[urgent]Planned Order generated before Purchase Order

hello to all,
Good day.
I currently have an issue with Planned order being generated before a Purchase Order.This is visible via MD04.  Can you explain why this is happening?  Normally the Planned Order should be generated after a Purchase Order.
Thanks.

Hi Vishal,
I think you did not get my point.
There was a PO created today - this PO will be on January 2008 (example).  Then after the MRP runs, a planned order was created having to be executed on December of 2007.  How is this possible?  And into MD04, I can see Exception number 30 for the Planned Order entry.
Thanks.

Similar Messages

  • Pls help - Urgent - Planned order transfer from APO to R/3 - inconsistency

    Hello experts ,
             Iam creating planned orders in APO using CTM planning. The planned order is getting transferred to R/3 but the order number is different in APO and R/3 .
             I tried deleting the application logs in R/3 and APO using transactions CFGD and C6 and running CTM planning again. But it did not work.
            Kindly suggest a solution. Thanks

    As other members adviced
    Please check the following as a list
    1) Check first fi the Material is in APO relevant
    2) Check if it has active integration model in cfm5 (R/3)
    3) Check if the material has no blocked queues in /n/sapapo/cq (APO)
    If there are any blocked queues please clear them accordingly.
    4) After that perform a reconciliation of the transactional data through.
    /n/sapapo/ccr(APO). perform it only for that material and on planned orders.
    If there are any errors it will usggest you to follow few steps.
    5) then again go back and check the /n/sapapo/cq transaction.
    6) Check if the material and its location has publication Types maintained in SPRO transaction.
    7) Check if the change pointers of this Planned order exists in /n/sapapo/c5
    This si change pointers transaction , soemtimes you can release ti from there also.
    If you still have problem, give the resutls of the following for reference.
    Let us know once you perform all these.
    8) Incase you need to perform the consistency checks  externally.

  • Planned order and Purchase requistion both is generating in MRP

    Dear All,
    At the time of MRP explosion for Finished material, system is generating Planned order and purchase requistion, both,  for detailed material, (e.g. the BOM is a single level BOM). Whereas, I want to generate Purchase requistion for all. I am not getting that for which logic it generating Planned order as well as purchase requisition.
    Pl. explain.
    Thanks,
    Prasun.

    Hi Prasun
    The procurement proposal indicator dependes on the procurement type assigned in material master. If you assign prod Type F it will automatically generate PR. If the procurement type is E or X the system will generate plan order .
    This configured in Plan order type LA means it should be for in house production E.
    There are two ways of solving this. If you want always PR for FERT. Assign Proc type F in material master MRP view. It will always generate PR for that particular material.
    Or
    You can run MRP with planning mode 3 create PR in front screen.
    Regards
    J . Saravan

  • Extra planned orders generated though there are sufficient Purchase orders

    Hi
    For a component material system is generating extra planned orders though there are sufficient purchase orders to meet the requirement.
    When i check the pegged requirements for the planned order it gives a message Order xxxxxx(purchase order) possibly contains recursive BOM components
    There is no recursiveness defined in the system.
    Below are the MRP settings for this component.
    MRP type: PD
    Lot Size: EX(lot to lot) min lot size is XXKG
    Availability check --- 02 (individual requirements)
    Please help me in understanding the reason

    Hi,
    First thing is BOM Where used lst.
    Check this component in which are all the BOMs it exists..
    If it is showing the BOM for the same matrial?
    Check the BOM of the same material..
    Regards,
    Siva

  • Why a Planned Order is generated form Return Purchase Order?

    Hi everyone,
    We are recently experiencing a problem that deals with return purchase orders and MRP.
    It occurs that when we generate a return purchase order, after executing the MRP,
    a Planned Order is created
    We don not understand this behaviour and we don't find it logical.
    I would be very logical if someone might explain why is this happening and specially how
    to avoid it. Basiquelly We don`t want the return purchase orders to be considered as requirements.
    Thanks a lot in advance and best regards.

    Dear,
    Can you please explain what it means by Return Purchase order in your business? Under what circumstances it is created and what are the subsequent exepected process of this order?
    Regards,
    Prasobh

  • Purchase order vs planned order vs process order vs production order

    Hi,
    Kinldy explain difference between the  Purchase order,  planned order,  process order and production order?
    Thanks & Regards
    Ravi kumar

    Hi Ravi,
    In simple terms:
    planned order - A procurement proposal generated by the system to meet a need, this can then be converted to a production / process order (for internal procurement) or into a purchase reqn & in-turn to Purchase order (for external procurement)
    Purchase order - A firmed procurement proposal which is sent to your vendor (external procurement) to supply the items as per your order
    process order - A firmed procurment proposal which is used for in-house procurement, this is used in process industries eg: chemicals, oil & gas etc 
    production order - A firmed procurment proposal which is used for in-house procurement, this is used in discrete production industries
    Based on the above am quite sure you should be able to figure out the differenced. If any doubts revert.
    Regards,
    Vivek

  • Planned order Vs.Purchase order

    Hi,
    can you tell me major differences between a planned order and  a purchse order.

