Dear Gurus,
My client wanted only one work center and usage only maintenance task list in begining. Now they want to chage to Only Routings usage. I want to know what is it and what impact it will have now if I changed.
Regards,
PMaddi

The Usage field in the work centre only controls which type of task list or routings the work centre can be used in.
In your case, if you use 002, then you will not be able to use that work centre in a task list or order
PeteA

Similar Messages

  • Routings and Work Centers Transfer using ALE

    Can anbody has written inbound function modules
    for Routing and Workcenters  using message types
    LOIROU and LOIWCS using ALE Transaction POIM
    High points will be rewarded.

    Hi,
    Check the FM for routing
    IDOC_INPUT_ROUTING_CREATE .
    Regards,
    Sharath

  • Maint work centers

    Hi experts
    please tell the procedure to create maint work centers in Plant maintenance

    Hie
    Go to t code IR01
    Enter Plant & Maint W.C name. W.C category 005
    Rest is the same as you Create for Prod W.C
    Hope this is clear to you
    Regards
    Abhijit Gautam

  • Doubts in plant maintenance

    what are the business process in plant maintenance.
    what are oraganisational level inside sap-pm.

    From a broad stroke, the business processes in plant maintenance are as follows:
    Maintenance Processing - This includes corrective and breakdown maintenance
    Preventive Maintenance -  This is where you set up the system to generate a maintenance order, notification or service entry sheet at a set schedule so that regular routine maintenance may be performed.
    The organizations levels in plant maintenance are as follows:
    <b>Maintenance Planning Plants</b>: This is where the maintenance work is planned my the maintenance planners for the work centers in the maintenance plants.
    <b>Maintenance Plants</b>: Where maintenance work is performed in/out of... These are tied in IMG Configuration to the Maintenance Plants. A maintenance plant can have only one planning plant assigned to it but a planning plant can be assigned to more than one Maintenance Plant.
    <b>Maintenance Planner group</b>:  Also assigned to the planning plants in configuration. These are the people who plan the work... also called maintenance managers, supervisors, foremen, etc. in the various industries.
    <b>Maintenance Work Center</b>: These are the people that actually perform the maintenance work. This is master data and they are created in relationship to a maintenance plant.
    I hope this helps clarify some doubt.
    Regards,
    Joe

  • Regarding Plant Maintenance configuration

    Dear Experts,
    I am working as SAP Plant Maintenance consultant and this is my first implementation project.
    Please help me with configuration documents required for implementing PM module to nageshar at gmail dot com.I shall be grateful to one and all of this group.
    Thanks in advance.
    Nagesh

    Hi everybody,
    Link: http://help.sap.com/
    Path: SAP Best Practices --> Baseline Packages --> Based on SAP ECC 5.00 --> Select Country: for eg, Localized for India --> Technical Information --> Building Blocks --> Select Country for eg, India -->
    Topic: J13_BB_ConfigGuide_EN_IN
              J13_BB_InstallGuide_EN_IN
              J13_Master_Document_EN_IN
    Here you will get both Configuration guide & Development master list
    Hope this helps.
    Regards
    Tushar
    P.S.Reward points if you find answer useful.

  • Routings/Work Centers to Cost Center Relationship

    Hi,
    For routing, work center and cost center master data setup, is there a limitation on the number of:
    Routings to cost centers?
    Work centers to cost centers?
    I want to find out if there are only a certain # of routings allowed when tie to a cost center, and same with work centers.
    Thanks,
    Alice

    Hi,
    Routing
    A routing is a description of which operations (process steps) have to be carried out and in which order to produce a material (product).
    Thus in routing  contains details about the work centers at which they are carried out, standard value  and component.
    Therefore there is no limitation for assigning number of time for same work center.
    Regards
    Suresh

  • Process code for Routings & Work Centers

    Hello All,
                I want to transfer Routings & Work Centers from server to server using ALE transaction <b>POIM</b>.
    What is process code for Routings & Work Centers?
    Regards,

    Hi,
    Routing
    A routing is a description of which operations (process steps) have to be carried out and in which order to produce a material (product).
    Thus in routing  contains details about the work centers at which they are carried out, standard value  and component.
    Therefore there is no limitation for assigning number of time for same work center.
    Regards
    Suresh

  • PRT Usage - three work centers, 2 PRTs, how to make it work?

