Using Primay cost element instead of secondary cost element for expenses tr

Hai  SAP Guru
WE are developer company, so when a land is acquired we create the project under business development with nomenclature "BD/LG/01" with  corporate  profit centre linked to it (as we are not sure if the project takes of due to various issues.)
When the project commences we create another project structure with nomenclature "BE/LG/01u201D  with new profit centre.
So when we transfer the cost lying in u201C BD u201D  project to u201C BE u201C project by giving settlement profile, the cost get transferred using secondary cost element. when we see the statement through CJI3 report the cost would have get transferred but when we
see the report through Finance Profit Centre report the cost would have not transferred.
So in order to get the report in profit centre, can we use primary cost element instead of secondary cost element, if we use the primary cost element what the consequence and what care needs to be taken for settlement.
Thanks.

Thanks.

Similar Messages

  • Can i use an alternate email instead of an apple ID for iMessage?

    can I use an alternate email instead of an apple ID for iMessage?

    iOS and OS X: Link your phone number and Apple ID for use with FaceTime and iMessage - Apple Support

  • HT5624 I just did the IOS 7 upgrade and it is using my email address instead of my cell number for my text and Imessage...How do i change that

    I just did the IOS 7 upgrade and it is using my email address instead of my cell number how do i change it

    Hi there,
    You may find the troubleshooting steps in the article below helpful.
    iOS: Troubleshooting FaceTime and iMessage activation
    http://support.apple.com/kb/ts4268
    -Griff W.

  • How do i use my phone number instead of my apple id for imessage on my iphone5?

    I accidentally selected my apple id for sending and receiving imessages. I want to be reached at my phone number and not my email first, but I can't figure out how to make my phone number the primary and my email the secondary.
    Also, my son and I are in a text message mode between our phones (both apple products) and we can't figure out how to get back to imessage mode. We have both powered off and shut down imessage and we are still going green to each other.

    iOS and OS X: Link your phone number and Apple ID for use with FaceTime and iMessage - Apple Support

  • I want to use my apple credit instead of my credit card for apple tv to purchase a movie

    Apple tv keeps asking me for my credit card security code to rent a movie. I want to use my apple credit.

    If you have credit then it will automatically use that, the code verification is simply for security purposes.

  • Secondary Cost Element data in CO-PA

    Hi,
    I have a doubt in CO-PA, regarding the flow of secondary cost element costs.
    I want to report the costs flowing through the Secondary cost elements (activity costs) in Profitability Analysis.
    Can someone advise me on process to do this.
    Thanks in Advance,
    Safi

    Hi,
    Please define a group for Secondary cost elements or identify the secondary cost elements and define an Assesment cycle using KUU5 in that go to Extras-Cycles-Create and define the cycle and attach segment in cycle with appropriate sender and receivers and then execute the cycle to see the values flown into COPA
    Regards
    Balaji

  • Creation of secondary cost element

    Hai SAP Gurus
    Could any one please let me now how to create secondary cost element in SPRO.
    Thanks.

    You can create secondary cost elements in KA06. There is no pre-requisite of creating GL accounts.
    Cost elements describe the origin of costs. Cost elements are defined as either
    primary and secondary. Primary cost elements arise through the consumption of
    production factors that are sourced externally. Secondary cost elements arise
    through the consumption of production factors that are provided internally.
    The Chart of accounts contains all general ledger (GL) accounts belonging to
    Financial Accounting.
    Expenses and Revenue accounts in Financial Accounting correspond to
    Primary Cost and Revenue Elements respectively.
    Secondary Cost Elements are used exclusively in CO to identify internal cost
    Flows such as assessments or settlements. They do not have corresponding
    General ledger accounts in FI and are defined in CO only.
    When you create a cost element, you must assign a cost element category. This
    Assignment determines the transactions for which you can use the cost element.
    You can create cost elements automatically by making default settings that are used
    To specify the cost element, or cost element interval that you wish to create.
    You can create cost elements manually in bulk with the help of LSMW or BDC.
    Primary Cost Element Categories:
    1 - Primary costs / cost-reducing revenues
    3 - Accrual / deferral per surcharge
    4 - Accrual / deferral per debit = actual
    11 - Revenus
    12 - Sales Discounts
    22 - External Settlement
    Secondary Cost Element Categories:
    21 - Internal Settlement
    31 - Order / Project results analysis
    41 - Overhead Rates
    42 - Assessment
    43 - Internal activity allocation
    50 - Project related incoming orders: Sales
    51 - Project related incoming orders: Others
    52 - Project related incoming orders: Costs
    61 - Earned Value
    Regards,
    Ravi

