We are currently upgrading from 46c to ECC604. In 46C we use a very small functionality of the dangerous goods master. Just some info for entering UN numbers, hazardous substances and user defined texts (5x). We have our own forms and print some fields from this masterrecord.
According to SAP we have run DGCONVERT to convert the texts into phrases.
- UN numbers in 46C was customizing and now they are maintained in phrases. Every key gets CUST-xxxxxxxxxx numbers, but the link with the UN number and the description of the UN number is not 1:1 anymore. You could enter an other description for the same UN number. So UN numbers is not customizing anymore, just masterdata in DGP2. Is that correct? Or can I make a direct link to the description?
- Because running the conversion report, every text (hazardous substances and user defined texts) are moved to phrases with CUST-xxxxxxxxxxx key. For us a problem because for us that key does not say anything, so probably we need to create new phrases. I have seen that there is CG3Y and CG3Z for uploading/downloading, but it expects /usr/sap/EHS_DATA/stocker/substanc.dat file for downloading. So is there an other way to upload our own phrases? so we can do a data migration from 46c to 604 without using the conversion report.
- In the tab 'printed text' of DGP2, you see the description of user defined text (UsDefTxt 1). Is there a way to change this description as this was possible in 46C.
- Is it possible not to use CUST- in for the phrases?
Any info would be appreciated! Thanks!

Hi, I set my question as answered as most of my questions have been answered or we have done some things differently. I just saw an other posting directing to this one so I sum up a little what we have done.
Please take in mind that we have the EH&S module but only use a small portion of the dangerous goods master (DGP2) as in only being able to put some info in the dangerous goods master, into the delivery documents. As I experienced from all the other sites this will be a bigger issue, but for the moment this is from the upgrade part:
1) Start first with setting the enhancement switch EA-PLM in customizing, else it will not work properly. See note 1157472 as in our case the menu structure was not visible in SAP menu.
2) Starting point (for us) has been note 692664. This report describes the steps you have to make to convert your texts with reports DGCONVERT used in the dangerous goods master (like texts maintained in DGTU and DGTD , specific and user defined texts). Read carefully as it seems that you must not run DGCONVERT for the same checkbox so do this step-by-step.
3) The UN number is not customizing anymore, you would have read it in note 1157472 already. This leads to converting. But the result is that you get stupid phrases (CUST-10000000012312). As the direct link to UN number and the description has been broken, we have finally created new phrases in the format like CUST-UN1133, so that the users at least know which description is the correct one.
4) For running the DGCONVERT you maybe endup in strange errors. The main cause was that the customizing and the texts must be maintained in the old system at least with AN translation in the language you run the report. Like the tables TDG33 (with text table TDG34) and TDG66 (with text table TDG67), we did not maintain every key in a language. So no empty values allowed. When one of them is empty in that translation, program stops. So we already prepared this in the old system. This also applies for the user defined text and standard text. At least the text translation must exist (and text maintained with at least an empty line) in one language. So if you have 100 texts maintained in DE and 2 are empty, we added the 2 in the system and run the program in DE language. That should work. Hope it's clear. Else ask an abapper, that's why I know this.
5) UN number / phrases / translation. In our case we do not get content (I do not know how this works and how and why). So our content is the old SAP version. Basically we did the DGCONVERT, then found out UN number was not nice, so downloaded TDG66/67.
- First we created LSMW to create the phrases in CG11. Ask your abaper to create one where you can maintain multiple languages.
- Next we linked the phrases to the correct phrase set in LSWM with CG12 to phrase set PHRASE_SET_UN_IDENTIFIER.
- Then we did an change DGP2 LSMW. Please be aware: slow!!! As we have couple of thousands materials we have to link to the new UN phrases, the performance is slow --> 20 hrs for us. (4400 materials).
6) Basically we did the same for our user defined texts. Only SAP converts them not in the correct fields, also the user defined texts are in 1 phrase set available (SAP_EHS_1022_042_TEXT). We have 5 user defined fields, and to be able to print correctly we have created 5 new phrase sets SAP_EHS_1022_042_TEXT_1 until SAP_EHS_1022_042_TEXT_5. Put the correct values in the phrase sets and then did a fresh change of masterdata DGP2 into the correct fields. In CGAB transaction you can change the phrase set to a new one (see note 632534 and look at the part: important information). In our case we linked in DGTM2:
PDGF5     User-Defined Text Key 5     SAP_EHS_1022_042_TEXT_5
PDGF4     User-Defined Text Key 4     SAP_EHS_1022_042_TEXT_4
PDGF3     User-Defined Text Key 3     SAP_EHS_1022_042_TEXT_3
PDGF2     User-Defined Text Key 2     SAP_EHS_1022_042_TEXT_2
PDGF1     User-Defined Text Key 1     SAP_EHS_1022_042_TEXT_1
7) As the conversion from 46C to 6.04 with DGCONVERT also created phrase sets for UN we actually did not want, it seems that the big amount of phrases in the phrase set is therefore slow, see point 5. So we deleted these, but also take into mind, with LSMW delete a phrase is also slow. So we think of the option not to convert this with DGCONVERT so we just do a fresh upload and link. Maybe this is faster. Currently busy with this.
8) During testing creating phrases, if you delete a phrase and create a new one with the same name SAP will give message. Run program RC1PHDEL to actual delete this from the database. See also note 1043546.
After this, we finally have everything back as we wanted and now we are able to print the data (with new selections on phrases) on our forms.
Hope this helps
Edited by: K. Peters on Apr 2, 2010 3:30 PM

