Validation on PLant and profit center for Material

Hi gurus
please advise on validation.
On FB50 transaction, Our users want a validation for particular accts say (GL:  No 999888)
that if  a material is entered in FB50, a plant and profit center must also be entered AND the entered plant and profit center should be the one from  the material master MM03.
Please advise steps as how to build validation for the above requirement.
Many thanks in advance

Hi
You should never post any entry to a material account from FB50. FB50 is a purely FI transaction, and the Inventory accounts get hit automatically by various MM transactions. If you will post an entry from FB50 to a material account, there will always be inconsistency between FI & MM records.
regards
Parag Bhargava

Similar Messages

  • Plant and Profit center wise Turnover and  gross profit for the Month for s

    Hi
    We need a report Plant and Profit center wise Turnover and
    gross profit for the Month for selected month and GL's
    We are using new GL. but our bi system old version.
    SAP_BW -- 7                      Patch:SAPKW70015
    BI_CONT - 703                    Patch:SAPKIBIIP7
    Do you have any idea or experiences which data source and data target required to full fill this requirement?
    Thanks
    Ramana P

    Hi
    You need to check if you really the report Plant wise and if yes, then check if the Accounting Transactions are maintained at Plant Level in your source system i.e. in R3.
    Ideally it should be Business area or Functional Area or Controlling area which are maintained in Accounting Transactions. You will also the relevant details for these Characterisitics + Profit Center in the NEW GL Accounting data sources.
    Cheers
    Umesh

  • Link between Plant and Profit Center

    Hi,
    Can any one let me know how to derive profit center for a plant or where this info is stored.
    thanks,
    preetham s

    Hi
    There is no direct relationship between a plant and profit center. Based on your configuration in the system, however, you can have various relationships. For eg, if your plant is one valuation arrea, there is a relationship for various cost center and cost elements at the valuation area level in T Code OKB9. In such a case, every valuation area relates to a plant and profit center derives the data for a plant from the cost center and cost element combination. Another way could be through the material master, where, for every plant view, you can assign a profit center. Another way of looking things could be a scenario, where every plant is also a profit center. In such a scenario, in EEC 6.0, you can draw Financial Statements also at Profit center level.
    Thanks & Best Regards
    Sanil K Bhandari

  • Plant and profit center

    Dear CO Gurus,
    I have a scenario as described below.
    The semifinished material is manufactured in first  work center/cost center. The Finished product is produced in second
    work center/cost center and consumes the semifinished product manufactured in the first cost center.
    The same semifinished material also sold directly to customer from the same plant. Now both the cost centers are under one plant. Is it possible to have separate cost and revenue reports for this two materials ( semifinished and finished product), two cost centers.
    Or is it necessary to divide the single plant having this two cost centers into two individual plants. If we split the plant into two, then the semifinished material will be issued to finished product as a stock transfer from plant 1 to plant 2. Customer do not want to do every time stock transfer orders.
    So is it possible to have single plant and 2 different cost center for the semifinished and finished product manufacturing .And can we take separate cost and revenue reports without splitting the plants.
    Thanks and regards
    Murugesan

    Hi,
    You have to split your issue into two parts i.e one is workcenter/cost center combination to capture activities costs and other one is Plant and profit center combination to have report.
    U can have different cost centers for both semi finished and finished products to calculate the activity types in the same plant. U define separately the activity cost for each cost center and activity type and assign the same in the respective workcenters of the products.
    If each plant is created as a profit center, one option is to assign the same profit center for both the products and taking the report on profit center with material as a sort field, which will give the desired report.
    Another option is to create two different profit centers for these products and assign in the material master for material and plant combination as Semi Finished and Finished goods are going to be different material codes.
    Regards
    Sudahkar Reddy

  • Table to link in b/w plant and purchase org for material?

    Hi Gurus,
    what is the table to link in b/w plant and purchase org for material?
    I want to know the materials available for particular plant and purchase org combination..
    thanks in advance..

    hi
    plz check that the materials are created on basis of PLANTS
    so u can get list of materials plant wise in MM60
    now this plants may be assigned to different P Org  ,so u have to find that PO to plant linkage
    if u need all this on one report then try to create a new z programme or use query writting
    regards
    kunal

  • Assign manual cost and profit center for 3rd party purchase order

    When we have a 3rd party purchase order we need to assign OUR cost and profit center to that document.  Here is the scenario:
    We buy a product from a vendor for $10 and then re-sell the product to a customer for $100.  Instead of posting this information to either cost or profit center of the vendor and customer, we need to assign the $10 to our company cost center and the $90 to our company's profit center.  We are basically acting as a middle man for selling a product.
    I am fairly a newbie, so please provide detailed answers if possible.  We create the sales order in VA01 and create the purchase order in ME22N.

