Using employee wage for project evaluation in cProjects

Hi ALL,
I have following question: is it possible to use employee hourly wage maintained in infotype 0008 to calculate project actual cost after time conformation instead of planned price for activity type maintained in KP26?
thanks in advance,
Denis

Its No and Yes
No in standard, yes in Z ...
Just to give some direction, for planned costs..
there are two options:
1  you can write a batch job which updates the standard cost revenue rates (CRR), in this case, create Cost revenue rates same as BP and update them by batch job, assign the relative CRR to each BP
2  in Badi pick 0008 based on BP number (which is XX<8 digit PERNR>) derive PERNR based on central person
For actuals modify CAT7.
Niranjan
Edited by: Niranjan Dandekar on Dec 22, 2010 4:12 PM

Similar Messages

  • Are you using GB 10 for projects with this version ?

    usually the ones who dont write in are happy with what they have
    are some of you happy with GB  as it is or are you patiently waiting for a workable upgrade version?
    i realize one thing: if you dont have the latest Mac computer with optimal RAM OS  etc apps dont work optimally
    this goes for FLICKR etc
    I am writing to those who dont constantly complain if some little bug appears.
    is this what you call a working GB ?
    my previous songs all load nicely into GB 10
    i just notice foreign parts im not used to and doing things with my old songs takes a learning curve and  this means ill use GB 11 for now
    2 things on my mind now
    1.  without a manual/ third party explanation i dont have time to test experiment and start a new learning curve
         with GB 10.  It looks beautiful and probably one day will be so. Fooling around with it will at this time  only lead to more frustration.
    2.  is there a manual for GB 10 and if so where is it located please?

    2.  is there a manual for GB 10 and if so where is it located please?
    I am using the online help:   GarageBand 10.0 Help Online
    And HangTime posted a link to a short video tutorial at Bullets & Bones, but I cannot find it right now.
    1.  without a manual/ third party explanation i dont have time to test experiment and start a new learning curve
    For the time being I create the projects first in GB 6.0.5, to have more patches for vocal tracks and my guitar, and then I finish it in GB 10.0 to add Arpeggiators and Smart drummers.
    It is simply easier to find anything in GB 10.0, if I know what is supposed to be there, because I created it in GB 6.0.5. 

  • How to use Classification Characteristics for project definition and WBS

    dear all:
    my step is below:
    1,  CT04, create "Characteristic"
    2,  CL02, create "Class". and class type is "14".
    3,  now how to customize to use the class in project definiton and WBS.
    Please explain me all the steps to be required.
    Thanks in advance!

    Hi
    Classification is only assigned for the network profile or in the activity.
    CJ20N  -
    > Extra ---> Classification --- > Classification
    Hope this will help you.
    Regds,
    Uddhab

  • Using Dynamic Link for projects cut in Premiere and effects in AE.. Rendering Question..

    Hello,
    So this baffles me. I've been working a lot in Premiere CC lately with ProResHQ green screen material. I send the sequence or individual clips using After Effects by right clicking on the clip in Premiere and selecting Create After Effects Composition...
    So I do my thing and when it comes time to render, I select render from IN to OUT in Premiere and wait. Now here's my question. If I select render in Premiere, it will be very sluggish until I click on the After Effects icon in my dock which brings the app to the foreground again. For some reason, this will dramatically accelerate my render speeds in premiere after I re-select the AE app. Why is this doing this?
    I'm using a new Mac Pro trashcan tower 3.5 clock speed. 64GB ram. Dual D700 graphics card. I am using a USB3.0 drive for my editing and the internal drive on the tower for the scratch. I'm getting a Lacie 1TB little bigdisk thunderbolt2 that will be my prime scratch and video location for future stuff.
    Thanks for your help -
    R

    Generally speaking, there is no 'one & only' proper workflow. Just keep in mind the following:
    - not all effects and transitions are properly translated when travelling from PrPro to AE;
    - in Dynamic Link scenario PrPro communicates with AE projects via single instance of headless AE, which creates a bottleneck. See this good old thread on Dynamic Link workflow, pay attention to Todd's comments;
    - since AE allows to set a DI as a proxy to dynamically linked comp, with reasonable amount of dynamically linked comps in PrPro project you can enjoy the best of both worlds, instantly switching between a DI and dynamically linked comp back and forth with no needs to replace anything in PrPro timeline. Test on your own with which amount of dynamically linked comps setting DIs as proxies still work. For my rig test 30 min sequence built out of 935 dynamically linked comps, which are just source footages in their own comps, hence, the equivalent to rendered DIs set to proxies, takes around 27 hours to render, while 30 min sequence built out of the same 935 source footages renders in real time.

