Hi,
I am facing a strange problem. In portal when I use a UWL iView the UWL item is shows one day behind in portal. In R/3 the date is perfect. I checked the dates in R/3 and Portal system and they are same.
Kindly help.
Thanks & Regards,
Vijith
Not being a portal person I just try a shot in the dark: Does the user have the same time zone setting in the portal and the R/3 system?
I assume there is a time zone associated with every user in the portal system also, and this may be used to adjust the time display. Of course my theory will not work very well if the time difference displayed in the two systems is exactly 24 hours....
Second shot in the dark: is it the same timestamp you are watching in both systems, i.e. are you sure it is the work item creation time you are looking at in both systems?
Similar Messages
-
Hi,
I am facing a strange problem. In portal when I use a UWL iView the UWL item is shows one day behind in portal. In R/3 the date is perfect. I checked the dates in R/3 and Portal system and they are same.
Kindly help.
Thanks & Regards,
VijithHi,
Thanks for your response. Will be greatful once you cacn update the message when you get a reply from OSS.
T&R,
Vijith -
Problem in UWl Iview transport
Dear Experts,
This is Raji.I am trying to tranport the UWL page and UWl iview.I ahev added these objects to Transport Package. If i click on Export button , i can see the added PCd objects are nothing. I can see only the blank transport package.
Steps performed :
1. I have copied the standard UWL iview in to my own folder as a copy( not the delta link).I have changes the iview properties according to my requrirement.
2. I have copied the standard UWL page also in to my own folder and assigned my above customized UWL iview to this page.
3. added these objects to Transport Package clicked on Export. ...................> now there are no PCD objects availble in the transport package.
Appriciate your help.
Raji.hi Raji,
This is because you have to change the id of the iview, page and roles which is to be transported.
Merely copying the standard (iview/pages/roles ) into the custom folder will not help.
Hope this help.
Regards
Pravesh. -
Mdm uwl iview [(Item) Item is missing from the UWL persistent cache ]
Hi All,
we have a custom MDM repository, so I created the xml configuration file and uploaded into SAP system and clicked on "Register Item types" button and I am able to see that my items has been sucesfully registered.
Now I am using the UWL iview and when I view the connection status, it says that it is sucessfull for the backend MDM system. but i couldnt get the task that i created in the backend system for my user id. I checked the Uwl Log file, The error in the log file is
"com.sap.netweaver.bc.uwl.UWLException: (Item) Item is missing from the UWL persistent cache #"
Also the views that I mentioned in the XML configuration are not appearing in the UWL.
Could you please help me in resloving this issue.? any help?
Thank You
RKR
P.S: Posted this question already in Portal Implementation forum, but thought that the MDM experts might have already worked on this type of problem..
Edited by: RKR on Jan 6, 2008 12:15 AM
Edited by: RKR on Jan 7, 2008 8:27 PMHi,
I have the same problem, have you found any solution?
Are you also running MDM 5.5 SP6?
BR
Michael -
Delete Attachment link and the launchWebdynpro button in the UWL iview
Hi,
Can anyone help me in deleting or hiding the Attachment link and the launchWebdynpro button in the UWL iview. I dont want to do it in the iview properties which would affect all the tasks. Is there a way I can do it in the backend.\
I appreciate the help.
ThanksHi Surjith,
I have the same problem. How can I remove the link? After I called the mentioned function module, the attachment was removed (content) but in the UWL the file name is still there:
From UWL:
myFile.pdf by WF-BATCH (94 kb)
myDeletedFile.pdf <-- I removed this one with the function module
CALL FUNCTION 'SAP_WAPI_ATTACHMENT_DELETE'
EXPORTING
workitem_id = me->mv_wf_instance_id
att_id = ls_att_id
delete_document = abap_true
IMPORTING
return_code = lv_return.
Could you please help me?
Thanks,
Thomas -
UWL refresh problem for ABAP BOR custom attributes
Hi all,
we are facing an issue with an UWL iView. We wanted to display custom attributes from an ABAP Business Object (ABAP_BOR).
The feature is working but when an end-user receives a new task in his UWL view, he needs to click on the refresh button in order to have all the custom attributes correctly displayed.
We have only the problem with custom attributes, for the columns containing standard workflow decision task attributes, the data are displayed directly without the need to push the refresh button.
