Upgrade to Unlimited BT Infinity 1: post-order iss...

A little earlier I accepted an emailed BT offer to upgrade from the Infinity package I have with a monthly limit, to Unlimited BT Infinity 1. Went through the online process, upgrade was confirmed online and now I have two issues.
(1)
The emailed offer clearly stated in one of the terms notes at the bottom (relevant extracts only):
... by invitation only to existing BT Infinity 1 customers signing up to the Unlimited Infinity 1 and Unlimited Weekend Calls package for 12 months. ... At the end of the minimum period of 12 months. ... You must stay on the Unlimited Infinity 1 and Unlimited Weekend Calls package for 12 months and you may not downgrade. ...
HOWEVER, the emailed order confirmation now received has this:
Your contract is for: 18 months. starting on 04 Mar 2013.
Questions:
(a) Why has the contract term I thought I was agreeing to increased from 12 months to 18 months, and who/where do I contact about it?
(b) Why does the new contract term start from 4 March and not now?
(2)
During the ordering process I had to set up a BT ID.
I'm not really sure why, as I already had one -- probably not called a BT ID at the time it was organised as I've had it for donkeys years, but it allows me to log in at BT's pages and see my billing, online usage and so on. Nevertheless and despite this, I "played ball" as there didn't seem to be an option for saying I already had one, or ignoring the step, so created this second ID with a new password, security question etc. Whether it will now replace the older one, or whether I'll now have two, I've no idea. But it said I would receive an email to activate it...
... which I did. Clicked the LINK from there and now in the middle of the activation process online, but really don't know what's going on as I'm being asked to choose a password and security question all over again. I've entered the same ones as I did during the ordering process, but don't know yet if this will be accepted or not, as I've hit a snag a bit further down -- this is what I need help with.
In the section for "Alternative ways of contacting you" there are two fields for a mobile phone number and an alternative email address (from my BT one), plus a radio button for "I don't have alternative contact details".
I don't have a mobile phone but do have an alternate email which I don't mind them having, and NEITHER of these fields was marked with a star meaning it was a required field (as most of the others were), so I filled in the email field and left the mobile one blank. But having completed the rest of the form I clicked to Continue and it won't let me! A red exclamation triangle's now come up against the mobile number box saying "Required field", presumably because I've left it blank. I tried putting in a dash, then n/a , but it won't have it ("Please enter a valid mobile number").
Aaaarrrghh! What do I do? All I can think of is to use the radio button to say I don't have any alternate contact details, but that's illogical when I do (the email addie): it could be helpful for them to have it if ever I can't access my BT mail for some reason.
So any ideas on that one too? Or again, who could I contact to get the ID activated, who could get round this mobile number requirement?
Many thanks.

Thank you, will try the Chat option tomorrow (or rather, considering the time now, later today).
On looking again at the order confirmation it's odd, because that date of 4 March for the contract is there, as copied iin my original post, but I've only just realised it's 2013, not 2014! (and actually early March last year is about when I first changed to Infinity from an ordinary broadband package).
So there is still a contract date/length question, but it's now different! Is it 18 months from last March, or 12 months from now??? Very confusing.
Lower down last night's email are two further dates, although the word "contract" isn't included:
Your new calling plan starts on: 09 Jan 2014
Your broadband starts on: 09 Jan 2014
I'll also try with all the zeros for the mobile number as you suggest (was scratching my head about how I could check it, then the penny dropped... just ring it. Duh!!)
Thanks again.

Similar Messages

  • Upgraded to Unlimited BT infinity 2 but still gett...

    Hi all,
    I hope someone can help as tech support is driving me round the bend. I placed two orders to upgrade to the new unlimited infinity 2 package, the second one finally confirmed to go through 3 days ago. However completing a test it says I am still getting throttled. I spoke to tech support today and as far as they are concenerned, because I am getting my download/upload speed there is nothing wrong. Where do I go from here?
    Thanks for your help,
    Craig

    subby wrote:
    Having the same problem, activation date was the 12th..  just tried to talk to BT via live chat and it was an epic fail.. very ovbiously indians who cant even spell. Not sure what to do next..
    As your activation date was the 12th then the p2p throttling won't get lifted until either 18th or 19th.

  • Thinking of upgrading from ADSL to infinity - cele...

