Using Substitution (GGB1) to change Cost Center assigned in (OKB9)

Dear all,
SAP Platform: ECC6
I've configured both VKOA (GL assignment) and OKB9 (auto acct assignment) for sales billing. In OKB9, I've mapped one cost center to one GL, i.e. GL-123456 = Cost-center-A.
Alright, now that I've a specific condition that requires to change the cost center at ad-hoc basis, i.e. for material # 2345678 only, I need to assign to GL-123456 but Cost-center-B instead. So, I attempt to use the substitution rule - GGB1 to replace the cost center based on material #. I did the configuration under Cost Accounting | Line Item by creating a new substitution and defaulted the constant to Cost-center-B when material # = 2345678.
So, I ran the billing in VF01 but the Cost-center-A was pickup instead of Cost-center-B. It appears that the substitution hasn't been triggered. Did I miss a step?
Thanks.
Steven

Hi,
Have you tried after removing the cost center assignment in OKB9? 
Thanks,
Krish.

Similar Messages

  • Cost Center Assignment in OKB9 issue

    Hi All.
    I have one issue related to Cost Center Assignment.
    1.Our profit center structure is based on Product
    2. 70% of FG we get from Sub Contracting and thus we have to pay sub contracting charges to them for that.
    3  sub contracting charges  GL account is a Primary cost element thus have to assign cost center.
    4. In OKB9 we can assign one cost center per valuation area.
    our requirement is that in one plant we have many profit center according to product thus having diff cost center so we want to capture cost in that respective cost center according to product.
    Regards
    Shayam

    Hi Thanks for your reply.
    @AP  I tried but not found any exit for that.
    @yogesh  .. we dont assign cost center at material so no logic of picking cost center. Entry is posted at the higher level i.e at the level of PC and not at tbe level  of CC. system pick PC  from CC and not CC from PC.
    Hope this is clear to you.
    Regard
    Shayam

  • After changing cost center assignment to Orgunit or Position in OM.......

    Hello,
    i delimit the relation between cost centers and orgunits or positions with the sap report RHGRENZ4 and created new relations in PP02 by a batch input map (which i create with the LSMW). This seems to work fine in OM but although the Integration to PA is active, the changes i make have no effect to infotype 0001.
    The value in the table T77S0 for PLOGI - PRELU is blank.
    When i run the report rhintecheck i find my entry. but when i run the report rhinte30 the report does nothing!?
    I have no more idea!!!!!!!!!!!!!!!!!!!!!!!

    Hi
    Please check the following:
    1) table T77S0
    PLOGI     PLOGI  – 01 ( 01 is your plan version)
    PLOGI      ORGA  -  X  
    2) Report RHINTE30 - Dates when the changes should be effective in IT 0001
    3) You have sufficient authorisations to the objects & relationships.
    Thanks & regards
    UR

  • VA01 Sales order (line items) and different Cost center assignment

    Hello gurus,
    im searching for solutions how to assign different cost center to sales order line items, but only thing that i found is the substitution (Using Substitution (GGB1) to change Cost Center assigned in (OKB9))
    Trying to do this i was unable to create something that could work, since there was no Logistic.
    Could somebody explain me the Line item in SO assignment to Different cost centers?
    I know alot about OKB9, VKOA and other transactions, but still cant find anything suitable to solve this issue
    Best regards
    Laurynas

    What i mean is that, on the end of every month we are gathering information for Statistical Key Figures (from Controlling) entering as CO document and then distributing the costs using KSV5 TC on Internal Orders according those entered statistical key figures.
    i.e. we got INCOME 1000000 from 10 internal order, which we distribute on even percentage parts like 10 cost center, each getting 10% of the income.
    I tried to create the SO, but the Profit center field, after i entered a number, was changed automatically into another.
    And the posting didnt reach Controlling and the assigned Cost center. I think it is a lack of configuration.
    Regards
    Laurynas

  • Mass change of cost center assignment

    in OKB9, we have around 1000 lines for different company code and cost center, we want to change around 300 cost center assignement, how can we effectively do mass change ? can we do txt file upload?
    in excel, we can do search and do mass replacment, but in okb9, my find button is greyed out
    also before/after I change the assignment, I export TK3A table into excel, my old/new cost center is in column A/B, so how to ensure every cost center in column A is not appaer in column B?

