Upload projects from cProjects to RPM

Hi RPM experts,
My client is working with cProjects(linked to PS) , but now they are thinking about using RPM. How should we upload existing projects from Cproject to RPM in order to they are linked?
Is it needed first creat the item and then linked to cproject or can they be uploaded and created automatically?
We have seen this function /RPM/CP_UPLOAD, Is it the correct one?
Thanks everyone for your help!!
Sara

Hi Sara,
This is another way to achieve the Project Upload to cProject. You can create a link between existing cProject and an existing item. Then you can upload the PS project to cProject and Item through RPM application.
For you next query about the mass creation of Item.
you have two options
1) Via Portal. Using Multiple Items create functionality
2) Via RPM_DX transaction, where you can prepare an excel sheet with basic details of the items to be created and upload this excel via this transaction, by selecting appropriate options on the selection screen.
With these two options you can create multiple Items at a time.
Hope this answers your query.
Thanks and Regards,
Piyusha

Similar Messages

  • Creation of WBSE in SAP-PS from all Phase of Project from cProjects

    Hi,
    Need suggestion for the automatic creation of WBSE in SAP-PS from each phase of Projects from cProjects i.e. multi level controlling scenario
    I have done the required configuration of Define Controlling Scenario where for the project type, controlling method has given (Multilevel Controlling (Structure Element, Automatic).
    But in my case only one WBSE is getting created for all phse s & project defintion of project in cProjects.
    Request you to suggest me on this issue.
    Regards,
    Ranjan

    Hi Vetrivel,
    Thanks for your prompt response. These are settings made for multi level controlling scenarios.
    1. Project Type:
    Accounting Intergation-accounting integration in my SAP ERP, as of relese of the project
    2. Define Object Links for Accounting Integration
    - 0FIN_INT_ERP_PS Single-Obj. Controlling on WBS Elements
    - Search Fields OLR3_TS_PRPS_SHLP
    - Proxy Class CL_DPR_OLR3_WBSELEMENT
    - 0FRAME9 frame has considered
    3. Controlling
    - Controlling Scenarios: PS01 Costing Variant
    - Then Costing Model has assigned to Controlling Scenarios
    - Assignment of Cost Elements to Cost / Revenue rate
    Please suggest me if i have missed some things. I am checking the planed cost in CN41 transaction of the PS module. Morever in Project in cProjects costing button is disabled & while doing calculate no planned cost os updating in Projects.
    I am following role based costing process. Project Role has defined & employee assiged to Projects.
    Thank you in advance.
    Regards,
    Ranjan

  • 'Released' System Status in Automatically created PS Project from Cproject

    Hi,
        My questions are related to  Automatic creation of PS project from cProject
    When We create a PS Project automatically from cProject, the Top Level WBS under Project definition is ' Released' Status . But We need it should be 'created' Status. Pls guide me to change this behaviour .
    regards,
    Ramesh Nachimuthu

    Hi Ramesh,
    In the current cProjects application design, nothing exists in standard. You have to create your own implementation, either by enhancing standard accounting class, or your own subsystem to trigger the interface at save.
    Zhenbo Wang started to write a sample code that could help you:
    Prototype 'Using Subsystem to synchronize the status of linked WBS elements
    BR
    Matthias

  • Viewing Rates assigned to a Project from cProjects

    Hi Gurus
    I have created a project in cProjects and released, etc.
    Is it possible to use a SAP PS Transaction to view the Rates assigned to each Task. I have tried using CJ20N but I have haven't been able to locate what I'm looking for.
    Any guidance on this will be much appreciated.
    Many Thanks in advance
    Panduranga

    Hi AP
    I've very new to SAP PS coming from a CRM background.
    I checked CN41 but could not see the Rates linked to the Project, I went into a number of views but could not locate.
    Would you be able to guide me through to where I need to be.
    Many Thanks
    Panduranga

  • Transferring the data from cProject to PS Project

    Hi,
         When we create a PS project from cProject some of the field values are not flowing.
    1. PS Project is not taking any  cProject Project type.  Is there any BAdI or Configuration Option available to change this behaviour?
    2. Person Responsible of the Project is not replicated in PS Project from cProject. Can We flow this detail from cProject to PS project?
    pls help me to solve these behaviours.
                             Thanking you
    regards,
    Ramesh Nachimuthu