    I'm thinking of upgrading from ADSL to Infinity to get fibre TV.  At the moment I have:
    * Unlimited ADSL 17Mb + Evening/Weekend Calls for approx £11.50/month
    The website upgrade for existing customers is £33 for Entertainment Plus + Unlimited BT Infinity 1 + Weekend Calls.
    However for new customers, it states a 'CELEBRATION DEAL ENDS 18TH JUNE', in which this is reduced to £22.50.
    Is there any way that existing customers can get these deals, or are we just stuck with the expensive route?

    there is no way you can get the deals available to new customers - many have tried without success.
    If you like a post, or want to say thanks for a helpful answer, please click on the Ratings star on the left-hand side of the post.
    If someone answers your question correctly please let other members know by clicking on ’Mark as Accepted Solution’.

  • Can anyone tell me how to upgrade to the BT infini...

    Hi, all
    I have an existing BT Total Broadband Option 3.
    can anyone tell me how to upgrade to the BT infinity
    Many thx
    Solved!
    Go to Solution.

    Hi and welcome.
    Enter your telephone (landline) number into the Infinity avaliability checker... scroll down a little on this site.-
    http://www.productsandservices.bt.com/consumerProducts/displayTopic.do?topicId=29017&s_cid=con_FURL_...
    If you receive an available result you can either have a look at the Infinity options and order on line.-
    http://www.productsandservices.bt.com/consumerProducts/displayTopic.do?topicId=25633
    Or ring BT on 150 from a BT Landline  (Contact us 0800 800 150 for non BT landlines).
    I ordered by telephone and changed from BT Total Broadband to BT Infinity option 1 with the 2MB upload cap and 40GB Usage...
    I added an uplift for Anytime UK landilne calls as I had that with my old BT broadband but the new Infinity only offered weekend.
    (They now include evening).
    There is the other Unlimited Infinity option to consider as well.... all info on that website above.
    Example of Infinity available now picture.-
    Please Click On any Text in Blue as that automatically links to information.
    PC (NDEGR)

  • HP 15-d030nr: What Upgrades Do I Need To Make In Order To Be Able To Use Adobe After Effects CS6?

    HP 15-d030nr, what upgrades do I need to make in order to be able to use adobe after effects cs6?
    I installed Adobe After Effectss CS6 because I was told by HP Support that it would still work; it doesnt.  It is very slow, and locks up bad.  What upgrades do I need to do, or am I looking at having to go buy another labtop?  Also, can I do these upgrades myself - at what cost?
    **HP 15-d030nr**
    Hardware
    Product Name 15-d030nr
    Product Number F5X99UA
    Microprocessor 2.0GHz Intel Pentium N3510 Processor
    Microprocessor Cache 2MB L2 Cache
    Memory 4GB DDR3L SDRAM (1 DIMM)
    Memory Slots 2 user accessible
    Video Graphics Intel HD graphics
    Display 15.6-inch diagonal HD BrightView LED-backlit touchscreen display (1366x768)
    Hard Drive 500GB 5400RPM hard drive
    Multimedia Drive SuperMulti DVD burner
    Network Card 10/100BASE-T Ethernet LAN (RJ-45 connector)
    Wireless Connectivity 1x1 802.11b/g/n WLAN
    Sound HD Audio with stereo speakers
    Keyboard Full-size island-style keyboard with numeric keypad
    Pointing Device Touchpad supporting multi-touch gestures without on/off button
    External Ports Multi-format digital media card reader for Secure Digital cards 1
    SuperSpeed USB 3.0
    2 Universal Serial Bus (USB) 2.0
    1 HDMI
    1 VGA (15-pin)
    1 RJ-45 (LAN)
    1 Headphone-out/microphone-in combo jack Dimensions 1.11 in (H) x 14.88 in (W) x 10.20 in (D) Weight 4.96 lb Power 45W AC adapter
    3-cell 31WHr 2.8Ah lithium-ion polymer battery ID Mech Description Front facing HP TrueVision HD Webcam with integrated digital microphone
    **After Effects CC (2014) system requirements and language versions Windows**
    Intel Core2 Duo or AMD Phenom II processor with 64-bit support
    Microsoft Windows 7 with Service Pack 1, Windows 8, or Windows 8.1
    4 GB of RAM (8 GB recommended)
    5 GB of available hard-disk space; additional free space required during installation (cannot install on removable flash storage devices)
    Additional disk space for disk cache (10 GB recommended)
    1280 x 1080 display
    OpenGL 2.0–capable system
    QuickTime 7.6.6 software required for QuickTime features
    Optional: Adobe-certifi ed GPU card for GPU-accelerated ray-traced 3D renderer
    Internet connection and registration are necessary for required software activation, validation of subscriptions, and access to online services.*
    *I also have a 1TB external hardrive*
    This question was solved.
    View Solution.

