Upgrading 4.6 c to ECC6

Hi All;
I need to upgrade from 4.6 c to ECC6
what are the steps to be followed for this.
send me the docs regarding this on [email protected]
Thanks and regards
Tushar

Hello Tushar,
Please visit the links:
https://websmp210.sap-ag.de/~sapidb/011000358700005278212005E
Here choose ur OS/DB combination.
Also visit :
https://websmp210.sap-ag.de/~sapidb/011000358700005395932005E
Please award points for useful information.
Regards.
Ruchit.

Similar Messages

  • HR - PA upgrade issue (4.6C to ECC6.0)

    dear all,
    we are currently in the process of upgrade from 4.6C to ECC6.0
    and we found this minor issue in the submodule PA:
    using tcode pa20/pa30 we can not see any record of IT0000 Actions using 'overview'
    but the all the detail actions can be displayed..
    the overview (mountain icon) can't show all the records- only happen when we want to overview the infotype IT0000 Actions.
    but all the details that we have recorded in IT0000 Actions, can still be displayed (using spectacle icon)
    this is only happen in IT0000 Actions
    all other infotypes can be overviewed using 'mountain icon' and can be displayed using 'spectacle icon' as normal condition.
    anyone ever gone through the same issue?
    we have updated patch for SAP HR : SP 32 and EA 7.
    the authorization is SAP ALL.
    looking forward to hearing from you.
    best regards,
    dhenny muliawaty (pei pei)

    Hi Abhishek,
    thanks for your reply and your guidance..
    we need more information from you..
    1. how to back up the table, is it right that we need to contact basis and ask our basis guy to back up the tables?
    2. after we do the backup of HR table T512W, before upgrading your HR support package, then we upgrade the support package and after that..
    is it right that we need to restore the table? or that the back up is use to do cross check on the content of the T512W after upgrade?
    V_512W_B                       Valuation Bases                                         
    V_512W_C                       Averages                                                
    V_512W_D                       Processing Classes, Cumulations, and Evaluation Classes 
    V_512W_O                       Complete View T512W                                     
    V_512W_T                       Wage Type Texts                                         
    thanks for informing us that it's a standard practice to backup this table before applying the HR patch to system. how do you know this is a standard practice?
    do you know any other additional standard practices for HR in upgrade project from 4.6C to ECC6.0?? do you have the link of this complete information?
    thank you for your kind attention and support.
    looking forward to hearing from you.
    thanks and best regards,
    dhenny muliawaty (pei pei)

  • PU19 PDF/SAPScript issue in upgrade between 4.7 to ECC6.0

    We are upgrading from 4.7 to ECC6.0. ADS is setup for PDF format. When I run Tax reporter, in the log, I see W2 is getting generated under both PDF format and SAPScript format. Actually creates spool for W2 on both formats (Forms generated in PDF and also in SAPScript format). How do I stop the W2 statement NOT to create in SAPScript format. and Create only in PDF format. Any help please.
    Thanks, Raj

    Config view V_T5UX7 for tax form 'HR_F_W2' . Delimit alternate form HR_F_W2' (having Sapscript radio button selected) and any forms you no longer want Sapscript to create with an early end date (e.g. 12/31/2007).
    Rgds.

  • Upgrade from 4.6C to ECC6.0 - development quality and production

    Upgrade from 4.6C to ECC6.0
    I have got three systems right now...
    Development(D1)     Quality(Q1)    Production(P1).
    These three systems need to be upgraded to ECC6.0
    The recommended process is to copy D1 to a new temporary server(D2) and
    then upgrade it. At the time of the copy we will have to run the transactions
    SPDD and SPAU for which the one one transport requests will be created.
    Now after the complete upgradation we will be running the UCCCHECK and SCUV.
    The problem is after running this process we are going to copy the Quality(Q1)
    to a new quality system Q2. Now the code in the D2 system is unicode complaint with all the
    same functionalities as in D1.
    How to get all the change and customizing objects which is updated in the D2 system
    to the Q2 system (only the relevant ones - this will also ensure for PRD as the same process could be followed)?
    Or else do we have to repeat the process for both the new quality(Q2) and new production(P2)
    systems?
    Useful answers will be rewarded accordingly....