  • Display of secondary cost elements in KSB1

    Hi
    One of our customers wants to delete the view of Secondary Costs to a particular cost center in Actual View of Cost Line Items (through T Code KSB1). The costs flow to the secondary cost elements based on the activity type carried out. The system is calculating the total cost and then deducting the secondary costs again from the total cost as a result of which the overall costs are in the negative. The customer wants to display the total costs only and not the flow to the secondary cost elements, even, though the data is posted for the current fiscal year for the said cost elements.
    Some transaction data already exists for the secondary cost element. We tried to changed the settings in allocation cost settings to Allocation Type 4, Manual Entry, no allocation for a future date, but still the costs are flowing to the cost element. Pls suggest a way out.
    Would assign points if the problem is sorted.
    regards
    Sanil Bhandari

    Solved

  • Secondary cost from WBS to AUC

    Hi All,
    I am facing a problem in posting secondary costs from WBS to AUC.
    In Project systems they are considering secondary costs from the activities in the network. i settled the cost from network to WBS. and when i tried to settle From wbs to AUC system is asking for settlement costelement for secondary cost. But the secondary cost should be settled to costcenter but not to AUC.
    Please suggest how can we do the settlement from WBS to AUC. How to handle settlement of secondary costs in this scenario.
    Any help will be greatly appriciated.
    Rgds,
    Kumar.

    Through MM, contract is created (ME31N) whereby the settlement G/L accounts are identified.
    The contract then is released through MM with TCode ME21N which prompts Commitment Costs to be entered, after which the Service Entry Sheet SES through TCode ME81L which then automatically updates into the WBS.
    Through WBS, CJ88 would be the TCode you would have to use for settlement.
    Hope this helps.
    Thanks.

  • Secondary cost element in KB11N

    Hello.
    I'm not allowed to use a secondary cost element in a reposting.
    What do I have to modify?
    Thank You

    Hello,
    You cannot use secondary cost element. You need to use primary only.
    Please go through the following:
    DISTRIBUTION =========== Distribution was created for transfer primary costs from a sender cost center to receiving controlling objects. During distribution, only cost centers or business process can be used as sender. A distribution receiver can be a cost center, WBS element, internal order, cost object, or a business process. You can restrict the number of receiver categories in customizing. Primary Postings (such as, energy costs) are collected on a cost center, and allocated at the end of the period by means of the user-defined key. You can only distribute primary costs. During this process, the original cost element remains the same. Line items are posted for the sender as well as for the receiver, enabling the allocation to be recorded exactly. You can reverse distributions as often as required. You use the Cycle-Segment method to define sender-receiver relationships. PERIODIC REPOSTING ================= Differences between periodic reposting and distribution are due to information content and performance. For periodic reposting, no separate credit record is written on the sender for the cost element in the summary report. Instead, the totals record for the cost element is reduced on the debit side, which means that the original debit amount can no longer be checked there (u201Cunclean creditu201D). However, during distribution, the system writes a totals record for the credit (u201Cclean creditu201D). The information on the receiver is the same for periodic reposting and distribution (u201Cclean debitu201D). Compared with periodic reposting, during distribution, the system also updates the partner in the totals record for the sender. This means that the partner can be displayed in the information system on the totals record level. As fewer totals records are written during periodic reposting, performance is better than during distribution. ASSESSMENT =========== Assessment was created to transfer primary and secondary costs from a sender cost center to receiving controlling objects. During assessment, cost center or business processes can be used as senders. The receivers for an assessment can be a cost center, WBS element, internal order, cost object, or a business process. You can restrict the number of receiver categories in customizing. Primary and secondary posting are allocated at the end of the period by the user-defined key. During assessment, the original cost elements are summarized into assessment cost elements (secondary cost element category = 42). As the system writes fewer total records, the assessment has a better performance than periodic reposting and distribution. The system does not display the original cost elements in the receivers. Therefore, assessment is useful if the cost drilldown for the receiver is not important. Similar to distribution, the partner is updated in the totals record during distribution You can reverse assessments as often as required. You use the Cycle-Segment method to define sender-receiver relationships. Regards, Ravi

  • Line item report on secondary cost element (cat - 21)

    Hi Gurus,
    Secondary cost element with category 21 is used for internat settlement from order to wbs or wbs to cost center. But can we see line item report on this cost element. Or we cannot see any line item report on this cost element. it is just used for internal settlement purpose.
    Please clear this doubt. thank you

    Hi Mohit,
    I hope you can have line item report @ order and WBS element stright away...
    for orders use: KOB1 transaction code for actual line items, where you have the facility of entering CE or CE group to find the vaues related to particular cost elements in the order. If you are flexible with CEs related to 21, give there otherwise create a CE group specific to 21 category and enter the group and find the results you want.
    same way for WBS elements/projects: we have transaction code CJI3 for actual line items, here also we can enter CE or CE groups
    Not only for actual line items, we have the option of viewing plan line items, budget line items, and commitment line items @ both order and WBS level with different transaction codes other than mentioned above, like KOB2, KOB3, CJI4, CJI2 etc
    I hope it helps a lot if I understand your query right
    Regards..
    Jose

  • Difference between type of Secondary Cost Element Category?

