URGENT:Process Chains And events Related

Hi All,
              I have created a new process chain which is a normal ODS Process Chain.For that I started with the start Process and then created event in sm62 to trigger the start of process chain.Similarly,I have at the end of the process chain ,I have added 2 ABAP Programs ,one to mark the successful completion of process chain and another to mark the Error or Unsuccessful completion.For these programs,I maintaines Processvariants and here, we have utility Programs.So used the relevant utility program and created a program variant and Events ,One for successful completion of process chain and another to mark the Error or Unsuccessful completion.
But ,Now ,I find that when I trigger the eventin sm64,I find that the process chain is not being run.Is that any problem with the events I created.This is the first i am involved  with creation of events in SM62.Can anyone help me in  this regard.
Can anyone,tell me thatdo we need to do anything else apart from  Creating events .Imean like assigning jobs and then Programs in the Step of that Job.
Please Kindly help me in this regard.It is very very urgent for me.Thank you.Points will be assigned.
Regards,
Samir

Hi,
I have tried in the same way you have said .I have maintained as after event and activated and scheduled.after that  i triggered the event insm64.But still,I am not able to see the Load in RSMO.
I have just checked out in sm37.And found that some jobs have failed.I think this might be the reason for the Process chain to not run.
I am just pasting the error msg and solution.
Job BI_PROCESS_ABAP, waiting for event RSPROCESS 489W6WH6I7OHV7BL3N9909F7F, has no predecessor
Message no. RSPC003
Diagnosis
Although job BI_PROCESS_ABAP has been started by event RSPROCESS 489W6WH6I7OHV7BL3N9909F7F and is recognized in the process chain, the current run for this process has no job preceding it.
This is why the system was unable to determine a log ID, and the chain is broken.
System response
The job has been terminated.
Procedure
With the exception of the start process, each process must have a process that precedes it.
Then Another error for the another cancelled job is
Job BI_PROCESS_OR, waiting for event RSPROCESS 489WC2QYBC4AJSYILQ10TWABF, has no predecessor
Message no. RSPC003
Diagnosis
Although job BI_PROCESS_OR has been started by event RSPROCESS 489WC2QYBC4AJSYILQ10TWABF and is recognized in the process chain, the current run for this process has no job preceding it.
This is why the system was unable to determine a log ID, and the chain is broken.
System response
The job has been terminated.
Procedure
With the exception of the start process, each process must have a process that precedes it.
Please kindly help me if you understand the problem.
Thanks,
Samir

Similar Messages

  • Process chains and event collectors

    Hi All,
    I need help in Process chains and event collectors.I joined in new project and this client using process chains and event collectors and they ask me to work on these areas.I didnt work on this as of now So please send any docs on this area and explain the procedure and technology methods behind this concept.I would really appreciate If someone can send me the full documentation on this concept as I couldnt find any  any docs on this.
    Thanks,
    Ras

    Hi Ras,
    Process chains are a sequence of processes to be performed. The are put together in a chain with the necessary dependancies (process A needs to finish before B can start) and conditions (if A and B are successful then C else send an email), and then scheduled. They usually revolve around processes related to data loading: Load, activate, roll up, compress etc.
    Please take a look at this links/threads for more info:
    http://help.sap.com/saphelp_nw04/helpdata/en/8f/c08b3baaa59649e10000000a11402f/content.htm
    process chains
    process chains
    Process chains
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9936e790-0201-0010-f185-89d0377639db
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/263de690-0201-0010-bc9f-b65b3e7ba11c
    Process Chains
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/8da0cd90-0201-0010-2d9a-abab69f10045
    http://help.sap.com/saphelp_nw2004s/helpdata/en/8f/c08b3baaa59649e10000000a11402f/frameset.htm
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/19683495-0501-0010-4381-b31db6ece1e9
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/36693695-0501-0010-698a-a015c6aac9e1
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9936e790-0201-0010-f185-89d0377639db
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/3507aa90-0201-0010-6891-d7df8c4722f7
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/263de690-0201-0010-bc9f-b65b3e7ba11c
    Re: Ho to make a variable mandatory or optional?
    There are lot of threads available in the SDN....go through them.....hope it really helps you in getting understand what are process chains and Events included in that.
    Assign points if it helps you.
    Regards,
    Sreedhar

  • Difference between process chain and event collector

    what is the difference between process chain and event collector and also plz explain about metachain.In what scenarios they are used.
    Many Thanks,

    hi,
    have a look at these help docs
    Process Chain:
    http://help.sap.com/saphelp_nw04/helpdata/en/8f/c08b3baaa59649e10000000a11402f/content.htm
    Event Collector:
    http://help.sap.com/saphelp_bw30b/helpdata/en/c1/6c0538c7cb583ae10000009b38f8cf/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/6e/192756029db54192427cf6853c77a7/content.htm
    Creating an event colector:
    http://help.sap.com/saphelp_bw30b/helpdata/en/45/253d3873130057e10000009b38f842/content.htm
    regards
    sham'm