    Hi,
    If you do SPDD and SPAU changes to create unique transports (as per upgrade guide) so the Q2 upgrade will have it embeded during the upgrade process then you should not have any problem because after the D2 combined upgrade (unicode and Technical Upgrade) the system will be in Unicode, UCCHECK is to check unicode compatibility as long as I know. You won´t need to use SPDD and SPAU again in Q2.
    Also you could do Upgrade to D2, run UCCHECK and SCOV and then create all changes to objects that needs to be changed to create requests. Then do Q2 upgrade and when is finished then you move every transport you need from D2 to Q2 to do the necesary tests, it should not take much time. In the upgrades I know and done this is the way the changes were moved up to PRD, we have never used the unique transport request mentioned in the Guide. During Quality tests developers and funtional consultants will need to keep doing changes until everything is OK so even if you create unique requests, you will also have to transport after PRD upgrade.
    Either way you won't need to run SPDD and SPAU after D2 upgrade.
    Good luck
    Edited by: AC on Nov 18, 2008 1:26 PM

  • Upgrade from 4.7C to ECC6.0 fields missing in t code FBL5N

    Few fields are missing while upgrading from 4.7C to ecc6.0 in SAP STD Transaction FBL5N.  Will pl clarify me.

    Hi,
    Can you clear whether you are in the process of upgrading to ECC6 or you have already completed the Upgrade to ECC6 ?
    Regards
    Suhas

  • Impact of upgrading SAP 4.6C to ECC6.0 to Java application

    Hi,
    Currently, my Java application is:
    1. using SAP 4.6C as backend
    2. using Java 1.4
    3. using SAP Enterprise Connector in SAP Netweaver Developer Studio 7.0.15 to generate the BAPI proxies
    4. using JCo 2.1.8
    If now the backend SAP system is going to be upgraded from 4.6C to ECC6.0, will there be any changes required on my Java application i.e.
    1. Is the BAPI proxies generation process with SAP Enterprise Connector remain unchanged?
    2. Are the BAPI structures remain the same that do not require any Java code change when calling BAPI?
    3. Is the JCo version remains unchanged?
    4. Is there any Java code changes required?
    Thanks!

    Hi,
    1. Is the BAPI proxies generation process with SAP Enterprise Connector remain unchanged?
    Yes. No change required except minor changes.
    2. Are the BAPI structures remain the same that do not require any Java code change when calling BAPI?
    Well you will have to check if the BAPI import/export/tables/changing parameters have undergone any change. If not then no change required.
    3. Is the JCo version remains unchanged?
    Yes. This shouldnt be an issue.
    4. Is there any Java code changes required?
    Well if your 4.6c system was non-unicode, ECC 6.0 would be unicode. So the RFC where you would have mentioned that a Unicode(java) system is interacting with Non-unicode(4.6c) system will require a change. This is applicable to both RFC's in SAP & Java.
    Thanks,
    Best regards,
    Prashant

  • Invoice Receipt Warning Message Appear After Upgrade from 4.6C to ECC6

    Hi Gurus,
    We do upgrade from 4.6C to ECC6. And we do Invoice Verification base on Delivery (Vendor delivery number), in our business process there more than one Purchase Order has same Vendor Delivery Number while GR executed. But only one Purchase order related to Invoice verification, others PO are Free PO (no need Invoice Verification).
    The problem is:
    In SAP 4.6C, while execute Invoice base on Delivery (Vendor delivery), system automatic select only PO with Delivery (vendor) which related/allow invoice receipt.
    In SAP ECC6, while execute Invoice base on Delivery (vendor delivery), all PO selected. So than there are warning messages appear (warning pop screen) for those PO not allow invoice Receipt (message M8035: PO item XXXXX does not allow invoice receipt), and at the end PO which allow Invoice receipt then appear for further Invoice Receipt process.
    At overall, the final result SAP 4.6C and SAP ECC6 is same (only PO which allowed Invoice Receipt will processed further).
    The Question are:
    1. Why in ECC6 appear warning message, while in 4.6C no warning message ? Is there config to ignoring the warning message. I've try to maintain system message for M8035 (t-code: OMRM) to ignoring the pop screen, but can not created.
    2. How do we make warning message dissapear (no need warning message), because if the PO's has hundred items so user need to click enter hundred times.
    Thanks in advance.
    Regards,
    Tri Wicaksono

    Hi,
    could you please check whether the flag "GR-based IV" is set in the purchase orders?
    If GR based-IV is ticked, then this pop-up cannot be suppressed.
    If you would like to post the invoice first then GR-based IV should not be checked, otherwise this pop-up will always appear.  I am afraid that this behaviour is standard. 
    Please, be aware that this feature is only available if you set  in the Purchase Order item the 'GR-based IV' indicator:
       If the GR-IV flag is not set in the PO, then the system does not                     
       differentiate individual goods receipts. Please see the <f1> help                    
       for the field "GR-IV" in the PO item detail. Since the individual                    
       receipts are not differentiated, an invoice is not tied per se to                    
       an individual receipt and a goods receipt can be reversed despite                    
       an invoice receipt.                                                                               
    With the GR-IV flag set on in a PO, you can specify which goods                      
       receipt is being invoiced in an IR and which goods receipt is being                  
       reversed in a return. It is this correlation between goods receipts                  
       and invoices that enables you to specify for GR-IV PO's whether an                   
       item can be returned despite an invoice. 
    Please refer to the note :457511 Question 10.          
    Best regards
    Erika

