Dear,
i am doing result recording to inspection point with partial lot and with batch,
i have some charactristics which is to be transfer to the batches for that i have to do separate Usage decision with every batches
Is it possible??
note i have used 120 inspection point.( with shift wise) and partial lot with batches..
Regards
Pravin

You can mkae a UD for the lot, but not by batch.
The characteristic data should be transferred to the batch after the valuation of each inspection point however.  So your results should already be copied over long before you make the UD.
Craig

Similar Messages

  • Rejection in Usage Decision of an inspection Lot

    Dear Masters,
    I want to know that is there any standard method to trigger the notification for rejection of an inspection lot?
    Please do explain. Thanks in advance.
    Chin2

    Dear Pushpa,
    Once again thanks for your reply. In the case mentioned above I can only define one notification type, what if I have more than one notification type to be used on rejection in usage decision? I will explain my scenario as below:
    I have 3 different quality notification types i.e, 1) Engineering Calibration notification (For Engineering Equipments)
                                                                              2) Quality Calibration Notification (For Quality Equipments)
                                                                              3) Fleet & Trade Calibration Notification (For Fleet & Trade Equipments)
    Now, I have 3 different types of orders from which the inspection lot will be created and for those 3 different types of orders I want 3 different types of notifications to be generated on rejection of the inspection lot.
    Please do guide if there is any standard method to achieve this
    Thanks once again.
    Chin2

  • Cancellation of UD of inprocess inspection lot

    Hi all,
      Can I not do cancellation of inprocess inspection lot  ?....
    partha...

    Hello,
    If you just want to cancel the insp lot then
    GOTO QA12, enter your insp lot no.
    Select usage decision at left top -> Functions-> Cancel lot. But in this case, if insp lot has been processed & stock have moved to unrest. then it will not show in insp stock after this process.
    If you want to transfer stock from unrest. to insp. stock then you have to cancel GRN no.
    GOTO MB01 enter PO no. & Mov type & select the option unrest. in stock type.
    Try it & confirm back.
    Thanks & Regards,
    Anisha

  • Need to send data, after Usage decision in quality inspection (QA11)

    Hi all,
    After Usage decision in quality inspection (QA11), i need to send some data like material number, qty etc to external database or to external party. is there anyway i can achive this in real time? real time means, it should send the appropriate data to external party after usage decision is made.
    Thanks
    Pabi

    Hi,
    You can change results recording in case the MIC in the inspection plan of the lot are marked as "long term characteristics", else it wont be possible to change result recording.
    you can change the UD code only after giving the Usage decision.
    you cannot change the defects recording.
    Thanks
    SUMIT

  • Inprocess inspection lot quamtity & Serial number

    Hello,
    Sr. No. is generated after confirmation of sales order.
    The production order is released & the inprocess inspection lot is generated. Production order quantity is 20.
    Now the question is:
    1. Why the inspection lot quantity always appears as '1'.
    2. If in inspection setup, sr. no. possible is checked, then why (or how) sr no.s can be seen automatically during result recording (inspection unit number) field.
    Regards

    Hi Hemant ,
           In configuration for serial No go to spro ->plant maintenance and cutomer service ->Technical Object--> serial No management -
    >Serial No profile -
    > serial no procedure -
    > Qmsl and mmsl  serial No usage should be 3
    so that what ever serial no assign to the GR will coming in the inspection lot and at the time od ud you can select accepted serial no only
    with regards
    Yashodhan

  • INPROCESS INSPECTION LOT CHANGE SPECIFICATION

    can any body give to me solution after   inprocess inspection  lot  i want to change specification is there any provision in sap standard  like  01 and  04 inspection type  we are change specification in  change inspection lot

    hi
    If results are not recorded and operation are not confirmed then do the following
    1. goto change routing / recipe -- change the specification
    2. go to prod/process order  --read PP master data
    then do RR new spec. get reflected during result recording
    regards

