Hi Guys,
I don't understand why during usage decision, system pops up the following message even though I have force the inspection completion on one particular inspection characteristic.
Valuate the non-valuated QM characteristics manually? Yes button and No button
        After hits Yes button, another message appears...
Class characteristic QNNVM1 can be manually evaluated.
There are two inspection characteristics in this inspection lot, and one inspectin characteristic has been record as pass and accepted during result recording, while another inspection characteristic (which is a required characteristic on system setup) did not perform result record. Thus, during QA11, I force this required characteristic to inspection completion.
My questin is why the system gave me "Valuate the non-valuated QM characteristics manually?" message?
Thanks
YY

Plz. tell me whether sampling procedure is used for these characteristics ?
If yes then whether valuation mode is 'valuate manually ' ?

Similar Messages

  • Error during Usage Decision - Not All Physical Samples are valuated

    Hi,
    I am using Sampling Procedure as follows:
    Sampling Type :   Fixed Sample
    Valuation Mode :  Attributive Inspection nonconf. Units
    Inspection Points : Sample Management
    I have assigned the  Inspection Point as  200  and Sample Drawing  Procdure in Inspection Plan Header.
    I have recorded and closed results for 3 samples. During Usage decision the following message shows:
    Not all physical samples are valuated!  Do you want to force inspection completion? 
    This means that Valuation of Inspection points have not updated. I request your help to solve this problem.
    Thanks & Regards
    V.Devaraj

    Hi
    Check the inspection plan, check for all the operation, by double clicking on operation you enter the opertioa details screnn, pls scrol down, you should have a field called VALUATION, select the option "automatic valuation option" .
    try this
    navin

  • Non-stock purchase for the non-valuated item

    For normal valuated items, if we make it account assigned on PO, it didn't update the inventory on receipt but rather gets charged to the cost object on the PO.
    Can we have similar functionality for non-valuated item.
    We are having a non-valuated but stock item purchasing scenario.  For this we are updating only the quantity of receipt but the value is getting charged to the cost object on PO.
    Now user wants to buy same item and charge it to the specific cost object (it's oka upto this point)..AND don't want to update the quanity in inventory.
    So in short can we control the no qty. update for the non-valuated item as we can control for valuated item through account-assigned purchasing.

    Hi,
    But why u need quantity and value both  of a material should not be updated ??
    Ok...
    Create a Material type  and go to OMS2 and  click Quantity upadating and Value updating in Dialog Structure .Now Check ur valuation Area( example Plant) and do not tick Quantity upadating and Value updating check box.
    Now try ur transaction and it will work without affecting quantity and value.
    If helpful then reward.
    Regards,
    Biju K

  • Split valuation for non-valuated materials

    Hi dudes,
    We are implementing SAP for our Subcontractor.
    our SC  receive all components from our company ( on free ) but sometimes they purchase the same material themselves for other uses. so we decided to use split valuation to separate valuated and non-valuated materials.
    I did configuration and created 2 valuation type ( valuated - nonvaluated )
    when I create Purchase order it askes for valuation type but even when I use non-valuation type in PO it asks for price!!!!
    do any of you have used split valuation for this target?
    have the same problem?
    what should I do actually??

    Hi,
    Is someone in the subcontracting plant going to do a process order on the materials you send them? Or are you only going to track the finished inventory once it reaches your plant?
    In the first case:
    1) Create a STO to the SC plant. This stock will have to be priced.
    2) Inventory reaches SC plant. They perform production process.
    3) finished inventory is sent using another STO.
    2nd Case:
    1) Create a SC vendor using the SC plant as a vendor.
    2) Create a SC PO to this vendor using this vendor and transfer goods to him. In this case, goods are transferred for 'free' as they really belong to you and not to the SC
    3) Once the production process is over and the finished product is sent back to you, do a GR. The raw material sent to the SC will be consumed.

  • Transfer material from Valuated project non valuated project

    Hi Experts,
    While i am trying to transfer material from Valuated project stock to Non valuated project with T.Code MB1B movement type 415 'Q', I am getting following error.
    WBS element  has different inventory valuation
    Message no. CN769
    Diagnosis
    The project definition for WBS element  only allows the following stock control:
    No project stock
    No project stock with defined valuation M
    ' ' = non-valuated project stock
    'M' = valuated project stock
    System Response
    Account assignment not possible.
    Procedure
    Change the settings for the project stock in the project definition (Control tab) or use a suitable WBS element.
    Kindly suggest me how to trafer material from Non valued project stock to valuated project stock.
    Regards

    Actually, you sohuld not be transferring stock to non-vlauated proejct directly. In case of non-valuated project, stock is never valuated while in case of valuated project it is valuated. So there is basic difference in valuation method. This will create inconistency if you attempt ot transfer it directly.
    You should rather transfer this stock to general stock and then transfer to non-valuated project stock.
    Regards,
    Mahendra

  • Valuated or Non Valuated Sales order or Project stock?