    Hi,
    Planned Order : Planned Order is generated by the planning logic, or arithmetical procedures, of the system itself with MRP set. When MRP is re-run after the closed-loop transactions are fed back into the system, all existing planned orders are deleted and a new set is generated. However, the newly generated planned orders may be identical to the previous set in timing and quantity, so that it will appear to the system user as if the old plans have simply been somewhat revised. The use always of planned orders in closed-loop MRP ensures that plans are always in synchronisation and that the planner does not need to concern himself with rescheduling messages.
    Purchase Order: The purchase order is a formal company document which conveys the instructions or detail of a required supply. The legal role of the purchase order in forming the contract of supply will vary with circumstances: most usually, it will be an offer, such that the supplier's acceptance of it at the price mentioned seals the contract, but it might alternatively be the acceptance of an offer (say, an order placed immediately against the supplier's tender.) The document itself may also be used by the company simply to convey detail, perhaps being a call-off for material against a yearly contract already in existence. The purchase order might convey a summary of substantial material to be delivered at various times in the future by special order forms.
    For more follow the link:
    http://www.xtuple.com/docs/userguide/ch03s09s03.php
    Regards,
    Biju K

  • Planned orders not getting generated

    Hi friends,
    we are running material level MRP  MD02 (make to `order scenario).
    when we run MRP instead of generating planned orders, it is generating Purchase requisition . i can see purchase requisition generated instead of planned orders in MD04 screen.(we are facing problem with only one material).BOM of FERT Contains 3 HALB.all the mrp parameters have been maintained.
    thanks in advance.

    Hi
    1. Since you are telling it is MTO scenario you need to use the MD50
    2. Also in the MRP screen check the Create Purchase Reqn try the setting   "" 3     Planned orders"""
    3. As you have mentioned only for that particular material - kindly check if any scheduling margin key has been maintained. ??
    check and revert back
    Reg
    dsk

  • Planned order not getting generated for FG

    Dear Experts,
    Planned orders not getting generated for the Finished Goods - X which is having MRP Type M0 - MPS fixing type strategy group 20 which is copied fron another FG - Y , its a new product and production plan has been updated through MC88 - Rough cut planning but the planned orders are not getting generated.
    And for the material valid production version exists with selection method 3 and individullcollective as 1.
    Please let me know what might be the possibalities and what all the key fields i need to check.
    Thanks & Regards,
    Sampath
    Edited by: sampath s on Jul 13, 2011 11:31 AM

    Dear,
    In general MPS is run for High value items ( if you use like Gold , Platimum or A class items. ).
    Always only single level is used for Explosion and planning. then only you can analyse the requirements at each stage before procurement.
    Otherwise if you run MPS to multi level, Bottom most high value will be procured without any notice to authorities. Even you may cancel the process in mid way. At that time what will happen to the procured high value material.
    So for that purpose only single item single level MPS concept is evolved.
    Fo that you run MPS at single level so that only for the first level MPS will be carried out.
    Check and revert back.\
    Regards,
    Alok Tiwari

  • Creation Of A Single Purchase Requisition From Different Planned Orders

    Hi,
         After MRP run i get different Planned Orders for different raw materials . My requirement is that can i combine all the Planned Orders for diiferent materials into a single Purchase Requisition.This is a urgent requirement.
    If useful i will award points.
    Regards
    Jimmy

    Hi,
    it is not possible to combine with planned orders for different materials into single PR but differet PR can combine into a single Purchase Order.
    pls let me know any clarification.
    thanks
    mohan
    Message was edited by:
            Mohan Ramalingam

  • Planned order not getting generated at plant level

    Hi experts,
          When i run MRP for a particular plant in T- code (MD01) Planned order is not getting generated but when MRP is done against a material in T - code (MD02) in the same plant planned order gets generated... Is there any customizing  to generate planned order in plant level.....
    Regards,
    Joseph.
    Edited by: joseph5885 on Aug 12, 2010 9:23 AM

    Dear Joseph,
    No it is not recommended. only in emergance cases this will be done
    Usually in MDRE and MDAB will be scheduled before MRP run at background for inconistancies in planning file enries
    So the above said t-codes will take care of the same
    Added
    Refer this link
    [Planning file entry;
    Regards
    Madhu
    Edited by: K.Madhu Kumar on Aug 12, 2010 6:53 AM

  • Update gets terminated when we convert planned order to purchase requisitio

    Hi All,
    I am facing a problem when I am converting a planned order generated after MRP run into a purchase requisition.
    My MRP settings are .
    Strategy is 10
    Procurement type F.
    When I convert my planned order into Purchase requisition with MD14 the system gives me a Purchase requisition number , but as soon as I press enter after that I get a message:
    "Express Document: Update was terminated , received from author my name".
    Now when I check the PR number the PR number generated above does not exist in the system. Please tell me where can i check the same.