    HI Ramesh,
    Both are unfortuenately not possible.
    1. PS Project is not taking any cProject Project type. Is there any BAdI or Configuration Option available to change this behaviour?
    >> the PS project type is determined by project profile. And PS Project profiel is determined by customizing, tocde  IAOM0, Business Scenario 'CPROJECTS'. In other words, only a PS project type is available.
    2. Person Responsible of the Project is not replicated in PS Project from cProject. Can We flow this detail from cProject to PS project?
    >> The reponsible of cProject is a BP, and the PS Project responsible is a person maintained in HR. They can have no relationship between them, though the name is the same. The corresponding information is not tranfered to the PS and there is no mapping logic applied so far.
    Kind regards,
    Zhenbo

  • Error while creating projects in SAP-PS from cProjects

    Hi,
    Need suggestion on creating projects in SAP-PS from cProjects. There is cProjects & SAP-PS interface.The requirment is to create project in SAP-PS from cProjects. All the configuration has done in cProjects & PS module also. While saving the projects & checking the accouting the following error & project is n't creating.
    1.Combination company / CO area is invalid Message no. KO124
    2.Acct assignment determination is not poss.in the account assgnmnt manager
    Message no. IAOM220
    3.Only one error message is transferred from the log to the cockpit
    Message no. IAOM_CPROJECTS029
    I would like to request all to suggest in fixing the issue.
    Thank you for your coopearation.
    Regards,
    Ranjan

    Hi Ranjan,
    If the companay code does not belong to the Co area,  the system will certainly raise an error message. The question is, where do the values come from.
    Woud you please check the customizing in ERP system, if you can find the inconsistence:
    1. Customizing of the Proj.Profile under 'Create Project Profile' , SAP standard delivered is CPR0001, may be replaced by customer,
    Which Co-area & company code are used. In Tab 'organization'
    2. Which responsible Org.unit is maitained at involved cProject, to which co-area or company codes is this org.unit assigned.
    3. If the Badi under the
    Integration with Other mySAP.com Components ->
    Collaboration Projects -> Controlling ->  Business Add-Ins (BAdIs),
    which set the org. information hardly via Badi method.
    Kind regards,
    Zhenbo

  • Error while creating project automatically from cProjects

    Hi,
    Need suggestion on creating projects in SAP-PS from cProjects. There is cProjects & SAP-PS interface.The requirment is to create project in SAP-PS from cProjects. All the configuration has done in cProjects & PS module also. While saving the projects & checking the accouting the following error & project is n't creating.
    1.Combination company / CO area is invalid Message no. KO124
    2.Acct assignment determination is not poss.in the account assgnmnt manager
    Message no. IAOM220
    3.Only one error message is transferred from the log to the cockpit
    Message no. IAOM_CPROJECTS029
    I would like to request all to suggest in fixing the issue.
    Thank you for your coopearation.
    Regards,
    Ranjan

    Hi,
    The neccesary configuration for cProjects & SAP-PS interface are as follows.
    1. Project Types in cProjects, Object types, Organisation unit with Org structure in line with project profile
    2. Activate Accounting integration
    3. Object types for object link (WBSE in this case)
    4. Accounting integration using cost collector
    5. Easy cost planing settings both in R/3 systems & cProjects
    6. Project profile configuration in R/3 (cProjects standard)
    7. CO Scenario maintainance view determination (Multi level controlling-Project role, automatic)
    All the enterprise structure assignments should be same in cProjects & R/3.
    Hope this may help you.
    Regards,
    Rakesh Pradhan

  • Upload Project Structure or Roadmap from MS Project to solution manager

    I have a project ready in MS Project .
    I want to make a roadmap out of it.
    How is that possible? Do I have to manually edit roadmap structure?
    OR Is it possible to upload Project Structure or Roadmap from MS Project to solution manager?

    Hi Hussain,
    Can you please check [this|Creating new Roadmaps; thread for general overview on custom Roadmaps.
    In answer to your specific question, it's not possible to create a Roadmap straight out of MS Project, in standard SolMan.
    Best regards,
    Srini
    Edited by: Srinivasan Radhakrishnan on Jun 5, 2008 1:06 PM

