Validation of material BOM quantity at the time of production order confirm

Hi,
I want validation on material BOM ,when i confirm production order.
Actually when i am going to confirm my production order by tcode CO11, In this screen,i click on "Goods Movement" button. According to confirmed quantity , consumed materials will display. Here i can change material quantities. And here i want some validation. I there any user exit for this screen.

Hi,
         Exit Name Description
PCSD0001 Applications development R/3 BOMS
PCSD0002 BOMs: Customer fields in item
PCSD0003 BOMs: Customer fields in header
PCSD0004 BOM comparison
PCSD0005 BOMs: component check for material items
PCSD0006 Mass changes user exit
PCSD0007 Check changes in STKO
PCSD0008 WBS BOM: Customer-specific explosion for creating
PCSD0009 Order/WBS BOM, determine URL page
PCSD0010 Order/WBS BOM, determine explosion date
PCSD0011 Knowledge-based order BOM, parallel update
PCSD0012 Customer - Mat. number/mat. number during material exchange
PCSD0013 Customer-specific processing of an explosion for BOM browser
PCSD0014 Knowledge-Based Order BOM: Status
BADI's are
WORKORDER_CONFIRM
WORKORDER_UPDATE
WORKORDER_GOODSMVT
<b>Reward points</b>
Regards

Similar Messages

  • Batch Determination at the time of Production Order Confirmation

    Hi,
    I am working with Batch Determination at Item Level.
    I already have configured system to generate Batch Automatically at the Time of Production Order Release.
    But now i want to generate Batch Automatically at the Time of Production Order Confirmation
    Please help me with the necessary Configurations which would be required into achieving the same.
    Thanks in advance.
    Harris

    Hi,
    I have maintained the same for my Order Type in OPJ2 but still the same is not being picked at the time of Order Confirmation and it is being put to COGI mentioning the error as No batch specified in production order
    Also if i try to Manually Select the Batch through in Goods Movt. of CO15 it is giving a msg that No Strategy could be found.
    I have done following settings:
    1. Have maintained Condn Records in MBC1 for the component whose batch is to be determined.
    2. In material master in MRP2 Batch Determination: 2
    3. In OPL8: Batch determination search procedure
    4. In OPJ2: BD ticked for that relevant Order Type
    5. In OPKP: Automatic Batch creation kept as BLANK.
    Please support
    Thanks
    Harris

  • Selection Of BOM & Routing at the time of production order creation

    Hi guys,
    Please clarify how i can go about for the following mentioned scenario
    I have one Master BOM(Finished Product Level) & alternative BOMs for that,similarly i have one Master Routing & alternate routings for the same finished product
    At the time of production order creation is it possible for me to choose one of the BOMs & One of the routings of that particular finished product without creating a production version?
    Awaiting for a quick response
    Vijai

    Hi vijai prasad shanmugam ,
                                              In the material master MRP-4 view under the BOM selection you can maintain on what fatcors you want the BOM to be selected  Viz. Selection by order quant.,Selection by explosion date.Selection by production version etc.
    As far as the master recipe is concerned ........ I guess that if there are more than one valid master recipe maintained then SAP will prompt to select the one manually.........
    But it the standard practice to maintain the production version ....... for the similar situation to the one that you have mentioned.
    Please Let me know if I can help you in any way regarding this........
    Please reward the points......... in you find the ans helpful.....
    Thanks
    Kaushik

  • Wrong GL at the time of Production order

    Hello
    At the time of Production order settlement....its showing error that this GL is not possible to post automatically............there wrong GL(recon ac) have been assigned....where can i check this assignment in the system.................I have already checked it in OBYC.......but there i hv not found anything.......
    regards

    Hi Pari
    Check the following accounts for the relevant Val Class
    PRD-PRF (Variance acct) / GBB-AUA or AUF (COGM) /
    Also check WIP Account as well as Change in WIP assigned in IMG
    br, Ajay M

  • Error at the time of Production order cancellation.

