Urgent : scheduling in Routing

Hi all ,
I am using Grouping of work center that is in capacity header No od Ind capacity : 6 , start and finish time of the work center is : 07:00:00 to 07:00:00 so the capacity available in the Hour is : 24 x 6 = 144 hr
In the Routing : Required split and no of split is = 6 .
base qty = 200 , setup = 60 , machine = 210 , labor = 105 min
Formulas used in work center scheduling tab : 
setup: SAP001 that is setup parameter  only .
processing : SAP002 that is
machine * Operation quantity / Base quantity / Operation splits.
when in routing i am carrying out FRWD scheduling for start date 15.06.2008 and lot size 1200 (multiple of base qty  ) scheduling earliest start time is: 07:00:00 and 2400 is also 07:00:00 (start time in work center capacity header tab ) BUt for 3600 qty it is : 20:00:00
and for lot size 4800 it is 16:00:00 date is not the issue but the earliest start time is issue here , what ever qty is it why it is not starting at 07:00:00 ??
Regards..
Edited by: venky  shree on Feb 20, 2008 6:52 AM
Edited by: venky  shree on Feb 20, 2008 7:39 AM

Hi,
  This is because you might have assigned Reduction startegy
   either to the operation or in the order type dependent parameters.
  If the lot size is  higher your Production dates may go outside
  the basic dates.
  In such case the system tries to reduce the lead time based on the setting defined in the OPU3and OPU5.
  That is why your earliest time is 20:00 in the case of qty 3600
  For further clarifications you can go thru topics Reduction strategy.
Regards,
nandha

Similar Messages

  • Scheduling in Routing..

    Hi all ,
    i am facing a problem scheduling in Routing  ,
    When i am doing scheduling in routing (CA02 ) as :
    Menu EXTRA  --> Scheduling
    here i am entering start Date : 30.09.2008 scheduling type Forward
    and lot size then the system is carrying the scheduling , the problem is with Earliest Start Time it is haphazardly(16:10:00) taking rather than that of the start time maintained for the first operation Work center, capacity header ,  which is there as 07:00:00 .
    From whr the sytem is picking / calculating this Earliest start time ?
    I haven't maintained interoperation times wait , queue time etc .
    Regards
    Venky shree
    Edited by: venky  shree on Feb 13, 2008 6:23 AM
    Edited by: venky  shree on Feb 13, 2008 6:33 AM
    Edited by: venky  shree on Feb 13, 2008 6:45 AM

    Res sir ,
    yes , i have assigned shift schedule for the work center :
    S1     SHIFT 1     01.01.2007     31.12.9999     07:00:00     15:00:00     7.00     BRK1
    S2     SHIFT 2     01.01.2007     31.12.9999     15:00:00     23:00:00     8.00
    S3     SHIFT 3     01.01.0001     31.12.9999     23:00:00     07:00:00     8.00
    and BRK1 is defined like :
    BRK1     0     Lunch Break               6.00     1.00
    in OP4A .
    is it affected by the same .???
    Regards

  • Scheduling with route

    Hi Every one
    Help me out in Configuring Delivery scheduling, Transportation scheduling & Route determination. Hope I maintaind all the things but still i am unable to get. So i would like to check it out with ur suggestions.
    Thanks & Regards

