Using WHSCON to Pick Pack and PGI

Hi,
I need to do Pick pack and PGI with inbound WHSCON idoc in WM non relevant delivery. Can anybody please suggest me what are all the necessary fields do I need to pass to achieve the same.
Thanks,
Neha.

Hi,
We have the same requirement as you have. We need an inbound IDOC to pick / pack and PGI and customer delivery.  We are working with message type WHSCON.
We initially created the delivery without any batches assigned to it. The IDOC coming in will have the batch details on it. We would like an IDOC to create these lines (batch split lines)
Is it possible to do this?
Regards,
Finbarr

Similar Messages

  • Need help on IDoc for Picking, Packing and PGI against the Sale order

    Hi All,
    I am new to this IDoc stuffs. Below is the scenario for which I would like to know the details of the IDoc...
    Business Case:
    1. Storage location is a HU Managed but not WM managed.
    2. This storage locations is managed by a third party
    3. Outbound delivery document against the SO will be created by our personnels in SAP for this storage location.
    4. Picking, Packing and PGI needs to happen/post via Idoc. (By packing here, i refer to assign the HUs that are already created for the materials and is available in the storage location and not repacking)
    Is there any standard IDoc that can be used here to Pick, Pack and post PGI. We would like to have picking and packing in a first idoc and PGI on the second idoc.
    Thanks,
    Prashant

    Hi Typewriter,
    Thanks for your reply on this post..
    The business process is as below (it was changed recently to have the creation of OBD, pick HUS and then post GI via single IDOC)
    1. We have a storage loc in our enterprise structure that is HU managed but not WM managed.
    2. This storage loc is being maintained by a third party.
    3. SO will be created to be shipped out of this plant/sloc.
    3. The stocks at this storage loc will be Special stock "E" against the sales order. And the stocks will be Packed in HUs.
    4. The third party is informed to deliver the stocks (HUs - that do have the special stock number which internally refers to the the SO number and the line item number) directly to ship to party address in SO.
    5. The 3rd party will physically ship the HUs to customer and send in the details that they have shipped goods against the sales order.
    6. The details sent by the 3rd party will be received in SAP to create OBD for the sales order, Pick, Pack and post GI. This can happen via a single IDOC..
    I am now planning to create a custom IDOC type referring to the standard IDOC type DELVRY03 and message type DESADV and to use a custom BAPI/FM.
    Do you think I am using the right ones?
    Thanks,
    Prashant Kumar

  • Bapi for Picking, Packing and Post goods issue (WS_DELIVERY_UPDATE)

    Hi,
    I have a requirement to update the outbound delivery. In that, I need to update the picking, Packing details and have to complete the PGI for the particular delivery. I got the suitable function module for the same is : WS_DELIVERY_UPDATE.
    Can anyone tell me what parameters should I need to pass to perform my above requirements.
    Thanks in advance.
    Regards
    Ramesh mavilla.

    I can Update picking and PGI using the above BAPI. But I am unable to create the Handling Units properly with the above mentioned BAPI befor PGI.  Can any one help me ASAP.
    Thanks
    Ramesh mavilla.

  • Pick & Pack and Sales BOM components

    We have noticed that pick and pack will put sales BOM component items on the list even if all the component items are not available to complete the parent Sales Item. If we are not watchful, we can inadvertently ship a partial kit - i.e. ship only a left shoe if the right shoe to complete the pair happens not to be in stock.
    Does anyone know of a way to ensure that pick and pack only allows/recommends complete Sales BOM's? Same issue exists for Deliveries.

    Hai!
    SP_Trans is a Stored Procedure.
    Please check the Blog..
    Check this link for explanation of SP_Tranaction Notification Procedure https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/e991e2b9-0901-0010-0395-ef5268b00aaf
    *Close the thread if issue solved.
    Regards,
    Thanga Raj.K

  • FM or BAPI for Delivery Order Picking and PGI

    Good day,
    I would like to check with you all on any function module or BAPI which can perform delivery order picking and PGI ?
    I did some research and found that a lot of people is introducing this FM "WS_DELIVERY_UPDATE_2"
    but i'm not sure how this FM works. Can anyone provide some information for me on this function like what data to propagate into this FM and etc... ?

    hi,please check this link.
    Need to update picking,packing and PGI using FM "WS_delivery_update"
    also,
    for picking:  WS_DELIVERY_UPDATE_2
    pgi :  BAPI_GOODSMVT_CREATE
    thanks.