  • USer Status for Project Elements in cProjects 4.0

    Hi All,
    I have created Status profile in cProjects 4.0
    How can I replace the system status with my created status profile?
    In other words, when I select my Status profile, the system status (Created, Released, Lock) should get replaced by the custom (Ex: Available, Closed, etc)
    <b>Useful answers will definitely be rewarded.</b>
    Regards,
    Sujay!

    cProjects allows User Status as an addition to System Status.
    In case you need to use user status you can change it only after selecting the status profile through the status tab page. Once a status profile has been attached, System as well as user status can be selected.

  • Subcontracting for Project

    Dear SAP Guru,
    In my organization, the business requirement is to use subcontracting process for project.
    I maintain the movement type 311 Q for subcontracting process, but at the time of reconciliation of subcontracting Challan, the system does not refer the stock transfer material docuement.
    Movement type 541 (for subcontracting) does refer the project stock.

    Hi,
    Subcontracting for Project Stock: -
    Purpose: - Subcontracting is also possible in conjunction with Project stocks. The subcontracting orders are account-assigned to a Project. Thus, the components are not transferred (using a transfer posting) to the "stock of material provided to vendor" but are directly withdrawn from the Project stock the time of the goods receipt. The material manufactured is also posted to the Project stock.
    The cost of subcontracting is then debited to the Project.
    Since the components are not transferred to the "stock of material provided to vendor", it is recommend that you use a transfer posting to transfer the provided components to a new storage location (for example, 9999). This enables you to obtain an overview of those stocks that are physically located at the subcontractor. This information is particularly important when you carry out a physical inventory of the Project stocks.
    Features: -
    Withdrawal from Stock of Mat. Provided or Project: -
    For components that are managed in Project stock, you can define whether the components are to be withdrawn directly from each Project or from the stock of material provided to vendor. You manage this via the dependent requirements indicator for individual customer requirements and collective requirements (MARC-SBDKZ).
    You can maintain this indicator in the following places:
    In the MRP view of the material master record (MRP 4)
    In the explosion types for the BOM item (in Customizing for Production in the step Basic Data -> Bill of Material -> Item Data -> Define explosion types)
    Configuring the explosion types has priority over the configuration in Inventory Management.
    If the indicator is set at Collective requirements only (2), the materials are withdrawn from the stock of material provided to vendor. If this indicator is set any other way, the system withdraws materials from Project stock.
    Here all the processes will remain same except; MB1B - Do Transfer Posting of material from RM Warehouse to this Storage Location via movement type "311 Q" (Instead of doing 541)

  • Error Importing Business Package for Projects 50.3.1

    Hey all
    We are trying to import and use Business Package for Project 50.3.1. Our backend system is R3 4.6C. We are getting an error while importing the package. I am pasting the dump i received. If anyone can put some light on it then please do so.
    Cannot deployed; See the following logs.
    Summary:
    ========
      There were 2 archives selected.
      0 archives successfully loaded.
       Loading of 2 archives failed.
    Details:
    ========
    1) Error loading archive
        C:\BP for Projects\BP for Projects\BPPROJECT503_1-20000646.ZIP
        (server side name is: C:\BP for Projects\BP for Projects\BPPROJECT503_1-20000646.ZIP)
        com.sap.sdm.util.sduread.IllFormattedSduFileException: The information about the development component found in the manifest is either missing or incomplete!
    Manifest attributes are missing or have badly formatted value:
    attribute keylocation is missing
    attribute keyname is missing
    attribute keyvendor is missing
    attribute keycounter is missing
    (C:\BP for Projects\BP for Projects\BPPROJECT503_1-20000646.ZIP)
    2) Error loading archive
        C:\BP for Projects\BP for Projects\SPPROJECT503_1-20000646.ZIP
        (server side name is: C:\BP for Projects\BP for Projects\SPPROJECT503_1-20000646.ZIP)
        com.sap.sdm.util.sduread.IllFormattedSduFileException: The information about the development component found in the manifest is either missing or incomplete!
    Manifest attributes are missing or have badly formatted value:
    attribute keylocation is missing
    attribute keyname is missing
    attribute keyvendor is missing
    attribute keycounter is missing
    (C:\BP for Projects\BP for Projects\SPPROJECT503_1-20000646.ZIP)
    Regards
    Bilal Nazir