We are on EP 7 SPS11 and the back-end is an ECC6 version.
We have followed the methodology described in the How to configure and customize the Universal Worklist pdf document:
ABAP BOR
<CustomAttributeSource id="ABAP_BOR"
objectIdHolder="externalObjectId"
objectType="FORMABSENC"
cacheValidity="final">
<Attribute name="COSTCENTER" type="string"
displayName="Cost Center"></Attribute>
<Attribute name="FIRSTDAYOFABSENCE" type="date"
displayName="First day of absence"></Attribute>
<Attribute name="LASTDAYOFABSENCE" type="date"
displayName="Last day of absence"></Attribute>
</CustomAttributeSource>
Do you have an idea where this problem come from and how it could be solved?
Thanks in advance and regards,
Sébastien BODSONHi Chintan,
This parameter has no impact on the problem we face. I found an exact description of our problem on SAP Help portal, in the UWL pages:
CustomAttributes, CustomAttributeSource and Attribute
Extract from SAP Help portal:
Every item type can have custom attributes defined, which can be filled from Business Object or Provider Data Containers like the Business Workflow Container or the Alert Container. These attribute sources are defined within the CustomAttributeSourcetag, which contains information on which attribute connector brings the custom attributes, how to identify these custom attributes in the provider system and how long the cache is valid.
Note that once an item arrives, these custom attributes are retrieved in additional calls to the backend. For performance reasons, in order to minimize responses times to the end user, this may happen while the item is displayed to the end user - causing such attributes to be empty initially and only to appear in subsequent requests.
The display names of the attributes for column headers and labels are defined in the display attributes of the default view of the item type.
Does anyone know a workaround in order to have directly the complete information displayed?
Sébastien BODSON -
UWL iView in Sharepoint: Popup shows TLN
We are displaying the Unviversal Worklist (UWL) iView in Sharepoint. Whenever an item therein is clicked, the resulting Popup displays the DTN (Detailed Navigation) and TLN (Top-level Navigation) in the Popup and displays the content in the Content Area.
My assumption is that this is happening because the UWL item Popup window has no Navigation Context.
Does anyone have any ideas on how we can make the item Popup like it does in SAP Enterprise Portal i.e. No TLN or DTN, but just the content in the Popup window?
Thanks.Simon, what we found is that when we add the Dynamic Property it doesn't append the URL with a URL parameter, but just appends a value pair to the "DynamicProperty" URL parameter. So the Dynamic Property of "NavMode=3" didn't work when I tried it.
I looked at the properties of the iView and there's nothing about Popups of items displaying the TLN/DTN or not.
Again, I don't think its a matter of setting a property to toggle the Nav display. It works just fine straight out of SAP Enterprise Portal. The problem exists only when the UWL iView is housed in Sharepoint. So, again, I feel its more related to the Navigation Context being unknown, though I am open to all suggestions.
Thanks for brainstorming this with me.
Edited by: Shibli Zaman on Jan 7, 2010 11:13 PM -
UWL iView Properties...
Hi all,
I'm Using EP7.0 and SP16.I copied the UWL iView from this location (content provided by Sap --> End User Content --> Standard Portal User --> iViews --> com.sap.netweaver.bc.uwl.iviews --> Universal Worklist).
Changed the iView Properties:
Display UWL Overview Page = Yes
Initial state of Navigation Panel = close
That iView works fine.. It displays the Overview look and feel and also hide the Detailed navigation part..
My Problem is
when i click the link (Tasks, Notification, Alerts and Tracking) in the Oveview page, it opens the corresponding Tab look and feel and open the Detailed Navigation part.. i want to close the Detailed Navigation part of the Tab iView also..
what can i do? how to achieve this? please help me..
Regards
Thillai JHi All,
Solution:
Goto this location
Portal content > Portal User> Standard Portal User > Universal Worklist> Task
Open the Task iView and close the Initial State of Navigation Panel. Its automatically close the Naviagtion Panel when we click the links in the UWL overview iView.
Regards
Thillai J -
When trying to configure the UWL by clicking the link:
Click to Configure Item Types and Customize Views Using a Wizard, and then in the wizard selecting:
Customize the look of the UWL main page
The Navigation Node Configuration page is not correct. The dropdown list and other controls are not populated.