  • Picking and PGI

    Any fm for doing picking and PGI

    Hi,
    Try this link
    [Need to update picking,packing and PGI using FM "WS_delivery_update";
    Regards,
    Surinder

  • Inventory without pick/pack

    Hi,
    we need to maintain inventory for some of the products in R/3 that dont have any pick pack and shipping associated with them,
    how can this be done? or what are the options available?
    Thanks,

    hi
    if u want to post inventory got Tcode MB1C and use 561 in the movement type.
    and enter your plant and storage location press enter now u can post inventory for the material.
    if u wnat to see the inventory goto Tcode MB58 and enter the details
    prashanth

  • Pre pick pack for sipment

    Hi
    I'm associated in auto componenet manufacturing comapny. We follow the make to stock process in our manufacturing division based on our sales forecast.
    The customer orders are a mix of normal products and company's branded products. The branded products are heavy duty and takes junk of time in preparing cartons, picking and packing during an order processing. To eliminate this heavy time consumption, we want to pick pack and store these heavy duty parts when the ever the order are less in a day. So we can directly pack them for shipment. Remember it will not go thu normal pick pack and labelling process as per the order as we allreday done for barnded ones.
    I know its out of way, is there any way we can achieve in SAP. I will appreciate if you could give me the best feasible solution to achieve this.
    Thanks
    Reena

    Dear Reena,
    As per my under standing you will do the packing activity physically before creation of the delivery or sales order am I correct !! If soo..
    What are the packing material you are going to use maintain master data for those material with material type VERP-Packaging material.
    Do the packing related configuration settings in the IMG
    IMG->Logistics execution>Shipping>Packing
    Assign the packing material group in the master data of the Finished material
    Physically you can do the packing any time but when you create delivery for that material you can do the packing in the SAP system according to the physically completed.
    I hope this will help you,
    Regards,
    Murali.

  • Using BI Publisher for printing pick, pack slips, invoices and statements

    We are trying to determine if we can use BI Publisher to print, fax, email, archive our primary business documents (pick, pack slips, invoices, AP checks, statements. In the past we used a 3rd party document generation product because the JD Edwards forms software delivered with EnterpriseOne did not have the functionality we needed to automate the presentation and delivery of the documents without modification to the JDE software. We need to automatically sort and split the Spool and or XML files and determine the delivery methods for the output dynamically using the data in the output file, merge with the correct form template(s) and send it to the correct printer(s), fax, email, portal. We also have 3 printers in the mail room for statements less than 8 pages, 8 to 15 pages and 16+ pages. The number of pages produced has to be sorted before it is sent to the printer because of the envelop inserter attached to the printers. Can this be done with the free version of BI Publisher? If not what does the paid version of BI Publisher cost? Does the paid version provide this functionality?

    Hi user953712,
    1. Check format should use fixed row enumeration matched to the number of remittance lines per stub setup on the Payment Document in EBS.
    2. "not using word columns"? I'd be using a table in Word. Is this a text based format? If so consider ETEXT.
    "should go into a different file"? Sounds like bursting or some other mechanism.
    Regards,
    Gareth

  • Inbound Delivery Idoc with batch split then PIC and PGI using DELIVERY03

    Dear Experts,
    Requirement to split the delivery item then PIC and PGI, while Processing Inbound Idoc using basic Idoc type DELIVERY03
    I have searched forum already but it vain. Please advice.
    Thanks and Regards,
    Thiru.
    Moderator message : Spec/requirements dumping not allowed, show the work you have already done.  Thread locked.
    Edited by: Vinod Kumar on Nov 16, 2011 5:09 PM

    Hello Finbarr
    I assume that you do NOT send any (suggested) batches to your warehouse. Otherwise you would have the same problem like we have that the WHSCON cannot overwrite a (suggested) batch.
    However, if you just send the quantity per item then the batch split is much simpler than you suggested:
    "First E1EDL24 segment:
    POSNR     50
    MATNR     000000000000602006
    MATWA     000000000000602006
    CHARG     L1519   " <<< first batch
    LFIMG     37.000
    VRKME     CT
    "Second E1EDL24 segment:
    POSNR     50
    MATNR     000000000000602006
    MATWA     000000000000602006
    CHARG     L1880   " <<< second batch
    LFIMG     37.000
    VRKME     CT
    Well, and as qualifier we use: E1EDL19-QUALF = 'XYZ'  " a dummy
    The SAP system is smart enough the realize that these two E1EDL24 segment belong to the same item yet have different batches and, therefore, yield a batch split in the delivery. The system generated the 9xxxxx numbers for this sub-item lines automatically.
    Although I believe that it is not possible to change a batch in the delivery using an inbound WHSCON I would appreciate to have a final proof of this assumption. I could imagine that if you first delete the item containing the suggested batch and then add a new item with the actual batch from the warehouse it might works. However, this would require to implement a user-exit which I do not prefer.
    Regards
      Uwe
    PS: It seems I gave an answer to the wrong question (should be EDI (DESADV): Can batches be overwritten by an inbound WHSCON (pick conf)? )

  • Partial picking and PGI (with Idoc)