    Hi Srinivasa rao
    ROUTE DETERMINATION
    Step: 1
    Maintain Purchase Organization
    Path: Spro—Enterprise Structure—Definition—Materials Management—Maintain Purchasing Organization.
    Step: 2
    Create Purchasing Group
    Path: Spro—Materials Management—Purchasing—Create Purchasing Group.
    Step: 3
    Maintain Transportation Planning Point to Company Code.
    Path: Spro—Enterprise Structure—Definition—Logistics Execution—Maintain Transportation Planning Point
    Step: 3A
    Assign Transportation planning point to company code.
    Step: 4
    Assign Purchasing Organization to Company Code.
    Path: Spro—Enterprise Structure—Assignment—Materials management—Assign Purchasing Organization to Company Code.
    Step: 5
    Assign Purchasing Organization to Plant.
    Path: Spro—Enterprise Structure—Assignment—Materials management-- Assign Purchasing Organization to Plant
    Step: 6
    Create Vendor Account Group
    Path: Img—Financial Accounting—Accounts Receivables and Accounts Payables—Customer Accounts—Vendor Accounts—Master Data—Preparations for Creating Vendor Master Data--Define Account Group
    Step: 8
    Create Vendor
    T-Code: XK01
    Step: 9
    Define Modes of Transport
    Path: Spro—Logistics Execution—Transportation—Basic Transportation Function---Routes—Define Routes—Define Modes of Transport.
    Step: 9A
    Define Shipping Types
    Path: Under the Same Menu path---Define Shipping Types
    Select New Entries and Assign the Shipping Type (e.g. Road or Train) and Assign Mode of Transport (Mdtr) and Assign Shipping type Procedure group.
    Step: 9B
    Define Transportation Connection Point
    Path: Under the Same Menu path--- Define Transportation Connection Point.
    Step: 9C
    Define Routes and Stages.
    Path: Under the Same Menu path--- Define Routes and Stages.
    Select the New Entries and Enter the Details
    Then Select the Routes stages and define
    Step: 9D
    Maintain Stages for all Routes.
    Path: Under the Same Menu path---Maintain Stages for all Routes.
    Step: 10
    ROUTE DETERMINATION
    Define Transportation Zone
    Path: Spro—Logistics Execution—Transportation—Basic Transportation Function---Routes—Route Determination—Define Transportation Zone.
    Step: 10A
    Maintain County and Transportation Zone for Shipping Point.
    Path: Under the Same Menu path--- Maintain County and Transportation Zone for Shipping Point.
    Select the Shipping point and enter the Country and Transportation Zone
    Step: 10B
    Define Transportation Groups.
    Path: Under the Same Menu path---Define Transportation Groups
    step: 10D
    Maintain Route Determination
    Path: Under the Same Menu path--Maintain Route Determination.
    Select New Entries and Define the Route Determination.
    SHIPMENTS
    Path: Spro—Logistics Execution—Transportation—Basic Transportation Function—Shipments
    Step: 11
    Define Shipment Types
    Path: Spro—Logistics Execution—Transportation—Basic Transportation Function—Shipments—Define Shipment Types.
    Select the New Entries and define Shipment Type
    Step: 12
    Go to Customer master data.
    In Address of General data. Enter the Transportation Zone id. and save
    U will get the route.
    If u want in detail with screen shot, provide ur mail id. i will send it to u.
    ROUTE SHEDULING
    1.Scheduling With Route Schedule For Shipping Point
    Route schedules (previously referred to in the system as delivery phases in this step) describe the periodic delivery of goods from a shipping point to different ship-to parties and their unloading points.
    Here you specify per shipping point whether this sort of periodicity is generally required.
    Requirements
    f you want to define route schedules, you must perform the following activities:
    1. Define routes
    2. Activate delivery scheduling
    Standard settings
    The control function without determination of route schedules is delivered with the system.
    Further notes
    Route schedules can be determined for deliveries, orders and stock transfer orders.
    2.Scheduling With Route Schedule For Sales Document Type
    Route schedules describe regular outgoing delivery of goods from a shipping point to different ship-to parties and their unloading points.
    This is where you configure whether you want this to apply to a given sales document.
    Requirements
    If you want to define route schedules, you must complete the following activities:
    1. Define routes
    2. Activate shipping dates
    Standard settings
    Controlling without determination of route schedules.
    Further notes
    Route schedules can only be determined for deliveries.
    3.Scheduling With Route Schedule For Delivery Type
    Route schedules describe regular outgoing delivery of goods from a shipping point to different ship-to parties and their unloading points.
    This is where you configure whether you want this to apply to a given delivery type.
    Requirements
    If you want to define route schedules, you must complete the following activities:
    1. Define routes
    2. Activate shipping dates
    Standard settings
    Controlling without determination of route schedules.
    Further notes
    Route schedules can only be determined for deliveries
    Reward if it is useful to u.
    Message was edited by:
            narendran vajravelu