    HI Kapil,
    For any accounting entry you need to define a General Ledger Account where the details (Amount) of the transaction will be stored.
    Just by maintaining cost centre will not help in completing any transaction involving accounts. So you need to  maintain G/L account in the controlling area of your company code.
    You can use T Code FS00 to create new G/L account in the chart of accounts.
    In the edit cost element Tab you can give the cost center that you want.
    I hope this helps.
    thanks
    rahul goel

  • Changing the profit center for Material impact on inventory turnover

    Dear All,
    Due to recent organization structure change, we have some up with new set of profit center in our organization.
    This means that old profit center as case in point in material master should be changed to new ones, after flushing the stock out. Probably, by moving stock to cost center with movement type 201 and then after the profit center change we reverse with movement type 202.
    We use standard SAP report MC.7 inventory turnover calculation. Based on this inventory turnover, we use this ratio to calculate the inventory obsolescence provisions.
    So, our issue is the above movement profit center change by moving it to cost center, does it impact the inventory turnover?
    Or alternatively, can use some other movement type which does not change the inventory turnover? So, that we are assured from our side, about no change on inventory turnover and subsequent the change to our inventory obsolescence provisions.
    Please help me here.
    Kind Regards,
    Prakash

    Hi Venkat,
    Thanks for the reply. How different this movement type 562 (intial stock upload) is different then 201 (cost center consumption)?
    I mean does it not update the info structure?
    Regards,
    Prakash

  • Cost center and profit center for a G/L account

    Hi
    Can nyone plss tell me whether a G/L account can have both Cost center and <b>Profit center or it can have just any one of them.

    Hello,
    Yes, a GL account can have both CC and PC. The tables for them are.
    in BSEG you will find KOSTL(Cost Center) and PRCTR(Profit Center). The Master Data and Text table for profit center and cost center are,
    Profit Center Master Data: CEPC
    Profit Center Text Table: CEPCT
    Cost Center Master Data: CSKS
    Cost Center Text Table: CSKT
    Regards,
    Shehryrar Dahar

  • Table for Profit center for Valid Plant

    Hello,
    Kindly provide me the Table for the Valid Profit centre against the Plant.in the result it should give me the list of Plant and Profit Centre.
    Thanks
    regards

    There is no direct assignment between plant and profit center. It is indirectly done in each material master
    Thanks and Regards

  • Validation - plant to profit center

    Hi Experts,
    Urgent!
    My client requirement is -  each profit center to be post only one plant.
    For that I  need to develop Validation .
    Friends send me some documents regarding validation.
    specily plant to profit center .
    mail id: [email protected]
    Thanks a lot for advance
    Regards
    vinod

    Hi Vinod,
    Use substitution instead of Validation for your requirmenet.
    You can create a substitution as below
    if plant = 1000
    Profit center to be substitutied with 100000
    IF Plant =2000
    Profit center to be substitutied with 200000
    You can create a substitution by using T.code:OBBH
    Hope it will help you more.
    all the best
    Edited by: prasad naga on Feb 7, 2008 2:23 PM

  • Plant vs Profit center

    Dear expert,
    How to check plant and profit center in transaction MM01, so when user input profit center which belong to other plant, error message occurs.
    thxs and sorry for my english.
    Rgds,
    Ely

    Hi Ely,
    Profit center is like a cost center. The difference is cost center is holding expenses mostly and a profit center create revenue for the organization.
    The profit center is entered in material master "Sales: General/Plant" view.
    Thanks and regards
    Muruegsan

  • Profit Center for Billing Substitution

    Hello,
    I am currently using this substitution in 0KEM to populate the profit center for billing (PCTRF) in an inter-company sales order.
    PrCtr Type = '2' AND Profit Center = '' AND (
    Sales Org. = '5010' OR Sales Org. = '5020' )
    It is working because the profit center for billing (driven by PrCtr Type = '2' ) field is originally blank and so I can substitute in a different profit center value.
    My question is I would like to take this a step further and substitute different profit centers in the profit center for billing field (PCTRF) based on the value in the profit center field (PRCTR).  Has anyone had any luck with this?  I see that is is controlled using the PRCTR_TYPE 1 and 2 in the PCASUB area, but I am yet to figured out the right combination for it to work.
    Appreciate any help.
    Kevin

    Kevin,
    Refer to SAP Note 815972 - PCA substitution for cross-company-code sale.. It gives the details on how to fill the two fields "Profit Center" and "Profit Center for Billing within the substitution.
    Thanks
    Venkata Ganesh Perumalla

  • Wrong Profit Center on Material document (Goods Receipt PO for Asset)

    Dear SAP Expert,
    When our company upgrade our SAP version from 4.6C to ECC6, all Profit Center on Material document (Goods Receipt on Purchase Order for Asset) is filled by profit center DUMMY.
    This condition not happend in our previous version (4.6C). Is there any new configuration on ECC6 for Asset Accounting?
    Many Thanks
    Maickel P