    Your problem is that the program wants a good video card and a fast hard drive and lots of memory and you have none of the above. If you upgraded the RAM to 8 gigs and installed a solid state hard drive you might make the program useable but the real bottleneck  is going to be the Intel HD graphics, which cannot be upgraded. 
    You do have an open slot to add one 4 gig memory module. This is an easy relatively inexpensive upgrade. See here:
    https://www.youtube.com/watch?v=L7FvZ-JduRM
    http://www.crucial.com/usa/en/ct51264bf160b
    I would try this a step at a time. Next would be the solid state drive. That would cost maybe $150. Post back if you need more help. 
    If this is "the Answer" please click "Accept as Solution" to help others find it. 

  • Post order processing for sales document is not yet complete

    hi,
    sap gurus,
    i am facing the error while saving the sales order and this ticket is unique and it is saying that
    "post order processing for sales document is not yet complete".
    please help me in this regard.
    and it is blocking the order for further processing.
    regards,
    balajit

    I dont think this is a standard error message.  Some exit is applied for sale order to meet some requirements.  You need to check with your ABAPer.
    In fact, you can conclude yourself based on the error message number.  If it starts with Z, then the above holds good.
    thanks
    G. Lakshmipathi

  • Adjust posting order of new/modified entities in ADF BC

    Hi,
    I have any ADF application which has two tables:
    BUDGET
    BUDGET_ID: NUMBER(12) -- Which is a sequence from DB sequence BUDGET_SEQ
    BUDGET_DETAIL
    BUDGET_ID: NUMBER(12) -- Foreign key to BUDGET(BUDGET_ID)
    LINE: NUMBER(7) -- A sequential number based on the master with one based, for ex: BUDGET_ID/LINE may be 1234/1, 1234/2, 1234/3 ..., and 1235/1, 1235/2, 1235/3...
    CONSTRAINT BUDGET_DETAIL_UK UNIQUE (BUDGET_ID, LINE)
    In JDev 11.1.1.2.0, the Model project has 2 entity objects, 2 view objects, 1 association and 1 viewlink, they are BudgetEO, BudgetVO, BudgetDetailEO, BudgetVO, Budget_BudgetDetail_Assoc and Budget_BudgetDetail_ViewLink (based on the association) to access the BUDGET and BUDGET_DETAIL table.
    When we mark budget, we will create a row in BudgetVO and then create some rows in BudgetDetailVO. In the BudgetDetailVO, we always reorganize the "Line" attribute to be sequential after create new row and delete row. The code like the following:
    private void reorganizeLineNo() {
    RowSetIterator iter = this.createRowSetIterator(null);
    try {
    int idx = 1;
    while (iter.hasNext()) {
    Row row = iter.next();
    row.setAttribute("Line", new Number(idx++));
    } finally {
    iter.closeRowSetIterator();
    My problem is if we add/remove BudgetDetail(s) in the following sequence, it will violate DB constraint BUDGET_DETAIL_UK:
    1. Create bRow1 in BudgetVO
    2. Create bdRow1 in BudgetDetailVO under bRow1, here bdRow1.Line=1
    3. Commit. Everything works fine
    4. Set bRow1 as current row
    5. Add a new bdRow2 in BudgetDetailVO under bRow1, here bdRow2.Line=2
    6. Remove bdRow1, here will call reorganizeLineNo(), so bdRow2.Line=1 now.
    7. Commit, exception occurs for violating DB constraint BUDGET_DETAIL_UK.
    The SQL running in DB is in order of (presodo):
    1. INSERT INTO BUDGET (BUDGET_ID) VALUES (BUDGET_SEQ.nextval);
    2. INSERT INTO BUDGET_DETAIL (BUDGET_ID, LINE) VALUES (:TheBudgetId, 1);
    3. Commit
    4. INSERT INTO BUDGET_DETAIL(BUDGET_ID,LINE) VALUES (:TheBudgetId, 1); -- Violate BUDGET_DETAIL_UK
    5. DELETE FROM BUDGET_DETAIL WHERE BUDGET_ID=:TheBudgetId AND LINE=1
    6. Commit.
    How to adjust to posting order in ADF BC to post the DELETE in step 5 before the INSERT step 4?
    Many thanks!
    Regards,
    Thomas.