  • Scheduling with route schedule

    Hii frnds i have defined routess,,,,,,,worked on route determination  but now I would like information n Scheduling with route schedule ...if anyone has snapshots or information regarding the same plss forward it to
    [email protected]
    Regards
    Maddy

    Chk this thread, hope will be useful.
    https://forums.sdn.sap.com/click.jspa?searchID=4197732&messageID=3437969
    Regards
    AK
    Reward points if helpful

  • Route schedule and Route Combination

    Hi Experts ,
    I have a Sales Order . Now Under schedule Line Tab I see two schedule Lines ,one line with confirmed quantity now, each schedule Line  with different route schedule .
    I would Like to Know , how the system understands when and which route schedule to take , when more than 1 route schedule is present for a Route .
    How the system Picks up the correct route schedule when 2 or more route schedule is there for A route.
    Thanks
    MM_sD

    Hi Sayantan,
    Actually I want to understand how a Route picks up different Route schedule .
    Below is the schedule Line . Now for the 1st date I see route schedule as SSGPT321TU
    For the 2nd Date in schedule Line I see different Route Schedule as SSGPT321MO.
    Now how the Route SGSGPT decides which schedule to take for which date , how does this works
    Thanks
    MM_sD

  • Scheduled job routes to Primary in AG automatically?

    Hello!
    We have a new setup of SQL Server 2014 running 12.0.2430.  We have two servers that are set up in AlwaysOn High Availability, which are hosting a database in an AG with a valid listener. Everything seems fine and is working as expected
    in terms of HA, except for the following:
    We have a scheduled job that was deployed to both servers in the HADRON cluster.  It runs a stored procedure in the db, which creates some temp tables and updates some records.  I was fully expecting that the job would fail on the server that is
    the secondary, however, we have observed that, when we set the secondary to be non-readable, the job will run on both the primary and the secondary, routing the traffic to the primary in both instances.  When we set the secondary to readable, this behavior
    goes away.
    What gives?  Is this expected?
    Thanks in advance for any info you can provide.
    Thanks!
    -Bill S.