  • How to do single usage decession  for multiple inspection lots

    we are clearing Usage decision each & every lot for which taking lot of time, if any setting for  a GR Document number/Multi GR document nos connected lots to be cleared at a time automitically,

    Hi,
    In addition to Anupam's reply,
    Follow the SPRO path for Auto UD---> Select your plant for AUTO UD settings -
    > then go to InspLot completion tab where you need to define following time fields under Automatic Usage Decision tab page :
    Delay time for skip lot (in Mins)
    Waiting time (hrs) & Waiting time (Mins).
    Waiting time is the time which must elapse after inspection lot creation after that only system will carry out automatic usage decision.
    Save above settings.
    Further as a master data part, you need to maintain tick in Automatic UD check box for the respective material for which you want activate automatic UD.
    Hope this clears your doubt.
    Revert if still any query.
    Regards,
    Tejas

  • Inspection lot status per operation

    hi,
    Is there an overview in SAP to get the status of an inspection lot per operation (other than QE51N). I've an operation for each laboratory. I'd like to get an overview of the status per operation. If not which tables should i use?
    Thanks.

    Use Bapi : BAPI_PRODORD_GET_DETAIL
    or
    Table : TJ02T along with JSTO & JEST
    Refer
    Operation status of the production order

  • Inprocess inspection lot

    Hai gurus,
    I had created a first operation as in process inspection for a halb material,where i had given control key
    as QM01 and assigned MIC and and sampling procedure in routing, when i release the production order
    inspection lot is not created, pls guide me where i had went wrong.
    regards,
    sekar chand

    Hai Mr Tejas,
    Thanks for your valuable ideas and my reply as follows.
    1) maintain in Material Master -
    >QM View--->Inspection Set up as
    03 In-process insp. for production order - Maintained as above
    2)In addition, you need to maintain under Detailed Information on inspection type on same tab page:
    Tick the check box Post to inspection stock and then enter.
    Now on main screen, you will find Inspection setup check box is ticked, further you need to maintain
    -  post to inspection stock  check box not available under  detailed information of inspection type, but available at main menu which i had activated.
    3)Under Procurement Data tab,
    Tick in check box : QM proc. active
    and respective control key in QM Control Key field.
    - i had done as per above reply, but inspection lot not created only production order is created with
    status as ILAS  inspection lot assigned
    waiting for your reply
    with regards,
    sekar chand
    Edited by: sekar chand on Nov 25, 2008 7:29 AM
    Edited by: sekar chand on Nov 25, 2008 7:30 AM

  • Usage Decision for an insp. lot

    dear all
    i want to make UD for an insp. lot of insp. type 06(return delivery).when i made ud it did not ask me for posting of that material.there is no insp. lot stock tab.can anybody help me to resolve this issue.

    hi
    inspection type 06 is non stock relevant ,hence you cannot able to post the material .
    Processing materials as non-stock-relevant goods
    If a material is not stock relevant, the system does not valuate and track the quantity of goods in an inspection lot. All inspection lots with the following inspection lot origins are not stock relevant:
    ·        02 - Goods issue
    ·        03 - Production
    ·        06 - Return from customer
    ·        07 - Audit
    ·        10 - Delivery to customer with sales order
    ·        11 - Delivery to customer without sales order
    ·        12 - Delivery (general)
    ·        13 - Production inspection on basis of run schedule header
    ·        14 - Plant maintenance
    ·        17 – Externally triggered inspection
    Posting stock-relevant materials to inspection stock
    In inspection stock, QM has exclusive control over the material stock. This means that the material can only be posted in and out of inspection stock via the inspection lot. Materials can be posted to inspection stock for the following inspection lot origins:
    ·        01 - Goods receipt
    ·        04 - Goods receipt from production
    ·        05 - Miscellaneous goods receipt
    ·        08 - Stock transfer
    ·        09 - Recurring inspection
    regards
    thyagarajan