    Hi PP Gurus,
    The transactions happened when Sales order costing was activated
    1. Sales order created
    2. Production order creation, release
    3. Production order confirmation and QM lot created
    4. QM lot cleared with Result recording and UD has taken
    5. While doing PGI system started to ask about Sales order costing
    Now as per CO requirements all the documents has to be reversed and Sales order has to be deleted. But when I'm trying to cancel production order confirmation, it's giving error that Stock of Sales order quantity is deficit in Quality stock (As it is already moved to unrestricted Sales stock). And when we reversed it through Movement type 322 its giving error like UD has already taken for partial lot....
    We tried following options.
    1. Another Sales order irrelevant to Sales order costing created and we tried to move stock from old sales order to new sales order through movement type 413E but got the same Sales order costing error.
    2. We tried to move stock from old Sales order to unrestricted use, same error we got.
    As per my knowledge UD can't be reversed in Standard system.... What could be done in that case... Please help if some one faced the same situation.
    Thanks & Regards,
    Abu Arbab

    Dear,
    If you want to change UD code, it is very simple from QA12. But if you want to reverse goods movements also, it is some thing big process. please check OSS notes 175842.
    Please check SAP note note 33924 Reversing the UD and 175842-QM lot stock reversal.
    Please refer my reply in this thread also,
    UD cancellation or reverse after GR
    Please go through the transaction CO09, you enter your plant,Material, MRP area (Plant) and Checking rule then execute, it will take you to next screen there you can able to see what are the conformed quantities for the Sales document wise(Reservations), and also you can see the current stock possition (Cummiletive ATP Quantity).
    Regards,
    R.Brahmankar

  • Loss qty related Bill of material move to scrap location automaticaly at the time of process order confirmation

    Hi experts,
    I need one  clarification, i am raise one process order in COR1 - Qty 1000 kg, reservation completed against the process order bill of material main storage location ( 0001 & 0002 ) To Production storage location ( 0004 ) through MB21 with mvnt.type 311, store person also moved the bill of material main storage location ( 0001 & 0002 ) To Production storage location ( 0004 ) through MB1B.
    Issue is at the time of confirmation i am enter the OK qty or packed qty in yield column - 950 kg , remaining 50 kg is enter in loss column.> Go to confirmation bill of material qty calculated at only for related in yield qty. Remaining loss qty related bill of material not consumed it is available in production storage location ( 0004 ),then one by one raw material and packing material qty moved to scrap location through MB1A - 541 Mvnt type.
    If any other way for easy reservation and goods issue against the process order main storage location to production storage location.
    I need at the time of confirmation enter yield qty related BOM qty consumed in 261 consumption, remaining loss qty related BOM qty taken scrap mvt.type  541 in automatically if it is possible for any customization at the time of loss qty enter related bill of material qty also posted in scrap  ?
    Kindly help me for the issue !
    Thanks & Regards,
    N.Umapathy

    Hi
    In Standard practice the scrap generated during the production process should be maintaid as negative qty and with differnent material codes which acts as BY Product.
    In your case when you maintain the scrap percentage for BOM components , it will copied to the production order with adtditional qty and it will be consumed when you do confirmation and Goods moevement and at the same time the Scrap material is generated/received  with movement type 531( not 541) as by product received out of production.
    You can maintain the same BOM component as By product in BOM system will generate the stock to a different SLoc but the cost will be wrong.
    Regards,
    Anupam Sharma

  • No. range issue : at the time of production order settlement

    Hi expert,
    My user is unable to settle production order due no no range issue:
    Short text of error message:
    Document number 9000 20001 2008 was already assigned
    Technical information about the message:
    Diagnosis
         Document number 20001 in company code 9000 and fiscal year
         already been assigned.
    System response
         Termination of processing.
    Procedure
         Check document number range 02 in company code 9000 and fi
         2008 and correct the number range status if necessary.
    Message classe...... "F5"
    Number.............. 152
    Variable 1.......... 9000
    Variable 2.......... 20001
    Variable 3.......... 2008
    Variable 4.......... 02
    Variable 3.......... 2008
    Variable 4.......... 02
    Pl advise.
    Regards,
    Samar

    Hi experts,
    Thaks for the reply.
    Pl advise what is the configuration/T code to be maintained for no range
    Regards,
    Samar