Similar Messages

  • How to add new fields to the system form (Ex.expenses to a/r invoice form)

    hi
    can any one tell me how to add new fields to the system form (Ex.expenses to a/r invoice form)
    i want to add expenses field to system a/r invoice form and connect data base also.
    i used the code of samples\11.system form manipulation(vb.net) but i'm not able to get it....so can any one help with code or concepts.
    reply soon plz..
    thankQ

    If I understood you correctly, you are just trying to add new fields to the invoice form and then use them in your form. you should first go and add the field to your tables, which you would do by going to Tool --> User Defined Fields --> Manage User Fields. There are different documents or categories given. For ex. for invoices, Sales Orders you would add your field under the Marketing Documents. If you want the field to be just one per invoice, add it to the Title, otherwise if you want a field per invoice or Sales Order line, add it to the Rows section. Once you have done that then you can just create a edit box or drop down to represent the field and set the datasource for that to your field. If you want example code to do that, let me know.

  • Uploading Meter data into the system

    Can some one please describe the process of uploading the meter data into CC&B.
    What is the content of the flat file that i upload.can i upload a meter read XML file directly into the staging tables.....kindly explain the steps..I have not been able to upload any daat into the system using staging control and staging upload page.
    Also i found out that there are batch process MUP1 and MUP2 which need be rum in order to upload the meter data into the system from the meter read staging table.Is this correct.
    With regards to the meter upload staging table, i referred to the MR staging table : CI_MR_STAGE_UP
    there is some data available with the installation as demo data.
    For column MR_UP_STATUS_FLAG, there are values such as E, P, C...I unsersatnd there meaning.
    1) For Pending P status, i submitted the batch processes MUP1 and then MUP2, expecting that teh status might change to Complete, c.......at the same time i ran MRUP-PRG ........well i was going to write nothing happened , but i saw that after some time all teh rows with ataus P and C are not present any more..........
    2)How do i rectify the data with E status.........
    Please helpp me uploading more data to the CI_MR_STAGE_UP Meter read staging table.

    Hi,
    thanks for the reply..
    can u please tell me what is the content of the flat file that i upload.can i upload a meter read XML file directly into the staging tables.....kindly explain the steps..I have not been able to upload any daat into the system using staging control and staging upload page.
    if u can give a flat file sample content for the meter read.
    Also is it advisable to insert data into upload staging table through SQL drectly.
    And can u pls tell me the difference between XAI upload staging table and other upload staging table such as for MR, FA etc.

