Upgrading 11i Payments to R12 Payments

Hi All,
We are now on Oracle EBS 11i [11.5.10.2] and Database 10g [10.2.0.4] now and we are planning to upgrade to R12.
We want to upgrade the all payment formats and templates to R12.
We have couple of questions..
1) How can we upgrade the reports(payments sent to Banks) to R12?
-- I know we need to use the e-text templates to achieve that, but my questions is , we have RDF files in R12 which fetches the data for us and have different RDF files for different layouts. So will it be the same case in R12 as well.
2) I have heard about common data extract in R12, how do we get that, what all changes needs to be done for that to have common data extract for all the Layouts(Templates).
Can you also please share if there is any document created to achieve this requirement.
Thanks,
S.

Duplicate Post. See answer here:
Re: Upgrading 11i Payments to R12 Payments
Regards,
Gareth
http://garethroberts.blogspot.com

Similar Messages

  • Is it possible to Partially upgrade some product to R12 and keep rest  11i

    Hi All
    I was wondering if its possible to upgrade say Financial and procurement modules to r12 and keep rest of modules like Order Management at 11i ?
    Or has there been any instance when the above was not possible that a separate box with r12 financial modules have been created and was integrated with 11i modules using custom integration , my feeling is that it may not be possible as both these will require massive effort and will complicate things
    Thanks
    Rohit
    Edited by: 918630 on Mar 4, 2012 6:46 AM
    Edited by: 918630 on Mar 4, 2012 6:47 AM

    I was wondering if its possible to upgrade say Financial and procurement modules to r12 and keep rest of modules like Order Management at 11i ?No.
    Or has there been any instance when the above was not possible that a separate box with r12 financial modules have been created and was integrated with 11i modules using custom integration , my feeling is that it may not be possible as both these will require massive effort and will complicate thingsIt is not possible, you either upgrade all products to R12 or all products remain running on 11i
    Thanks,
    Hussein

  • Upgrade from 11i projects to r12 projects

    Can anyone provide me with a document on how to upgrade from existing 11i projects to R12 projects?
    Or if you let me know the pre-requisites that would be of great help me to me.

    You will need to follow the standard R12 upgrade process. You will first need to upgrade to 12.1.1 (http://download.oracle.com/docs/cd/B53825_03/current/acrobat/121upgrade.pdf), then apply the R12.1.3 patch (MOS Doc 1081434.1- Oracle Projects Release 12.1.3 Readme)
    MOS Doc 256.1 (Upgrade Advisor: Oracle E-Business Suite Financials and Projects Upgrade from 11.5.10.2 to 12.1.3 and 12.1.2) may also be relevant.
    HTH
    Srini

  • Any one really use mw to upgrade 11i to R12?

    any one is really ising mw to upgrade 11i to R12?

    Yes we have many customers using Maintenance Wizard for their upgrades.

  • Has any one upgrade ZOOM forms to R12?

    Dear All,
    Currently we are upgrading from 11.5.10.2 to R12.1.3, As per R12 there are some forms are moved to OAF Pages,
    we have zoom functions created in 11i for those forms, Any idea on this ?
    Regards,
    Nagu

    Hi Nagu;
    Please see below links and notes:
    Upgrading Form Personalizations and OA Framework Personalizations from Oracle E-Business Suite Release 11i to 12.1 [ID 1292611.1]
    Custom form upgrade 11i to R12
    Planning to upgrade from 11i to R12
    Oracle Custom 11i Forms compatablity in Oracle R12
    Oracle Custom 11i Forms compatablity in Oracle R12
    How To Migrate My Customized reports & Forms To R12?
    How To Migrate My Customized reports & Forms  To R12?
    I could not see any specific notes for ZOOM,if upper note-link does not help than i suggest rise SR
    Regard
    Helios

  • Customizations when we upgrade from R11 to R12

    what needs to be done with OA Framework jdeveloper customizations when we upgrade from R11 to R12.DO THEY NEED TO BE RECOMPILED USING THE NEW JDEVELOPER VERSION ????

    what needs to be done with OA Framework jdeveloper customizations when we upgrade from R11 to R12.DO THEY NEED TO BE RECOMPILED USING THE NEW JDEVELOPER VERSION ????Please see these docs/links.
    Upgrading Form Personalizations and OA Framework Personalizations from Oracle E-Business Suite Release 11i to 12.1 [ID 1292611.1]
    New Whitepaper: Upgrading EBS 11i Forms + OA Framework Personalizations to EBS 12
    http://blogs.oracle.com/stevenChan/entry/personalization_upgrades_whitepaper
    Thanks,
    Hussein