    Hi,
    The syntax of the created SDA may be wrong
    Check the main attributes defined in SAP_MANIFEST.MF are equal or not to their corresponding componentelement entry.
    SAP_MANIFEST.MF file is located in META-INF subfolder in the .sda file.
    The values of "keycounter" and "counter" should be the same. Also the values of "keyname" and "name" should be identical.
    Refer this note: 1111316
    Regards,
    Padman

  • Results Analysis for Projects

    Hi Guys,
    We use Results analysis for projects and also we use RA in Product Costing.
    Can anyone let me know what exactly does this Results Analysis mean ( not in SAP terms ).
    I am trying to look for this over help.sap.com and google but could not find information on what exactly this term means.
    Also how is this related to WIP?
    Please clarify.
    Thanks,
    Srikanth.

    Dear srikusap,
    Calculation WIP through the SAP, RA key will play important role.  Work in process calculation is diferent from industry to industry. 
    In SAP RA key will shows the WIP amount while u running KKAX Transaciton Code.  After when ever u do the settlement then ti will be settled to Financial Account.  At that time A Accounting Document was generaged.  when ever the Order Status is Teco then the provious period WIP will be reversed.
    Revert back if u any calrification.
    Raj

  • Evaluation - Cost/Revenue Costing for Project

    Hello,
    executing the evaluation "Cost/Revenue Costing for Project" I get no results. Could someone tell me where the values for this report come from? Can I find somewhere a list with all the evaluations (except the one like completed checkpoint items, ... which are really self explaining) and the source of the shown values?
    Thx, Max

    Hi,
    I hope that you have assigned Cost revenue rate to Roles.
    Check in spro> cProjects> Evaluation--> Define extract layout, Iterator for the specific layout RES_PART, Object and attributes.
    Also check in Define evaluation assigned extract layout to Evaluation is correct which is defined in earlier step.
    Regards,
    Karan Hon
    Award if useful..

  • Setting up number range for projects in cProjects

    Hi,
    I am new to cProjects & my apologies if my question may sound very naive. My client wants an alpha-numeric number range to be set up for numbering of projects. Is this possible & if yes how? Which is the object for setting the number range? (I believe the transaction in "SNRO")
    Thanking you for taking a note of my querry.
    Regards
    Deepak

