4 GHz Intel Core i7, Memory 16 GB 1333 MHz DDR3) running Mac OS X 10.6.8, and some of the photos that were transferred from a CD-ROM, and some that were recently transferred from an SD card are

  • Problems with EAS 11.1.2

    1. After opening Outline, I can't expand the dimension hierarchy 2. Substitution variables are not visible after i have created one, but when creating the same substitution variable, I get the error, saying it already excists... 3. When choosing "cre

  • Why can't I see these results in the results grid

    If I run the pl/sql below as a script F5 I can see the results of the "select * from TestOutput", but If I execute it with F9 I don't see any results in the results grid. Anybody know why? Thanks in advance for any help. CREATE TABLE TestOutput (val1

  • Datsource for extracting Project profile to BW in CJ20n TCode

    Hi, I'm lookin for a datasource which brings Project Profile to BW.Project profile can be seen in Transaction code CJ20n>Control Data>Project Profile Thanks, SP.