  • Creation of C project from xRPM item and automatic creation of proj in PS

    Hi all,
    My requirement is to create a cproject from xRPM, once the status of the item is "Approved" and a BAdI is there(RPM_PROJ_CUST_WF) which will trigger, when the status is changed to "Approved".
    My problem is how to create a cproject from xRPM item, any FM or BAPI available? If cproject is created, then automatically a project needs to be created in PS (ECC).
    Also how to create a project in PS from cproject, any config? Please help in this regard. How I can proceed?. I need to make any config. for acheiving the same?
    Regards,
    V Kumar
    Edited by: V Kumar on Sep 18, 2009 3:06 PM
    Edited by: V Kumar on Sep 18, 2009 3:09 PM

    Hi,
    I don't know how to create PS upon approval of item but I have done auto creation of cProject upon approval of item. Use FM
    DFM_DO_CREATE_PROCESSING.
    Here is sample code for this. In this code you have to create a cProject from a template.
    FUNCTION Z_RPM_ITEM_CPROJECT_LINK2.
    ""Local Interface:
    *"  IMPORTING
    *"     VALUE(I_ITEM_GUID) TYPE  /RPM/TV_GUID OPTIONAL
    *"     VALUE(I_BUCKET_ID) TYPE  /RPM/TV_BUCKET_ID OPTIONAL
    *"  EXPORTING
    *"     VALUE(EV_RC) TYPE  I
    Data declaration
    Data:
          lt_rpm_messages        TYPE /rpm/tt_messages,
          ls_source_context      TYPE inm_object_context,
          ls_operation_context   TYPE inm_operation_context,
          IT_TARGET_TEMPLATES TYPE  INM_TT_GROUP_TEMPLATE_ASSOC,
          ls_target_templates TYPE INM_TS_GROUP_TEMPLATE_ASSOC,
          lt_triggering_objects  TYPE inm_tt_object_context,
          ls_triggering_object   TYPE inm_object_context,
          lt_params              TYPE inm_of_tt_field_names_values,
          ls_params              TYPE inm_of_ts_field_name_value,
          lv_object_id           TYPE  INM_OF_TV_OBJECT_KEY,
          lv_templateId           TYPE  INM_OF_TV_OBJECT_KEY,
          lv_parent_guid        TYPE  /RPM/TV_GUID,
          lv_portfolio_guid      TYPE  /RPM/TV_GUID,
          lv_parent_guid1        TYPE  INM_OF_TV_FIELD_VALUE,
          lv_portfolio_guid1      TYPE  INM_OF_TV_FIELD_VALUE,
          ET_Messages    TYPE INM_OF_TT_MESSAGES,
          ls_ilink_db      TYPE /rpm/item_il.
    Data:  lv_cproject_template  TYPE  ZTEMPLATE1-CPROJECT_TEMP,
           lv_cproject_template2  TYPE  DPR_TV_PROJECT_ID,
           lv_temp_guid  TYPE  DPR_TV_ENTITY_GUID,
           lv_log_sys  TYPE  string.
    lv_object_id = I_ITEM_GUID.
    Get the cproject template guid
    select single CPROJECT_TEMP into lv_cproject_template
    from ZTEMPLATE1
    where EXTERNAL_ID = I_BUCKET_ID.
    lv_cproject_template2 = lv_cproject_template.
    select single GUID into lv_temp_guid
    from DPR_PROJECT
    where  PROJECT_ID = lv_cproject_template2.
    lv_templateId = lv_temp_guid.
    Get Parent & Portfolio guid
    Select single PORTFOLIO_GUID PARENT_GUID into
    (lv_portfolio_guid, lv_parent_guid)
    from /rpm/item_d
    where guid = i_item_guid.
    lv_portfolio_guid1 = lv_portfolio_guid.
    lv_parent_guid1 = lv_parent_guid.
    Get logistic system
    concatenate SY-SYSID 'CLNT' SY-MANDT into lv_log_sys.
    condense lv_log_sys.
    Assigning more data
    ls_source_context-OBJECT_ID = lv_object_id.
    *ls_source_context-LOGSYS = 'DY1CLNT200'.
    ls_source_context-LOGSYS = lv_log_sys.
    ls_source_context-GROUPING = 'PPO'.
    ls_source_context-OBJECT_LINK_TYPE = '0INMITEM'.
    ls_source_context-CREATE_TEMPLATE_TYPE = '1'.
    ls_source_context-TEMPLATE_ID = lv_templateId.
    ls_source_context-TARGET_OBJECT_GROUPING = 'PDCP'.
    ls_operation_context-OPERATION = 'C'.
    ls_target_templates-GROUPING = 'PDCP'.
    *ls_target_templates-LOGSYS = 'DY1CLNT200'.
    ls_target_templates-LOGSYS = lv_log_sys.
    ls_target_templates-TEMPLATE_ID = lv_templateId.
    ls_target_templates-TYPE = '1'.
    append ls_target_templates to IT_TARGET_TEMPLATES.
    ls_params-EXT_FIELD_NAME = 'PARENT_GUID'.
    ls_params-EXT_FIELD_VALUE = lv_parent_guid1.
    append ls_params to lt_params.
    ls_params-EXT_FIELD_NAME = 'PORTFOLIO_GUID'.
    ls_params-EXT_FIELD_VALUE = lv_portfolio_guid1.
    append ls_params to lt_params.
    Calling FM to create cproject & linking to item
    CALL FUNCTION 'DFM_DO_CREATE_PROCESSING'
      EXPORTING
        IS_SOURCE_OBJECT_CONTEXT = ls_source_context
        IS_OPERATION_CONTEXT     = ls_operation_context
        IT_TARGET_TEMPLATES      = it_target_templates
        IT_PARAMS                = lt_params
        IT_TRIGGERING_OBJECTS    = lt_triggering_objects
      IMPORTING
        ET_MESSAGES              = ET_Messages
        EV_RC                    = EV_RC.
    commit changes
    ENDFUNCTION.
    Please let me know if you find a way to create PS from xRPM or cProject.
    Regards
    Mohinder