    USE [msdb]
    GO
    /****** Object:  Job [test]    Script Date: 3/27/2015 8:42:15 AM ******/
    BEGIN TRANSACTION
    DECLARE @ReturnCode INT
    SELECT @ReturnCode = 0
    /****** Object:  JobCategory [[Uncategorized (Local)]]    Script Date: 3/27/2015 8:42:15 AM ******/
    IF NOT EXISTS (SELECT name FROM msdb.dbo.syscategories WHERE name=N'[Uncategorized (Local)]' AND category_class=1)
    BEGIN
    EXEC @ReturnCode = msdb.dbo.sp_add_category @class=N'JOB', @type=N'LOCAL', @name=N'[Uncategorized (Local)]'
    IF (@@ERROR <> 0 OR @ReturnCode <> 0) GOTO QuitWithRollback
    END
    DECLARE @jobId BINARY(16)
    EXEC @ReturnCode =  msdb.dbo.sp_add_job @job_name=N'test', 
    @enabled=1, 
    @notify_level_eventlog=0, 
    @notify_level_email=0, 
    @notify_level_netsend=0, 
    @notify_level_page=0, 
    @delete_level=0, 
    @description=N'No description available.', 
    @category_name=N'[Uncategorized (Local)]', 
    @owner_login_name=N'sa', @job_id = @jobId OUTPUT
    IF (@@ERROR <> 0 OR @ReturnCode <> 0) GOTO QuitWithRollback
    /****** Object:  Step [test job]    Script Date: 3/27/2015 8:42:16 AM ******/
    EXEC @ReturnCode = msdb.dbo.sp_add_jobstep @job_id=@jobId, @step_name=N'test job', 
    @step_id=1, 
    @cmdexec_success_code=0, 
    @on_success_action=1, 
    @on_success_step_id=0, 
    @on_fail_action=2, 
    @on_fail_step_id=0, 
    @retry_attempts=0, 
    @retry_interval=0, 
    @os_run_priority=0, @subsystem=N'TSQL', 
    @command=N'SELECT TOP 10 [AlertID]
          ,[UTCOccurrenceDateTime]
          ,[ServerName]
          ,[DatabaseName]
          ,[TableName]
          ,[Active]
          ,[Metric]
          ,[Severity]
          ,[StateEvent]
          ,[Value]
          ,[Heading]
          ,[Message]
          ,[QualifierHash]
          ,[LinkedData]
      FROM [SQLdmRepository].[dbo].[Alerts] 
      WAITFOR DELAY ''00:00:10'' -- THis is the test job
    @database_name=N'SQLdmRepository', 
    @flags=0
    IF (@@ERROR <> 0 OR @ReturnCode <> 0) GOTO QuitWithRollback
    EXEC @ReturnCode = msdb.dbo.sp_update_job @job_id = @jobId, @start_step_id = 1
    IF (@@ERROR <> 0 OR @ReturnCode <> 0) GOTO QuitWithRollback
    EXEC @ReturnCode = msdb.dbo.sp_add_jobserver @job_id = @jobId, @server_name = N'(local)'
    IF (@@ERROR <> 0 OR @ReturnCode <> 0) GOTO QuitWithRollback
    COMMIT TRANSACTION
    GOTO EndSave
    QuitWithRollback:
        IF (@@TRANCOUNT > 0) ROLLBACK TRANSACTION
    EndSave:
    GO

  • URGENT:Schedule date restricted to a date in SO

    Hi All,
    I was trying to schedule a sales order, but it restricted to date like (31-dec-2008), I can't change this date. Is there any setup for ,why schedule date is restricted to a specific date? Please help.
    Thanks,
    Shishir

    I tried after logout, that date restriction was gone, but now it' showing message "Unable to find calendar date". I changed the calender date by Inventory->setup->organization->calender and rebuild it , rebuild program is throwing error. Is these are right steps or I have to do anything else.
    regards,
    Shishir

  • Urgent schedule agreement

    Hi,
    i want to change for all schedule agreement the validity
    date to new one .
    is there any command to change them all at a time

    Hi,
    If you are on version ECC 6.0 then only it is possible. The transaction code is MEMASSCONTRACT for Contracts & MEMASSA for Scheduling Agreement.
    For 4.7 this is not available. You will have to maintain LSMW for this,
    Regards,
    Prashant

  • Calculation of goods issue date in scheduling agreements with routes

    Hello together,
    i have a problem with the calculation of goods issue date in scheduling agreements when we use route, because the system ignore the days of transit.
    Example:
    We had customized the route 4711 with a transit time of 3 days. This route would be related to a scheduling agreement. But this setting has no influence to the calculation of the goods issue date for the schedules. The same happens with loading date and so on.
    Can anyone give me a tip, which setting is additional necessary?
    Regards
    Andreas Walter

    Hi,
    check the following settings
    1, Route determination Path : IMG>sales and distribution>Basic function>Routes>Route determination
    2, Activate the route Determination for your sales document type in following path :IMG>sales and distribution>Basic function>Routes>Route Schedule Determination-->Schedule with route schedule for sales document type
    3, Maintain Delivery scheduling and transportation scheduling in the following path:IMG>sales and distribution>Basic function>Delivery scheduling and transportation scheduling>Maintain Duration
    Regards
    Senya

