Using SolMAn / ChaRm for upgrade to ECC6

Good Day;
We are planning on using SolMan / ChaRm for our upgrade from 4.6C to ECC6 and I am wondering if it would be possible to do the following
  Upgrade a development system to ECC6.
  Define 2 virtual ECC6 Systems, 1 for the QA system and 1 for the production system
  Create a project that contains all the business processes and has the above landscape assigned. This project does not have ChaRM active.
  Create a maintenance cycle with the above landscape attached and ChaRM active.
As we upgrade the real QA and production systems to ECC6, we want to u201Cflip outu201D the virtual systems for the u201Crealu201D ECC6 systems.
Does anyone have any input in this type of plan?
Regards
Don

Good Day;
We are planning on using SolMan / ChaRm for our upgrade from 4.6C to ECC6 and I am wondering if it would be possible to do the following
  Upgrade a development system to ECC6.
  Define 2 virtual ECC6 Systems, 1 for the QA system and 1 for the production system
  Create a project that contains all the business processes and has the above landscape assigned. This project does not have ChaRM active.
  Create a maintenance cycle with the above landscape attached and ChaRM active.
As we upgrade the real QA and production systems to ECC6, we want to u201Cflip outu201D the virtual systems for the u201Crealu201D ECC6 systems.
Does anyone have any input in this type of plan?
Regards
Don

Similar Messages

  • Our computer crashed that we mainly used iTunes on for upgrades, new purchases, etc.  We've downloaded iTunes onto my laptop but none of my apps are in the library.  We've made this laptop an authorized computer, but it's still not working.  Why is this?

    Our computer crashed that we mainly used iTunes on for upgrades, new purchases, etc.  We've downloaded iTunes onto my laptop but none of my apps are in the library.  We've made this laptop an authorized computer, but it's still not working.  Why is this?

    See Recover your iTunes library from your iPod or iOS device.
    tt2

  • SolMan ChaRM for NW BPC 10 and BOBJ?

    I am looking to find whether BOBJ and NW BPC 10 can be integrated into SolMan ChaRM. Do you have any experience/documentation?
    Thank you!

    Hi loanna
    have u checked these documents
    http://scn.sap.com/docs/DOC-28446
    http://scn.sap.com/people/robin.haettich/blog/2011/08/19/sap-change-and-transport-system-for-sap-business-planning-and-consolidation-version-for-microsoft-platform
    http://scn.sap.com/people/dolores.correa/blog/2009/06/05/cts-configuration-in-solution-manager-70-ehp1
    http://scn.sap.com/people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    My Blogs
    http://scn.sap.com/docs/DOC-44166
    http://scn.sap.com/docs/DOC-46528
    once  you have configured your Change and Transport System which is a base for ChaRM you can configure it further with project creation and activation with logical components
    let me know if u have more queries
    regards
    Prakhar

  • Step by step procedure for Upgrade to ECC6.0

    Hi,
    I gained a lot from this forum . Can someone please mail me at
    [email protected]
    step by step procedure for upgrade .
    Will award full points for helpful documents..
    With regards,
    Mrinal

    SAP defined a roadmap for upgrade.
    1) Project Preparation
    Analyze the actual situation
    Define the objectives
    Create the project plan
    Carry out organizational preparation for example identify the project team
    2)Upgrade Blueprint
    The system and components affected
    The mapped business processes
    The requirements regarding business data
    3)Upgrade Realization -- In this phase the solution described in the design phase is implemented in a test environment. This creates a pilot system landscape, in which the processes and all their interfaces can be mapped individually and tested on the functional basis.
    4)Final Preparation for Cutover -- Testing, Training, Minimizing upgrade risks, Detailed upgrade planning
    5)Production Cutover and Support
    The production solution upgrade
    Startup of the solutions in the new release
    Post processing activities
    Solving typical problems during the initial operation phase.
    SAP expects at least 2 to 3 months for Upgrade and that again depends on project scope and complexity and various other factors.
    STEPS IN TECHNICAL UPGRADE
    •     Basis Team will do the prepare activities. (UNIX, BASIS, DBA).
    •     Developer need to run the Transaction SPDD which provides the details of SAP Standard Dictionary objects that have been modified by the client. Users need to take a decision to keep the changes or revert back to the SAP Standard Structure. More often decision is to keep the change. This is mandatory activity in upgrade and avoids data loses in new system.
    •     After completing SPDD transaction, we need to run SPAU Transaction to get the list of Standard SAP programs that have been modified.  This activity can be done in phases even after the upgrade. Generally this will be done in same go so that your testing results are consistent and have more confident in upgrade.
    •     Run SPUMG Transaction for Unicode Conversion in non-Unicode system. SPUM4 in 4.6c.
    •     Then we need to move Z/Y Objects.  Need to do Extended programming check, SQL trace, Unit testing, Integration testing, Final testing, Regression Testing, Acceptance Testing etc.,
    The main Category of Objects that needs to be Upgraded is –
    •     Includes
    •     Function Groups / Function Modules
    •     Programs / Reports
    •     OSS Notes
    •     SAP Repository Objects
    •     SAP Data Dictionary Objects
    •     Domains, Data Elements
    •     Tables, Structures and Views
    •     Module Pools, Sub Routine pools
    •     BDC Programs
    •     Print Programs
    •     SAP Scripts, Screens
    •     User Exits
    Also refer to the links -
    http://service.sap.com
    http://solutionbrowser.erp.sap.fmpmedia.com/
    http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
    http://www.id.unizh.ch/dl/sw/sap/upgrade/Master_Guide_Enh_Package_2005_1.pdf
    Hope this helps you.