    Sample Code Method SET_DEFAULTS_UPON_CREATION
    Method IF_EX_DPR_ATTRIBUTES~SET_DEFAULTS_UPON_CREATION
    */ This method is called when creating a new project element (i.e. project definition,
    */ phase, task, etc) and can be used to fill in default values for standard as well
    */ as customer defined data fields.
    */ This implementation is provided to assign customer specific numbers to project
    */ elements.
    */ It's interesting to note that when this method is called, the external ID of the
    */ object has already been determined and assigned by the default numbering services
    */ class CL_DPR_NUMBERING_SERVICES. It is also interesting to note that if a user
    */ specified an ID for the object through the user interface, changing the identifier
    */ in this method will have no effect -- meaning the user specified ID will still be
    */ assigned to the object.
    */ Only the example for Project Definition is provided.  For other project elements,
    */ insert similar code between the Beginning and End comments below.  In addition,
    */ the filter for this BADI implementation must be updated to include any other
    */ project element for which custom number assignment is desired.
      DATA:
        lr_parent              TYPE REF TO if_dpr_common,
        lr_project             TYPE REF TO cl_dpr_project,
        lr_approval            TYPE REF TO cl_dpr_approval,
        lr_individual_approval TYPE REF TO cl_dpr_individual_approval,
        lr_phase               TYPE REF TO cl_dpr_phase,
        lr_task                TYPE REF TO cl_dpr_task,
        lr_checklist           TYPE REF TO cl_dpr_checklist,
        lr_checklist_item      TYPE REF TO cl_dpr_checklist_item,
        LV_NUMBER              TYPE DPR_TV_EXTID,
        LV_NUMTEXT             TYPE CGPL_EXTID,
        LV_INTERVAL            TYPE NRIV.
      FIELD-SYMBOLS:
        <ls_project_attrs>             TYPE dpr_ts_project_int,
        <ls_phase_attrs>               TYPE dpr_ts_phase_int,
        <ls_task_attrs>                TYPE dpr_ts_task_int,
        <ls_checklist_attrs>           TYPE dpr_ts_checklist_int,
        <ls_checklist_item_attrs>      TYPE dpr_ts_checklist_item_int,
        <ls_approval_attrs>            TYPE dpr_ts_approval_int,
        <ls_individual_approval_attrs> TYPE dpr_ts_individual_approval_int.
    */  Determine which project element (object category) is being processed
      CASE flt_val.
        WHEN cl_dpr_co=>sc_ot_project.
          ASSIGN cs_attributes TO <ls_project_attrs>.
          lr_project ?= ir_common.
    */ Beginning of custom project number assignment.
    */    In this example, the default system numbering is manipulated to
    */    produce the Project Number...
    */    Get info regarding the number range for operative projects...
          CALL FUNCTION 'NUMBER_GET_INFO'
            EXPORTING
              NR_RANGE_NR              = 'DO'
              OBJECT                   = 'DPR_EXTID'
    *         SUBOBJECT                = ' '
    *         TOYEAR                   = '0000'
            IMPORTING
              INTERVAL                 = LV_INTERVAL
            EXCEPTIONS
              INTERVAL_NOT_FOUND       = 1
              OBJECT_NOT_FOUND         = 2
              OTHERS                   = 3.
          IF NOT SY-SUBRC IS INITIAL.
            RAISE EXCEPTION TYPE CX_DPR_FATAL_ERROR
              EXPORTING
                TEXTID = CX_DPR_FATAL_ERROR=>SC_INVALID_PARAMETERS.
          ENDIF.
    */    Strip off the year that has been appended to the object number
    */    by the default numbering services...
          write <ls_project_attrs>-project_id(20) to lv_number.
    */    Get the incremental number of the project from the number range...
          lv_number = lv_number - LV_INTERVAL-FROMNUMBER.
    */    Format the number according to customer specific requirements:
    */    In this example the number is PROJ-<inc num> where <inc num>
    */    is the incremental number of the project (i.e. for the 33rd project
    */    created, the <inc num> is 33).
          WRITE lv_number to lv_numtext no-zero.
          condense lv_numtext.
          CONCATENATE 'PROJ' lv_numtext INTO lv_numtext SEPARATED BY '-'.
          TRY.
              CALL METHOD LR_PROJECT->SET_PROJECT_ID
                EXPORTING
                  IV_PROJECT_ID              = lv_numtext.
          CATCH CX_DPR_OBJECT_UPDATE_ERROR .
              RETURN.
          ENDTRY.
    */ End of custom project number assignment.
        WHEN cl_dpr_co=>sc_ot_phase.
          ASSIGN cs_attributes TO <ls_phase_attrs>.
          lr_phase ?= ir_common.
    */ Beginning of custom phase number assignment.
    */ End of custom phase number assignment.
        WHEN cl_dpr_co=>sc_ot_approval.
          ASSIGN cs_attributes TO <ls_approval_attrs>.
          lr_approval ?= ir_common.
    */ Beginning of custom approval number assignment.
    */ End of custom approval number assignment.
        WHEN cl_dpr_co=>sc_ot_individual_approval.
          ASSIGN cs_attributes TO <ls_individual_approval_attrs>.
          lr_individual_approval ?= ir_common.
    */ Beginning of custom individual approval number assignment.
    */ End of custom individual approval number assignment.
        WHEN cl_dpr_co=>sc_ot_checklist.
          ASSIGN cs_attributes TO <ls_checklist_attrs>.
          lr_checklist ?= ir_common.
    */ Beginning of custom checklist number assignment.
    */ End of custom checklist number assignment.
        WHEN cl_dpr_co=>sc_ot_checklist_item.
          ASSIGN cs_attributes TO <ls_checklist_item_attrs>.
          lr_checklist_item ?= ir_common.
    */ Beginning of custom checklist item number assignment.
    */ End of custom checklist item number assignment.
        WHEN cl_dpr_co=>sc_ot_task.
          ASSIGN cs_attributes TO <ls_task_attrs>.
          lr_task ?= ir_common.
    */ Beginning of custom task number assignment.
    */ End of custom task number assignment.
      ENDCASE.
    ENDMETHOD.