  • Upgrade Bi publisher on R12

    Hi,
    Is it possible to upgrade Bi-publisher on R12?
    My current server version is 5.6.3, which i think is default when installing EBS.
    The latest desktop version available is 10.1.3.4.2, is it possible to upgrade the server bi publisher to this version?
    Please advise!

    ok understood thanks Hussein.
    can someone maybe help me with a work around on a issue i have?
    this is a piece of the XML I'm working with:
    *<G_AMOUNT_DUE>*
    +*<SORT_TRX_SEQUENCE>5</SORT_TRX_SEQUENCE>*+
    <SORT_TRX_DATE>04-SEP-09</SORT_TRX_DATE>
    <SORT_INVOICE_NUMBER>900000000</SORT_INVOICE_NUMBER>
    <SORT_DUE_DATE>04-SEP-09</SORT_DUE_DATE>
    <PS_SEQUENCE>20000</PS_SEQUENCE>
    <TRX_SEQUENCE>50000</TRX_SEQUENCE>
    <RECEIPT_CURRENCY_CODE />
    <AMOUNT_APPLIED_FROM />
    *<LIST_G_LINE_CLUSTER>*
    *<G_LINE_CLUSTER>*
    <INVOICE_NUMBER>900000000</INVOICE_NUMBER>
    <TRX_DATE>04-SEP-09</TRX_DATE>
    <TRANSACTION>Credit Memo</TRANSACTION>
    <DUE_DATE>04-SEP-09</DUE_DATE>
    <REFERENCE />
    <BILL_TO_LOCATION>51111</BILL_TO_LOCATION>
    <LINE_CUSTOMER_ID>6666</LINE_CUSTOMER_ID>
    <GENERAL_SEQUENCE>93000</GENERAL_SEQUENCE>
    <AMOUNT_DUE />
    <TRX_AMOUNT>-11400</TRX_AMOUNT>
    <CD_TRX_AMOUNT>-11,400.00</CD_TRX_AMOUNT>
    <DUMMY_REFERENCE />
    <C_BILL_TO_LOC>1</C_BILL_TO_LOC>
    *</G_LINE_CLUSTER>*
    *</LIST_G_LINE_CLUSTER>*
    *</G_AMOUNT_DUE>*
    i want to loop by G_LINE_CLUSTER but when the field SORT_TRX_NUMBER is 5, data between G_LINE_CLUSTER tags mustn't display.
    I'm using this at the moment : *<xsl:for-each select="//G_LINE_CLUSTER[../../SORT_TRX_SEQUENCE!='5'">*
    It works fine in BI Desktop 10.1.3.2, but XML Pub 5.6.3 doesn't read this code.
    Any advise? Please...
    thanks in advance.

  • Upgrade 11i.ATG_PF.H.delta.2 to 11i.ATG_PF.H.delta.7

    Hi All,
    Can we upgrade 11i.ATG_PF.H.delta.2 to 11i.ATG_PF.H.delta.7 directlly.? Please suggest.
    I hav gone through the metalin doc id Doc ID 783600.1 but could not get hint.
    Please help me out on this.
    Thanks in advance.

    Can we upgrade 11i.ATG_PF.H.delta.2 to 11i.ATG_PF.H.delta.7 directlly.? Please suggest.Yes -- Make sure you meet the requirements under "Before you apply this patch" section.
    Please also consider the patches in (Known Issues On Top of 11i.ATG_PF.H.delta.7 (RUP7) - 6241631 [ID 858801.1]).
    Thanks,
    Hussein

  • EBS upgrade 11i to R12.1.3

    Hi Hussain,
    we are currently on 11.5.10.2 and looking for upgrade to 12.1.3 (LATEST RELEASE)
    my concern are
    - i need to shortest patch for upgrade , minimize the downtime as much as possible
    - can we upgrade directly to 12.1.3 without prior 12 releases?
    - can we upgrade technically only and keep the functional as in 11i without changes and gradually upgrading module by module?
    - please share the MOS for EBS upgrade from 11i to R12.1.3 if any.
    many thanks for your help and support
    regards
    Raj