  • Upload data from excel to crm using BDOC possible or not

    Hi all,
    I need to upload data from excel to crm(opportunity management) .is it possible using bdoc or not. Please provide the list of methods to upload data from EXCEL and also provide the best method for this scenario .

    BDocs are used to transfer data from one SAP system to another like from CRM to ECC or R3.
    If u want to upload data from excel to CRM, this can be done with the help of idocs and not bdocs (method 1 - using LSMW).
    Take help of a crm technical consultant and define lsmw projects. The project will take care of field mapping and conversion. Once that is done, 4 steps need to be done.
    1. Read data
    2. Convert data
    3. Generate idocs
    4. Post idocs
    Once the posting of idocs happen error-free, the data will be available in crm system.
    Another method will be using transaction SECATT.
    Here u can define test scripts and record what all activities are done in a transaction. Then define ur test configs which will contain the excel sheet data and then upload the data.
    Reward with points if this helps.

  • Hi i was in the process of uploading photos from my phone three days ago- and have tried to re start  my computer but cannot get out   of " Photos are being import to photo library please wait for import to complete"there are 90 photos and this came

    Hi I was in the procces of uploading photos from my phone three days ago as i have an important art project to finish today. I have tried to restart my computer log off come back on but every time i put my phone to the computer and press up load photos its comes up with "Photos are baeing import to photo library- please wait for import to complete".
    There are 90 photos and this came after it uploaded a few - can you help me - i have tried to quit iphone but this keeps coming up and i need these pics imported from my phone to my computer.
    please help
    thank you

    Apple menu ==> forec quit
    LN

  • Uploading data from Legacy System to SAP (In PS Module)

    While Implementing Project system Module, Whether LSMW is applicable for uploading data from Legacy sytem. If not, then what is the method used for uploading the data from Legacy sytsem to SAP

    For creating/uploading the master data from legacy system to SAP we either use below options
    1. BDC (recording)
    2. BAPI
    3. ALE iDoc.
    I would sugguest you to use BAPI and there's already this post which explains few details about the BAPI:
    Problems with BAPI_PROJECT_MAINTAIN
    Regards
    Sreenivas

  • Error while importing MS project into cProject

    Hi
    I am getting the below error while importing MS project client file or XML file into cProjects.
    dpr_shared087
    Logon language becomes original language
    Message no. DPR_SHARED087
    Diagnosis
    The logon language is defined as a possible text language in Customizing for Collaboration Projects under Specify Text Languages. Therefore, it is valid.
    System Response
    The logon language becomes the original language of the new object that was created.
    Kindly suggest what configuration data if any is missing.
    Regards
    Srikrishna

