Usage based contract

Hi all,
can any one tel me the best practise for usage based contract
and demo, how to create it like web blog.
Please help me on this.
Thanks,
Priya

Hi Pete,
Thanks for you input.
We are recrding the daily readings in Measuring points of the Equipment. At the end of the month, I could get the Total value of each Components.
My idea is to
1. Create a Sales order w.r.t to the Contract --> copy all the line item with rate per unit or hour
2. User has to enter (manually) quantity of each parameter
3.System will calculate the amount for each parameter ( Qty X Rate per unit / hour)
(Rate (condition value) of 3rd parameter (Stoppage die to supplier) is negative (-200))
Is it right the right way of approaching this requirement? Is there any other possibilities available in SAP?
Thanks,
Babu.K

Similar Messages

  • Capturing Counter Readings for Usage Based Contracts

    Hi,
    I need clarification regarding capturing the Counter Readings for Usage Based Contracts. Which is it better to capture Counter Readings..in Service Contracts module or in Install Base ?.
    I am new to Usage Based Contracts and need to understand this.
    Gurus, Appreciate your quick responses.
    Thanks,
    Sid

    Hi All,
    Has anyone used the API's for capturing the counter readings.
    As far as I know, we need to use the public APIs of CS_CTR_CAPTURE_READING_PUB in the following sequence:
    CS_CTR_CAPTURE_READING_PUB.PRE_CAPTURE_COUNTER_READING--retrieve the counter_group_log_id and pass it to the next api
    CS_CTR_CAPTURE_READING_PUB.CAPTURE_COUNTER_READING and then call the API
    CS_CTR_CAPTURE_READING_PUB.POST_CAPTURE_COUNTER_READING.
    Has anyone used the API CS_CTR_CAPTURE_READING_PUB.PRE_CAPTURE_COUNTER_READING?
    I want to know what values are passed into the record type CTR_GRP_LOG_Rec_Type.
    Can anyone tell me what has to be passed, please?
    Thanks!

  • CRM SERVICES USAGE BASED BILLING

    Hi,
    I need some information on UBB, especially on the setup and configuration side. Can any body help me out here. I am confused in terms like usage function credit overview. I am unable to make a clear picture of this functionality.
    Thanks in advance.
    Aditya

    Hi Aditya,
        Not so sure try to check this Doc Link: http://www.scribd.com/doc/64693553/50/Usage-Based-Service-Contract-Management
    Try to Download it if you don't see some part of the doc.
    Regards

  • Billing value should not exceed contract(value based contract) value

    Hi,
    We are using value based contract and in item category we set E in incompletion rule which stops me to create relaease order where its value exceeds the contract value.
    But via release order we recognize revenue(service based revenue recognition) and we do billing directly through contract via milestone billing plan,
    At present i can bill more then my contract value.Now i want to system should not allow me to bill mre then contract value.
    I checked the option in VOV8 and VOV7 but all those are meant for release order not for bliing.
    Thanks in advance.

    Hi Satya
    You can set the billing amount in milestone billing plan itself. based on that value billing will done.

  • Usage Based Optimization Wizard not finding Queries for Selected Measure Group (2008)

    I have configured my analysis services server to capture queries in an OLAP Query Log table. The connection string points to a table on a SQL Server relational database.  I have verified that the dbo.OlapQueryLog table was created. I have set it to
    capture every 5th query.  The table has been collecting query statistics for several hours. I opened my model in BIDS, clicked on the cube and opened the Aggregations tab.  I click on the measure group partition and select the Usage Based Optimization
    button. The wizard opens up and I click next.  In the "Specify Query Criteria" dialog, there is a warning that there "are no queries in the log for the selected measure group".  The problem is that there are queries but the UBO
    Wizard doesn't seem to be finding them.  Do I need to set a property in the BIDS to point to the location of the query log file in the relational database?
    davidg12

    Hi David,
    Is your SSAS database name and ID are same? We came across same kind of issue while ago. We initially created our database with one name and later renamed the database.
    The database name and ID should be same in order to perform Usage Based Optimization.
    To do so,
    On the solution explorer the top node is the database.
    Right click on that node and click edit database. In the property windown you should be able to see ID. The ID and the name of the database should be the same. 
    If both are not same, Change the database name to match ID.
    Please mark as Answer if this helps!
    Rajasekhar.