  • Infopackage laoding scheduled in Process Chain and events involved

    Hi BW-Experts,
    Till now I was loading a infopackage normally and it had an subsequent event. Now if I schedule this infoapckage in process chain will it raise event after the load finishes.
    Thanks
    Arun Purohit

    Its BW 3.5
    in it when we go into infopackage we get options like..
    Scheduling Options
    Subsequent Processes
    in subsequent processes we can tick on chk box for triggereing event.......
    if I load this infopackage without Process Chain then it will raise event after load finishes....
    my query is?
    will this infopackage raise event if I Schedule it thru Processs Chain after load finishes..
    Edited by: Arun Purohit on Jan 16, 2009 2:24 PM

  • How to include Events Concept in Process Chain and how to trigger it

    Hi
    I have Three Process Chains PC1, PC2, PC3 .
    I want to trigger there Process Chains by Events .
    I want PC1 needs to run every day 7:00am . And once it is finished then PC2 needs to start . And once PC2 is finsihed then PC3 needs to execute .
    So please give me step by step process for Process for implementing the Events in this model and give me the steps to include Events concept in my model .
    Thanks Alot
    Regards
    rizwan

    Hi,
    You can do this without event also. Schedule PC1 first and then have PC2 as local to your PC1 and PC3 as local to PC2. In that way, as soon as PC1 is done it will trigger PC2 and as soon as PC2 is done it will in turn trigger PC3.
    If you want it through an event, first create event in SM62 and you can trigger this event in SM64. Then for the PC1 in start variant, click on select conditions, select After Event and give this event name. Now again its better & efficient to trigger this even automatically, for which you need to write an ABAP program in SE38 and define a variant there. This ABAP program can be scheduled as a background job in SM36, click on Click on step on top. Give program name and variant.Click save.Next click on Start Condition and schedule is as your require it to run. So this background job starts automatically and runs your ABAP program which in turn will trigger your event and PC's will get triggered.
    For both the approaches, you have to have PC2 & PC3 as Local chains as I explained above.
    Guru

  • Error in process chain - AND

    Hi Experts,
    I am facing problem in process chain execution in the AND node. The error is
    This AND process is not waiting for event RSPROCESS, parameter 4941U4Q6QKIR8RFKMAZWYP5JB
    I checked the log in ST22 but there is nothing , also no error msg in display msg or maintain variant.
    is there any solution?

    Hi Soniya.....
    The problem is due to the successor process is not activated, again try to
    activate the process chain and schedule it.........
    As a work around.........if instance and variant is already generated........then continue the process chain using the program : RSPC_PROCESS_FINISH.......
    otherwise copy the rest of the chain and execute............To do this open the chain using RSPC1>> in the top where we write tcode.........there write COPY.........Give a name to the new chain.....remove all the processes till AND process...........then create a new Start process..........make the start condition as immediate..........and schedule the chain...
    Hope this helps......
    Regards,
    Debjani.......

  • Process Chains with Event Trigger

    Hi Experts,
    Happy Valentine day.
    I have a requirement to run a Process Chain using Event IDs. Now these Evenrt ID should be triggered by a Program which raises this Eovent. Then this Program should be scheduled in BAckground to run periodically. Has anyone done this before. If yes, could you please shower some light on this topic with details on the steps.
    Thanks
    DV

    Hi,
    1)You can make the process chain to be trigered by an event.
    You create user events in SM62. In SM62, next to "User even names", click on Maintain and press Enter. Click on the Create icon to create a new event (let's call it ZEVENT).
    Next, in your process chain, change the Start variant to be scheduled "After event", and put in ZEVENT for the event name. Also, click on the "Periodic job" at the bottom. This will automatically reschedule the jobs for the process chain after it executes.
    Next, create an ABAP program (let's call it Z_EVENT_RAISE) to call the function module BP_EVENT_RAISE. You're code can look like this:
    codeREPORT Z_EVENT_RAISE.
    PARAMETERS: P_EVENT LIKE TBTCO-EVENTID.
    CALL FUNCTION 'BP_EVENT_RAISE'
    EXPORTING
    EVENTID = P_EVENT.
    IF sy-subrc 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    ENDIF.[/code]
    This ABAP program will prompt for an event name, so you will need to create a variant (let's call it ZEVENT) which will save the value of the event name (also ZEVENT). You will need the variant name to be able to trigger the event in a batch job.
    Now all you need is the batch job. Use tcode SM36 to create a batch job where you call the ABAP program (Z_EVENT_RAISE) using the variant (ZEVENT).
    Note, SM64 only triggers an event manually.
    and you can copy this job to schedule it three times a day.
    2)In the Start process of your process chain, select Direct Scheduling and then click the Change Selections icon. This will bring you to the Start Time window where you can put in the Date/Time you want to start your process chain. At the bottom of this window, click on the Periodic job box and you will notice another icon way at the bottom called Period Values. Click this to determine what frequency the job should be rescheduled (ie. daily, weekly, etc.).
    3)you can do this by right-clicking on the start process, selection "Maintain Variant", choose "Direct Scheduling". Next select "Change Selections", pick your date and time, set your period values and you're done.
    Thanks,
    JituK