Anyone know how to fix this?Hi Paul,
See if this can help:
https://www.sdn.sap.com/irj/sdn/wiki?path=/display/bpx/uwl%2bconfiguration%2bwizard%2bshows%2bempty%2bdropdown
"Issue :
While using EP7.0 and customizing UWL look and feel through UWL Configuration Wizard, you see an empty dropdown under the property "Select the Navigation Node To Be Customized".
Workaround :
The issue is due to a programming error in the XML. The basic problem is that the wizard does not support the Navigation
Node name format that the mss file uses (<NavigationNode name="com.sap.pct.erp.mss.Main"....) This is fixed in newer releases, but there is no need to upgrade since the workaround provided here is fine.
Open the XML configuration file named "com.sap.pct.erp.mss.001". The top navigation node should be changed to "Main" instead of the longer name "com.sap.pct.erp.mss.Main". Just replace this string with "Main".This is what I just did and have attached the new com.sap.pct.erp.mss.001 file.
So that the UWL knows what navigation configuration to use, you need to go to the UWL iview properties and change the property 'useNavigationId' to "Main". Otherwise, you will run into problems.
So, in summary, the solution is two parts: changing the navigaiton node from "com.sap.pct.erp.mss.Main" to Main, and setting the "useNavigationId" iview property to Main."
Best regards,
José
Edited by: José Esteves on Apr 23, 2008 10:34 AM -
Inconsistence UWL iviews(with warning). UWL configuration not found
Hello,
Please, I have a problem with UWL EP7. Some UWL iViews are with warnings in PCD and others with Runtime error. When accesing System Administration --> System Configuration --> Universal Worklist Administration link and KM folder are empty. Please, I need help! What could it be happening?
Than youIt's resolved transporting development iViews to this portal.
-
Hi, I am getting below error while opening UWL iView...
Portal runtime error
An exception occurred while processing your request. Send the exception ID to your portal administrator.
See log file for details about this exception
com.sapportals.portal.prt.runtime.PortalRuntimeException: Failed to load Universal Worklist! Server side include of the application integrator failed!
at com.sap.netweaver.bc.uwl.ui.UWLMain.redirectToWebDynpro(UWLMain.java:124)
at com.sap.netweaver.bc.uwl.ui.UWLMain.doContent(UWLMain.java:135)
at com.sapportals.portal.prt.component.AbstractPortalComponent.serviceDeprecated(AbstractPortalComponent.java:205)
at com.sapportals.portal.prt.component.AbstractPortalComponent.service(AbstractPortalComponent.java:121)
at com.sap.portal.prt.core.RequestDispatcherFactory$PortalComponentRequestDispatcher$5.service(RequestDispatcherFactory.java:308)
at com.sap.engine.services.servlets_jsp.server.deploy.impl.module.IRequestDispatcherImpl.dispatch(IRequestDispatcherImpl.java:270)
at com.sap.portal.prt.core.RequestDispatcherFactory$PortalComponentRequestDispatcher.service(RequestDispatcherFactory.java:298)
Please do advice how to fix..and appreciate your quick reply.
-IanThanks Beth.
Problem with UWL iView path now I corrected it and could see preview of uwl. I have identified few issue on this context -
One is, when I see the preview of sap given standard uwl page (content provided by sap -> end user content -> ....Universal worklist) I could see default view with 5 tabs, where as if I assign eu_role or eu_core_role to user then browse Home -> work -> Universal Worklist then I could see single tab named "Open Items" alone.
We are using sap standard configurations and no customization had done, and more over working on BPM so I have checked uwl.standard.xml & uwl.bpem.xml configuration files with Q system where UWL UI and functinality is working fine.
Here my question is, Is the problem with eu_role & eu_core_role..or how come in run time UI is changing.
Second one is, If I tried to check system connection by click on Display Connection Status at UWL page getting error - Page not found or not available I am not sure where to check this.
I assigned Process viewer as related link to uwl page, If I open that link getting error as No autorization and the same error even to see preview at iView level as well. usr having BPEM End user role.
http://xyz.abcd.com:52100/irj/servlet/prt/portal/prtroot/pcd!3aportal_content!2fcom.sap.pct!2fevery_user!2fcom.sap.bpem!2fcom.sap.bpem.pages!2fcom.sap.bpem.ProcessListViewer?sap-config-mode=true
Now I have created a cusome role with sap standard UWL page. I have assigned role to user and could see standard UWL now. But still I coulln't test system connection.