  • I have to  make usage-based ABC analysics  with material type

    i have to  make usage-based ABC analysics  with material type if i use mc40 it wont give output based on material type .please can anyone provide me other than mc40 to make usage based analysis based on material type.

    do MC40.
    click multiple selection button next to the material number.
    Then click again multiple selection on the pop-up.
    After this you get to the match code. Choose matchcode for material type, enter the material type you want and execute. Select all hits. and hit enter. then excute.

  • Sales Based Contract : Error : Selec a valid settlement

    Hi,
    Iam new to the RE Module.
    Whil doing the TCODE : RESRSE, iam getting the message as 'Select a valid settlement'.
    Contract details are as follows:
    Condition type is selected only one that is the Sales based and it is statistical.
    Sales quantities has been updated.
    Sales amount given in the "Sales Rule" - Calculation.
    I've given the validity dates, posting date, settlement date correctly.
    My question is : Here, is actual condition type (like any rent) are necessary to get calculate and settle the sales ?
    If the actual condition type is not necessary then what would be necessary things to be updated ?
    Please reply with your inputs.
    VVR

    Hello
    Pls check the below:
    1. Before RESRSE, the respective sales figures should be available in the Contract or if no sales available Tick Zero Sales upto the period for which the sales settlement you would like to do.
    2. In RESRSE, in addition to default fields like Co Code, Contract No, etc select Settlement Method Simulate, Settlement Type as Standard, Settlement schema as Using Actual AP, Settlement step as 05 Simulation of Posting Costs.
    3. In Selection of Sales Rule tab, give Settle Upto Date.
    4. In Parameters tab, give Text, Posting & Doc Date, Posting Period, Baseline Date as per the requirement.
    Now execute and see. If successful remove simulate and select execute in Settlement Type.
    Regards
    Amarnath.R

  • Service entry sheet pick price from Scales based contract

    Dear SAP Team,
    We are doing the service entry sheet using Transaction Ml81N & facing the pricing issue.
    Before doing the service entry sheet a SAP contact which has prices based on the scales as distance is created .We pay the vendor based on the depth where the drilling operation are performed.
    Purchase order is created using as limit order as at the time of PO the exact depth & time consumed for the service is not clear.
    While creating a Service entry sheet against the PO, when I click on the pushbutton u2018Service selectionu2019 the system prompts me to choose the Service from different sources.
    I select the option of service to be selected from the purchasing document (which is my contract number with scale pricing).
    After this step, I could see my contract service as below but I do not have the option to select the scale prices based on the depth where the services are performed.
    I do not know when SAP has provided the scale pricing in contract & it allows you to select the contract during the service entry sheet then but it does not allow you to select the prices maintained in the contract for the scales. I would highly appreciate any solution provided on it or any other alternative possible.

    Hi,
    You have two options, just check for to carry out....
    OPTION--1:
    You can create three service master/activity number namely Pumping depth 0-500 M , Pumping depth 501 -1000 M & Pumping depth 1001-Above and keep  base unit of measure for service master/activity number  is Hour.
    Now create value or quantity contract as per your requirement with  three service master/activity number  & you can maintain
    the cost per unit as Pumping depth 0-500 M is 400$/ Hr , Pumping depth 501 -1000 M is 500$/ Hr, Pumping depth 1001-Above is 600$/ Hr
    Then you can create Release Order/Purchase Order WRT contract.
    Now during SES creation in ML81N, you can select which activity number performed and accordingly the cost and service number copied to SES & you can save SES and release SES.
    OPTION--2:
    You can have source list(ME01) & Info record (ME11). In the info record , you can maintain all scales as your requirement
    and then create contract & then release order and finally SES.
    Regards,
    Biju K

  • Best Practice unit of measurement usage in CONTRACT.