    Hi,
    a) What factors should i consider before deciding on whether my Sales order or Project stock should be Valuated or non valuated?
    b) If i have decided to have the Project and Sales order stock as valuated how can i go about doing the settings for the same in SAP? How can i assess its value in financial accounting?
    Thanks

    Hi
    As per my knowledge, the Material type controls whether that material is valuated or not.
    Thanks,
    Ravi

  • Valuated and Non-valuated project stock in same SAP system

    Dear All,
      Can we operate with the system where projects are with valuated and non-valuated project stock at the same time. If yes, are there any precautions we need to take before doing this.
      Currently we are changing to 'valuated project stock' from 'non-valuated project stock' due to advantages of 'valuated project stock'. But since we are implementing this change in already stable system where projects are running with 'non-valuated project stock'. Please suggest of there are any complication with this.
      Thanks in advance !
    Regards

    Hi Muralidhar Lanka,
    Thanks for your time and efforts to share your thoughts with all of us. Hope you will not mind, did you done this kind of changes to profiles midst of the project in the past? or its your guess.
    Because, many times these kind of questions comes from business to change, but we are not sure how it will affect the existing as well new projects. In such circumstances, normally we politely propose to go with two profiles rather changing the existing one since we are not sure of how it will affect.
    It would be great help to all of us if you can share your experiences how the goods movement and value flows have taken in  system for old projects and new projects. What kind of changes you could notice after changing profile in terms of .. a few of them
    1.  Goods movement
    2. Consumption of production orders and internal order.
    3. Settlement and RA (customer projects/ investment projects)
    4. POC calcualtion of projects
    I am sorry if you find my questions are silly and not worth to answer, please disregard.
    Looking forward to hear from you at your convenient time.
    Thanks,
    PSR

  • Does table MCHB (batch stocks) contain both valuated and non valuated stock

    Hello
    Does table MCHB (batch stocks) contain both valuated and non valuated stock?
    Is it possible that material has both valuated and non valuated stock for the same plant and storage location?
    Thanks

    Hi ,
    Most of your queries has been answered by Jurgen.
    1)Does valuated or non valuated is linked with valuation type? yes ..if the material is valuated then only there is valuation type.It is used for split valuation .
    2)Where can I see whether material is valuated on plant or not?
    to check the valuation level IMG >Enterprise Structure>Definition>Logistics - General>Define valuation level
    and to check value and quantity updation at plant level check
    IMG >Logistics - General>Material Master>Basic Settings>Material Types-->Define Attributes of Material Types
    3)Case1
    I want material A to be valuated at the plant without split valuation
    Case
    I want material B to have 0 value at plant
    go as Jurgen has recommanded in the previous post . for material B used different material type which is not valuated at that plant .
    Regards,
    Anupam

  • Valuated and non valuated stock

    Dear Experts,
    I have 20 thousand PO i need to identify Valuated and non valuated stock, can any body suggest me  how i will go about this
    Any standard report is there or from tables ?
    Thanks
    Raj

    Hello,
    If you want to take report for Stock and Non-stock(consumables) items then you can execute ME2L and Filter with Account assignment category.Blank and Non blank as mentioned above.
    But if you want to take a report for Valuated and Non valuated then You have to take a report from Tables
    Go to SE16 enter Table EKPO
    Restrict the Entries with "changed on date" and Doc. Category " F".
    execute the entries,then download into excel and filter the datum with the Field
    Field Label:GR non-Valuated.
    Field name: EKPO- WEUNB
    Hope it is ok.
    Murug

  • Splitt valuation for non valuated material

    Hi all,
    Is it possible to make splitt valuation for non valuated material? if yes how?
    Our business scenerio
    Large no of spare parts (ERSA).Divide spare parts material type into 2,
    1 for valuated and another for non valuated,
    For non valuated spares,copy from ERSA make  it ZBLB for non val spares
    now
    How to make the split valuation for ZBLB material type material's ??
    Do u have any idea ??
    Regards,
    Hareesha

    Hi
    Split valuation is the concept used for individual valuating of different lots of same material.
    Here you have created a new material type ZBLB from ERSA for maintaining non-valuated materials. There are several significant points in your actions.
    1) When u  are able to maintain materials seperately with different material types, what way u want to use split valuation concept?
    2) As the non-valuated material implies for no value updating, the material type does not provided with accountign view. So no valuation class and obviously no valuation type. The prpcurement of non valuated material will be account assigned.
    3) For non-valuated materials, either u have to use standard material type UNBW or copy from UNBW. donot copy from ERSA.
    I hope your doubts are cleared. Please come out with your comments if any specific.
    warm regards
    sairam akundi