    Good day.  First time poster here.  I've looked for help and can't seem to find an answer to my question.
    I have three work centers, lets call them 1 2 and 3.
    I have 2 cells, lets call them A and B.
    Cell A can run parts from work center 2 and 3.
    Cell B can run parts from work center 1 and 3.
    So a matrix of possible combinations would look like:
    Cell A               Cell B
    WC 2 part         WC 1 part
    WC 2 part         WC 3 part
    WC 3 part         WC 1 part
    How do I best set this up?  I'm more of an end-user working with a developer, and I know what I want (above), but I have no idea if even this is easily accomplished.
    I will be glad to assign points for helpful answer.  Thanks a bunch!

    Hi,
    Create Routing (ca01) & then enter the operations.
    <b>Eg:Routing 1.</b>
    <b>Cell A can run parts from work center 2 and 3.</b>
    Opr WC      PRT to be assigned
    10   WC2    Cell A
    20   WC3    Cell A
    <b>Routing 2</b>
    <b>Cell B can run parts from work center 1 and 3</b>
    Opr WC      PRT to be assigned
    10   WC1    Cell B
    20   WC3   Cell B
    For the combinations you can create alternate routings & then create a production version (t.code c223), then during production order creation you can choose the appropriate routing.
    create PRT with material type FHMI with PRT view.
    Regards,
    Senthilkumar

  • How to extend work centers of existing plant to newly created plant?

    Hello Gurus,
    We have SAP setup for one plant and there are various operations are happening under it which is captured under various work center's. Now we have created new plant under same co code. Can we extend WC to newly created plant?  Or we need to create whole list of W/C againg newly.
    Seeking your help in this regards.

    create whole list of W/C againg newly.
    You can use existing work centers for copy function.
    Regards,
    Dhaval

  • Authorization in the PP routing to change defined work centers

    Is there an authorization object for routings to set the authorization to change only defined work centers in the operation of routings?
    For PS networks there is the authorization object C_AFVG_APL. But this doesn´t work for PP routings.
    Thanks in advance for a response.
    Regards
    Kathrin Worlitzer

    Hi,
    Yes, similar type of Auth. Objecct is not available in PP.
    But, check these Auth. Objects: May be useful for your scenario:
    C_ARPL_ART : CIM: Work center category
    C_ARPL_WRK :CIM: Work center- plant
    Regards,
    Siva

  • Restrict creation of inspection lot for certain work centers

    Hi
    My client needs to restrict the creation of inspection lot at certain work centers although QM is active for all material processed in these work centers.
    I am using the  function module 'EXIT_SAPLQAAT_002' of QAAT0001 for this purpose. Z04 inspection type ( with Post to insp stock) is maintained for all these material.
    A different Z table is there , where material-work center combination is maintained for which no inspection lot is required.
    Logic provided so that system searches Material-Work center from production order then compares it with the Material-Work center combination with the maintained Z Table.If both found same then no inspection lot will be generated.
    But an error message (Change the inspection stock of material XXXXXX in QM only) appears for all those material while doing confirmation in CO11N . Hence system does not allow to complete confirmation for those material where QM is active.
    Please suggest if i am using the correct Exit or any further improvement is required.
    Thanks and regards
    D Mohanty

    Hi
    Actually the issue is resolved now.The problem was with coding where we were using Table-AFRU for reading prod order details.But AFRU does not consider fresh orders for which it was replaced with AFKO.
    Also the Z table must be maintained as Plant-Material-Work center combination prior to go for any order confirmation.
    Thank you all who have gone through the post , hope this will help those who have to map the same scenario at their end.
    Regards
    D Mohanty

  • Shift patterns for work centers

    Hi,
    I have question regarding shift patterns for work centers. We are actually utilizing the work centres in a aftermarket setup (service jobs). What we would like to do is to add shift patters to the work centers which look similar to this:
    Mo-Su 07:00-19:00, Mo-Su 19:00-07:00     4days on/4 days off/4 days on/4days off. As you see we would like it to be a rolling schedule so the first 4 working days the day shift, then 4 days off, then the next working days the night shift and so on.
    Is there a way of simplyfying this setup? The length of the cycle can only be set to a maximum of 7 days meaning I can not create a rolling schedule in a simple way. I do know that I can manually add intervals with say a seven day cycle and defining the working hours and additional create shift for holding predefined working hours and breaks.
    I have looked at shift sequences but that doesn't seem to be helpful in this scenario? The sequence seems only to be used as a sequence on a daily basis. 
    If anyone has solution for this or if you have any thought on how to process I would be very thankful if you shared these.
    Thanks in advance
    Edited by: Karimi on Aug 12, 2008 1:13 PM

    In T.code : SHR0 (zero) Shift Report overview.
    Enter Report Type and Usage as workcentre, please do the this customazation then you find workcentres in F4.
    http://help.sap.com/erp2005_ehp_03/helpdata/en/45/c9ba093c512e96e10000000a155369/frameset.htm
    Please read the information from above link this should help.
    Jim