  • New plant in the system

    Hi..
    I want to create a new plant in the system.
    Please tell me the customising steps required to do that.
    Thank you

    Hi
    1. Definition:
    Enterprise structure->Definition->Logistic gen.->Define...plant
    2. Assignment:
    Enterprise structure->Assignment->Logistic gen.->Assign...plant
    Max

  • Cannot add a new characteristics from the system catalog

    Hi,
    I am trying to pull and add a new characteristics from the existing characteristics catalog. However when i save and activate the new char, the system throwing a yellow warning message as "Field KMKDGR has the same name as field KDGRP". When i proceed to save it since its just a warning message the system says all fields are saved. However when i quit and come to the characteristics list of the op concern, i notice the new characteristic is not added into the list of characteristics. Why is it so?
    Is it because of the warning message?

    Hi
    The warning message can be ignored...
    Once you save the char, you need to reactivate your data structure in KEA0... Ideally, when you save and press the back button, system itself gives a pop up message to reactivate the data structure...
    1. Push the char from right to left
    2. There will be a "match-stick" icon at the top left of the screen.. Click it
    3. Then press back button
    4. Whether with our without pop up message, activate your data structure in KEA0
    Regards
    Ajay M

  • Uploading SAP not from the system

    I have downloaded the SAP note 1045888  using a download manager.
    Now I need to upload it into SAP.
    In transaction SNOTE I used the option Goto-->Upload SAP note.
    But the note is not getting uploaded.(I can not view it in the list).
    I tried to upload other notes, they were getting uploaded.
    Can any one tell me what the problem might be.

    Hi ,
    First you  need to down load the note to your system and then upload it .
    Execute the transaction SNOTE in the SAP system
    - In the menu..Goto -> Download SAP Note (if connected to marketplace)
    otherwise Goto->Upload SAP Note.
    If downloading from marketplace then specify the note number in the screen and continue (execute)
    else if uploading select the file from the local system and upload (browse)
    - Once that is done then you can see the note on the screen. You will be able to view the note number on the screen
    - Select that particular note number and click on the execute button to Implement the SNOTE into the system.
    Sail

  • Want to create new certificate for the SYSTEM PSE

    when i got o tcode 'STRUSTSSO2" In my system i am seeing a wrong certificate for the system PSE.
    i want to delete and and create a new certificate.
    Can some one tell me detail steps how i can remove the existing  certificate and create a new one.
    I am going to use the new certificate for SSO from portal to this server.
    Thanks
    Andy

    Hi Andy,
    To remove the System PSE, follow the procedure described in [SAP Help|http://help.sap.com/saphelp_nw70/helpdata/EN/b6/23273aafa35d46e10000000a11402f/frameset.htm].
    To create a new one, see the procedure [here|http://help.sap.com/saphelp_nw70/helpdata/EN/07/03473cbff75b01e10000000a114084/frameset.htm].
    Regards,
    Henk.

  • Cant upload new extension to the Exchange

    I am trying to upload some new extensions to the the Exchange
    and I am receiving the following error:
    The following error(s) must be corrected before this form can
    be completed:
    There was a problem parsing your MXP file (The cause of this
    exception was that: java.io.IOException: Not enough space.). Please
    choose a new file.
    My extensions are fine.
    I have tried using Firefox and IE and both report the same
    error. I have emailed [email protected] but have had
    no responses.
    thanks

    Hi JRodriguezRentas,
    Welcome to the Support Communities!
    The article below may be able to help you with this.
    Apple - Support - iTunes U - Public Site Manager - Contact Support
    https://ssl.apple.com/support/itunes-u/public-site-manager/contact.html?form=psm &topic=Public%20Site%20Manager%20inquiry
    Cheers,
    - Judy

  • HT1918 how do you change payment info when there is a pendent payment and you have a new card issued in a new country and the system will not let you do it?

    Can any one help me, I want to change my credit card info. The system will not let me do it, as I have an open purchase and credit cards from one country A and need to change it to creditcard from country B and the system does not allow for it. Any suggestion?

    Contact iTunes Customer Service
    Apple  Support  iTunes Store  Contact Us
    And request assistance with your issue...

  • Upload new member in the dimension not from BPC Admin

    Hi Experts,
                     If we want to upload a new account not from of BPC admin, how we can do it?
        I tried to do it in MS version and was able to do it, as we have a dimension files in excel format (other than the temporary excel file ), we can add member in that excel file and run the Dimension process without selecting the "from member sheet". And it includes the new member.
                  But in Netweaver version if we do same thing in the xml file of that dimension and try to process, it doesn't take the new member which was added in the xml file.. Any idea ..
    Thanks
    IshitaD

    Hi Ishita,
    Can you try using Data Manager to load master data? I know that is too much trouble if you want to load say just 1 record but it  is a clean option that does not require BPC Admin.
    Regards
    Pravin

  • How do I install the new upgrade when the system will not let me? Help!!! I have tried to do this 30 times or MORE!