    Hi,
    I checked the system, and during the secondary cost element (CE) creation, I can select some of the CE category as follows:
    21 Internal settlement
    31 Order/project results analysis
    41 Overheads
    42 Assessment
    43 Internal activity allocation
    50 Project-related incoming orders: Sales
    51 Project-related incoming orders: Other
    52 Project-related incoming orders: Costs
    61 Earned value
    My question, what kind of report that I can read entries with these kind of CE?
    Reason: I want to check what has been posted to these secondary CE.
    Or
    Could anyone explain the use of above-mentioned CE category in brief?
    Thanks.

    Cost element that is used to allocate costs for internal activities.
    Most often used categories are
    21 Internal settlement
    (When ever an order is settled e.g internal order settling to cost center through this type of cost elements)
    31 Order/project results analysis
    (WIP in production orders are calculated and posted using this category)
    41 Overheads
    (Used in costing sheet to do an overhead allocation)
    42 Assessment
    (whenever cost is allocated between cost centers through allocation method - Assessment)
    43 Internal activity allocation
    (found in production orders when a routing activity is confimed the charge goes to the production order through this cost element)

  • In controlling secondary cost element cost is considerble for financial rep

    in controlling secondary cost element cost is it considerble for financial reporting requirment. In controlling for pm orders based on planning in kp26 they are booking man hours  activity price. when at time of confirm of the order planning converted to actual.
    Client is giving activity price based on primary cost, when we plan the activity price It will double booking what we incured in primary cost. let me clarify for financial report requirment can we consider secondary cost or not

    Hi,
    Secondory cost is a re allocation of Primary cost. It should not be considered if you are considering primary cost. Secondary cost is used for analysis and should not be confused with Primary cost
    Ex. Cost gets collected to cost centers, The activity is a carrier which carries cost to Process/ production order. So that doent mean that the cost is gernerated twice once you book the financial and second when you acutally allocate the cost.
    In controlling we allocate the cost in a more meaningful way to get the required analysis which will support the decision.
    So both the cost should not be considered
    This may be useful
    Regards
    Shantanu

  • Report on Secondary cost elements

    Hi all,
    Can any one tell me how to see line item report on the secondary cost element that are used in asessment cyles and also how to display the documents that are generated for these secondary cost elements after running the asessment cycles.
    Thanks

    Hi MKR,
    I am assuming that your assessment cycles are tied to cost center as senders, so even though you don't look by assessment cycle you could use transaction S_ALR_87013611. Set the selection criteria for the Controlling Area, month year/period combination and version you need, leave the cost center fields blank and enter as cost element the secondary cost element(s) of your cycles. After executed, double click on the total actual cost amount associated individually to each cost element and an additional screen would be displayed, from where you can select the option to display actual line items report. The list of line items is displayed. If you have the ALV functionality additional columns can be added in the display to segregate the information based, transaction type, origin, etc.
    Hope it helps , if it does please award points.
    Thanks,
    GG

  • Instance where Secondary Cost Element Linked to GL also

    Hello Gurus,
    What are the instances where secondary cost element is a GL also.
    Regards
    Rohit

    Dear Rohit,
    You will not find any instances were secondary cost element is linked to GL.
    Secondary cost element can be use within co. Linking cost element to GL means integration between FI and CO.
    That can be possible only for General Ledger (FI) and Primary cost element (CO)
    Rupesh Kumar Singh

Maybe you are looking for

  • Error in creating  External Table

    I am following the following procedure to create an external table,but somehow i am not getting success.Can anyone pls explain the error? CREATE OR REPLACE DIRECTORY TEST_DIR AS 'C:\TEST' Directory created. GRANT READ,WRITE ON DIRECTORY TEST_DIR TO P

  • Why are tabs on screen,of web based database, no longer opening with FireFox 16.01? Can't access secondary screens

    Just downloaded newest FireFox 16.x I am using organization specific membership database I have full access rights. I can use main menus on the screen and open a member record but FireFox no longer opens tabbed pages (screens) inside the player recor

  • How do I delete a movie that is downloading

    I was downloading a movie and it's taking longer than expected, not to mention it's eating up my data. I have turned off my data and it's now downloading thru Wi-Fi. At this point I just want to delete the movie completely, how do I delete movie whil

  • Confuse..where are the java files(bean) related to JSP in Portal??

    Hi.. Can anybody plz help me.. I already deploy the new JPDK Jan 2003. It's works fine in the Portal. Just, i don't understand, where they put the java files(bean) related? For example..the Lottery (lotto.jsp) it called this bean.. "<jsp:usebean id =

  • ALV - simulate a enter in background

    Hi all, i have an ALV with an editable field. Now i import some values from a Excel File. How can i simulate in background that i fill a field and click enter on this field. I need this because a have some checks on this field and with REFRESH_TABLE_