  • Can't convert stack XML file using report RPT_MOPZ_COPY_STACK for upgrade

    Hello Colleagues/ SAP Experts,
    Here is a background. 2 weeks ago, we have generated an XML stack file using MOPZ in solman 7.1 for the following systems (P6D which is DEV,
    P6Q which is quality, P6R which is regression and P1P which is production). We were at our technical cutover rehearsal phase and the system that we were rehearsing was P6R. But AFTER our technical cutover, a new java component, which is seeburger as2 adapter, was installed in P1P, PRODUCTION. Thus, the landscape  of P1P has changed as a new component was introduced and we believe that the generated XML file 2 weeks ago will no longer be valid for P1P. Instead of generating another xml file thru mopz for P1P, we would like to use report RPT_MOPZ_COPY_STACK_XML to convert the XML file OF P6R to map it toP1P.  I have uploaded P6R XML and the target is P1P. So as you can see, P6R XML (source) --> P1P target.
    Actions already done are the following:
    1) Fulfilled and followed the resolution in note: 1711612
    RPT_MOPZ_COPY_STACK_XML Report Troubleshooting
    2) SAP-OSS is working in SM59
    Basically, program RPT_MOPZ_COPY_STACK does not convert the Regression system's xml to the target, which is production. Kindly see attached screenshot. *the screenshot shows only 1 component in error but upon clicking the 'next difference' button, it will still show other components. I have checked my lmdb settings, will there be workaround for the issue?
    Regards,
    Meinard

    Hello Divyanshu Srivastava / Reagan Benjamin ,
    Thank you  for your replies. Yes I noticed that a new higher patch for one java component was already present when I have regenerated recently for production using mopz. Anyways, SAP has returned a message wherein they edited the xml file themselves. Most of errors were eliminated only error was kernel versions was not matched. We need to upgrade kernel of our production and test if it works. Hopefully it will. Thanks though at first we did not edit the xml as according to one sap note I read it will not be supported by SAP. Closing this thread now

  • How do I upgrade to lion using my receipt for my recently purchased mac book pro?

    The lady at the apple store told us we could use our receipt for upgrading for free to lion but i don't know how! thank you

    http://www.apple.com/macosx/uptodate/

  • Satellite L300-22L - Which RAM for upgrade?

    Hello.
    I have Satellite L300-22L notebook. Can you tell me which is the best RAM for my system in speed and capacity?

    Hi!
    The Satellite L300-22L belongs to the PSLB8E series and is equipped with Intel GL40 chipset.
    That means for upgrading the RAM you need modules with the specification DDR2 667MHz to a maximum of 4GB.
    Theoretically you can buy modules with these specifications from every manufacture but I have good experience with Kingston modules. I use them always for upgrading my notebooks and never had problems.
    Bye

  • Is it a must to use Solution manager for ECC 6.0 upgrade

    Is it a must to use Solution Manager for ECC 6.0 (FICO & HR) upgrade? I am told Solution Manager is required only if it has ABAP and JAVA stacks, or involves Enhancement Packages; and could be optional if it is only ECC 6.0 with ABAP stacks.