    You will have to upgrade to 12.1.1 then upgrade to 12.1.3
    Technical upgrade only won't be sufficient and you will need to consider the functional changes.
    Oracle Applications Upgrade Guide: Release 11i to Release 12.1.1
    http://download.oracle.com/docs/cd/B53825_03/current/acrobat/121upgrade.pdf
    Database Preparation Guidelines for an E-Business Suite Release 12.1.1 Upgrade [ID 761570.1]
    New Whitepaper: Planning Your E-Business Suite Upgrade from Release 11i to 12.1
    http://blogs.oracle.com/stevenChan/2010/03/ebs_121_upgrade_whitepaper.html
    Oracle E-Business Suite Release 12.1.3 Now Available
    http://blogs.oracle.com/stevenChan/2010/08/ebs_1213_available.html
    Release Content Documents for E-Business Suite Release 12 and 12.0.x Release Update Packs [ID 404152.1]   
    Oracle E-Business Suite Release 12.1 Release Content Documents [ID 561580.1]
    Thanks,
    Hussein

  • Upgrade 11i (11.5.10.2) to R12 (12.1.3)

    Hi all,
    I am starting to upgrade my EBS from 11.5.10.2 to 12.1.1 then to 12.1.3 on AIX 6.1 Operating System in Test instance. Any advise steps and recommendations.
    I've check the Doc: Oracle EBS Upgrade Guide Release 11i to 12.1.1 and I am facing below issue :
    1) Do we must to upgrade the DB to 11g as the Oracle desupport issue or want to reduce downtime?
    2) Do I need apply 11i.AD.I.7 and 11.ATG_PF.H.Rup7 patches first?
    3) And do I need to convert the application/DB to Multiple Organizations before upgrade? Any guideline?
    4) There is no any customization, how much downtime can you experience?
    The below is our system configurations :
    Server : AIX 6.1 (Test instance / Prod. instance) - Single node
    DB : 10.2.0.3.0 (non RAC)
    APPS : 11.5.10.2 (non multi-org) :
    - use Financial (GL, AP, AR, FA) only
    - The lastest applied patchsets:
    11i.ATG_PF.H CU2
    11i.AD.I.4
    11i.BNE.C
    11i.FRM.F
    11i.OAM.H
    Forms 6.0 (Form Compiler) Version 6.0.8.27.0 (Production)
    PL/SQL Version 8.0.6.3.0 (Production)
    Oracle Procedure Builder V6.0.8.21.0 Build #0 - Production
    Oracle Virtual Graphics System Version 6.0.5.39.0 (Production)
    Oracle Multimedia Version 6.0.8.25.0 (Production)
    Oracle Tools Integration Version 6.0.8.17.0 (Production)
    Oracle Tools Common Area Version 6.0.5.32.0
    Oracle CORE Version 4.0.6.0.0 - Production
    Server version: Oracle HTTP Server Powered by Apache/1.3.19 (Unix)
    Server built: Mar 25 2005 15:40:05 (iAS 1.0.2.2.2 rollup 5)
    mult-org not enabled
    select multi_org_flag from apps.fnd_product_groups;
    --> N
    I found below the list of docs, any advise steps and recommendations? And please suggest me which of the below document I need to follow?
    Oracle Applications Release Notes, Release 12.1.1 [ID 798258.1]
    Oracle E-Business Suite Upgrade Guide Release 11i to 12.1.1 [ID 1082375.1]
    Database Preparation Guidelines for an E-Business Suite Release 12.1.1 Upgrade [ID 761570.1]
    Interesting Documents Concerning E-Business Suite 11i to R12 Upgrades [ID 850008.1]
    Upgrade Advisor: E-Business Suite (EBS) Upgrade from 11.5.10.2 to 12.1.3 [ID 269.1]
    Upgrade Documentation -- http://docs.oracle.com/cd/E18727_01/index.htm
    Oracle E-Business Suite Installation Guide Using Rapid Install -- http://docs.oracle.com/cd/E18727_01/index.htm
    Oracle E-Business Suite Release 12.1.3 Now Available
    https://blogs.oracle.com/stevenChan/entry/ebs_1213_available
    Thanks
    Sam