  • CProjects-Bapi's for project and task details

    Hello,
    I am searching for bapis for cProjects to use in a report at back end which has all the project fields and task fields.
    For project i found a bapi BAPI_BUS2172_GET_DETAIL, but it does not have fields like project name,status, calculated start and finish date from teh basic data tab, division,design center from teh additional data tab.
    For task fields i found bapi BAPI_BUS2175_GET_DETAIL but it does not have task status, latest start and finish date of the basic data tab.
    any pointers to bapis which cover all the above fields would be really helpful.
    Also I want to know is there anyway i can get the URL of the document that is uploaded in teh documents tab of the task.
    Thanks,
    Simmi
    Edited by: Simmi Balakrishnan on May 2, 2008 9:13 PM

    Hi Simmi,
    Some information can not be retrieved via Bapi call. If you would like to read it, you can use simple select to get it from DB directly. The related DB are cgpl_project (dates), cgpl_text (descritption), and crm_jest (for status).
    Kind regards,
    Zhenbo

  • How to use a pwa group in CREATE A TASK PROCESS in SPD 2013 for project server workflow approval process

    I am working on a Project Server 2013 workflow. I am creating this using Sharepoint Designer 2013. In this workflow I am using approval process at one stage. I have created a security group SalesManagers in PWA. I want to use this group for workflow approval
    process. I want all users of this group get approval tasks. 
    For this I used START A TASK PROCESS activity in the SP Designer. I clicked on
    this user and created task process. But here I could not find SalesManager group which I created in PWA. I was only able to find the users. I can also see
    Administrators for PWA . But couldnot find SalesManager or any other security group created in pwa.
    Can anyone suggest how I can get the security group created in pwa.

    NBDevelopment,
    I believe SPD only recognizes the SharePoint Groups and not the project server security groups.
    The Administrators for PWA, and few other groups like Project Managers for PWA etc., are synced SharePoint Groups with the security groups, which is why they show up in SPD.
    You could create a SharePoint Group for the Sales Managers group and use that in SPD.
    Cheers,
    Prasanna Adavi, Project MVP
    Blog:
      Podcast:
       Twitter:   
    LinkedIn:
      

  • Wish To Use Flex 2 For My University Project

    Dear All
    I am a mature student studying a Computer Science Degree in
    the UK .
    For my final year project, I am creating a Stock Market
    Simulation with a Database back end (e.g. SQLite ?) and some kind
    of front end, both to be run a a stand-alone machine.
    I have a 28 weeks to design, build and run it for my
    supervisors. I would like to push myself academically by building
    the software using Flex 2, for the GUI and even to carry out any
    calculations or processing needed for the simulation to operate
    correctly.
    My questions are
    1) Is it possible to create the simulation as I can find no
    definitive way to connect Flex 2 directly to a database back end in
    a similar way to ADO.net?
    2) If it is possible which book do you recommend to get the
    best and quickest results out of Flex 2?
    Thanks In Advance
    Steven

