Urgent Correction: Release transport request (transport is red)

Hello!
Has some one experience to solve the problem bellow:
By an urgent correction it is not possible to release transport. In the field "Task" I can see a red point that not allow to proceed.
If I release the transport manually in the satelite syytem, without CharM, my import runs with error:
AGR_1016 table class is 'C'. Entries are only imported to client '000'.
AGR_1016B table class is 'C'. Entries are only imported to client '000'.
AGR_PROF table class is 'C'. Entries are only imported to client '000'.
AGR_USERT table class is 'C'. Entries are only imported to client '000'.
AGR_TIMEB table class is 'C'. Entries are only imported to client '000'.
Main import
End date and time : 20071115141115
Ended with return code:  ===> 8 <===
The question is:
I would like to copy some existing role to  cutomer's namespace Z... save the rolle and transport the role via CharM.
Is it usual to get the error I get?
Thank you very much!
regards
Thom

Hi Liza:
You cannot delete released transport requests.
Don't import them into QAS or PROD.
If you already imported them, then your only option is to delete the Objects manually in DEV, capture the deletes in a new request and transport th enew one.
As you know if you released a request, you can ignore it without moving it anywhere.
Ram Chamarty
Message was edited by: Ram Chamarty

Similar Messages

  • Shall transport request transport master data as well.

    Hi,
    I need to transport objects ( e.g. infoobjects and Cubes)  to the QA. These objects are currently in Developement server.
    these objects do contains some data. I want to know when I create transport request on these objects, will that request contain data as well OR shall I have to remove all data containt of these object before adding them in transport request.
    Regards.

    Hi,
    While transporting only the definition is transported.
    No need to delete data. Thats fine, even if in dev it has data. Only the structures are copied on to next server.
    Naveen.A

  • How to import a transport from an urgent correction into QAS again ?

    Hi guys,
    we're new in charm.
    We have an urgent correction document, with 1 transport.
    We've put the urgent correction in status "to be tested" so now the linked transport is imported into QAS system. But this was a little bit too soon :-s
    I had to do some manual work on QAS before importing that transport.
    Can I easily (or how can I do this at all) import that same transport again into QAS ?
    kind regards,
    David De Boel

    Hi Guys,
    We have implemented change request and upgraded for SP 15 support pack
    when the user tries to import through urgent correction by selecting pass correction to test the TP is not getting imported, when i checked the log it is saying
    System cancel RFC destination SM_BQ2CLNT100_TRUSTED, Call TMW_SET_PROJECT_SWITCHES: No authorization to logon as trusted system (Trust ed RC=2).
    You cannot import any requests for project BD2_P00001 at the moment
    Then i went to show project status switches and changed as "Request can be imported" from " request cannot be imported", then the user is able to import the UC from the task list,
    But ideally the status switches should be " request cannot be imported" so that the TP can be imported only through change request.
    kindly give ur inputs as it is very urgent.
    Regards
    Raju

  • Difference between CTS and Transport request

    Hi,
    i need to know what is the Difference between CTS and Transport request.
    kindly expecting replies

    CTS (Change & Transport System)
    The CTS is a tool that helps you to organize development projects in the ABAP workbench & in customizing and then transport the changes between the SAP Systems & clients in your system landscape.
    This docuentation provides you with an overviewof how to manage changes with the CTS & essential information on setting up your system & client lanscape & deciding on a transport strategy. Read & follow the documentation when planning ur development project.
    For practical information on working with the Change & Transport system, see Change & transport Organizer & Transport Management System.
    Transport Request
    Transport Request is a Request number where the developments are given logical storage number which in turn help in transporting the developments to one system / server to other server.
    T.Code SE09 & SE10 are used to Transport the request..
    Click the Display button.
    The list of Workbench ( Workbench request )Customizing ( Customizing request) are shown.
    Reward Points if useful.

  • Unable to release transport request because of control program tp

    I have create a customized transaction type as a copy of urgent correction SDHF. I am not able to release the transport requests using the action in the toolbox 'Release Transport Request' and I obtain the following error in the log:
    could not start transport control program tp
    But if I directly execute the task 'Release Transport Request' in the task list, it works.
    Another strange thing is that at the beginning both ways worked, but after some days I started to have this problem.
    Thanks
    Antonello

    I did not find any note about this error.
    Someone can help me?
    Thanks.
    Antonello

  • PROBLEM IN RELEASING TRANSPORT REQUEST THROUGH SE10

    Dear all,
    I am trying to release transport request of development server via. transaction se10.Now my problem is that the child(DEVELOPMENT/CORRECTION) is getting released while the parent request is not getting released.
    I checked everything and its showing 'test call of transport control program ended with return code 0208.' I even checked overview of system,overview of connection type,over view of transport protocol and they are fine.my only doubt is after going to se10 when I click transport proposals its showing "WORK FLOW NOT ACTIVE' .
    Is my problem is because of this. Please help its very urgent as due to this I am not even able to transport any request on production server.
    Helpful contribution will be duly rewarded.
    Thanks & Regards,
    VICKY

    hi
    vicky just went through your Query regarding release
    of requests..first of all U be sure of TMS configuration
    see whether it is consistent or not.then after Refresh
    the system and then come to release of requests.
    its true that we can transport through scc1 but first
    check about STMS configuration and the way you set
    that.
    Regards
    manjula.