    Hello All
    I have a situation below
    MATERIAL 1234 have two UOM Respectively Ordering unit as CAR and basic Uom as EA .
    1 car = 10 EA
    1 . I create a contract for
    item 01 material 1234 with 100   USD CAR .
    2. later vendor told us that they can not supply via CAR , they can supply via only EA DUE to their BUSINESS  reasons.
    3. should i change the item 01 material 10 USD EA ? OR should i lock 01 ITEM 1234 with 100 USD CAR? and add a new item below?
    4. 02 ITEM 1234 10 USD EA.
    Which one is allowed as per SAP standard.
    APPRECIATE YOUR HELP.
    Thanks
    Muthu

    system will create a contract with default Base Unit of Measure maintained in material master data.
    The system will automatically do the conversion of CAR <--> EA as per what is maintained in the material master.
    Thus, if your base unit of measure in material master is set as CAR, then you can create a contract for 1 Car to order 10 EA and vice versa.
    it will be better to add a new line item for UOM as EA
    Hope this helps you. let me know if this answers your query.
    Regards,
    Nikz
    Edited by: Nikita... on Feb 18, 2010 4:59 AM

  • Is the 30 period calendar based or usage based?

    i.e. if I am away from my computer for two months do I return to dead apps imediately?

    Sadly yes, 30 calendar days from first start.

  • Error in UBB Service Contract

    Hi All,
    I'm Configuring UBB - Usage Based Billing scenario. Once I enter Service Product & reference product in UBB Service contract, I see the following messages.
    1. Error when reading billing plan date with GUID 00000000000000000000000000000000
    2. Transfer parameter missing in function CRM_BILLPLAN_D_READ_OB
    3. Item was not found
    Please advise me where the config is missing.
    Thanks & Regards,
    JM

    Hi J M,
    I am configuring Milestone billing.
    I also have seen same error messages while creating transaction in CRM.
    Please advice me if i missed any configuration.
    Thanks,
    Venu.

  • Comparing the BOM usage with the actual usage for materials.

    Hi All
    My client want to compare the BOM usage with the actual usage and have a report for this within a period? More specified they want to calculate the BOM usage, based on the requirement quantity from confirmation - but with out the scrap %. mulitplied with the confimed quantity of the header material.
    The actual usage should be based on  goods issuing from stock, either as goods issue to order (backflushing) or as goods issue to cost center. 
    I havent been able to indentiy a standard report for doing this - does some of you know a standard report?
    -  I was thinking of the following method:
    Look at  tabel RESB and compare it  with MSEG, but I have some diferent problems with this.
      - In resb there is no qty before scrap. 
      - The data amount from MSEG, is so huge so it is not possible to make a data search for a whole period (eg. month)
    Br. M

    There is one std report MCRX which gives a comparison of quanity in order and actual consumption,
    if it doesnt meet your need, you may have to create a custom report.
    logic can be find the quantites as per BOM for the produced quantities
    issued quantities to the order
    tables you may need are AUFK AUFM
    AFKO, STAS STPO
    MSEG, MKPO
    JEST ( if you want to filter using order status)

  • Best practice followed on CONTRACT

    Hello All
    What are the best practice needs to be followed on changing the material data information ,
    Step 1. created a contract for Material and PO released agains contract. later some times.
    Step 2:- material master changes some important piece of data like order Unit/ Deletion or material group changes on MATERIAL.
    step 3:- We do the same for the  materials in the contract and deactivate the w.r.t line and create a new line item so that my new line item picks up from material master.
    What are the other incidents material master team may do on material master so that i can inform the contract team to do the same.
    What are the actions material master team may do on MATERIAL and which is relavant for contract data.so that i can alert CONTRACT and MATERIAL master team. so that communication will be seemless.so that every thing perfect and sync.
    Muthu

    Please check these answered links:
    Contract best practices
    good practices in SAP Value Contract
    Best Practice while creating Contract, Purchase Requisition, Purchase Order
    Best Practice unit of measurement usage in CONTRACT.

  • Contract against purchase order

    Dear All..
                        I want to create purchase order with reference to quantity based contract but i want to know the report contract against purchase order details..
    in ME2L this is not showing any other standard reports available in Standard SAP.
    Regards
    Anand.