Highly appreciated your inputs on this..because project is in crusial stage.
Thanks in advance,
Ian
Edited by: ian.sapce on Oct 2, 2011 5:21 PM -
Unable to open UWL iView!
Hello,
I did all the configurations for UWL.
I am using user mapping with the same user ID (both portal/R3).
I get this message when I open the UWL iView...
Unable to perform the request. Try again. If the problem persists, inform your system administrator
What could be the problem.
Here is the UWL log:
com.sapportals.portal.prt.runtime.PortalRuntimeException: Failed to load Universal Worklist! Server side include of the application integrator failed!
Failed to load Universal Worklist! Server side include of the application integrator failed! No child node binded!I increased the log level to "ALL" on the location "com.sap.netweaver.bc.uwl.ui",
Here is the stack trace
Caught com.sapportals.portal.prt.runtime.PortalRuntimeException: Failed to load Universal Worklist! Server side include of the application integrator failed! at com.sap.netweaver.bc.uwl.ui.UWLMain.redirectToWebDynpro(UWLMain.java:230) at com.sap.netweaver.bc.uwl.ui.UWLMain.doContent(UWLMain.java:374) at com.sap.netweaver.bc.uwl.ui.control.ControlSupport.doContent(ControlSupport.java:589) at com.sapportals.portal.prt.component.AbstractPortalComponent.serviceDeprecated(AbstractPortalComponent.java:209) at com.sapportals.portal.prt.component.AbstractPortalComponent.service(AbstractPortalComponent.java:114) at com.sapportals.portal.prt.core.PortalRequestManager.callPortalComponent(PortalRequestManager.java:328) at com.sapportals.portal.prt.core.PortalRequestManager.dispatchRequest(PortalRequestManager.java:136) at com.sapportals.portal.prt.core.PortalRequestManager.dispatchRequest(PortalRequestManager.java:189) at com.sapportals.portal.prt.component.PortalComponentResponse.include(PortalComponentResponse.java:215) at com.sapportals.portal.prt.pom.PortalNode.service(PortalNode.java:645) at com.sapportals.portal.prt.core.PortalRequestManager.callPortalComponent(PortalRequestManager.java:328) at com.sapportals.portal.prt.core.PortalRequestManager.dispatchRequest(PortalRequestManager.java:136) at com.sapportals.portal.prt.core.PortalRequestManager.dispatchRequest(PortalRequestManager.java:189) at com.sapportals.portal.prt.core.PortalRequestManager.runRequestCycle(PortalRequestManager.java:753) at com.sapportals.portal.prt.connection.ServletConnection.handleRequest(ServletConnection.java:240) at com.sapportals.portal.prt.dispatcher.Dispatcher$doService.run(Dispatcher.java:524) at java.security.AccessController.doPrivileged(Native Method) at com.sapportals.portal.prt.dispatcher.Dispatcher.service(Dispatcher.java:407) at javax.servlet.http.HttpServlet.service(HttpServlet.java:853) at com.sap.engine.services.servlets_jsp.server.servlet.InvokerServlet.service(InvokerServlet.java:156) at javax.servlet.http.HttpServlet.service(HttpServlet.java:853) at com.sap.engine.services.servlets_jsp.server.HttpHandlerImpl.runServlet(HttpHandlerImpl.java:401) at com.sap.engine.services.servlets_jsp.server.HttpHandlerImpl.handleRequest(HttpHandlerImpl.java:266) at com.sap.engine.services.httpserver.server.RequestAnalizer.startServlet(RequestAnalizer.java:386) at com.sap.engine.services.httpserver.server.RequestAnalizer.startServlet(RequestAnalizer.java:364) at com.sap.engine.services.httpserver.server.RequestAnalizer.invokeWebContainer(RequestAnalizer.java:1039) at com.sap.engine.services.httpserver.server.RequestAnalizer.handle(RequestAnalizer.java:265) at com.sap.engine.services.httpserver.server.Client.handle(Client.java:95) at com.sap.engine.services.httpserver.server.Processor.request(Processor.java:175) at com.sap.engine.core.service630.context.cluster.session.ApplicationSessionMessageListener.process(ApplicationSessionMessageListener.java:33) at com.sap.engine.core.cluster.impl6.session.MessageRunner.run(MessageRunner.java:41) at com.sap.engine.core.thread.impl3.ActionObject.run(ActionObject.java:37) at java.security.AccessController.doPrivileged(Native Method) at com.sap.engine.core.thread.impl3.SingleThread.execute(SingleThread.java:104) at com.sap.engine.core.thread.impl3.SingleThread.run(SingleThread.java:176)
Is there a setting am missing under "Security Zones" on portal... -
Action for workitem in subject of uwl iview is not working
Hi,
UWL is configured in EP 7.0 and using ECC 6.0. when i click on the workitem under subject, the concerned action is not opening. instead it is opening the data which is displaying in detail area of the uwl iview.