  • Transport request not getting released by se10

    Dear all,
    I am trying to release transport request of development server via. transaction se10.Now my problem is that the child(DEVELOPMENT/CORRECTION) is getting released while the parent request is not getting released.
    I checked everything and its showing 'test call of transport control program ended with return code 0208.' I even checked overview of system,overview of connection type,over view of transport protocol and they are fine.my only doubt is after going to se10 when I click transport proposals its showing "WORK FLOW NOT ACTIVE' .
    Is my problem is because of this. Please help its very urgent as due to this I am not even able to transport any request on production server.
    Helpful contribution will be duly rewarded.
    Thanks & Regards,
    VICKY

    Are you the owner and in the right  client ?
    use SWU3 to activate/configure WORKFLOW.

  • Unable to release Transport request in CHARM

    Hi all,
          After Setting up CHARM,created a Transport request,while releasing it thru CHARM gives error:"Release of system Q11 Could not be determined"
    rgds,
    rajesh
    Message was edited by: rajesh
            Rajesh M

    Dear Rajesh,
    1.Did you released the Task of the request in satellite system?
    2.What error you get when you check inside the task list of that correction.
    Please give inputs,which will help us in solving the issue faster.
    Thanks and Regards,
    Avinash.

  • Error while Releasing a transport request - DSO 0SD_O03: Active version

    Hi all,
    I am getting below error when I am trying to release a transport request.
    Object ODSO 0SD_O03: Active version differs from modified version.
    I activated DSO again,but I was not successful to correct the error.Please help me correcting this error.
    Regards,
    Bob

    check
    match and copy while installing the business content
    Match (X) or Copy
    If the SAP delivery version and the active version can be matched, a checkbox is displayed in this column.With the most important object types, the active version and the SAP delivery version can be matched.
    When a match is performed, particular properties of the object are compared in the A version and the D version. First it has to be decided whether these properties can be matched automatically or whether this has to be done manually.
    A match can be performed automatically for properties if you can be sure that the object is to be used in the same way as before it was transferred from Business Content.
    When performing matches manually you have to decide whether the characteristics of a property from the active version are to be retained, or whether the characteristics are to be transferred from the delivery version.
    The Match indicator is set as default in order to prevent the customer version being unintentionally overwritten. If the Content of the SAP delivery version is to be matched to the active version, you have to set the Installindicator separately.
    The active version is overwritten with the delivery version if
     the match indicator is not set and
     the install indicator is set.
    check following thread
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/102906a4-f13d-2e10-7199-ce316ff254b8?QuickLink=index&overridelayout=true
    Thanks and regards
    Kiran

  • Problem of calling BAPI to release transport request

    Dear Friends,
    I want to automatically release Transport Request using BAPI (BAPI_CTREQUEST_RELEASE), but I met a difficult during the process that only TR TYPE 'K'or 'W' can be release using this BAPI, if I create an addon program which TR Type is 'S' (stand for Development/Correction), then this BAPI does not work. 
    BTW, you can refer table E070.
    Could you please kindly give me some idea to solve this problem?
    Thank you in advance.
    Best regards,
    Nick

    Dear Li Nick,
    The reason that you cannot release a request of type 'S' is that type 'S' names a local correction, which cannot not be transported (and therefore of course not released).
    Regards, Tino

  • How to release transport request

    Hi,
    Good Morning!!!!!!!!!!!!!!!
    How to realease the transport request?,in that one rquest is header in that one one more task number is there.
    can u help me,this is very urgent,
    please send step by step procedure.
    very urgent.please
    Yours
    srilatha

    Hi,
    1) first u r collected objects should be in transportable package(not in $TMP)
    then u check in SE09 which are the objects u r collected those things are avilable in that request or not if not there once again u should collect before transport and check that request if any locks are there if there release in SE03
    2) now in SE09 first u relase the task(subordinated one) then release the request.and u can see that request in imported server in tcode of STMS.
    Thnaks & Regards
    sathish

  • How to find the transport request which was released to Quality

    Hi Friends,
    Could anyone please let me know, how to find the transport request that was already released from Development to Quality?
    there was some change in customization took place. I could find the user (through change log) who made these changes, however I could not find the transport request number he has already released. I did give his user name in SE10 and checked the released checkbox and did click transports to see them, however I found nothing. A message got displayed on the screen: Cross-system information for user xxx. I can't ask the Basis people about it, as its not yet been trasnported to Productive.
    Is this the correct way to see the transport request number? Is there any other way to find the number. I can give the tentative dates when the change was released.
    This post might already posted before, I did some search, could not find the exact info what I am looking for.  Would appreaciate if anyone could give the step by step method to find it.
    Thanks in advance.
    BR,
    Sats.

