Urgent-material quantity knows at GR

Hi gurus,
My client's product say material XYZ comes through bags.And they want to keep inventory for these bags also and price of these bags should be include in XYZ material.
Scenario is that while placing PO for 1000kg of XYZ they doesnt know in how much bags this XYZ will come.
They know at the time of GR.
So,is there any facility in MIGO where you can add these bags to XYZ material stock account while giving PO reference?
And how will I get inventory for these bags?
Pl help

Hi,
    your scenario is the sale of empty bags. It is similar to the sale of empty oil drums, cartoons,boxes etc, etc.
why you want to load the cost of empty bags into your material stock account?
your vendor will not be charging you separately for the material that is coming in these bags and the cost of the bags. bags are packing material for your material .
if he charges you extra, then in PO pricing procedure you can have the condition for packing and forwarding.
from your question it doesnot appears to be this case, as at the time of PO you donot know your material will be shipped in how many bags.
You have two situations :-
1. You have a bags stock which is available in physically but not in system and you want to dispose it.
you should use 202, to get the bags in stock. You will have to create a material number for the bags with appropriate MAP (confirm with your accounts). I have also seen organizations using 561, 552 etc. Nothing wrong in using 531 if it hits the correct G/L account,concept wise 531 is not the right movement.
mvt 561, 552, 531 are movement type with 'nowhere' concept. by using these we are writing on stock from "nowhere" and so you will have to balance out the posting somehow?
The movement type to be finalized will depend on the G/L account it hits in your system and the thoughts of your accounts department.
The most important thing to do is to find out from your financial department where the stock value is supposed to come from. If they want to use a cost centre then a 202 is fine (even if a 201 was never used).
Also, check with accounts how they want to sell it ( as scrap sale ) ?
2. other way. I think at the time of GR for material itself you can create the stock of bags with 501. However, I have seen organizations follow the process 1 every time they want to sell scrap.
This is a very tricky process in organizations and accounts, excise along with materials need to be consulted before going for the final solution.
for selling this these bags, SD consultants will map the sale of scrap process for these bags. only things will be TDS of 1.133 %.
use material type NLAG or UNBW for bags depending upon your requirement.
Regards
Rajesh

Similar Messages

  • Batch determination issue in process order Material quantity calculation

    Dear Gurus,
    We are facing issue in auto batch determination in process order (Material quantity calculation ).
    eg Material X  is active material 200 KIA used in BOM as
    10  X   200  KIA  
    20  Y   10           Filler
    30  Z
    40  X   200  KIA
    50  Y
    60  Z
    We select line item 10 and 40 and do Batch determination system proposes 2 batches for line item 10 as Batch A and B
    and for line 40 again Batch A (with 0.01 KIA) and batch B proposed which is wrong.
    For line Item 10 Batch A and B
    For line Item 40 Batch B and C or as per FIFO logic.
    As Batch A should be consumed in Line item 10 then it proposed Batch B and so on....
    We have already maintain data in COB1.
    Can any body explain what is wrong in determination.
    Regards,
    J.H.Pert

    Hi Pert,
    Follow the below link you have some idea OK.
    Any questions revert me back.
    Batch search strategy
    Regards,
    Madhu.G

  • Material Quantity difference document line item for HU

    Dear Experts,
    When I try to clear differences in LI21,  i get the error message as above.
    Error Message : 'Material Quantity difference document line item for HU'
    Any idea why this error occurs?
    Regards,
    Shetty

    Hello Shetty,
    It may be due to some stock inconsistency. You may try iin case of  a non HU managed storage location HU to run LX23 and it can fix discrepancy overwrting MM-IM with LE-WM data. But if it is a HU managed then you can run HUDIFF transaction but only to see if there is stock differences not to fix anything, usually SAP Support (Development Support) does that job.
    Have a nice day !!

  • Function module to retrive material quantity based

    Is there any function module which can help me retrieve material quantity for a particular material where i pass material number, plant, storage location and start date and end dates(posting period) for which i require the material quantity.

    Hi Kaushal,
        Check this lnik out...
    http://www.geocities.com/victorav15/sapr3/abapfun.html
    Regards,
    Santosh

  • COR2- Process order material  quantity change

    Hi, I want to change the material quantity of process order with COR2 transaction, could you plese help me out in finding the bapi or function module which will be relevent.

    I have done it through BDC recording, change on first line, then upload using bdc from 2nd line.