    This work flows screens for this kind of constrain violation. On solution would be to commit the operation after inserting line 2, and then deleting line 1.
    I think this is a poor design, because you will run in trouble if more the one user is working in your system.You have to edit a bunch of rows only you deleted one. It's never a good idea to have an editable pk or even a part of it.
    I would try to decouple the line number from the primary key all together. You could easily generate the line number when you show the lines (i.e. using an index of the iterator). This way you can use a sequence number as pk for the line item. The order of the line items is simply the order of the sequence numbers (which will never displayed to the user).
    Timo

  • F110 - Posting orders: 2 generated, 0 completed???

    Hello,
    Carried out Automatic Payment Run through F110
    Posting orders: 2 generated, 0 completed
    In Payment Run Log,  Accounting Docs. are shown however, infact Accounting Docs. are not generated by clearing open items within vendor account. Open Items within vendor account are Overdue Down Payment Requests
    What could be the reason for such behaviour?
    Will really appreciate your inputs on this
    Thanks & Regards,
    Ameya...

    Hi
    After you get the mesage
    Carried out Automatic Payment Run through F110
    Posting orders: 2 generated, 0 completed
    You need to refersh data by pressing Status or Pressing Enter.
    Regards
    Venkat

  • F110 Issue: Posting orders: 8 generated, 7 completed

    Hi,
    I am facing issue with F110,
    Posting orders: 8 generated, 7 completed.
    The Payment Run Log shows a problem with the Form Type.
    I have checked SM13 as well and the log shows:
    Function Module        POST_DOCUMENT
    Status                 Update was terminated
    Report                 LF005F01
    Row                    1.990
    Error details   Class:     F1         Number:    805
    Clearing: Line item 005 in document 6650 1600001334 2012 already cleared.
    Finally, can any one help me out that Is there a problem with the Form as per the Payment Run Log  or is it because of SM13 log showing Line item cleared???
    Please assist.... Any input will be really appreciated.

    Hi Team,
    I am getting the following Error:
    In form ZF_110_HOME_TRF9 / window MAIN, the element 510-C (Text-C) is missing
    In form ZF_110_HOME_TRF9 / window MAIN, the element 515 (Heading) is missing
    In form ZF_110_HOME_TRF9 / window MAIN, the element 520 (Carry forward above) is missing
    In form ZF_110_HOME_TRF9 / window MAIN, the element 526 (Py.adv.note) is missing
    In form ZF_110_HOME_TRF9 / window MAIN, the element 530 (Total) is missing
    In form ZF_110_HOME_TRF9 / window MAIN, the element 615 (Heading) is missing
    In form ZF_110_HOME_TRF9 / window MAIN, the element 620 (Carry forward above) is missing
    In form ZF_110_HOME_TRF9 / window MAIN, the element 625 (Line items) is missing
    In form ZF_110_HOME_TRF9 / window MAIN, the element 630 (Total) is missing
    Output of the relevant forms is defective
    Is there any SAP Note for this????
    Please Assist....

  • HT1711 I just down loaded the upgraded itunes  now i cant change the order of my songs on a playlist

    With the new upgrades itunes    How do I change the order of my songs on my playlist.  I used to just drag it up on down in the list
    this does not work now

    Control click one of the out-of-order songs.  Choose "Get Info".  Click the "Info" tab. You will see "Track Number" XX "of" YY.  Change the first number there.
    Do the same for all songs that need correction.