    Hi,
    I'm having a difficult time finding some guidance for setting up our R/3 Enterprise system in solman properly, so that I can create the upgrade XML file required to go directly to ERP 6.0 EHP4. 
    I've set up the R/3 system fine, but when i create a maintenance transaction i cannot for the life of me figure out how to tell it I want to go from r/3 to ERP6 ehp4.
    Any docs out there for this?
    Thanks!
    I figured it out... i had to add the R/3 Enterprise logical components to my system landscape.  After that I was able to select R/3 as the initial data in the maintenance transaction and then the system i wanted to upgrade, and then the option to upgrade.
    Never mind!
    Edited by: Tom Janes on Sep 9, 2009 12:52 AM

  • SAP_MANG Evaluation Path not working for MSS after ECC6 Upgrade

    Hello All,
    We are upgrading to ECC6 and still using an older version of the java/HTMLB MSS Business Package. We are seeing strange results in the vacancy request overview iview (team viewer like component)  which is using a view driven by SAP_MANG Evaluation Path.
    SAP_MANG looks like this...
    10 * B 008 * S
    20 S A 012 * O
    30 US A 208 * P
    Our View is ZRCPOS using...
    Eval Path - SAP_MANG
    Eval Objects - O_NACH_S
    Initial Evaluation Depth - 3
    Column Group - ZRC_VACREQ_OV
    Header Type - RC_VAC_HEADER
    The iview is meant for position maintenance and should show a dropdown of orgs. When an org is selected a list of positions/holders is shown to modify, delimit, etc. The problem is that in the dropdown "Select organizational unit to display positions" instead of...
    Test Org 1
    Test Org 2
    We have...
    Test User1
    Test Org 1
    Test Org 2
    ...so the user us shown as an org. Right off I suspected the upgrade to MSS 60.1.22 (the newest version of the old Business Package) so I installed the older versions of the components and the actually still worked but also showed this condition. So I have ruled out the java side as a source of the problem.
    Looking at HRP1001 I see the following relationships among suspect objects.
    Object P 1234567 to Object S 9876543 via B008
    Object S 1234567 to Object O 9876543 via A012
    no relationships US to P via A208
    Given the Eval Path above, does anyone have any idea why this would display this way or have a suggested approach to solve.
    Thanks,
    Doug

    >
    Doug Steckel wrote:
    > Hi Ranganath,
    >
    > Thanks for the quick reply. Yes the Skip flag is set on relationships 10 and 30. I would also think that would prevent this but it is not.
    >
    > Thanks,
    > Doug
    not all relationships represent physical data records in the database.  some are derived and without looking at the system, I believe the US 208 to P is a derived relationship.
    Are you sure all the users you are testing with have a proper sy-uname setup for all respective pernrs in PA0105?

  • I can't use firefox after upgrading to 4.0. I get the message I have to restart my computer for upgrading, but ik doesn't start. I get the message over and over

    I can't open firefox after upgrading to 4.0
    I get the message over and over again that i have to restart my computer for upgrading to firefox.
    I tried new installation. But i got problems on all my accounts

    Start your '''Computer''' in safe mode. Then start Firefox. Try '''Safe''' web sites.
    Starting The Computer In Safe Mode;
    If running, turn your computer off.
    Remove any disks and thumb drives that are in your hard drives or ports.
    Now start your computer but also;
    '''Windows; '''Press the <F8> key repeatedly.
    '''Mac: '''Hold down the Shift key.
    '''Linux; '''Using the command line, Linux/Unix computers can be booted
    into various run levels that determine which resources are loaded.
    For example, "runlevel 1" is typically the equivalent to Windows and
    Mac safe modes.
    * Source; '''[http://encyclopedia2.thefreedictionary.com/Linux+Safe+Mode Safe Mode; Free Online Encyclopedia]'''
    When the '''Boot''' menu is displayed, release the key you were pressing.
    You must now choose what mode to use. The most used are;
    * Safe Mode; The computer runs with only a minimum set of programs.
    * Safe Mode '''With '''Networking; Same as above, but with internet access.

  • Can i use another family members upgrade for an iPhone?

    I currently have a Blackberry Bold with unlimited data, and the other line on my plan is just a basic phone. Currently walmart, has the iPhone 5 on sale for $127 but the sale goes off before my upgrade which is on 1/23/12. Back in October one vzw sales Rep told me j could transfer the other persons upgrade to my line to get an iPhone 5. But last night on the vzw support twitter someone told me that the iPhone 5 wasn't eligible for early upgrades therefor I couldn't use the other lines upgrade, that I could only use mine on 1/23? Does anybody know which is right?     Also could I keep my unlimited data if I was to transfer her upgrade? I know I couldn't if I used mine.