  • How to create process chains,and how to use process like and or xor

    Hi,
    How to create process chains,and how to use process like and or xor.
    can any one please give me a example in each.
    Thanks,
    cheta.

    Hi Cheta,
    Here is step by step procedure to create process chains
    Process chain is nothing but executing a process ..(or) loading the data any process we can do in background.. that means.. automatically we can execute our process based on Time or any event..
    Creating Process Chains
    Prerequisites
    If you want to include a load process in the process chain, you need to have already created an InfoPackage.
    You cannot load flat file data from a client workstation in the background. For this reason, you have stored your data on an application server.
    Creating Process Chains
    You have the option of creating a process chain in the process chain maintenance screen directly or by using a maintenance dialog for a process:
    Creating a Process Chain Directly in the Process Chain Maintenance Screen
    You are in the BW Administrator Workbench.
    1. Click on the Process Chain Maintenance icon in the AWB toolbar.
    The Process Chain Selection dialog window appears.
    2. Choose Create.
    3. Enter the technical name and a description of the chain, and confirm your entry.
    The Add Start Process dialog window appears.
    4. Create a variant for a start process.
    1. a. On the Maintain Start Process screen, choose whether you want to schedule the chain directly or whether you want to start it using a metachain.
    2. b. If you choose to schedule the chain directly, enter the start date value for the chain under Change Selections and save your entries.
    The Maintain Start Process screen appears again.
    3. c. Save your entries, return to the previous screen and confirm your entries in the Add Start Process dialog window.
    You are taken to the Plan View of the process chain maintenance screen.
    In the left-hand area of the screen, a navigation area is displayed. In the right-hand area of the screen, the process chain is displayed.
    5. Use the drag-and-drop function to add the relevant processes into your process chain.
    You use the Process Types function to select the processes. This sorts the process types according to different categories. You can also call up InfoPackages and processes for the data target from the separate InfoSources and Data Targets navigation trees.
    Hope this helps
    Regards
    Karthik

  • Process Chain and CPS

    Hello all,
    We are currently having a problem with submitting process chains. When the chain runs it does not display any of steps in the process chain and where they are running from the job we submit (RSI_START_BW_CHAIN) So what we see is that the PC has been submited and completes in say 17seconds...however everything is still running on the system...for example our CIF PC runs for 3hrs but alls we are able to see is that the job executed from CPS with no problem. I've been digging around trying to find clear documenation about PC and CPS with little luck. Am I approaching the job submission incorrectly? We are on 7.0.3.

    Hello,
    You should be using the RSI_RUN_BW_CHAIN job to start process chains. Maybe you can try that first. For the rest things should be straight forward. Depending on the BW backend systems you might encounter some issues, with BW 7 the synchronization has changed and you would be better of using one of the latest 7.0.4 versions (SP6 has just been released).
    Regards Gerben

  • Process Chain and Info Package Transportation?

    Hello All
    Case 1
    How to transport a Process chain and a Info Package Individually?(<b>first time from DEV to QA</b>)
    Case 2
    I have 9(<b>IP1 to IP9</b>)infopackages and 3(<b>P1 to P3</b>) Process chains and in each Process chain I have 3 Info packages like IP1,IP2,IP3 in P1 and so on.,
    Now is it necessary to transport Infopackages and Process chains individually or is it enough to transport Process chains only(If v transport Process chains will the Infopackages will also transport)then how to assign a request to each one?
    What I mean is,all <b>Infopackages are in $TMP(Package</b>),and Process chain is also <b>$TMP</b>,Now is it necessary to change the package for Infopackages as well as Process chain and Tranport only PC,Iam confused here,can anyone help me out?
    Many thanks
    balaji

    Hi Balaji,
    If you have created new infopackages then you have to transport them. It is not necssary to transport the info-packages if you have them in the process chain but have not changed them.
    Also you cannot transport any BW object with $ tmp package. Assign a package and then transport the objects.
    The best way to transport the process chain is from the RSPC screen. Click the transport button there and collect all the objects and transport them.
    Bye
    Dinesh

  • How to find deleted process chain and query

    Hi All
    Some body has deleted one process chain and one query from development system
    how can i know who has deleted these?
    is there any table where deleted process chain and queries will maintain????
    Thanks & Regards,
    Krishna
    Edited by: krishnamurthy g on Sep 1, 2008 5:33 PM