there is no action mentioned for the task type in xml file.
anyone have faced this problem....
how to resolve this
vvHello Rajendra,
This sounds like the same issue that is described in SAP note 1319278, apply the recommendations from the note and it should resolve the issue.
Regards,
Lorcan -
How to get rid of prefix of UWL iViews
Hi all,
In my UWL implementation I wanted to modify a parameter in the uwlSapLaunch iView so that UWL will trigger workitem execution in Windows GUI rather than in HTML GUI. Since I should not touch standard iViews, I copied all the iViews located under Portal Content>Portal Users>Standard Portal Users>Universal Worklist and pasted them (delta link) in my own folder. I also changed the optional UWL config parameter "Path to the UWL iViews" to point to my folder with all the delta link iViews.
The problem with this was that my delta link iViews still had the prefix com.sap.netweaver.bc.uwl, which prevents me from transporting the iViews. So I removed the prefixes of these iViews.
Now when I try accessing UWL I get an error message that shows clearly that it still tries to get to the iViews with the prefix.
Anybody faced this before? How to solve it?
I am on EP 7.00
Any help will be appreciated.
Greetings,
Patrickhi Patrick,
in order to have a backup UWL, you can export it and save to other location.
and i think in order to have to change the execution from HTML to windows GUI, you just need to create a new i-view which will link to your windows GUI and do some modification in your UWL.
the modification in your UWL will change the link from the standard / old i-view to your new one.
hopes it helps, please award points if helps
regards
eddhie -
Issue with Refresh link avaiable in standard UWL iView
Hi All,
We have added the custom column "Comment" in the Tasks tab of UWL iView.In the Tasks tab we can view some rows in the table.When we click on one row it is opening the ABAP ADOBe forms.In this Form when we change the text for the field Comment and click on save button in adobe form then we can see the new text in SWI1 tcode for the work item id. But in portal the new text is not appearing in the custom comment column.If we click on Refresh link (this link is the standard link available in UWL iview) also the new text is not appearing.
After clearing UWL Cashe from System Admin role after that we can able to see the new text in the comment column.
If in Adobe form after changing the text we click on Check and Send button then on portal UWL automatically new text is appearing in commnet column.In this case no UWL cacshe release is required.
Please find the attched document
Can you please provide me the inputs why refersh link is not working to show the updated /modifiedd text in the comment column?
Thanks & Regards,
SusmitaHi Rajesh ,
you can implement using java script also
check below thread
Implementing iView auto-refresh in JSP DynPages
Koti Reddy
Maybe you are looking for
-
Problem in Adobe Form Execution
Hi, I am getting an error "ADS: SOAP Runtime Exception: CSoapExceptioFault: SOAP(100102)" while executing Adobe Form. It seems the ADS configuratoin is not correct. Can some help me out in fixing this issue.
-
Adding a date and a time to create one channel in a data plugin
I would like to preface this question with the fact that I am new to VBS programming. What I want to do is create a plugin. Most of it is done but I am having a problem with adding two times to make one. I have a text file that stores the date and
-
Help please: can you just save a layer?
I have created a layer that I want to use in Fincal Cut. It is a rectangle that is colored yellow. When I save it and then reopen the file, it is my box with a white background like a blank page, but I don't want that - I just want the box. Is ther
-
Standard users of workflow provided by sap
I need to know who r all the standard users of workfow Provided by SAP like (WF-BATCH).where can i find the list of these standard users.Kindly help me in this issue. Thanks in advance, Ramesh Kumaar.S
-
Every time I optimise a pdf that has transparency in it, it tags all the images with icc profiles? I have turned off colour management in Bridge, but it still happens. Can someone point me to a setting etc., that will create a optimised pdf that is n