  • Scheduling of Parallel Sequence in Routing & Production Order

    Hello Friends,
    I have gone through sap library & many other threads related to maintaining & scheduling of parallel sequence in Routing as well as Production Order.
    For the example, I have 3 operations : 0010,0020 & 0030.
    I want to maintain 0020 & 0030 as Parallel Operations ( Parallel Sequence) i.e. for both operations I have maintained same lead times so that both should start & end at same time parallely.
    First of all, I have maintained all operations in standard sequence 0 all 0010,0020 & 0030 operations and also maintained tick in Required splitting check box.
    Same way , I have maintained operations 0020 & 0030 in Parallel sequence with branching operation as 0020 & Return operation as 0030. Ref. sequence i have maintained as 0 (Std. Sequence).
    Now when I am checking in Graphic it is not showing both operation 0020 & 0030 as parallely scheduled and hence same is not reflected in Production ORder as well.
    Kindly share your valuable views reg. what may be other settings for parallel sequence which I may be missing.
    Thanks in advance.
    Regards,
    Tejas

    Hi Abhijt,
    Thanks for your reply. I went through your thread & I followed same steps as mentioned by you in your suggested threads.
    I have removed Parallel sequence fully & maintained Required Overlapping for all my 3 operations : 0010,0020 & 0030
    I have maintained workcenters as below :
    0010 A  Set up 2.0 Hrs   Machine 5.0 Hrs   Labour 1.0 Hr
    0020 B  Set up 2.0 Hrs   Machine 5.0 Hrs   Labour 1.0 Hr
    0030 A  Set up 2.0 Hrs   Machine 5.0 Hrs   Labour 1.0 Hr
    I checked scheduling in routing itself same way you suggested with start date today's date & forward scheduling it gives following results :
    0010 start time 07:00:00
    0020 start time 07:13:42
    0030 start time 09:14:39
    My concern is with mainly start time of operations 0010 & 0020 since for both of these are processed on different workcenters A & B respectively then why not starting exactly on same time on 07:00:00 AM only instead another operation is starting on 07:13:42AM. I am unable to find how this difference of 13mins 42 seconds is coming.
    Kindly provide your feedback. Also let me know if you need any more details.
    Regards,
    Tejas

  • Determinate route schedule in SD order VBEP-AULWE

    Hi all,
    I want to activate route schedule :
    - I have a route schedule masterdata (VL51) : for one route, one shipping point and one sold-to party
    - I have actived scheduling with route schedule for my shipping point and for my sales document type (spro > LE > shipping > basic shipping > routes > routes schedule determination)
    - my shipping point has a working time and a value in "pick pack time in work hours".
    In my order, route and shipping point are determinate but not the schedule route  (field VBEP-AULWE)
    I don't solve the problem, I've you got an idea ?
    Thanks a lot !!
    Celine

    Does anyone found a solution in the meantime?
    I maintained all the mentioned settings but route scheduling for the relevant shipping point is still not working. I have only success when I add receiving hours for the specific day at the customer master of partner WE. But this cannot be the solution. If so I wouldn't need the route scheduling functionality.
    What is the minimum requirement to get route scheduling to work? Maybe I missed something.
    Is it really mandatory to maintain working hours for the shipping point? At note 146829, point 3.2 it's written that working hours are only necessary when I want to get "precise" scheduling results. I don't want this, determination on a day basis is precise enough.
    Best regards,
    Stefan
    Edited by: Stefan Engel on Feb 16, 2010 12:54 PM

  • Scheduling in collective order

    I need some hint on a problem I'm facing here...
    We are using collective orders(Proc. E- SP. 52) and no scheduling parameters are defined in our workcenters...
    When I create a production order on the top level (finish good) for 10/ 31, the component that has an In-house production time =1 scheduling margin key = 000 is scheduled to finish 11/03
    I tried using "backwards" scheduling, "backward in time" scheduling...
    I would like the component to have start date 10/30 and finish date 10/31
    Any ideas?
    If I remove the in-house production time, the finish date of the component is the same as the finish good...