  • Availability of the Work Centers

    Hi all ,
    I have work centers (ARBPL) with me .
    I have to find when these work centers are available (if already work for other orders) .
    IS there any FM to find this .....
    Regards
    Raj

    Sreekant Bilihalli wrote:
    Hello Experts,
    >
    > I am trying to design a solution where, during rough cut planning for a material (SOP), the user can check the capacity availability of his work centers / resources. I can see there is a standard link in the rough cut plan:
    >
    > Views >> Capacity situation >> Rough cut planning
    >
    > I am not able to see the capacities of my work centers. What am I doing wrong here? Is this the correct way to check the capacity situation during rough cut planniing? Please help me. Thanks.
    >
    > WR,
    > Sreekant
    Dear,
    First create a rought cut planning profile MC35 - Create. Enter Info structure and execute then plant material and then rough cut planning profile data against resources.
    Create flexible planning MC93 against only this material and enter quantity in periods and then follow path >Views >> Capacity situation >> Rough cut planning
    I hope this will solve your issue.
    Check and revert back.
    Thanks
    Muhammad Ashfaq

  • Systems are not visible in SM Work Centers

    Hi,
    I am facing strange problems in the Solution Manager Work Centers.
    I have connected some managed systems to the Solution Manager, their data can be displayed normally in SMSY, SLD, solution_manager, ccmsping availabilty in RZ20....
    But when I go to the workcenters, there are no systems listed (tabs like System Landscape Management, System Monitoring). What is strange
    - I can see CCMSPING statuses in the top of the screen (red/green/gray icons with numbers of systems) but I cannot see the list of systems.
    - RCA tab is correct, but this is special configuration in my opinion, so not related to my issue.
    I suppose this is somehow related to the queries but I haven't been able to find a solution.
    I checked filters, but with no success.
    I have full authorizations (sap_all, SMWORK roles).
    Version of system: SM 7.01 / SPS 28, managed systems ERP6 or NW7.3
    Thanks a lot for advice!
    Vasek

    Hi Jansi,
    I have checked solman_setup, everything seems to be fine. I assigned to my user sap_all and all SMWORK roles, so there shouldn't be any authorization issue.
    What is strange, I can see the list of systems in some filters, when I open Favourites management popup windows or for example on the Downtime management tab. But System Management shows only availability icons with correct numbers, all other data are empty (All Systems (0) ABAP Systems (0)Java Systems (0)Favorites (0))...
    Why?
    Vasek

  • COOIS report: not able to select operations based on work centers

    Hi All,
    When accessing the COOIS report using operation listv& selecting the std profile.I need to get the operation perfomred on specific work center.
    I enter the work center & plant code in the selection fields available in the "select at operarion level" & i get the all the work center.
    Need to get list of operation performed at the entered work center.
    The requirement is due to the reason that a order is performed in two or three production facilities & production guys needs to look at operation list for given work centers.
    Regards
    Vineet

    Hi,
    This one of the options we had explored, but it would be better if we can get  the report by work center. The focus is to reduce the effort to get the report as there is need to get the same report for atleasr 8to 10 different group of work centers ( which are not in serial nos).
    We would then need to put the work centers in the filters & save the layout.
    Regards
    Vineet

Maybe you are looking for

  • Database Adapter Configuration Wizard "File already exists" error

    I'm uding JDeveloper 10.1.3.1 on an XP machine running Java 1.5.0_06 and having trouble editing SOAOrderBooking.bpel as part of the tutorial. The tutorial calls for me to drag a new Database Adapter onto the diagram, select the "soademo_ssn" database

  • Does a person need Adobe Reader in order to use a fillable PDF form?

    I have created a fillable form using Acrobat XI and I find that some persons are unable to use it  while others are.  Does a person need Adobe Reader to use the fillable  form?  If so, how easy is it to download? Thank you

  • Can't Publish movies of any size!

    When I try to publish a movie from iMovie to iWeb it says I have a publishing error. It may occur at anytime during the uploading process. I have turned off Disk Syncing, I have turned off all Screen Savers and such. I was able to post video before I

  • Upgrade does not have new features

    On a new desktop I am building out, I installed Firefox. I noticed that on my current desktop, the large back button doesn't appear. It does appear on the the new machine. On Google, the new machine has Google telling me about the new interface. On t

  • Safty stock

    can any one tell how to make use of Safty stock for delivery creation for customer. as some times we don't have the req. quty open for delivery/ stock tranfer. thanks in advance