  • How to handle the interfaces in upgradation from 4.6c to ECC6.0

    we are going for the upgrade from 4.6c to ECC6.0
    actually we are using n number of interfaces like webmethods, informatica powercenter, ALE, EDI....
    powercenter was created some programs in SAP R/3, when we are upgrading from 4.6c to ECC6.0, what kind of issues we will face regarding this informatica. what is strategy we have to follow to upgrade this informatica in SAP, if anyone have the documents regarding informatica powercenter please help me and guide me
    if anyone have documents regarding this interfaces upgradation or procedures bestpractices, common issues please forward me
    thanks,
    chandra

    thanks

  • Functional upgrade from 4.6C to ECC6, changes in Controlling

    Hi
    We will be doing a functional upgrade from 4.6C to ECC6. I need to know what are the changes in Controlling on ECC6, with specific reference to the Aerospace and Defence Industry Solution. We have completed the technical upgrade.
    Thanks
    Henry Bekker
    [email protected]

    Hi
    We will be doing a functional upgrade from 4.6C to ECC6. I need to know what are the changes in Controlling on ECC6, with specific reference to the Aerospace and Defence Industry Solution. We have completed the technical upgrade.
    Thanks
    Henry Bekker
    [email protected]

  • SQ03, user group removed after release upgrade from 4.6C to ECC6

    Dear All,
    I have a problem about user group - transaction code SQ03.
    After the release upgrade from 4.6C to ECC6 the user group, that I created in the old system, are not present in quality and production environment.
    In the development environment there is the user group but doesn't contain the queries that I created in the old environment.
    How can I solve this issue?
    Can I recover all missing queries?
    (moreover I can access to the old environment)
    Thanks in advance.
    Regards

    Hi
        Please refer to the SAP note 1278056 and 1278115 - PDS Display: F4-characteristic values are not selectable.  Hope this will resolve your issue.
    Regards,
    JB

  • BAdi & user-exits while upgrade from 4.6c to ECC6

    Hello all,
    Can anybody put light on how User-exits and BAdi will be effected while upgrade from lower version to ECC6.
    Many Thnanks.....
    Apps.

    Hi,
    The main concept of enhancements is to keep the code unaffected during version upgrades
    Hence all the BADI implementations and User Exit/Customer exits implementations will be in place and no effect due to upgrade...I hope in case of badi, some new BADI(as part of enhancement framework-GET BADI/CALL BADI) will be added up and the old BADI(Those in 4.6c or below) will not get affected.
    Regards
    Shiva

  • Fund Management - Issues in Upgrade from 4.6C to ECC6

    Hello,
    We are upgrading SAP Application for a client who is on 4.6C to ECC6. The client is currently using Funds Management in 4.6C. With ECC6 I understand that this functionality is moved into Public Sector and is available only on activation of IS-PS Extension Set.
    The question I have is that does this activation impact any other business processes or is just a technical activation.
    What I mean is that if I activate this extension set does the system start doing things differently and needs specific data related to Public Sector which the business users will be required to be entered while doing transactions OR the activation will not impact business processes as such and would work as earlier with Funds management active. (except where there was a change in the functionality between 4.6C to ECC6)
    I would like to know the risks, if any involved in upgrading Funds Management from 4.6C to ECC6.
    Please reply and let me know any question to get more clarity on the issue.
    Best Regards
    Kuldeep

    Hi Kuldeep,
    There are several main issues that have to be addresses when upgrading from 4.6 to ECC6. The main ones are:
    1 - Derivations. The object are no longer connected through tables or master data entries (you may have a table that links Cost Centers to Funds Centers for example). These assignments are now maintained through a flexible derivation tool. These derivation rules have to be maintaind, or the posting addresses will have no FM values and you will not be able to post any documents.
    2 - Inventory purchases. The inventory purchases scenarios are no longer maintained through the customization (you can no longer choose one of the 4 inventory scenarios, and there's no warehouse Funds Center). These are all maintained through derivations.
    3 - BCS. There's a new budgeting and AVC tool called "Budget Control System" (BCS). You can either activate it, or keep working with the old budgeting (called "former" in the customization). The new BCS affords flexibility in budgeting and AVC, including several AVC ledgers.
    More data regarding migrations can be found in documentation. If you want, I can send you the PDF document.
    Best regards,
    Shahaf Yaari
    [email protected]

  • ABAP Query in Upgradation from 4.7 to ECC6.0

    Hi there,
    We are upgrading SAP system from 4.7 to ECC6.0. We have s/w component SAP_BASIS = 700.
    It would be of great help if anybody share their thought on handling ABAP queries after upgradation from 4.7 to ECC6.0.
    We have refered SAP notes 132813 and 672784 where in we need to change the default query area.
    Also, do we need to re-genarate the queries? If yes then how can we achive the same.
    Thanks in advance.