    Luc,
    Check with Route time for the component. It is likely the route time is higher than 1 day. Production order schedules on route time & hence likely the order has a finish date of 11/3.
    If your only looking at the planned order planning then it will take the material master inhouse production time. Also please check if you have 31 Oct as a non working day in your factory calendar. If yes then it is likely 1 & 2 Nov( SAt/Sunday) are non working too & hence the order plans to finish on 11/3( monday).
    That also explains if you remove inhouse time, system takes 0 days & has finish date as 10/03.
    Hope this gives you with some hint about what might be going on in your system.
    Thanks,
    Ram

  • Warning due to check scheduling date

    Dear SAP GURU
    I release production order & check all log.
    when i chen log for scheduling they give messege "START DATE IN THE PAST TODAY SCEDULING"
    i made all necessary setting for scheduling in routing, float,customization in scheduling"
    what is the error meaning?

    Thank's sir
    Dear sir I get solve this problem.
    But i request to  give me detail setting,process or best example to scheduling.
    Suppose sir i have create routing For 1st fert material system give scheduling DATE(25.02.2009) for forword starting.
    i create semifinsh material sytem get forward starting with same DATE (25.02.2009).suppose sir period of time for semifinshed material is 2 days for semifinished operation.
    If i have change finished scheduling date (27.02.09)   What effect on scheduling for my assumption.
    give me reply
    yogesh

  • Route determination for PO and Delivery

    Hi Experts,
    I would like to ask how to set up route fro deliveries and Stock transport orders.
    Hope you can help me on this.
    Thank you very much.
    Regards,
    Mylene