    1) Do we must to upgrade the DB to 11g as the Oracle desupport issue or want to reduce downtime?It is recommended you upgrade to 11.2.0.3 before you start R12 upgrade -- Interoperability Notes Oracle EBS 11i with Oracle Database 11gR2 (11.2.0) [ID 881505.1]
    2) Do I need apply 11i.AD.I.7 and 11.ATG_PF.H.Rup7 patches first?No.
    3) And do I need to convert the application/DB to Multiple Organizations before upgrade? Any guideline?Yes.
    https://forums.oracle.com/forums/search.jspa?threadID=&q=Multi-Org&objID=c3&dateRange=all&userID=&numResults=15&rankBy=10001
    https://forums.oracle.com/forums/search.jspa?threadID=&q=Multi-Org+AND+Setup&objID=c3&dateRange=all&userID=&numResults=15&rankBy=1000
    4) There is no any customization, how much downtime can you experience?You can determine the downtime unless you try it yourself on an instance with a hardware that is close to your production instance.
    I have one more question, do I need to download and install the following files only from https://edelivery.oracle.com/EPD/Download/get_form?egroup_aru_number=11249864 ?
    A) Oracle E-Business Suite Release 12.1.1 Rapid Install Start Here
    B) Oracle E-Business Suite Release 12.1.1 for IBM AIX Based Systems (64-bit) Rapid Install RDBMS
    C) Oracle E-Business Suite Release 12.1.1 for IBM AIX Based Systems (64-bit) Rapid Install Databases
    D) Oracle E-Business Suite Release 12.1.1 for IBM AIX Based Systems (64-bit) Rapid Install Tools
    E) Oracle E-Business Suite Release 12.1.1 for IBM AIX Based Systems (64-bit) Rapid Install APPL_TOPYou need to download the following under (Oracle E-Business Suite Release 12.1.1 Media Pack for IBM AIX Based Systems (64-bit)).
    From: Oracle E-Business Suite Release 12.1.1 Rapid Install Start Here (Part 1 of 4)
    To: Oracle E-Business Suite Release 12.1.1 for IBM AIX Based Systems (64-bit) Rapid Install APPL_TOP - Disk 3 (Part 2 of 2)
    Thanks,
    Hussein

  • Upgrade 11i to R12 Doubt

    Hi,
    this is just for my understanding and for practising purpose....
    we have the environment like this
    (a) Application Node on HP-UX PARISC 11.5.10.2
    (b) Database Node on HP-UX Itanium 9.2.0.7
    we want to upgrade the Applications from 11.5.10.2 to Release 12, finally both Applications and Database should be on Itanium Architecture ( NO PARISC at all for Applications)
    is it possible?
    I am new to Apps Upgrades things. can you please point me to any step by step document for Upgrades?

    is it possible?You can run Oracle Apps R12 and 10gR2 (64-bit)/11gR1 (64-bit) on HP-UX Itanium.
    Note: 402307.1 - Oracle Applications Installation and Upgrade Notes Release 12 (12.0.4) for HP-UX Itanium
    https://metalink.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=402307.1
    Oracle Certification Matrix
    http://www.oracle.com/technology/support/metalink/index.html
    can you please point me to any step by step document for Upgrades?Please refer to the following links/notes:
    Oracle Applications Upgrade Guide: Release 11i to Release 12.0.4
    http://download.oracle.com/docs/cd/B40089_09/current/acrobat/r1204upg11i.pdf
    Note: 552973.1 - Oracle 10gR2 (10.2.0.3) Database Preparation Guidelines for an E-Business Suite Release 12.0 Upgrade
    https://metalink.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=552973.1
    Note: 461705.1 - Oracle E-Business Suite Upgrade Guide - Home
    https://metalink.oracle.com/metalink/plsql/ml2_documents.showDocument?p_database_id=NOT&p_id=461705.1

  • Upgrade 11i ---------- R12 on laptop

    as i have dell studio 1545 with 4 GB ram , I can assign max 2.5 - 3 gb RAM for this vm ware workstation.
    Can i do EBS 11i installation on this and then upgrade this to R12 ?
    Is this possible and somebody have done it ?