  • Automatic creation of inspection lot for Expired Batches

    Hi All,
    I am in one trouble and need some help in above scenario.
    I am able to create inspection lot for batches about to expire, but how to create inspection lots for batches which were already expired or which next inspection date already missed?
    Master data like '09' inspection type, inspection plan is already maintained.
    Second question, is QA07 also affect on special stocks like vendor stock or project stock etc?
    Immediate response will be appreciated.
    Thanks

    Hi
    To meet you above mentioned requirement you have to modify the program RQAAAS10 as per your logic both to create lot for Expired Material and to consider project stock or vendor stock as In standard SAP these stock are not considered.
    regards
    Manish

  • Latest inspection lot for a batch

    I need to extract the latest inspection lot from QALS using charg matnr werks and insert into i_qals

    you can write simple logic to get latest record from QALS based on creation date ERSTELDAT
    See the example one :
    REPORT ZJOINS .
    data i_qals like qals occurs 0 with header line.
    start-of-selection.
    select * from qals into i_qals up to 1 rows order by ERSTELDAT
    descending .
    if sy-subrc eq 0.
    exit.
    endif.
    endselect.
    Thanks
    Seshu
    loop at i_qals.
    endloop.

  • How partial inspection is done for a inspection lot & vendor payment done based on inspection result

    Dear Gurus,
    In our business 1000 bag material is received in one material document. So one Inspection lot is created.
    Now business take randomly 10 bags from that 1000 bag & inspected. The Bags are inspected on various parameters such as Weight , Fabric , Valve Size , Cross Sec Area, Print Quality , Stitching Thread , etc . The values for all this types of parameters are prepared in an excel sheet in a prescribed format.
    The Values for each Quality Parameters are then matched with the desired prescribed average figures.
    Based on the Values which deviate from "Average" figures , deductions are computed
    Logic is 1% for single defect in a bag for 1 parameter . Likewise if more defects is found then add 1% in multiples
    e.g 1% + 5 defects then .05 * basic Raw material cost .
    This figure along with proper description is recorded under "Remarks" column of the report format and send to Accounts department for the
      deduction process from Vendor
    we need to capture the inspection parameters in system as per the above process.
    And please tell me how I configure this process in SAP .
    Thanks & Regards,
    Bubai

    Hi Bubai,
    you can create a QM Control Key (which is used to QM View of Material Master) which you have to set the indicator Block Invoice. This indicator is blocked invoice with blocking reason I (I = Inspection) if there is still no usage decision for the inspection lot or the inspection lot is reject.
    (SPRO -> Quality Management -> QM in Logistics -> QM in Procurement -> Define Control Keys).
    Best Regards,
    Apostolos

  • Inspection plan for inprocess inspection

    Hi QM Gurus
    please let me know can I use an inspection plan for inprocess inspection
    Thanks
    TR

    Dear,
    Inspection Plan is similar to routing, which will indicate what are all characteristics need to be checked / inspected when you receive a material. Is a master data. Once the inspection lot is created we will check the inspection plan and perform the inspection and give the defects recording and usage decision for the inspection lots.
    So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
    when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1.
    Regards,
    R.Brahmankar

  • Exit For Inprocess Inspection

    Hi All,
    I have an issue regarding in-process inspection. With the inspection type 03 , when process order is created immediately
    inspection lot is created .In this case the system will allow me to carry out conformation after each operation results according.
    i need an exit  like after confirmation only , i should be able to do results recording.How to achieve this . Please let me know is it possible ti achieve through any User Exit.
    Regards,
    Madhu.

    Dear,
    Inspection Plan is similar to routing, which will indicate what are all characteristics need to be checked / inspected when you receive a material. Is a master data. Once the inspection lot is created we will check the inspection plan and perform the inspection and give the defects recording and usage decision for the inspection lots.
    So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
    when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1.
    Regards,
    R.Brahmankar