  • Contract updation for Delivered material quantity

    Hi All,
    I have a problem related, contract and release order updating with reference to delivered material quantity.
    for example let's say contract is created for 1000 units of material A, after that sales order with reference to contract is created for 500 units and delivery is created for 300 units then remaining order quantity cannot be delivered as  customer master is maintained so.
    Now I want to create sales order for 700 units of 'A' but system is not allowing to do so saying the 500 units are already referenced.
    If i use rejection reason in sales order still system is not allowing to create a new sales order with 700 units.
    How to solve this issue?
    Please Help
    Thanks and regards
    Amit

    Hi Manam,
    thank you very much for your immediate reply.
    But the issue is a sales order will have only one delivery as the sales order contains freight amount at header level which helps calculate the excise duties as the prices quoted to customer include freight and duties.
    So now is that possible to update the delivered quantity at contract level so that undelivered quantity can be referenced to create another sales order and can be delivered.
    To describe the process:
    A contract will be created, a sales order will be created for required delivery quantity then delivery will be created. In case due to some problems if delivery quantity is less than sales order then the undelivered quantity will be getting updated in sales order. and the sales order undelivered quantity will be rejected and the contract will get updated.
    Please help.
    Regards
    Amit

  • I urgently need to know how I can connect 8 thunderbolt display, I was thinking with the new mac pro will come out, but I wonder if it is possible to connect an iMac to 4GB of graphics card, but suffers from the imac. thanks

    I urgently need to know how I can connect 8 thunderbolt display, I was thinking with the new mac pro will come out, but I wonder if it is possible to connect an iMac to 4GB of graphics card, but suffers from the imac. thanks

    I tightened all HD screws and it didn't help. With the machine running and side of the case off, I physically stopped both the video card fan and the front case fan with my finger for a couple seconds and the noise continued. I also took all hard drives out one by one and rebooted each time. Again, the noise continued until I took out the Mac HD in Bay 1, rebooted, and I had a very quiet, silent machine. The issue is the hard drive in bay 1 that shipped with the computer, it's without a doubt causing the hum/woosh sound. I still need to know if I can safely swap the Mac HD from bay 1 to bay 4 without any issues to the operating system. I would like to try that to see if it dampens the noise but I also want to make sure this swap won't screw up my machine at all.

  • Need Enhancement which is triggered after material quantity creation

    Hi guys,
    Iam in need of enhancements or exits which would be triggered after creating quantity for my material. Kindly enlighten me on this issue . I need a place to right a code which will be triggered when i create a material quantity .
    Regards,
    Sivaganesh

    Hi Siva,
    I hope you are talking about transfer posting with movement type 561 to get quantity of material in. If yes then you can go for BADI MB_DOCUMENT_BADI after put wait for few second and then get the document number generated.
    Please correct my understanding if it is wrong.

  • Material quantity calcuation

    Hello all ,
    I am working with  pharmacutical company as SAP support consultant , I want to learn Material quantity calculation  , i read SAP library but stil not clear about it can anybody pls explain?
    Waiting for reply.
    Rgds
    Perna Verma

    Hi Prema,
    MQC is concept which used in pharma Industry perticular formulation ( Tablet Manufacturing ). In this scenario API ( Active pharma ingradient) is a basic raw material which is used along with some other component.
    API qty is used on basis assay or purity basis & may be other component called as filler material.
    Qty filler material is calculated by system on basis of result of yuor API material so you need to assign formula to filler material .
    So that when you determine batch in process order in that case system will calculate filler qty on basis of result of batch of API.( Tour API may have rdifferent results 98.00% or 99% )
    Pharma people calculates filler qty on basis of result of API.
    To implement this you need to update your master data .
    You need to create here Class charecteristic ( CT04) then assign this charecteristic to Class CL02 .This class you need to assign to material say API ,then additional data of material master give alternative unit of measure 98 KG =100KGA .in same additional data praportion data field data to filled ,
    IN QM you need to assign same class charecteriastic to MIC QS23
    Finally formula has to assign in recipe where this API material & filler material being used
    This is tatally SAP standard functionality .
    For any further clarification please revert me back
    Regards
    SANIL

  • Bapi for mrp wfich has material quantity as import parameter

    hi to all,
    i need a bapi for mpr run  which has material quantity as import paramaeter so that we can create pr for given material quantity.
    Regards,
    Manoj Rwat.

    HI!
    Try,
    MD_MRP_SINGLE_MAT_REPLAN
    BAPI_ALM_ORDER_MAINTAIN
    hope this will helps you.
    regards,
    Kiran

  • Update the material quantity in the sales order using LSMW...