    I tried to add upgrade but when I put the icon into my Applications there appears a white x on the icon after I have downloaded the upgrade. Sometimes a statement like; You do not have permission to use upgrade? (error message)

    Firefox 4 versions and later do not run on a PowerPC Mac.
    Firefox 4 and later require at least OS X 10.5 and an Intel Mac.
    * http://www.mozilla.com/firefox/6.0.2/system-requirements/
    For an unofficial Firefox 4 compatible version (TenFourFox) that runs on PowerPC Macs with OS X 10.4.11 or OS X 10.5.8 you can look at:
    * http://www.floodgap.com/software/tenfourfox/
    * http://code.google.com/p/tenfourfox/
    Firefox 3.6.x (Mac OS X 10.4 and later) can be found here:
    * http://www.mozilla.com/en-US/firefox/all-older.html
    Check and tell if its working.

  • Software activation Premiere elements: error 1: internet connection not recognized - error 2: failure: "Der eingegebene Antwortcode ist ungültig. Geben Sie ihn erneut ein." This I did for several times. I generated a new "Antwortcode", but the system gave

    computer: Lenovo ideapad Z710
    OS: Windows 8.1
    program: Premiere Elements 12.1

    Dear Mylenium,
    my problem is:
    Adobe programs do not recognize an established and working internect connection.
    So I used the same computer to get with the given request code ("Anforderungscode") an answer code ("Antwortcode"). But Premiere Elements does not recognize this answer code and tells me, that this answer code is invalid ("ungültig"). So what should I do ?
    Everytime I try to repeat this, I get the same request code and the same answer code. Should I wait until the 72h time limit is over to get than a new answer code ?
    Anyway, why does Premiere Elements (like Photoshop Elements, too) does not recognize the established internet connection, but is able to recognize that there is for instance an update available ?
    Thanks for help.
    HTJ3BA

  • How to install new fonts on the system

    using java application.
    anu

    what files (names and extensions) did you download?
    Downloadable installation files available:
    Suites and Programs:  CC 2014 | CC | CS6 | CS5.5 | CS5 | CS4, CS4 Web Standard | CS3
    Acrobat:  XI, X | 9,8 | 9 standard
    Premiere Elements:  13 |12 | 11, 10 | 9, 8, 7
    Photoshop Elements:  13 |12 | 11, 10 | 9,8,7
    Lightroom:  5.7.1| 5 | 4 | 3
    Captivate:  8 | 7 | 6 | 5
    Contribute:  CS5 | CS4, CS3
    Download and installation help for Adobe links
    Download and installation help for Prodesigntools links are listed on most linked pages.  They are critical; especially steps 1, 2 and 3.  If you click a link that does not have those steps listed, open a second window using the Lightroom 3 link to see those 'Important Instructions'.
    window using the Lightroom 3 link to see those 'Important Instructions'.

  • Ive the new mbp with the system 10.7.1

    At first ive no problem connecting to the internet but now the massege "wifi has the self assigned ip adrdress 169xxxxxxx and will not be able to connect to the internet" is prompting. What can i do to give a soltion to this problems.
    thanks

    Jip, I found the same "fix" by disconnecting & reconnecting the adapter. Already sent, and hopefully this gets fixed, because it's the most irritating problem I've had with any Apple product.

  • What would cause the screen to swith between backgrounds as if it is being controlled remotely? the system had created 7 new folders on it's own.

    System is currently switching between mutliple screens without me touching it. The system has created several new folders. The system is performing as if it is being remotely controlled.

    How recently did you switch?  If it's less than 60 days, then Verizon simply reinstates your previous account.  The fact that you were on the EDGE plan and mailed the devices back, and they apparently are somewhere in the system, could cause complications, and it might just work out that you just go back on the same plan and they set you up with the same devices.  I'm not sure how it will go - but since you are still being billed for the devices... 