    Yes if you transfer her upgrade you can A) get the iphone and B) keep your unlimited data and because your coming from a blackberry to iphone i advised doing backup assistance on your blackberry before the transfer but other than that youll have no problem with the activation just make sure that if you get it from walmart that you call to activate it otherwise they will activate it on the wrong line and cause all sorts of problems

  • Using another number for an upgrade for a phone online

    Okay, so I'd like to use another phone number in my plan to get an upgrade online. So does anyone know if that is possible and how I could do that. Thanks.

    Thanks, Rignu217 and lewisr13, for your replies.
    Hello JBerg,
    I'm glad to hear you'll be taking advantage of an alternate upgrade on your lines.  As previously mentioned, this can be done directly from My Verizon, where you can compare up to five devices and decide which device is perfect for you. Keep in mind you'll first select the line that is eligible for an upgrade.  Once this is done you will get an option to choose the line where the device will be activated. I'm sure you'll find this information useful. Thanks for being part of Verizon Wireless.

  • Can I upgrade iCloud storage using iTunes cards for payment?

    I have chosen not to use my credit card in conjunction with my AppleID, so I purchase all of my apps and media using iTunes cards.  Can I pay for upgraded iCloud storage using iTunes credits?  I would prefer to pay one year at a time using those credits, but if it needs to be monthly, that would be fine as well.  I just want to use the iTunes cards instead of a credit card for the payment.

    Thank you.  So to clarify, if I put a credit card on file for this AppleID, but I have plenty of iTunes credit to cover the monthly cost, then the monthly fee will be pulled from iTunes credits instead of my credit card.  Is that correct? 
    It sounds like the credit card is required in order to provide a backup payment option if the iTunes credits are all used up.  Is that also correct?
    You're awesome!! Thanks for the help.

  • Do we need to be in unicode to use webdynpro for abap in ECC6 ?

    Hello,
    we study migration to SAPR3 46C SR2 to ECC6.
    a question is: Do we need to be in unicode to use webdynpro for abap in ECC6 ?
    Our SAPR3 are in non unicode
    thanks

    The problem, if you backend system is not unicode, can be, that user with the browser accessing the Webdynpro page, can enter data of any codepage (because browser is Unicode), the data will then be stored with a wrong codepage in the system and will be destroyed.
    Additionally all successor versions of ERP will be Unicode only.
    And on top of that, if you plan to use Java components (such as a portal), the backend must be Unicode (see Note 975768 - Deprecation of Java features with non-Unicode Backend).
    Markus

  • Autofill in Google Toolbar does not appear to be working with Firefox 4 - Aways saying Autofill not available for this page even on pages I have used it before FF4 upgrade

    Autofill in Google Toolbar does not appear to be working with Firefox 4 - It aways gives the message "Autofill not available for this page". This is happening on pages I have used Autofill on before upgrading to FF4 from Firefox 3.5.x

    i did not see a solution posted - I tired what I read. Going back to an old version may solve the problem but it is a stupid solution so I have yet to do that.
    I am on version 4 and autofil this does not work :
    Popular answer Go to this answer
    Uninstall version 5, then Google "google toolbar version 4", follow the link to FileHippo.com, and download and install the last version 4. When you reinstall it, make sure you turn off the option to perform automatic updates.
    6 of 7 people found this answer helpful. Did you? Sign in to vote. Report abuse

Maybe you are looking for

  • Select query to read data from a view

    Hi friends, We have been using a query to read data from a custom view which used to work perfectly. Now the program sits at that select query forever. We are able to extract same data from se16. Not sure what could be the problem. Thanks in advance.

  • Indesign CS5 - how to align objects

    Dear All, I have a problem with Indesign that is present from CS2 trough CS3 & CS4 version. I thought that CS5 version finaly will solve this issue, but it seems to me that nothing changed. When we have to align two objects lets say in Illustrator, 

  • How to connect Cintiq 22HD to 2010 iMac

    I bought a Cintiq 22HD and the suggested adaptor (Mini -DVI to VGA) but found that it is for newer iMacs. My iMac is from mid 2010 - so I bought the Mini DisplayPort to VGA Adapter which fits my iMac. Unfortunately it does not connect with the config

  • Problems with html content in box

    Hi! I have a problem with html content. For example photoswipe. If I import the folder with the index.html of photoswipe as an article all works fine. If I link it trough the folio overlay creator/webcontent) into a box in indesign dps, it stays empt

  • Modify the behaviour of an aggregate function

    Hi all, I have to modify the behaviour of a measure (ex: MEASURE) object depending on the value assumed by a dimension (ex:DIMENSION) object. When the dimension objects is a number the measure is sum([measure]) When the dimension is " " (in the DB th