  • Rough BOM at the time of product development

    dear expert:
    excuse my nascent approach. i dont know how to address this but my client is asking to fullfill the below requirement
    we are Apparel manufacturing company. as per our scenerio we pass a long development period approx 6 months before receiving confirm sales order. we need to create preliminary or rough BOM at this stage to manage the sudden load of information. as during the development time we just got little information about the product and it is subject to change is it possible to create a rough BOM and update it continuously as and when required with proper material code and finally when we are sure we need to confirm it as final BOM.
    please suggest.
    best regards
    javed iqbal

    Dear
    We are dealing this kind scinario in small project business where total product developement takes mini 4-5 motnhs and based on design BOM is not confirmed 100% .
    So we do estomation through Quotation stage -VA21 where we follow Unit costing methodology with variable and item details based on the customer requirement.Some time we also create Engineering BOM based on the design lay out and after final approval and contractual aggrement , we logg sales order for cost roll up based on the approve BOM and routing .There may be  lot consumables as well low cost material required  , which we add directly at Production order but the most crtifcal items are in Qoutation or estimation stage  /Engineering BOM.
    But if you want to create BOM at the intial stage and subsequently , want to trace the changes doen then you should adop ECM ( Engineeting Change Management ) .For engineering change management to be activated you need to define in
    modification parameters that ECM is to be active.
    Following is the link where you can get details
    http://sap-img.com/pp007.htm
    engineering change management
    Engineering change management
    Regards
    JH

  • Alternative BOM picking at the time of creating sales order.

    Dear All,
    I have on requirment and it is as follows.
    I have 3 alternative BOMS for one material in same plant.Now sales order is created for this materila which alternatibe BOM will system pick.
    If there any possibility to customise alternative BOM picking at the time of creating sales order.Please let me know what settings do I need to configure for this.
    Thanks for your support and time.
    With Rgds,
    Babu

    hi,
    this is to inform you that,
    1. since you have 3 alternative BOM's.  so by default system will pick up that BOM which is first according to hirearchy level at the plant level.
    alternatively if the same material is going to be used for different purpose (PRODUCTION OR PLANNING), SECOND ALTRENATIVE bom will be picked.
    2. you will have to assign the BOM which you want to pick add it to the picking list (ASSEMBLY OF THE PRODUCTS/COMPONENTS).
    in CO27 - maintain the range of components at component level with plant as same for which you have already created a BOM.
    create a sales order according - that alternative BOM will be directly assigned to the sales order.
    please check and confirm.
    balajia

  • Batch number coming automatically at the time of Process order release

    Hi All,
    I want the system generated batch number for header material to come automatically at the time of process order release.
    At present ,the batch number is entered manualy dering process order creation.
    Can anyone pls guide abt the settings required for the same

    Dear,
    Define the  production scheduling profile CORY then
    Auto Batch Creation = 2 On release.
    Then assign this to your FG or SFG materials in work scheduling view in material msater MM02. Then create new order and check.
    Now for automatic generation i have to set internal number asignment for batches.
    Batch will create for movement type say 101 SPROLogistics - GeneralBatch mangment--Creation of New Batches --Define Batch Creation for Goods Movements. so it will have same logic in MM for 101 GR against PO will be internal number range but no effect in SD.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Mar 12, 2010 12:40 PM

  • What is the use of production order without material?

    Hi gurus,
    can anyone plz tell what is the use of production order without material?
    n steps involve to perform this task?

    Dear amnpp,
    It's widely used for capturing the rework activities(components and activity cost),both for final rework and inprocess rework
    activities.
    Check these links,
    Rework order manually (not Trigger)
    rework order
    Rework Order Steps
    Re: Coustomization order type for Rework
    Regards
    Mangalraj.S

  • Profit center updation at the time of delivery order

    Hi,
    We have three profit centers & three finished goods..All the three finished goods are manufactured  in all the three profit center.At the time of sales order , i am not sure from which profit center i am going to deliver to the customer.so i want to update the profit center field at the time of delivery order.
    How to tackle this problem? Please advice
    Regards
    Sarang
    09937732217

    Dear Sir;
    i have the same your problem but in the deferent way but also i need to change the profit center in the delivery wise
    thanks
    Mohamed Helmy
    +20 10 222 0 386

  • Help help please...Photoshop CS, on a Windows XP machine.   After re-booting the machine after an unexpected power failure I have been told that the "Configuration appears to have changed since the time this product was activated. To continue using this p

    Help help please... I'm running Photoshop CS, on a Windows XP machine.   After re-booting the machine after an unexpected power failure I have been told that the "Configuration appears to have changed since the time this product was activated. To continue using this product I must re-activate it".  BUT the activation link informs me that they no longer support the product (neither online nor telephonically).  So how can I re-activate this software?