    Hi,
    It may happen that some times, the queries are not generated after the upgrade.
    Hence call the FM: RSAQ_GENERATE_PROGRAM
    Pass the Query name and user group.
    For all global queries: refer table AQGQCAT and local/client specific queries: Refer to AQLQCAT.
    This can help to regenerate the queries.
    You can also write a small program to generate using the above FM(one time program) that runs after upgrade
    Hope this helps
    Regards
    Shiva

  • Hi..need document on Upgradation from 4.6c to ecc6

    Hi Rakesh,
    We are planning to upgrade our R/3 system from 4.6B to ECC 6.0.
    It would be very helpful for us if you can send the upgrade docs.
    particularly functional MM side,
    [email protected]
    Cheers
    Rgds
    V.Suranjan.

    Upgrading notes 4.6 to ECC6
    http://www.sap.com/services/servuptech/bestpractices/index.epx
    Solution Browser would give the differences (Features):
    http://solutionbrowser.erp.sap.fmpmedia.com/ Give source and target versions.
    Release Info:
    ECC 6.0:
    http://help.sap.com/saphelp_erp2005/helpdata/en/43/68805bb88f297ee10000000a422035/frameset.htm
    ECC 5.0:
    http://help.sap.com/saphelp_erp2004/helpdata/en/c6/feda40ebccb533e10000000a155106/frameset.htm
    You can find the difference in release notes of each SAP version.
    Here are the links.
    http://help.sap.com/saphelp_47x200/helpdata/en/fc/e3003deddfae4de10000000a114084/frameset.htm
    http://help.sap.com/saphelp_scm50/helpdata/en/28/b34c40cc538437e10000000a155106/frameset.htm
    http://help.sap.com/saphelp_erp2005/helpdata/en/43/68805bb88f297ee10000000a422035/frameset.htm
    Reward points if it helps.

  • Purchase order header text in ME21n upgrade from 4.6c to ecc6

    We had changed the nomenclature of the header text from SAP standard to the way we required as per our business needs
    in Purchase order.
    Now we have done technical upgrade form 4.6c to Ecc6.0.However, the nomenclature of the header text is reset to original SAP standard names.
    Hence suggest the way to restore as per our business requirement.
    Thanks in advance.

    in other words: you had modified SAP programs.
    If you upgrade or apply hotpackages then you have to perform the transaction SPAU, where you define whether you accept SAP changes or keep the modification as is.
    It can be that basis just resets all to SAP standard. hence you have to redo your changes.

  • Regarding upgradation from 4.6C to ECC6.0

    Hi Friends,
    We want to upgrade from 4.6C to ECC6.0 .
    Pls can any one suggest me which tool i have to use .
    Possible pls send me some docs on this one.
    Thanks & Regards,
    Ramnaresh.P

    You have to refer Upgrade documentation at https://service.sap.com/instguides
    Regards,
    Nikunj Thaker.

Maybe you are looking for

  • Need help for Format HD

    Hi I need Help for Formating HD so Wat Key need hold on start up for format HD I apprciated you Help

  • Export/import oracle9

    Hi, since I do not have a good knowledge of oracle, hopefully somebody may help me to understand better how export/import work (oracle 9) A colleague as run an export from a production server, now he needs to run the import on a test server but it fa

  • Javac missing (?) from SDK install

    Any help appreciated: I installed the 5.0SE SDK. When attempting to compile a source code file, I received the message: 'javac' is not recognized as an internal or external command, operable program or batch file. After some research, I properly set

  • I have a HP Pavilion zv6000 (service tag zv6130us), How much memory will it take?

    I have a HP Pavilion zv6000 (service tag zv6130us), The manual says it takes 2GB the HP help and support center says it will go to 8GB. Does any one know how much memory this will actually take on a per slot bases?

  • Correlated analog and encoder readings with M-series

    Hardware: PCI-6220 Driver: NI-DAQmx Software: VC++ 6.0 My goal is to collect synchronized (correlated) analog and encoder readings to provide position-based voltage and current information. First question is regarding the potential alternatives and w