    Hi
    I am getting the below error while importing MS project into cProject.
    Error occurred when importing from Microsoft Project
    Message no. DPR_UI_BSP116
    Diagnosis
    When a project is imported from Microsoft Project, the system generates an XML string during internal processing. A project is then created in cProjects from this string.
    The XML string contains errors because the values from Microsoft Project were transferred without verification.
    Procedure for System Administration
    Notify SAP or call the cProjects application with the "DebugMode=X" query string and carry out the import again.
    The XML string that was generated temporarily is then validated against the cProjects XML schema. The error message from the XML parser is then displayed in the popup.
    Kindly suggest, if the below steps for importing MS project is ok or not?
    step 1: Create project in MS project with tasks.
    step 2: Maintain maping fields of MSP in cProject configurat
    step 3: Import MPP file into cProject using "Import" button.
    step 4: I am getting the above error while importing the MPP file.
    Regards
    Srikrishna

  • Problem in moving project from Old Sol Man 3.1 to New Sol Man 4.0

    Hi All,
    I am trying to move a project from solution manager 3.1 version to a new solution manager 4.0 version. I followed the below steps:
    1.Slected and transported the project using solar_project_admin tcode and created the transort requests in the old sol man version 3.1.
    2.Copied the cofile and datafiles from old sol man and kept in trans directory of new Sol man 4.0 version at OS level.
    3.Imported the requests into the new Sol Manager 4.0 successfully
    4.When I tried to open the imported project it told me to run the "solman_log_comp_mgr program" to convert the project to the central logical components. I just did it and it went well.
    I can see the project and do see the document types but no document names and getting all sorts of error messages when I tried to open these documents. Also I dont see the logical components under system landscape.
    Before importing, I just have configured servers/hosts, databses and all the components of system landscapes in the new solution manager.
    I request you to help me solve this issue. I also would like to know whether i followed proper procedures that i listed above? If not please suggest what procedures I should have follwed.
    Thanks in advance.
    Aravind Serikar

    Hi Aravind,
    to transport a project from 3.1 to 4.0 I would not use SOLAR_PROJECT_ADMIN to "migrate" a project. There for we developed SOLAR_MIGRATION there you can transport system landscape info, also you can transport projects. You should only transport system landscape info if in 4.0 SMSY is EMPTY. To transport projects you have only to specify your project and define a local folder. In this folder we store a few important information. Then all information will be collected in a batch job and automatically exported. Then you have to copy the data file and the cofile into the new trans folder. BUT do NOT forget the i-file. In the folder cofiles you will find a i-file, because we export knowledge warehouse content. This file is important, if you forget it you will get a return code 8. You do NOT have to add the files in the import buffer, we will do this automatically. To import the project, you have to call SOLAR_MIGRATION in SolMan 4.0 there you have to select import, then specify the folder with the few important information. We upload the info and start the import. That is it
    Regards,
    uDo

  • How do I export a project from Final Cut Pro onto my desktop?

    How do I export a project from Final Cut Pro to my desktop as a movie?

    Can anyone please help me.. when I click on my timeline in my project library and try to export movie nothing happens! and when I  try to "share" to youtube I get an error message stating that it cannot be exported because it contains "no video"... The 4 minute music video that I've created with shots off my Canon T2i looks and plays great....If I uploaded the videos into Final Cut but did not save them on my desktop or anywhere else on the Mac would this be a reason to get this message? I have never experienced this before...the only option under "share" that works is "email"
    [email protected]

Maybe you are looking for

  • Sharepoint 2013 AAMs and IIS 7 bindings

    Hi everybody, I have a server running Sharepoint Foundation 2013 and IIS7. On the IIS7 there was already a website running on port 80. Now I have configured a sharepoint site running at port 31600. From internal network everything is working fine. Bu

  • S_ALR_87013019 -List: Budget/Actual/Commitments Report Error

    Dear All I would like to bring your kind information that while executing the SAP standard T.code: S_ALR_87013019 - List:Budget/Actual/Commitments,we are not able to get the report based on the year wise. As in the SAP release 4.7, when we run the sa

  • Iphone in recovery mode and DFU mode but PC still doesn't recognize device

    HELP! My iphone 4 just keeps blinking the apple logo for hours! I tried the recovery mode and DFU mode, the first time went well, but it started to blink again after I restored it. Now I'm doing the same steps going to recovery mode and DFU mode, the

  • Issues in CRM Quality

    Hi, We transported all our activated datasources to CRM Quality. Replicated the Data sources to BI Quality system and then transported the BI objects to BI Quality. All the objects are in active state in Quality systems. But when I am trying to check

  • Deletion Flag for WBS element

    In what situation we can use a deletion Flag. Once we set a deletion Flag for the WBS element, what are the impacts, i mean what can be done and what cannot be for that particular project.