    Hi
    In ME2N you can get the PO's pertaining to a contrcat , click on dynamic selection (Shift+F4)
    Open the PO Item details & in the Field Outline Agreement , enter the Contrcat Number & in the Field
    Principal Agmt Item enter the Contrcat item number & execute the report. You will get all the PO's for that Contract
    Thanks & Regards
    Kishore

  • Looking for a contract actionscript developer

    San Francisco Based Contract Actionscript -  Flex Developer | Streaming Video Solution
    We are currently seeking a full or part time (at least for the next several months) senior Actionscript & Flex contract developer to help establish our online streaming video abilities.
    This person must:
        •  have strong application development skills in AS3
        •  be comfortable working with Flexbuilder, Eclipse, Ant or similar tool-sets
        •  have experience with Adobe FMS
        •  be familiar with latest video streaming abilities including use of Dynamic Stream-switching with QOS
        •  be comfortable modifying an established Flash VOD product (such as flowplayer, JW Player, OSMF)
        •  have strong skills in communicating between AS and external supporting applications (Webservices, JSON)
    Our player is the centerpiece of our web experience and must be flexible, secure, and intelligent. The person we are seeking must have strong application development instincts to drive this to successful completion. While we'd prefer candidates with some creative-integration abilities, this is primarily an opening for a veteran application developer with strong, standards-based coding skill and a passion for establishing bullet-proof online solutions.
    Ideally, we are seeking an SF local who would be able to meet on-site when needed, but would consider exceptions for the right fit.
    If interested and qualified please send your resume to [email protected]

    I sure wouldn't turn a new user loose on Wordpress. It gives
    me a headache,
    and a new user would be just lost....
    Murray --- ICQ 71997575
    Adobe Community Expert
    (If you *MUST* email me, don't LAUGH when you do so!)
    ==================
    http://www.dreamweavermx-templates.com
    - Template Triage!
    http://www.projectseven.com/go
    - DW FAQs, Tutorials & Resources
    http://www.dwfaq.com - DW FAQs,
    Tutorials & Resources
    http://www.macromedia.com/support/search/
    - Macromedia (MM) Technotes
    ==================
    "Vix" <[email protected]> wrote in message
    news:eo2urs$pdn$[email protected]..
    > Have you thought about using a system like Wordpress or
    Textpattern? It's
    > free and pretty customisable. It will make it easy for
    you to edit the
    > content yourself too.
    >
    > KJP88 wrote:
    >> Looking for someone versed in dev. i.e. enough to
    include flyout menus,
    >> flash and php to develop a css site for me ( for
    money). Fairly straight
    >> forward, I would add the content, but I live in a
    country where the
    >> average income is about 700 USD a month, so
    hopefully someone with a kind
    >> heart will reply.
    >>
    >> If interested, plz email me here:
    [email protected]
    >>

Maybe you are looking for

  • Risk Terminator ECC 6 - CC 5.2 - RFC  Test: Program not registered

    Dear board, I am configuring the risk terminator functionality and stumble accross problems with the setup of the RFC destination from ECC to the CC. The connection test fails with "ERROR: program GRCRTTOCC5X not registered". The RFC connection is of

  • ACC Adding New Coupon

    When I tried adding a new coupon using ACC, i am getting the dialog box in disabled mode. So I am unable to create a new coupon. Please help me out.. Thanks, Arun Varghese Matthew

  • Importing a package recursively (with subpackages)

    Hello everyone, I'm a 1st-year CS major and am new to Java. I had a question about importing packages. As I understand it, when you use a wildcard when importing, it will import the classes within the package specified before the asterisk, but none o

  • IOS upgrade on 2801 failure

    As usual , I copy tftp : flash: to copy IOS on Cisco2801 but failed. Connection between Fe0/0 interface and PC is stable, 100Mbps Full link is up. I am not sure why Connection time out during copy. Flash free space is enogh for new IOS. Please let me

  • Ruby on Rails and openssl issue

    after a systemupdate ruby on rails isnt working anymore. it seems that the problem is openssl.. at@at-book ~ $ ruby -ropenssl -rzlib -rreadline -e "puts :Hello" /opt/ruby1.8/lib/ruby/1.8/i686-linux/openssl.so: /opt/ruby1.8/lib/ruby/1.8/i686-linux/ope