    Hi
    (1) may i know which table store this set id and relevant from and to cost center?
    Table SETLEAF
    (2) may I know the t-code to create additional set used in the FI substitution rule?
    t Code GS01
    Hope this addresses your query
    Regards
    Ajay M

  • Change of Cost Center Assignment for Organization Unit in HR

    Hi,
    Recently my client is changing their cost center number from 6char to 5 char format. I have created customized mapping table to link between old cost center number and new ones.
    Create new cost center referencing to old cost center is done too.
    However, for each Personnel Number, i need to change the cost center assignment which link to org unit. I have done this too manually at t-code PPOM. How can I do this for mass change? I have a list of org unit number with me. Is there any standard program to do this or i should use LSMW ?
    How do I make sure for each Personnel number, their cost center assignment will change to new 5 char format in the end as required?
    I am new to HR module.
    Thank you for your help.

    Hi,
    As Sikandar said, you will have to write an LSMW or BDC ( where in you can check and validate the input Cost centers) using PP01 or Po10.
    Also I think if you use BDC or LSMW you will have to run the RHINTE30 report. Check the documentation on RHINTEXX reports to get better idea.
    Cheers..
    Ajay

  • Change profit center assignment in cost center

    Hi All,
    We have around 20 cost centers and assigned to 10 different profit centers.From 01/01/2011,we would like to change Profit center assignment in cost centers.
    all cost centers postings should post to old profit centers till 12/31/2010 and from 01/01/2011,postings should go to new profit centers.
    What is the best way to achieve this?any help is appreciated.
    Thanks,
    Anusha

    Hi Ajay,
    Thanks for your reply.profit center changes are working with analysis period changes.
    i have one more issue here,i can't change hierarchy in cost center and getting errors..
    Message no. KS042
    Diagnosis
    Field Hierarchy Area to be changed must be unique for the entire interval. You selected a change interval which does not include the entire period. Any change in the field would result in an inconsistency.
    I have try to change time depended field in configuration.system is not allowing for field "KHINR" in OKEG TC.
    any help is appreciated...
    Thanks,
    Anusha

  • How to change cost center for employee

    Hi,
    I want the engineering groups to change to different cost centers for this new year.I was able to change the home cost center for a work center through IR02. But not able to change the home cost center assignment for specific personnel through PA30. SAP allows to enter the cost center but while saving it gives the error message as "Start date after initial entry date (01/01/2010)" when I used a 01/01/2011 start date and "Cost Center does not exist on 01/01/2010" when I used 01/01/2010 start date
    Could please tell how to change the cost center for the personnel?
    Thanks & Regards,
    Jegashree

    Hi Jegashree!
    The Cost Centre is always assigned in creating Position. So If you want to change Cost Centre, please using T-Code PPOME and find the position and change the Cost Centre.
    The another way, you use t-code PP01 (create) PP02 (edit) to change the relationship (IT 1001) and A-011.
    Hope you can solve it.
    Regards!
    Woody.

  • Cost center assignment in subcontracting ??

    hi Experts
    i want to change the costcenter assignment in subcontracting scenario.
    Here my query,
    1.I have created subcontract PO
    2.GR done. accounting docs been gnerated.
    3.In GR document display , u can view line item1 as finished material, then in 2nd line item the consumption of raw material will be generated automatically with 543 movement type.
    In this 2nd line item i want to change costcenter assignment for consumption of raw material account .
    Where trhis configuration setting been done ??
    How and where i can change this cost center assignment ??
    Thanks
    SAP-MM

    Hi,
    Use t.code OKB9 and assign G/L ACCt to cost object with ur company code and save.
    Now try ur transaction.
    OR
    Check the field status of the account  in FS00. If this account requires CO object as mandatory then check whether a cost element is created or not , this error normally occurs when CO object is mandatory but relevant cost element is not created.
    Example: CO object may be cost center, cost element, WBS element
    OR
    Use transaction code: KA02: enter(Cost element) and in default acct assinmt TAB,assign the Cost Center and save.
    For more check the link
    http://www.sap-img.com/financial/requires-an-assignment-to-a-co-object.htm
    Vipin