    Working with Route Schedules
    Use
    Using a route schedule, you can control periodic customer deliveries of a particular shipping point to different ship-to parties (for example, customers or stores) in a certain sequence on a certain defined route. The planning is based on calendar weeks. The period unit is a day. Also, route schedules have a goods issue time.
    The route schedule function supports the following processes:
    Periodic deliveries from a shipping point to stores or customers are planned in advance on the basis of calendar weeks and weekdays, also without reference to particular deliveries.
    You adapt the schedules in the specific cases to the planning. For example, you can plan a GI date for a Monday at 8 o’clock, without knowing the exact date or the delivery.
    On the basis of this planning, deliveries that are to leave the warehouse at the same time are combined into groups. In Shipping you can thus distribute the workload by processing these groups.
    Features
    You can display all deliveries for a particular route schedule on a particular day, for a particular shipping point, and so on. In this way, for example, you can choose picking lists on the basis of route schedules.
    You can create route schedules for the following documents:
    Sales orders
    Stock transfer orders
    Deliveries that are based on sales orders, store orders, stock allocations, stock transfer orders, and deliveries without reference.
    The route schedule is displayed in the header data of the delivery. For each delivery within the route, the system prints the expected date and the expected time of the delivery (on the basis of the local time at the original shipping point) on the delivery note; the goods issue date is used for the goods issue posting and the stock valuation.
    In Customizing, you define for each shipping point, delivery type, stock transfer order, and order type whether or not route schedules are to be used.
    You create the route schedules in the master data for shipping. Here you define the route schedule determination and the validity period for the route schedule and the itinerary.
    As soon as the legs have been defined, you can branch to another screen to determine the actual itinerary, as well as the time (days/hours/minutes) required to get from one unloading point to the next. In this screen there is a field beside each leg. Here you can enter the number of the itinerary for the individual legs of the route. If, for example, you enter legs A and B, but assign itinerary number 2 and 1 to these, B is the first unloading point on this route. If you press Enter, the legs are displayed in the correct sequence.
    At the same time it is possible to control the route schedule determination for each delivery type, stock transfer order, and order type. It is activated in the same manner as the repeated route determination. If the route schedule determination for a delivery is active, the system automatically attempts, during creation or change of a delivery, to determine a route schedule and records this in the delivery. Simultaneously, the scheduling is adjusted. All the deadlines, for example, the transportation planning time, the picking time, the loading time, the goods issue time, and the delivery time can change.
    Deliveries with the same route schedule and the same date can be selected for the same picking run and the same goods issue. The same procedure can be used for printing delivery notes and freight lists, for the grouping of deliveries into shipments, and for confirmation of picking orders.
    Deliveries that leave the warehouse at the same time, but are assigned to different routes and can therefore have different route schedules, can be combined together and processed through the creation of wave picks. The only condition is that all deliveries have the same goods issue time.
    Route Schedule Determination
    If exactly one route schedule is defined for a particular combination of requirements, then the system will use this.
    For each combination of requirements for the route schedule determination, you can define several route schedules.
    In the case of a delivery without a preceding document, the system determines the route schedule with the earliest delivery time at the ship-to party.
    In the case of deliveries based on preceding documents (for example, stock transfer orders), the system searches for the route schedule that is nearest to the planned date/time of the delivery. The system uses the following search algorithm:
    - If a route schedule exists for the specified time, this is assigned to the delivery.
    - If there is no route schedule for the time specified, the system searches for the previous route schedule up to the GI time.
    - If there is no route schedule from the GI time to the planned time, the system searches for the next route schedule in the future and assigns this to the delivery.
    Requirements for Route Schedules
    The route schedules are determined by the following conditions:
    · Shipping point
    Where are the goods coming from?
    Ship-to party and unloading point
    Where are the goods going to?
    Shipping condition
    How are the goods being shipped?
    Transportation group
    Which goods are shipped?
    ® For example, which type of goods?
    Calendar week / year
    When are the goods to be shipped?
    If you do not explicitly enter the week and the year, the entry applies for each calendar week. If you enter a week and a year, the route schedule only applies for this week.
    You can only use route schedules if you have maintained the working times and therefore at least one of the following times in minutes:
    · Transportation planning time
    · Pick/pack time
    · Loading time
    · Transit time
    A route schedule can leave the warehouse exactly once in a week. If a route schedule runs several times, either on several days or several times a day, it must be copied to another route schedule.
    Special schedules and public holiday weeks are possible.
    Processing a Route Schedule
    Implementation Options