  • Controlling Post Order of Multiple View Objects

    Hi ,
    Here is the scenario:
    I have a use case of "Creating an Abstract"
    Steps:
    step1 ) (Page 1) Author presents the details of the abstract (Details goes to 2 tables ABSTRACT & ABSTRACT_CONTENT tables). For the 2 tables i have 2 entities. I use a view here called CreateAbstractView from both the tables( here i control the post order of the entities ....code from jdeveloper 11g guide)
    Step 2)(Page 2) Author presents details of Additional Authors. I use the view (*AdditionalAuthorDetailsView*) (Details goes to 2 tables AUTHOR & ABSTRACT). Here in the abstract table i have a parent key(parent abstract id) So all the additional authors has a record in Abstract table with parent_abstract_id from step1. ABSTRACT table also has a foreign key (author_id) .Here also i control the post order of the 2 entity object using the code from jdeveloper 11g guide.
    I also have a link from CreateAbstractView to AdditionalAuthorDetailsView (abstract_id in Abstract table from CreateAbstractView to parent_abstract_id in Abstract table from AdditionalAuthorDetailsView )
    If i have a commit on both the pages , i don't see a problem.
    But i want to have a commit process at the end so that the user can review the information. So when i try to add a commit process at the end , i get a exception (Parent Key not found exception) which i came to understand that commit from AdditionalAuthorDetailsView is happening first which is trying to insert a record into ABSTRACT table and cannot find the parent_abstract_id.
    How do i control the post order for multiple view objects in such scenarios?

    Hi!
    Please take a look at the dev guide. It comes down to controlling the posting order on entity level.
    http://download-uk.oracle.com/docs/html/B25947_01/bcadveo007.htm#CEGJAFCF
    Sascha

  • How to upgrade NetWeaver 2004 to NetWeaver 2004s in order to abtain WD for

    Hi Experts:
    At the minimize level, How to upgrade NetWeaver 2004 to NetWeaver 2004s in order to abtain the capabilities of Web Dynpro for ABAP ?
    FYI: NetWeaver 2004 is run in my server.

    hi Guixin,
    During Netweaver 2004s upgrade, the upgrade program detects what software is installed on the source release system and maps it to the SAP NetWeaver 2004s usage types. SAPJup then upgrades your system to a
    system with the determined usage types.
    Please refer to the section '1.2.5.3 Upgrade Paths: Overview' of the Upgrade Master Guide : SAP NetWeaver 2004s to have details about the target release of the usage types which will be mapped to the components installed on the source system.
    Netweaver 2004s Upgrade guides are available on SAP Service Marketplace http://service.sap.com/instguidesnw2004s
    Hope this information help you in your upgrade tasks

  • ADF BC - unable to control posting order

    Hello,
    we have big troubles with controlling entity posting order when deleting entities.
    For simplicity consider this example:
    - you have Dept (master) and Emp (detail) entities
    - then:
    a) change some attribute in current Dept row
    b) remove all Emps in current Dept
    c) remove current Dept
    - then postChanges
    You will get JBO-26048 (oracle.jbo.DMLConstraintException - ORA-02292: integrity constraint violated - child record found)
    I would expect (as my operations are in correct order) that it will be posted to database without problem. It isn't.
    Explanation:
    First change of Dept entity (point a) will put this entity to the first place in transaction list of object waiting to be posted to database. It is ready for update now. Point b) will put all removed Emp entities in posting list from 2nd ... N-th position.
    Then point c) - Dept remove - instead of putting the Dept to (N+1)th posting place will change Dept state from modified to deleted because it is already in the list on the first place. Now Dept is 1st and in deleted state.
    It means first post operation will be Dept (master) deletion => constraint violation.
    Our real situation is much more complicated. We cannot just omit Dept update.
    We tried to post the Dept update first and then post removings afterwards but posting order is not cleared after postChanges. The only solution we found (very bad solution) is to clearEntityCache between postings - this also clears transaction posting list (it means: update Dept, postChanges, clearEntityCache, remove Emps, remove Dept, postChanges)
    Is there another solution how to solve this problem.
    Is it possible to postChanges after Dept update and to have transaction posting list empty and ready for another independent operations.
    Thank you.
    Rado

    Hi Sascha,
    yes I have.
    The problem is that entity accessors wil not return data when entity is in deleted state.
    In my example dept.getEmps() returns RowIterator with row count = 0 when it is used in postChanges method.
    I tried to workaround this with own ArrayList in master collecting deleted details. As a master (Dept) mustn't know its detail is going to be deleted, it is job for Emp to aks its master to store it into its temporary array of deleted Emps. Then in Dept postChanges I can iterate through the array not through accessor row iterator.
    The weakness of this solution is that remove operations and post operation mustn't be in one request. So it is not guaranteed the temporary array will survive. Therefore it must support passivating and activating. And I think it is very complicated for so "simple" problem.
    For now steps:
    1. update dept
    2. postchanges
    3. clearentitycache
    4. delete emps
    5. delete dept
    6 postchanges
    work for me.
    Rado