    Hi Guru's,
    I created one sales order using BAPI..now i wanted update the material quantity in the sales order using LSMW...
    could you please provide the step by step process....
    if anyone of you provide the program logic similar to requirement that would be helpfull to me...
    thanks in advance
    Srinivas....

    Hi Sri,
    Hope it may help you.
    First do the recording for VA02 transaction, in that give the existing sales order number
    and update the Quantity and save it. Remaining steps are same what we used(LSMW) to upload data to applications.
    Regards,
    Vishvesh
    if helpful, rewards it.

  • Material quantity calculation to be done upto a limit

    Dear PP experts,
    I am using material quantity calculation for acitve ingredients. The quantity of API should be calculated as per the assay recorded in inspection lot. But the additional requirement is that the API quantity should be calculated after batch determination only if the assay recorded is 99 % or below 99 %. If the assay recorded against inspection lot is more than 99 % the API quantity should remain the same.
    Pl. suggest how to proceed.
    Thanks,
    Prashant

    Dear Prashant
    If you can post this question in PP forum, may be you can get lot of suggestions.
    thanks
    G. Lakshmipathi

  • CO11N header material quantity not populated

    when doing co11n in single screen entry and i give 2 kg in the yield and go to goods movement tab, i dont see any quantity populated for the header material?
    because of this when i post confirmation, not material document is generated. how can I make the header material quantity field to be automatically populated?
    please note, this is not for componet materials and for the routing I have maintained auto gr for the final operation.

    Dear
    Header material added in goods movement Screen with movement type 101 and quantity instead of populating screen. kindly check goods movement screen, header material is added in screen.
    if operation in order is more than one, kindly check all operation's goods movement one by one.
    if problem is not solved, kindly recheck operation control key configuration that Auto GR indicator is set.
    Thanks

  • Urgent: how to know the cost of raw material used in a finished gud

    hi,
    i am making a report in which have to display the the payment and quantity of the components of finished guds which are sold throught sales bill,i am able to display all the things except displaying the cost of material,WHICH IS THE TABLE USED FOR THE GETTING THE COST OF MATERIAL........
    plzzzz help me making this report as help will be definately rewarded..
    Edited by: ric .s on Apr 19, 2008 10:37 AM

    Hello,
    You will have to map Sub-Contracting Process in your system. Your company is the Sub Contractor for your Customer.
    Please search in SAP Building Blocks for Sub Contractors. This is oe of the link I found: http://help.sap.com/bestpractices/BBLibrary/HTML/J75_ThirdPartyOrdProcwithSub_EN_KO.htm
    Hope this helps,
    Thanks,
    Jignesh Mehta

  • Find material quantity (urgent)

    Hi abap gurus,
    i want to find inventory on the base of the material using plant.
    like for x material check plant Y and get quantity .
    please tell me which table i need to check
    i found  MBEW table where i am getting LBKUM . but i need to check plant before getting that quantity ..
    so i dont understand how to do .... how to make validation for plant.
    thanks,
    Jack

    Hi Jack,
    Check the SPRO setting .
    Enterprise Structure->Definiton->Logistics General->Define Valuation Level.
    If the 'Valuation Area is a Plant is Selected then in MBEW valuation area is same as plant.
    I am not sure what will be the case if the other option is selected.
    Regards
    Nishant

Maybe you are looking for

  • I have problem with concept in labview

    i have project active noise control using loudspeaker to cancel the noise i have problem with the cancellation any suggestion i will apperciate that . the code attatched if u could see and tell me what is the wrong thanks in advance Solved! Go to Sol

  • How can i use a number from a cell in a different sheet into a new sheet

    I am using 2 different sheets. I want to use into the second one the resulting number from a cell from the first sheet.

  • Multiple copies of processor control in menu bar

    I installed the CHUD tools to use the Processor Prefs and enabled the "Show control in menu bar" option. Now I have 4 copies of the item in my menu bar. Only one of the items has an icon, the others are just little 10 pixel wide slivers, but if I cli

  • BSOD Bug Discovered in Audigy 2 ZS Dri

    I have an Audigy 2 ZS. I did a custom install from the driver CD in XP SP unchecking the following items: - Creative MiniDisc Center - Creative Wave Studio - Getting Started Demo - MIDI Samples - SoundFont Banks - Online Manual - Music Creation Guide

  • XML Form Builder does not load

    I am having the following problem, when executing the Form Builder tool under Content Management, it does not load and i get the following error message: CONNECTION ERROR: couldn't read response code* And sometimes the window gets freezed. I have rea