    Hi,
    Usually its totally in tractable to find a deleted chain :
    But you can try out with the following options:
    1> T-code SLG2 .
    2> T-code SLG1 - find out who was logged on to the system on that particular client at that time.
    3> Try out the following tables in se16 :
    RSPCLOGS           --- Application Logs for the Process Chains
    RSPCLOGCHAIN    --- Cross-Table Log ID / Chain ID
    RSPCCOMMANDLOG --- System Command Execution Logs (Process Chains) .
    Hope it will be expedite.
    Thax & Regards.
    Vaibhave Sharma

  • Authorization objects for Process chain and Data source in BW 3.x

    Hi,
              Can any one tell me the authorization objects regaring process chain and Data source in BW 3.x versions. I guess we have auth objects for both of them in BW 3.5 that is S_RS_PC AND S_RS_DS .
    Can any one help me solving this issue
    Thanks
    Bharat

    Hi bharat
    I dont thin these objects are part of 3.0
    check from SU03 weather these objects are present in 3.o box
    In 7.0 they exist:
    http://help.sap.com/saphelp_bw33/helpdata/en/8b/134c3b5710486be10000000a11402f/frameset.htm
    TO see weather these objects exist:
    Go to Tools -> Administration ->User maintenance ->Information System -> Authorization objects -> Authorization objects by Complex Selection Criteria -> By Object Class. For the object class, enter either RS (for Business Information Warehouse objects)
    OR
    S_BCE_68001413 (Tcode for this rep)
    Thanks,
    Raj

  • Authorization objects for Process chain and Data sources in BW 3.x version

    Hi,
              Can any one tell me the authorization objects regaring process chain and Data source in BW 3.x versions. I guess we have auth objects for both of them in BW 3.5 that is S_RS_PC AND S_RS_DS .
    Can any one help me solving this issue
    Thanks
    Bharat

    its the same thread again
    /community [original link is broken]
    Thanks,
    Raj

  • How to find Process chain for event and parameter

    Hi,
    I have Event and parameter for the process, I wanted to know the which process chain does that process belons to.
    Is there any table where I can see those.

    Hi,
    Try these tables.
    RSEVENTCHAIN    Event Chain Processing Event Table 
    RSEVENTHEAD     Header for the event chain 
    RSEVENTHEADT   Header for the event chain 
    RSPCCHAIN  Process chain details
    RSPCCHAINATTR   Attributes for a Process Chain 
    RSPCCHAINEVENTS   Multiple Events with Process Chains 
    RSPCCHAINT   Texts for Chain 
    RSPCCOMMANDLOG  System Command Execution Logs (Process Chains) 
    RSPCLOGCHAIN   Cross-Table Log ID / Chain ID 
    RSPCLOGS  Application Logs for the Process Chains 
    RSPCPROCESSLOG  Logs for the Chain Runs
    RSPCRUNVARIABLES   Variables for Process Chains for Runtime 
    RSPC_MONITOR  Monitor individual process chains 
    Hope this helps.
    Thanks,
    JituK

  • List of process chains and RSCRM queries triggered after an event

    HI Experts,
    Is there anyway to find out the list of process chains scheduled after an event is triggered in BW? Is there any table maintained for the same?
    Thanks In Advance,
    Srivatsan.S

    Get the list of Start Variants from table RSPCTRIGGER by giving the list of event ID's or EVENTID <> Blank.
    Then enter this list of start variants in RSPCCHAIN to get the list of process chains.

Maybe you are looking for

  • Itunes not syncing to iphone 5

    I have the iphone 5 version 6.1.4 and I want to sync my library to my phone and ipad but it is not allowing me saying that I need the itunes version 10.7 or higher when I have 10.6 so I went to itunes to download the new itunes and it wont let me dow

  • Problem with multiple .swf in the same page

    Hi everybody, I got a small animation written in actionscript 2.0. I need to load it several times in a webpage (about 20 instances), but seems to be too many work and the web browser freezes. Anyway, it's a relatively simple script (not complex arit

  • OBPM BPM Studio support for SOAP 1.2 based Proxy services (OSB)

    Hi, I tried to import proxy services from OSB (as external resource). The proxy service is based on the SOAP 1.2 WSDL standard. When BPM studio introspective SOAP1.2 based proxy services, it is givng the following warninigs. Bacause of this i am unab

  • Please what can i do for this message

    Dear all , please when i record invoice in miro this message appear Account 307050 has been set as not relevant  for tax . what can i do ??? Thanks

  • How to make a method Synchronous in Repository Information System ?

    In SE80 Transaction i create a copy of object TSTC. I want to set the Execute method of that object to Synchronous. I tried in Repository information system but could not find anything related to it. Can anyone help me? Thank you.