    Hello
    a) We have a scenario where we would like to achieve partial picking and PGI with Idoc:
    For example
    In the delivery the delivery qty is 10 from the beginning, but we would like to pick only 7 and perform the PGI anyway. The 3 remaining units should remain open and create a new delivery with VL10 or whatever. For the picking confirmation we are using SHP_OBDLV_CONFIRM_DECENTRAL03. We are not using WM, just inventory management in this scenario.
    We know that per standard SAP functionality the picking quantity must match the delivery quantity when doing the PGI.
    b) However: we have another scenario where we run picking and confirmation from a DWMS, where all confirmations are made by the idoc type SHP_OBDLV_CONFIRM_DECENTRAL03. In this scenario, it is possible to achieve the partial picking and PGI.
    So my questions are really:
    1) Anyone knows why SHP_OBDLV_CONFIRM_DECENTRAL03 would post partial picking PGI with DWMS succesfully, and not with a "normal" scenario where there is no DWMS in use, just a normal plant/storage location?
    2) Anyone knows a suitable idoc type to achieve partial picking idoc, one where the picking qty and the delivery qty could be adjusted at the same time so that picked and delivery quantities would be exactly the same?
    3) Any suitable user exit that could be used in order to change the delivery qty according to what has been picked for the delivery? Some success stories around it would be appreciated.
    Thanks in advance,
    OT

    Hi,
    I am not able to get the details whether you want to know the information about the Inbound Idoc or Outbound Idoc. But you want to do the picking and packing of the delivery then I can presume that you are doing the Inbound process.
    In that case you can do use the process code SDPI which has the message type SDPICK. In this we have the function module SD_IDOC_INPUT_PICKING which can do the picking and PGI of delivery.
    In this you can also change the delivery quantity if you are not picking up the whole quantity from the plant. So it allows you to change the delivery quantity and then do the PGI for the same.
    Regards
    Suneet

  • Link Sales Order and PO and Pick & Pack

    Ability to add a manual Link between a Sales Order and Purchase order to reserve the item(s).
    Also do not allow Pick & Pack manager to create pick list for sales orders with an earlier date if other sales orders exists waiting for complete shipment.

    HI,
    WE can use the table VBKD (SALES DOCUMENT: BUSINESS DATA )
    1.  VBELN - Sales order
    2.  BSTKD - Customer Purchase order
    we can link these two fields and can pass the data in a internal table after that Vbeln is also present in
    Tables VBAP ( SALE DOCUMENT ITEM DATA )
    1. VBELN - SALE ORDER
    2. MATNR - MATERIAL NUMBER
    3. KWMENG - ORDER QUANTITY
    which could be used for further procssing
    Thanks
    Rajat

  • Pick Pack Time and Route

    Hello Everyone,
    I know that Pick and pack times are using the Shipping point working times or calendar.
    Just to confirm, can I say that Pick / pack time cannot be derived from the Route?
    regards
    John

    This is really depends on what value you set in the field Determine Pick/Pack time in the shipping point definition. If value A is selected then the pick/pack time becomes route dependant.
    By definition the pick/pack time is the time in days that is required for allocating goods to a delivery as well as the time in days that is required for picking and packing. It is calculated using the shipping point, the route, and the weight group of the order item. (from help.sap.com at http://help.sap.com/saphelp_47x200/helpdata/en/dd/5607e7545a11d1a7020000e829fd11/frameset.htm). So the route can impact the pick/pack time.
    Regards,

  • Delivery  PICK  Pack  PGI by shipment through SAP WM RF  Please help me

    Hello gurus,
                        I want to use standard SAP funtion to do the following funtion in RF gun as folllows
    Delivery >>> PICK >> PACK >>> PGI by shipment -
    > whole this step should be done in LM46. Please let me know anyone has Idea or solution
    Edited by: happytaj on Aug 10, 2010 12:13 AM
    Edited by: happytaj on Aug 10, 2010 12:14 AM

    You should talk to various institute.

  • Pick List and Pack List

    Can anyone please provide some light on how the system should generate a pick list and pack list. what config needs to be done and settings. or help me with some tutorials even.
    Thanks,
    Kanna Palle.

    Dear Kanna,
    Picking & Packing lists are the output types in the shipping output process.
    Packing list
    Standard output type for Packing list is PL00
    To get the Packing list output you need to do the output determination settings for the outbound deliveries.
    In the output determination procedure you keep the Packing list output type.
    Picking list
    1. First assign your Output type EK00 to the shipping point(Enterprise Structure - Definition of Shipping point), also maintain the time and medium.
    2. Use TCode V/38, to maintain the condition type EK00, maintain the time,print parameters and transmission medium.
    Also assign the processing routines Prog: RVADEK1,Form Routine: ENTRY, Form:SD_PICK_SINGLE
    3. Mainatain the print parameters for shipping pt using TCOde VL01SHP.
    For output determination in shiiping go through this IMG path
    IMG>Logistics execution>Shipping>Basic Shipping functions>Output control>Output determination>Maintain Output Determination for Outbound Deliveries
    -->Maintain Condition Tables
    -->Maintain Output Types
    -->Maintain Access Sequences
    -->Maintain Output Determination Procedure
    -->Assign Output Determination Procedures
    Maintain condition records through VV21 transaction.
    I hope this will help you,
    Regards,
    Murali.