    Hi
    Check the PR number range, whether the PR number range is created or not
    Go to OMDT t.code and check the PR accounted assignment for your plant.
    If the planned order created through PIR the account assignment must be U
    If the Planned order created from through the sales order the account assignment must be E or C.
    try this
    Thanks
    S.Murali

  • No Account Assignment when I created Planned Order to Purchase Requisition

    Hi ,
    No Account Assignment when I created Planned Order to Purchase Requisition from Funds Management , where as If i change  ( eq : PR item qty is 10 , i just changed to 0 , enter then replace back that 10 ) any thing in the PR , Account Assingment is populated and list of accountin  documents are attached to PR.
    Please suggest me , what might be the problem .
    Thanks in adv

    Hi,
    a) When you convert the PldOrd into PurReq it disappears from table PLAF, it ceases to exist. There will be no PldOrd-reference in PurReq (you will not find such field in EBAN). (if you check field RSNUM in PLAF before converting the PldOrd and you check field RSNUM in EBAN after converting the PldOrd into PurReq, you wlll find the same number)
    b) It's not easy to say. You can check PLAF-PSTMP and PLAF-PUSER and compare these with data you get from trx STAD. But this is also not an exact methode since these field are in connection with the last date of change.
    Firming indicator cannot help also since you can remove it manually... - even though the PldOrd was changed manually, no firming indicator will be seen...
    (Of course, generally firming indicator helps if the user doesn't remove it intenionally)
    Regards,
    Csaba

  • How to convert planned order to purchase requisition

    Hi,
    We have executed MRP run with the option create purchase requisition as '2' i.e purchase requisitios in the opening period.Now the system has created some planned orders and some purchase requisitons.
    Now we want convert the planned orders in to purchase requisitions ,how to convert them in to PR.
    We have MD14 and MD15 transaction codes but don't have authorisation.
    Will the system automatically convert them to  PR in the next MRP run or we have convert them manullay?
    Is it possible to delete the palnned order and re run the MRP with the option of creation indicator as '1' and in this cas whether teh system will consider existing PR(which got created earlier)?
    How to delete the palnned order?

    Hi chinni,
    You can convert the planned orders to purchase requisitions in MD04. to avoid this check If procurement type for the materials is E then, change it to F. Now Rerun the MRP by selecting planning mode as 3 - Delete and recreate planning data and create purchase requisition as u20181u2019. All planned orders will get deleted and purchase requisitions will be generated.
    Try this and revert back for further clarifications.
    regards
    Venkat.V

  • Planned order to purchase requisition - Manual / MRP---How do we confirm

    Hi,
    I have a planned order which is converted into purchase requisition (PR). I want to know the following.
    I know only PR number now.
    a) How do I know the reference planned order from Purchase requisition number? (In PR, creation indicator shows as U-Converted planned order)
    b) How do I confirm whether this planned order is created manually or by MRP?
    Please help me in finding out the above.
    Thanks in advance
    Muthu

    Hi,
    a) When you convert the PldOrd into PurReq it disappears from table PLAF, it ceases to exist. There will be no PldOrd-reference in PurReq (you will not find such field in EBAN). (if you check field RSNUM in PLAF before converting the PldOrd and you check field RSNUM in EBAN after converting the PldOrd into PurReq, you wlll find the same number)
    b) It's not easy to say. You can check PLAF-PSTMP and PLAF-PUSER and compare these with data you get from trx STAD. But this is also not an exact methode since these field are in connection with the last date of change.
    Firming indicator cannot help also since you can remove it manually... - even though the PldOrd was changed manually, no firming indicator will be seen...
    (Of course, generally firming indicator helps if the user doesn't remove it intenionally)
    Regards,
    Csaba

Maybe you are looking for

  • What is the recommended way to upgrade system ruby and python binaries and their libraries?

    I'd like to upgrade my system ruby to 1.9.2 instead of old 1.8.7. Also was wondering what's the recommended way of upgrading any scripting languages installed on system?

  • White screen when resuming from standby

    Hey, For about a week when I resume from standby by opening the lid I get a white screen. I'm using a MacBook Pro 2,7 GHz, Intel Core i7 with 4 GB ram bought in September this year (2011). Fully updated as of today. Basically, I close the lid of the

  • CRIO Hard Drive Fragmentation

    I'm working on a data logging application for cRIO and I started wondering about hard drive fragmentation. This is something that we've had to worry about in the past on Windows PCs. Our Windows file logging routines preallocate files on disk for the

  • How Do I Get my im,port songs to my IPOD?

    I am just a plain rookie IPOD user. I imported my songs on my CD via Itunes. It's right in front of my screen. Now how do I get those imported songs into my CD?

  • Installing programs - in this case Adobe Acrobat

    Complete Mac novice.  I cannot for the life of me figure out how to installed Adobe on this computer!  I can go to the site, hit dowload.  The program shows up in my downloads, but I have no idea how ro open it, save it to the desktop, etc.  On my wo