    Hi, Maickel:
    There is a setting for Dummy Profit Center, you can check in SPRO: Controlling->Profit Center Accounting->Master Data->Create Dummy Profit Center.
    And you can refer to the help of this IMG activity:
    Create Dummy Profit Center
    This function lets you create the dummy profit center for the current controlling area.
    The dummy profit center is updated in data transfers whenever the object to which the data was originally posted (cost center, order, and so on) is not assigned to a profit center. This ensures that the data in Profit Center Accounting is complete. You can later send the data on the dummy profit center to the other profit centers using assessment or distribution.
    You create the master record for the dummy profit center using this special transaction. To change or display it, use the normal profit center maintenance functions.
    The name of the dummy profit center is displayed in the controlling area settings for Profit Center Accounting.
    Prerequisites
    The standard hierarchy must exist for the current controlling area.
    Actions
    Enter the name of the dummy profit center. The rest of the steps are the same as when you create a normal profit center.
    Choose the function Extras -> Set controlling area first to make sure that the correct controlling area is set.
    Notes on transporting
    You can transport the Customizing settings for Profit Center Accounting under Transport Connection.

  • Wrong profit center on material doc (Goods Receipt against PO for Asset)

    Dear SAP Expert,
    When our company upgrade our SAP version from 4.6C to ECC6, all Profit Center on Material document (Goods Receipt on Purchase Order for Asset) is filled by profit center DUMMY.
    This condition not happend in our previous version (4.6C). Is there any new configuration on ECC6?
    Many Thanks
    Maickel P

    HI Werner,
    Based on Note 684659
    Question 10:
    "Why aren't the correct profit centers derived from the account assignment objects?"
    Response[1]:
    You first have to maintain the account assignment objects as described in the response for question.
    Action:
    I Already assign account assignment object PS_PSP_PNR "WBS Element of Investment Project", transaction type '*', account assignment type 'APC Values Posting' because our transaction is using WBS element as an account assignment on purchase order.
    (Before I assign this account assignment object on t-code ACSET all transaction for asset which account assignment using WBS element doesn't generate controlling document on GR process)
    Response[2]:
    You also have to make sure that the profit center is ready for input in the field status of the account and the posting key.
    Question:
    Where I have to check this condition?
    Please check the field status of the account FS00 if Profit Center and Cost Center maintained optional.
    Action:
    I Already check on "FS00 - Edit cost element" and found that "Default account assignment" is blank

  • Plant and Cost Center are not displaying in FI doc. for asset scrap ABAVN.

    Hi All,
    When we do asset retirement by Scraping using Transaction Code ABAVN, Plant and Cost center are not appearing in the FI document. But, in the master data the Plant and Cost center are assigned for the particular Asset. 
    When I see the FI document display, the fields Cost Center and Plant are blank.  Business Area and Profit Center fields are getting updated.
    Can any one help me how to get this Plant and Cost Center in the posted document.  Is there any OSS notes for this.  I am using ECC 6.0 version.
    Thanks in advance for your help.
    Regards,
    Rajesh

    Rajesh
    Aditional on me answer.
    The systemtakes not the cost center from the asset you have to assign it in OKB9 or to fill in during this posting:
    Steps
    Click on Simulate, than you see the posting screen:
    Click on the line (pk 40)
    Click on Goto and Additional account assignment and fill in the cost center whatu2019s in the master record of the asset and post
    An other option is to make a substitution to get this information

Maybe you are looking for

  • AME error: WinFile.cpp-754

    I updated Adobe Media Encoder to version 4.1.0.107 - it worked fine in the past. But I now get this error message when starting to convert a clip: [../../Src/Win/WinFile.cpp-754] It doesn't matter which settings I use. It also doesn't matter which co

  • Loss of HDV support after latest Adobe patches...

    I recently applied the latest patches that were released for AE, PPRo and a few of the other applications in the master suite and after the patches were applied I lost the abilty to edit HDV in PPRo and in AE.  In PPro, it actually grayed out the opt

  • CRM ORDER CHANGE / CRM_ORDER_MAINTAIN

    Hi Max. Firt of all, Let me thank you for taking the time and replying to my question. Thank you again. Now, Inyour reply, you said that it is a little tricky on how we fill in the BAPI structures, can you please explain how. I did try your advise wi

  • Can't start my VM after I deleted snapshot

    I can't start my VM after i deleted my snapshot. Before I deleted my snapshot it said merge in process but becouse I ran out of disk space I had to delete the snapshot. The error I get is "An error occourred while attempting to change the state of vi

  • Sorting by genre trouble

    Have a trouble sorting my music in iPhone by Genre. Got a lot of randomly selected "Unknown genre" folders. But in iTunes everything is ok. Everything is tagged properly. Furthermore, sorting by album works fine, but new albums of existing artists do