    Hello Helios & Eb29075,
    +1. Please check log file for error message.+
    +2. Check status of EM.+
    +3. Please see:+
    +How To Drop, Create And Recreate DB Control In A 10g Database [ID 278100.1]+
    +Problem - emctl start dbconsole Fails with Error OC4J Configuration issue OC4J_DBConsole__ not found [ID 555218.1]).+
    As you said above, yes, I did find OC4J config issue & EM Config issue and resolved them. But still I couldn't get my DBConsole started.
    Yes, I was able to drop DBConsole<sid> service using 'emca' repository drop. But, when I started recreating repository for DBConsole service, I wasn't able to do it. I tried several times but in vain.
    Thanks,
    A.P.

  • How to restrict the GR for Production Order when Goods Issue is not done

    Hi Gurus
    How to restrict the GR for Production Order when all the required components for production order are not issued with all required quantity. Even for partial issue system should not allow GR with 101. The user status with RMWA, RMWF & CGFB is not working.
    Pls suggest best solution.
    Abhijit.

    Hi,
    You can club together the GI nad GR at the time of confirmation..
    I.e Backflush for the components and auto GR for the Product.
    So that you can stream line the Process.
    The best Option would be to use the User Exit:
    Enhancement - MBCF0002
    Functional Module - EXIT_SAPMM07M_001
    Include - ZXMBCU02
    Refer below link for further details..
    How to stop the goods receipt before issueing the goods for production orde
    Regards,
    Siva

  • Production order confirmed quantity

    hello!
    can i change the settings, that production order atp-check confirms quantities from e.g. purchase requisitions, not only stock in warehouse?
    best regards,
    matthias

    hello!
    every supplies are ticked in OPJJ. it works for receipts before demand from production order, but no receipts in future are confirmed.
    Date                          MRP element                           Req/rec     Confirm     ***. ATP
    04.03.2009     Stock                                                  1      0      
    12.03.2009     OrdRes     Totals record     3-     1      0
    14.03.2009     PurRqs     Totals record     1      0      1
    02.06.2009     -
    >     End lead time     0      0      0
    02.06.2009     PurRqs     Totals record     3      0      0
    i would expect that the order confirms the quantity from the purchase requisition.
    best regards,
    matthias

Maybe you are looking for

  • Creating Conditions for Purchase Info Records using IDoc COND_A01

    Hi All, we are using IDOC COND_A01 to update and add conditions in ME12 transactions. But when we send a condition IDoc which contains 2 condition types (Segment KONP), the standard function call creates only one database entry in the table KONP. The

  • Census Report Help needed

    I have a report that I am working on for a hospital Emergency dept. They want an hourly count of how many people are in the ER. Sounds easy, right. Well here's the kicker - the hospital wants an running count by hour of how many patients have been in

  • How to activate Instant Messaging in Outlook 2010

    Hi, I have a very bad habit of Instant Messaging. Currently, I am using Microsoft Outlook 2010. Is there any instant messaging feature in Outlook? If yes, then please help me out in configuring it and using it. Thank you friends.

  • Warning 20225

    I'm trying to install Acrobat 6 Std, and I receive the below error: Warning 20225: Adobe Acrobat 6.0 was unable to create a new item: Adobe PDF Converter. The Adobe PDF Printer may be unavailable. GetLastError: Cannot create a file then that file alr

  • How to Read XML tags....

    Hi guys... Can any one here tell me how to read the XML tag in PL/SQL. In table Enquiry there are following fields. Id          number Status          varchar2(5) Request          XML Reply          XML Error          varchar2(10) Now the following X