  • ADF BC - Controlling Entity Posting Order when deleting

    Hello,
    I'm trying to remove detail and master entity. Default posting order is wrong so I'm getting:
    ORA-02292: integrity constraint (DET_MAST_FK) violated - child record found.
    All examples are for insert, not delete.
    This code in master entity postChanges method doesn't work:
        public void postChanges(TransactionEvent e) {
            if (getPostState() == STATUS_DELETED) {
                RowIterator ri = getDetails();
                DetailImpl detail = (DetailImpl)ri.first();
                while (detail != null) {
                    if (detail.getPostState() == STATUS_DELETED) {
                        detail.postChanges(e);
                    detail = (DetailImpl)ri.next();
            super.postChanges(e);
        }because getDetails() returns empty RowIterator. It is empty probably because this entity (master) is already deleted.
    Has somebody solution how to delete these entities without composition and cascade delete enabled?
    Rado

    This is exactly what I do.
    In MasterImpl.java:
        public void cascadeDelete() {
            RowIterator ri = getDetails();
            //deletedDetails = new ArrayList<DetailImpl>();
            while (ri.hasNext()) {
                DetailImpl detail = (DetailImpl)ri.next();
                //deletedDetails.add(detail);
                detail.remove();
            remove();
        }This method works ok. All entities are removed.
    The problem is that entities are not posted in this order. Master postChanges() will not be invoked as the last. It must be the last. I must control it and what I'm looking for is how to do it.
    Master postChanges should look like:
        public void postChanges(TransactionEvent e) {
            if (getPostState() == STATUS_DELETED) {
                [... invoke postChanges of all details with STATUS_DELETED ...]
                //if (deletedDetails != null) {
                //    for (DetailImpl detail : deletedDetails) {
                //        detail.postChanges(e);
            super.postChanges(e);
        }The part [... invoke postChanges of all details with STATUS_DELETED ...] is problematic because accessor getDetails() is empty RowIterator (deleted entities are not visible in it). This is why I wrote code which is remarked in this example.
    Methods cascadeDelete and postChanges are invoked in two separated html requests.
    Rado

  • F110 Posting Order Not Generated

    Hi
    I am using F110 - Automatic Payment Program.  Payment run has been carried out but not able to generate posting orders.
    Kindly help in resolving the issue.
    Regards
    Sonica

    Hi,
    I am not able to edit the payment proposal & below is the error message that pops up :
    Company codes 1001/1001 do not appear in proposal 05.03.2008 ABCDE; correct
        Message no. FZ003
    Diagnosis
        No data exists for the specified paying company code 1001 and the
        specified sending company code 1001 in payment proposal 05.03.2008
        ABCDE.
    System Response
        The payment proposal cannot be edited.
    Procedure
        Check the flow trace and payment proposal list in order to determine why
        the specified company codes are not contained in the proposal.
    kindly assist.
    Regards
    Sonica

Maybe you are looking for

  • WEB WIDGET - HTML SNIPPET  how to post myspace music in iWeb

    i'm making a site for a band. i'm using the *web widget- html snippet* to insert the myspace player from a band. the bands site is http://www.myspace.com/mod39lone. this is the code i'm putting in : <embed src="http://lads.myspace.com/music/musicplay

  • Can no longer scan from my HP Photosmart C 4650 to my computer since upgrading to Maverick

    I can no longer scan from my HP Photosmart C 4650 to my computer since I upgraded to Maverick.  I have to use image capture to do so.  Are there any fix's out there?

  • Cold RESET For HP laserjet 200 color M251n

    Dear Support,, I Have joined To new Organization And I was Requested to install Hp Laserjet 200 m251n in a new remote site when i tried to enter it is asking for Password ( Secured ) i know the saved ip Address But I Am not Able to change it so is th

  • Display UTC-Timestamp in timezone of user/server

    Hello, the view of my WD Component displays UTC-Timestamps in a table (Cell Editor LinkToAction). The user has the possibility to alter the timestamps by providing date and time. The controller converts date and time to a UTC-timestamp by using ABAP-

  • What is the name of Illustrator COM/DCOM Service?

    Hi, I have installed Adobe Illustrator 6 on my PC (Windows XP Pro), have an issue in creating the application instance from the code that I deployed in my local IIS, but it works great in Visual Studio 2010. Per some suggestions on MS forums, I am tr