    Can i do EBS 11i installation on this and then upgrade this to R12 ?
    Is this possible and somebody have done it ?For 11i, it would be enough but when you plan to upgrade to R12 you will find it slow and your patch workers may hang. Also when running R12 as you might notice a bad performance in the application. It is always recommended to have at least 4 GB only for Oracle E-Business Suite R12 (apart from the memory you dedicate to the OS).
    Thanks,
    Hussein

  • Upgrade from 11i ocp to R12

    Dear All
    I have a OCP 11i Financials Payables, how can i update it to R12. or can can i write the r12 receivables exam. or is their any upgradation exam to r12 from 11i.
    Regards

    I have a OCP 11i Financials Payables, how can i update it to R12. or can can i write the r12 receivables exam. or is their any upgradation exam to r12 from 11i. Please see this link.
    Certification Upgrades -- E-Business Suite
    http://education.oracle.com/pls/web_prod-plq-dad/db_pages.getpage?page_id=44
    You can upgrade from "11i Financials OCP, Payables or Receivables" to:
    - Oracle EBS R12 Supply Chain Certified Expert Consultant, Purchasing
    - Oracle EBS R12 Financials Certified Expert Consultant Receivables
    - R12 Advanced Supply Chain Planning Consultant Certified Expert
    Please also see:
    Oracle E-Business Suite R12
    http://education.oracle.com/pls/web_prod-plq-dad/db_pages.getpage?page_id=142#2
    Thanks,
    Hussein

  • Upgrade 11i to R12

    Hi experts,
    I need to upgrade my ERP 11.510.2 to R12.
    Please suggest some ID or link to do the same.
    second please let me know which version of R12 I can upgrade max to max from 11.5.10.2
    thanks in ADV

    Hi;
    Similar topic discussed here before,please check them.If you have any question update thread
    R12.1 upgrade from 11.5.10CU2 with 11g
    Upgrade 11.5.9 to 12.1.2 11.5.9 to r12.1.1
    http://forums.oracle.com/forums/ann.jspa?annID=772 << Steven Chan post
    12.0.6 to 12.1.1 (or 12.1.2 or Fusion) upgrade
    You can move to R12.1.2 from r11 for a now.
    Regard
    Helios

  • 11i information in R12

    Hello all,
    In 11i AP, gl_je_lines table we found the below information
    jl.reference_2 "INVOICE_ID"
    ,jl.reference_5 "INVOICE_NUM"
    ,jl.reference_1 "SUPPLIER"
    ,jl.reference_3 "CHECK_ID"
    ,jl.reference_4 "CHECK_NUM"
    In 11i GL, ap_ae_lines_all table we found the below information
    ,l.reference2 "INVOICE_ID"
    ,l.reference5 "INVOICE_NUM"
    ,l.reference1 "SUPPLIER"
    ,l.reference3 "CHECK_ID"
    ,l.reference4 "CHECK_NUM"
    My doubt is where we can find this information in R12.
    Thanks and Regards,
    Muthu

    Vikas Chaudhary wrote:
    Hi Muthu,
    There is no change in gl_je_lines and ap_ae_lines in R12, so the information you are looking for will be found in the same tables .
    ThanksPl see this MOS Doc
    Technical Changes in Payments from 11i to R12 [ID 786423.1]
    HTH
    Srini

Maybe you are looking for

  • [iPhone] How to change Portrait / Landscape mode.

    I am tring to change view mode between portrait and landscape mode. UIViewController has two UIViewes and I want them to be shown as a landscape mode. I found the property of interfaceOrientation in UIViewcontroller. but it is readonly. Is there a wa

  • Using a String in the "IN" clause

    Hello folks,     I am trying to output results from a table based on a String which I was planning on using in the "IN" clause. When I run the query through the PL/SQL procedure, I get no results. In the PL/SQL program, I have a variable p_string whe

  • IPhoto 9.6 will no longer recognize my Library

    I just upgraded my iMac to Yosemite. Once upgraded, I had to update my iPhoto to 9.6. Now, I can't open any of my photos. This is the message I get when I open iPhoto: Caution The iPhoto Library is locked, on a locked disk, or you do not have permiss

  • I have Ipod touch and now an Ipad2, can I sync both of them with out use of a computer?

    I want to eliminate laptop.   I have a Touch for work and I just got an Ipad2.  Can I sync the touch and Ipad without use of computer & if so how?

  • Moving shape with arrow keys

    Hello, How would I click on one of the circles I've created and move them using the arrow keys. The circles move just fine with the drag of the mouse but now I want to use the arrow keys. Can somebody help me please? I would really appreciate the ass