    Wholesale trade customers and stores can receive goods at regular intervals. These delivery rhythms have an influence on the workload in the warehouse. To help delivery planning, the route schedule serves as a tool for planning regular, repetitive customer deliveries on a particular route. At the time of planning, potential deliveries that have not yet been created are grouped in the route schedule. When the deliveries are created, the system can automatically determine a route schedule and assign it to the delivery. All deliveries with the same route schedule and the same date can be processed together in the shipping point. All these deliveries leave the shipping point together at a particular time. They are distributed along the same geographical route.
    · Deliveries for route schedule MO10H leave the shipping on Mondays at 10:00 in the direction of Philadelphia.
    · Deliveries for route schedule MO10M leave the shipping point on Mondays at 10:00 in the direction of Boston.
    · Deliveries for route schedule MO10S leave the shipping point on Mondays at 10:00 in the direction of New York.
    You can print picking lists for all deliveries that belong to route schedules MO10H - MO10S together.
    Prerequisites
    If you want to define route schedules, you must perform the following tasks:
    - Activate the route determination
    - Activate the delivery scheduling
    - Activate the route schedule for your shipping point and make the following settings:
    Transaction
    Activity
    Delivery
    Route schedule determination for delivery type
    Sales order
    Route schedule determination for sales document type
    Stock transfer order
    Route schedule determination for delivery type
    Set delivering plant and order type
    Maintenance of the itinerary should be uniform for all the route schedules used. To ensure exact planning, maintain the itinerary for all the route schedules. If rough planning is sufficient in this case, you do not need to maintain the itinerary for a route schedule.
    If you do not define any goods accepted times in the customer master for the unloading points of the ship-to party, the system assumes that the goods acceptance is possible at any time. The system determines the delivery time from the departure time in the route schedule plus the required traveling time to the ship-to party, as set in the itinerary (specific move time). This delivery time must be within the goods acceptance time of the unloading point of the ship-to party. If not, the respective route schedule is not determined during delivery creation.
    For more information on route schedules, refer to the Implementation Guide (IMG) under Route Schedules.
    Process Flow
    Select the shipping point you are working for and enter the number of the route schedule.
    Enter the data that defines the route schedule more exactly:
    - Description of the route schedule
    - Route
    - Departure day (weekday)
    - Departure time
    You define the route schedule determination. When you create the delivery, the system can determine a route schedule on the basis of the following data:
    - Shipping point
    - Ship-to party
    - Unloading point (if available)
    - Shipping condition
    - Transportation group
    - (Optional) year/period
    You enter this data (with the exception of the shipping point already entered in step 1).
    You decide whether or not you wish to define the itinerary for this route schedule.
    (Optional) You enter the itinerary and, if required, also the travelling time.
    Creating a Route Schedule
    Choose Logistics ® Logistics Execution ® Master data ® Transportation ® Routes ® Route schedule ® Create.
    In the screen Create Route Schedule: Initial Screen, enter the shipping point and the number of the route schedule.
    If you wish to use data from an existing route schedule as a reference, enter the respective shipping point and the number of that route schedule. If you also wish to copy the itinerary, check the Copy itinerary box.
    Press ENTER .
    The Create Route Schedule screen appears (here the system displays the number you just entered for the route schedule and the shipping point).
    Enter the following data:
    Description of the route schedule
    The respective route
    Departure day (weekday)
    Departure time
    In the Determine route schedule section, enter the following data:
    Ship-to party
    Unloading point (if available)
    Shipping conditions
    Transportation group
    (Optional) Year/period
    If you wish to define for this route schedule the itinerary according to which the individual ship-to parties are to be delivered to, choose Extras ® Itinerary.
    The Create Itinerary screen appears.
    Enter the itinerary and, if necessary, the travelling time.
    When you determine the travelling time from one ship-to party to the next, you should include the wait time of the vehicle at the previous ship-to party.
    If the same route is planned for several route schedules, define for each of these route schedules the same itinerary that should correspond to the stages and legs of the route.
    Choose Goto ® Back.
    You return to the Create Route Schedule screen.
    In this screen, the Itinerary maintained field is now selected. If you wish to add other ship-to parties, you must also maintain the Itinerary for them.
    Check your data and save your entries.
    Reward if helpful...
    Regards,
    Diogo

  • Problem with scheduling planned orders in MRP

    There is a problem with scheduling planned orders in MRP. SFG is assigned to the BOM of FG. No inhouse production time maintained in the material master of SFG & FG. routing maintained for both . In OPU5 scheduling & capacity reuiremnts tickmarked for detailed scheduling. Scheduling level - via detaied scheduling. Scheduling type - backward. Adjust basic dates , adjust dep. req. to order start set. In MD02 , scheduling is via ' lead time scheduling'.
    My problem is the start date & time & finish date & time is same for planned orders of FG & SFG in the detailed scheduling tab of the planned orders. (Duration is same because of same capacity requirements on the same work centre. But how is the finish date same for both SFG & FG?)
    (Capacity requirements are being generated.)
    What could be the problem ?

    Dear,
    By scheduling the routing and maintain lot size dependent time in material is best practice and result of scheduling will be consistent.
    If you want SFG before FG you need to define lead time offset in BOM or need to maintain the floats before production.
    Hope clear to you.
    Regards,
    R.Brahmankar