  • Cost Center assignment to Business Area

    Hi,
    Please tell me the Cost Center assignment to Business Area.
    Also please let me know that in our system, it is configured or not???
    Plz guide..
    Anil Kumar
    Moderator: Please, do not use SMS language. The assignment of cost centre to BA is in the master data of the cost centre itself

    Hello Robert,
    You can have only one business Area in one Fiscal Year.
    So for the current year, you should  keep the Business Area, but you can change it for future FYs.
    To do that go to menu > Edit > Analysis Period and click "Other Analysis Period". Than you should be able to change the Business Area for future FY. You have to select the Analysis period, so it begins when FY is beginning...
    Pls reward if helpfull.
    I hope this helps.
    Richie.
    Message was edited by:
            Richie

  • Repeat depreciation run can change cost center in GL a/c or not?

    Hi Gurus,
    I have hit the following issue.
    Fixed Asset 1 originally assigned to CC-01 for month of March.
    And my user has run depreciation for March already.
    Later she changed cost center to CC-02.
    Then she repeat depreciation run for the month of March, from the depreciation result shows the new cost center CC-02.
    But there is no document generated and thus from corresponding GL account, there is no change, still point to CC-01.Which means CC-02 has not been posted to GL account yet.
    May I please know if repeat depreciation run can change cost center in GL a/c or not?
    If cannot, what should be the correct way to post the new cost center in GL?
    Thanks a lot.
    Best Regards
    Li Juan

    Hi, I have tried the method you mentioned.
    I managed to generate the new document (Message shows: Document is posted under number 7500000000).
    So can I say that repeat depreciation run cannot change cost center for corresponding cost element?
    Everytime user has to do manual posting.
    Thanks a lot.
    Rgs
    Lijuan

  • How to find cost center assigned to a work center

    Hi Guys,
                 I need to find cost center assigned to work center.
    from Which table I should to get it.
    Cheers
    S Kumar

    Hi,
    Please use the table CRHD to get the object ids and then go to the table CRCO with the object ids and get the Cost center assignment to resources.or you an create a query by SQVI and use it.
    regards,
    kaushik

  • Cost center assigned to which group

    Hi,
    Can someone guide me how to ascertain which cost center is assigned to which group? for eg: i want to know cost center 4000xxxx is assigned to which cost center group? is there a standard t code in sap to ascertain the same?
    Thanks in advance
    Rajesh

    Hi,
    You can use transaction code OKENN, the cost center standard hierarchy, in this you are able to see the cost center group and cost center created under your controlling area.

  • Change Cost Center Valid To Date

    Hi,
    I want to change cost center valid To date. Please let me know which t code I use for that. Thanks in advance.
    Thanks & Regards,
    Hemant Maurya

    Hi,
    You can change cost cener validity by creating new cost center through t.code KS01 with reference to same cost center.
    Ex. suppose you have created cost center 5009000000 from 01.07.2005 to 30.06.2006. Now you want the same cost center to be created from 01.07.2006 to 31.12.2009.
    So, Go to KS01 and put this CC code and Valid From to To Date as 01.07.2006 to 31.12.2009. Also put same CC code with CO area in reference. The same CC will be created with all required information. Also If profit center is required field in your CC, then first of all you need to extend your profit center through KE52 t.code.
    Pls get back for further query.
    Thanks & Regards,
    Taral Patel

  • Change cost center in asset master data

    Dear All,
    When I go to change cost center in asset master data by transaction code AS02 it does show gray cost center field and system does not allow to change. I also tried to use time dependent option but field was still gray. Kindly help me in this regard,
    Regards,
    Uddin

    Hi,
    check the accounting object customizing in IMG FI-AA. At the step where you activate the accounting objects you can set a flag "balance sheet relevant" for the accounting objects. If this is checked, then you will not be allowed to change this accounting object in the asset master record after the first posting to the asset.
    Regards,
    Markus

Maybe you are looking for