  • UOM Change during Usage Decision

    Hi Gurus,
    I am maintaining 2 UOM in the material master .
    1) Kg
    2 ) Tonne
    I am purchasing my material in Tonnes . During Usage decision, I want to post my material in Kg.
    I ] Is it possible to make the UOM change during Usage Decision.
    II] Is it possible to use same inspection plan for the same UOM, In case of I am recieving the material  by Kg or Tonne
    Thanks in Advance.
    Srinivasan

    You cannot normally change the UOM in the UD.  You can only use the bas UOM.  SAP however does have a note on using alternate UOM in the stock posting. It is not as seamless as you would probably like, but its the best you'll do.
    The note is 605861.
    I posted part of it below.
    Craig
    With the import of the assigned Support Package or the implementation of
    this note, a Business Add-In is made available with which you can program
    an input help for quantities in the usage decision.
    For example, this enables you to specify quantities for the stock posting
    in an alternative unit of measure in the usage decision. Via a
    corresponding BAdI implementation, you can call up a dialog box - in which
    you can specify the respective quantity with the required unit - in the
    usage decision when you use the input help (F4) for the quantity fields.
    However, the quantity is always transferred in base unit of measure to the
    stock posting.
    The BAdI can only be used for stock-relevant inspection lots. You can only
    enter the quantities in other unit of measures manually (explicit call of
    the input help).
    You can implement new BAdI QEVA_ALT_QTY_INPUT using Transaction SE19.
    Take also the documentation on the BAdI into account.
    You can transfer the BAdI definition together with the respective
    documentation using the assigned Support Package.

  • What is diff b/w valuated and non valuated

    hi
       can anybody tell me what is difference between valuated salesorder and nonvaluated saled order stock
    thanks
    prasad

    Hi,
    While creating the Sales order, system explore the BOM for that FERT. Say, I add one more extra component in sales order which is not been maintained in BOM or which has not been valuated for Std cost estimate for that FERT material. This extra component is call it as Non-valuated sales order stock. All other, valuvaed materials are valuated sales order stock.
    Hope, it helps!

  • Difference between Valuated and Non valuated Sale order stock

    Hi All,
    Can anybody tell me the difference between the above said subject with the steps involved in each scenario.
    That is valuated sale order stock and Non valuated sale order stock in Product cost by Sale Order.
    With Journal entries at each step and whether any WIP or variances at Production order level and sale order level and all the financial entries related to them
    Thanks in Advance,
    Ravi Kumar

    Hi Shail,
    Thans for your inputs,
    But I wanted to know it in more detail. In what scenarios they are used with financial entries in both the cases.
    I will give you my scenario. It goes like this,
    My client is in pipe coating business, who receives pipes from customers and does only coating work(which is considered as service) and despatches it to the customer. this process is carried on the basis of work order(Sale order).
    Now Production order is created and work is done on that with reference to Sale order for that particular customer.
    So the pipe which my client receives should be non valuated stock as it will not be a raw material to them and the cost incurred on it is booked on production order like chemicals as raw material consumption, activity cost etc.
    now in this scenario just tell me how and at which stage FI entries get generated at Production order and Sale order level, and also at wat level Standard cost estimate should be created i,e at production order level or sale order level(sale order cost estimate).
    Will there be any entries at goods isssue and GR against production order. If no then how the COGM account will get hit.
    Please tell me this scenario in both cases Valuated sale order stock and Non valuated sale order stock with financial entries in Sale order costing.
    Thanks & Regards,
    Ravi Kumar

  • Project stock options: valuated and non-valuated

    Hi Experts
    In some discussions, i have been told that the 'valuated project stock' option is adaptable for customer projects where as 'non-valuated project stock' option is for cost projects. is it right?
    May explain what circumstances non-valuated project stock option is chosen?
    If we choose non-valuated project stock option, the results analysis is must, is it right?
    warm regards
    ram

    Even Customer projects may be Non-Valuated. It depends on client requirement.
    Regarding result analysis it is  not must in case of valuated. Again depends on customer requirement.  Resulst anlysis can be used for both Valuated as well as Non-valuated projects.
    Venkat

  • Initial entry stock (561) is valuated for non-valuated material

    Hi Gurus,
    I am doing initial entry of stock balance (MvT 561) for several non-valuated material. But when I check the table MSEG, I got status of "X" in the field MSEG-WERTU, which mean the material is valuated. The consequence is the value is updated, so I get inconsistency in stock (stock value is updated, table MBEW)
    So how can I can get valuated when I done my first initial entry of stock balance for non-valuated material?
    How can I trace, where did I go wrong?
    I have checked these:
    - I checked the material type, and it is properly configured (quantity update only).
    - No changes have been made in the material type.
    - No changes have been made in the material master data.
    Please help, and thanks!

    Hi,
    Please refer the below links....
    MB1C 561 With no Financial accounting Document created
    Valuated material to Non valuated material movement
    I am getting accouting Document when I do GR
    Regards,
    Udaya.