    Ram,
    let me tell you the the situation in a better way.
    When I see se10 with my user id I could see all the transport requests that I have released. However, now when I enter my colleague user id who did these changes (he is on vacation, otherwise I could simply ask him the transport number), nothing is shown on the page. in simple words the page is completely blank. Initially I thought it is because of some authorizations, but I can get the transport request numbers that are released by another user.
    the info what I have right now are:
    1. I knew the user name who did these chages
    2. I knew the date when it was changed.
    I just need the Transport Request number I mean which starts with DEVXXXXXXX.
    As per your solution --> If you have any idea when the reques was relase you can select the request and click on goto-transport logs. This way you can find out the request. --> I knew the date when it was released, but didnt understand, the bold and underlined sentense in your answer.. select on which request? as I said, the page was blank after I enter his user id and activate it.. May be I did not understnd your solution properly. Could you please simplify it.
    Thanks a bunch in advance
    Sats.

  • Database tables holding details for a non - released transport request

    Dear All,
    We are implementing SAP ECC 6.0 u2013 ABAP stack, on IBM iSeries / System i, i5/OS V5R4 -
    SAP kernel release 7.00, kernel patch number 173
    Could someone please guide me to the database tables holding the details for a non u2013 released transport request.
    The problem is the following :
    We encountered some data corruption in the database of our development system, so we did a restore from the previous day's backup (RSTLIB  command) for the database library : R3DEVDATA, without restoring the /usr/sap/trans  directory, then we did an APYJRNCHG command for the journal receiver spanning from the previous day's backup until the corruption time (remote journal on a remote system.)
    We are now facing the following conflict :
    One of our programmers is now un-capable of updating an ABAP program, which he previously added in a transport request, which he did not release.
    ( This was done during the day of the data corruption)
    When the programmer is trying to update the ABAP program through the ABAP workbench, he receives the error :
    'Request lock on non u2013 existent task / request DEVK921426'
    No details for the transport request DEVK921426 exist in either of the two directories :
    /usr/sap/trans/data   , /usr/sap/trans/cofiles
    The way I see to solve this conflict (eliminate this lock) is to delete the different entries related to the un-released transport request from the database tables.
    Any clues would be highly appreciated.
    Thank you in advance for your cooperation.
    Best regards.
    Reda Khalifa

    Dear Volker,
    Thank you very much for your interest.
    The transport request of interest did not appear in transaction code SE03
    Eliminating the record from table TLOCK indeed did solve the problem.
    Thank you again.
    Best regards.
    Reda Khalifa

  • Released the Transport Request which is in Local Change Request

    Hi,
            Actually without knowing I have released  transport requests which are  under Local Change Request.Due to this they are not available for importing in Quality system.My  Package is also there in one of those Requests.Now please guide me how to recover these requests.
    Regards
    Karthik

    Hello Karthik
    The easiest way should be to copy the object list of your local request to a new (transportable) workbench request.
    However, the system might tell you that your objects can only be put into a local request.
    In this case you need to find out why your objects are not (yet) transportable.
    Usually there are two reasons for local request:
    1.) The request does not have a target system -> check the request header and enter the correct target system (if possible)
    2.) Your package has an inappropriate transport layer assigned -> change the transport layer
    Regards
      Uwe

  • Large number of transport request released from Dev

    Hello Gurus,
    Our Landscape for Dev consist of three clients. We do development in one client and the testing teams test it in another client. We maintained all these clients in a route which takes around 10 mins to reach after releasing a transport and when testing team fails the test then we correct the error and again create a fresh transport and release it. I understand at some point we are going to reach Maximum number of transports.
    Normally, If the tesing team fails the test two times. I create a test role in a testing client and request the user to test it. When everything goes well then I insert it into original role. But all this stuff takes time.
    Please advise if there is any other way also to cut this short.
    Regards,
    MA

    Hello,
    >
    Salman123 wrote:
    > I understand at some point we are going to reach Maximum number of transports.
    The number range for transports is alphanumeric  (over 40 million free numbers are available ). Have a look at sap note [106911|https://websmp230.sap-ag.de/sap%28bD1kZSZjPTAwMQ==%29/bc/bsp/spn/sapnotes/index2.htm?numm=10691] for details.
    >
    Salman123 wrote:
    > Please advise if there is any other way also to cut this short
    You could copy customizing transport requests via transaction SCC1. But personally I would not recommend this.
    Cheers
    Joerg

Maybe you are looking for