    You are correct, Flex does not natively connect to any
    database. Further, security restrictions on both the browser and
    the Flash Player prevent access to *any* client resources, such as
    the filesystem.
    So if you use standard Flex, you will need some back-end web
    technology. This can be almost any platform/language you choose.
    Now, the newest, coolest thing in the Adobe world is AIR. AIR
    applications can be written using Flex, Flash, HTML and javascript,
    and have full access to client asseets. AIR is essentially an
    internet delivered desktop application.
    AIR has SQLLite database built-in.
    AIR is currently in public Beta. I do not know what will be
    available as far as non-commercial or educational licensing when it
    is realeased.
    I don't have a book to recommend, but here is a partial list
    of on-line resources:
    Tracy
    Flex 2.x Resources
    Flex sites/blogs:
    Adobe:
    http://www.adobe.com/devnet/flex/
    DEVNET - start here!
    http://www.adobe.com/products/flex/productinfo/faq/
    http://www.adobe.com/cfusion/communityengine/index.cfm?event=homepage&productId=2
    http://blogs.adobe.com/
    http://weblogs.macromedia.com/mxna/
    http://labs.adobe.com/
    http://labs.adobe.com/community/
    http://www.adobe.com/cfusion/exchange/index.cfm#loc=en_us&view=sn610&viewName=Adobe%20Exch ange&avm=1
    http://blogs.adobe.com/flexdoc/
    Other:
    http://www.searchcoders.com/flex/
    http://www.flexination.info
    http://flexibleexperiments.wordpress.com/2007/03/14/flex-20-primitive-explorer/
    http://www.scalenine.com
    http://www.flexcursion.com
    http://www.theflexshow.com
    http://www.JeffryHouser.com
    http://blog.digitalbackcountry.com/
    http://code.google.com/p/flexlib/
    http://flexbox.mrinalwadhwa.com/
    http://dougmccune.com/blog/
    http://www.cflex.net/
    http://www.quietlyscheming.com/blog/
    http://www.everythingflex.com
    http://www.waldosmeets.com/
    http://www.jessewarden.com/
    http://www.cbetta.com/blog/
    http://www.cynergytv.com/
    http://www.flexdaddy.info/
    http://www.richinternet.de/blog/
    http://www.brightworks.com/technology/overview.html
    http://www.crossdomainxml.org/
    http://flexsearch.org/
    http://labs.flexcoders.nl/
    Flex style Explorer:
    http://examples.adobe.com/flex2/consulting/styleexplorer/Flex2StyleExplorer.html
    Documentation:
    http://www.adobe.com/support/documentation/en/flex/
    http://livedocs.macromedia.com/flex/2/
    http://www.adobe.com/cfusion/knowledgebase/index.cfm
    Lists:
    http://www.adobe.com/cfusion/webforums/forum/index.cfm?forumid=60
    http://groups.yahoo.com/group/flexcoders/
    http://groups.yahoo.com/group/flexcomponents/
    Bugs/enhancement requests:
    http://www.adobe.com/go/wish

  • Retrieve Java Employee Selection for use in ABAP

    Hi Experts
    I have a case where I need to retrieve the PERNR from the Java Employee Selection iView for use within an ABAP WD iview.
    I'm assuming that this can be handled from FPM...
    Could someone help me in the right direction to get this done?
    Thanks in advance
    Anton Kruse

    Hello Anton Kruse,
    you need to use portal events for communicating between one iview to another. Refer the following documentation for portal events
    http://help.sap.com/saphelp_nw70/helpdata/en/f6/7d6f4151dc5758e10000000a1550b0/frameset.htm
    in your case,
    the java component should raise a portal event whenever there is employee selection and the webdynpro component should register for this event and act accordingly whenever this event is raised.
    BR, Saravanan

  • Using my MacBook Pro as the host for projection to my TV via AppleTV?

    Can I subscribe to HBOGO thru Apple TV and avoid cable service using my MacBook Pro as the host for projecting to my TV via AppleTV?S

    Possibly.
    Some sites such as TMN GO which is similar will not allow mirroring to take place.
    It works for about a minute then shuts down... Security settings from the site.

Maybe you are looking for

  • Missing Plug-In

    I receive the Missing Plug-In message when I drag a PDF file from the desktop into the Mail icon in the dock; however when I create a new message first, then drag in the PDF file to the body of the message, it works fine. I am also now receiving the

  • 24" iMac HD Replacement & Warranty

    I have an early 2008 iMac 24" with a 500 GB HD. I also have the extend Apple warranty that is good until May 2011. If I take the iMac to a service center listed on the Apple website and have them replace the hard drive with a 2 TB HD will my warranty

  • How can I use the gps without internet in my Ipad3 - 4G

    How can I use the gps without internet in my Ipad3 - 4G. Do I need to download any additional app than the one that already came with it?

  • Dynamic JDBC Credentials error

    I create my login page as article "How To Support Dynamic JDBC Credentials" (http://www.oracle.com/technology/products/jdev/howtos/10g/dynamicjdbchowto.html) but if i run application i get this error 500 Internal Server Error java.lang.RuntimeExcepti