Valuation for the Finished Good

I have finished good material with Price Control u201CSu201D with a price of Rs 100.
To make this finished good I need 5 raw materials and all the 5 material masters are having the price control u201CVu201D.
Price of these 5 raw materials is fluctuating and the total cost of the finished good varies accordingly.
Now If I valuate this finished good then the system is valuating this on the price which I have maintained in the FG master (under price control-S i.e Rs 100). But due to the fluctuation of the raw material price, now the FG price is Rs 120 (after adding all the Production charges etc)
I want to valuate the FG stock at Rs 120 not at the Rs 100.Valuation level is maintained at Plant level.
Because of this, huge difference is coming into the stock valuation.

Hi,
I suppose you are trying to change the Standard price in the MMR. It will not work,
Use MR21, enter the material and valuation type and the new price and save. If there is stock, necessary adjustment entry will be passed and the inventory gets valuated with the new Standard price.
Now check the MMR, it will have been updated with the new Standard price
Regards
Merwyn

Similar Messages

  • Excise Invoice cannot be captured for RG1(Finished Goods) material

    Dear Friends,
    While creating GR and choosing the option only capture Excise Invoice system showing error as follows:
    Excise Invoice cannot be captured for RG1(Finished Goods) material
    Message no. 4F276
    The Material is a Raw Material(ROH) and Price control is "V".Pl tell me and earlier 3 times GR is done on this material w/o error.
    Pl help me how to get rid of this error.
    Regards,
    Ask

    In GR check in Excise item tab under excise item whether it is showing Raw Material or Finished goods?
    Simulteneously check in J1ID for the said material & chapter-id combination what material type has been maintained?
    Regards,
    Indranil

  • To know the Finish Good or FInish Product name

    i am developing an Batch wise consumption report, in that i want to know the finish product name, is there any FM or a table where we can find the name of the Finish Goods or Product name,,,
    Regards
    Mukesh Kumar M

    Usually, it depends on your business requirements.
    Bare minimum fields will be MARA-MATNR, MARD-LGORT (storage location), MARC-WERKS (plant), MARA-NETPR (Price), qty, shel-life expiration date, batch number, vendor, etc.
    Please refer to these links for step-by-step details.
    https://forums.sdn.sap.com/click.jspa?searchID=1680871&messageID=3147313
    https://forums.sdn.sap.com/click.jspa?searchID=1680871&messageID=2727595
    Material Replication filtering problem
    https://forums.sdn.sap.com/click.jspa?searchID=1680871&messageID=939819
    https://forums.sdn.sap.com/click.jspa?searchID=1680871&messageID=3051093
    https://forums.sdn.sap.com/click.jspa?searchID=1680871&messageID=1446371
    https://forums.sdn.sap.com/click.jspa?searchID=1680871&messageID=2906955
    https://forums.sdn.sap.com/click.jspa?searchID=1680963&messageID=2906855
    https://forums.sdn.sap.com/click.jspa?searchID=1680963&messageID=3107068
    https://forums.sdn.sap.com/click.jspa?searchID=1680963&messageID=2987071
    https://forums.sdn.sap.com/click.jspa?searchID=1680963&messageID=3171466
    Hope this will help.
    Please reward suitable points, incase it suits your requirements.

  • InterCompany Billing issue for the Free Goods?

    Hi All,
    I created the info record (MM) for the free goods determination in the STO with Condition Type NR00. When I am creating STO  for the stock transfer from one company code to other, the free goods are determing automaticaly, but  while doing the Intercompany billing system is considering the price for the free goods also.
    Please suggest How to configure to determine the free goods while doing the Intercompany Billing ?
    Regards,
    C S Javali

    Hi Javail
    Any have all free goods so you can create the po indicator with free goods in receiving  plant.
    after delivery from supplying plant, you have to do the GRN in receiving plant.
    so supplying pant value of goods zero ( P101 CONDITION TYPE). in this you have to specify if any other charges like transport etc. then do the billing.
    Laxman

  • How to control the finished goods that have already sold to customer

    Dear Gurus,
    I have a problem.
    In normal situation, SD process is....SO->DN->Post->Billing, after post the material, the goods won't exit in the plant anymore.
    But there is a special business mode.....
    After we sold to customer, and AR accounting document created...
    But NOW the finished goods still in our plant, we wanna manage the quantity in SAP,  is it possible?
    Thanks in advance.

    and AR accounting document created
    No it is not possible.  Once the customer is debited, you cannot show the inventory in the delivering plant which is logically wrong.
    G. Lakshmipathi

  • If my ipad was stolen, how to register my ipad for the stolen goods, and lock the hardware requirements?

    If my ipad was stolen, how to register my ipad for the stolen goods, and lock the hardware requirements?

    It's really disappointing as a newly converted Apple customer who has already had his iPad stolen, that Apple just sits back and let's this happen. 
    I've viewed a number of posts regarding stolen iPads.  Yes, I did have the "find my iPad" enabled.  That's how I knew when the iPad was gone for good.  It's a useless function in the case of theft because the thieves know how to hack into your iPad.  It disappeared from my list of devices in the "find my iPad" utility that very same day. 
    Apple loves the fact that their devices get stolen all the time!  That way they sell more of them.  Theft could easily be significantly reduced if Apple chose to give users a means to report stolen devices on the Apple site.  They choose not to do this.  If the black market for Apple devices was limited to hackers who know they have a stolen device, the items wouldn't be such a hot commodity!  Apple knows this... I guess they want to get their devices into as many households as they can.... Legally or not. 
    So for all you hard working folks out there, find a way to make sure your Apple products are secure because if they get stolen, you're out of luck.  Apple refuses to help when they could easily do so. 

  • How to including the finished goods as raw material to the other FG?

    Hi Gurus,
    Have a nice day!
    We would like to create production order for our semi finished goods and then we will doing confirmation. After we have produced our semi finished goods, we would like to include it in the bom as raw materials for our final FG. But how to handle this situation? Any suggestion on how the procedure to do it that the cost will not be double..when confirming the semi FG production it will generate cost for the usages of it raw materials. The semi FG is valuated then when i included it as raw material into Final FG it will generate cost for consumption in doing confirmation. I dont know the correct term for this scenario. In other word or semi FG will be part as a raw material to the next production.
    Please advise if you have been encountered the same scenario with me.
    Thanks ,
    Weldin

    Hello Gurus,
    Thanks julian for contributing your idea. I really appreciated it.
    Right now all activity in manufacturing FG is combine in one production order. Let say we have two activity one is the extrusion and the other one is bagging and printing. From our current set up, we would like to separate the activity. The idea is one production order for extrusion serve as semi-finished good. Then this semi-FG will be added in the component of our final FG which is the bagging and printing because in actual transaction that would be the procedure. Theoritically, we would like to separate the cost of extrusion activity to bagging activity. That is why we will be trying to figure out how to do it right for the analysis purposes.
    Other of my idea is when  i will set the semi FG to non valuated material. So that when i add  the semi FG as component to our Final FG no double costing happen. But when we will run the costing run it will compute low cost in terms of standard price for our final product.
    Thanks and best regards,
    Weldin angelo

  • To get Actual Materail Consumption for a Finished Good

    Hello Experts,
       I would like to know,  how we can find the actual materials consumed to make a finished good. The FM "CS_BOM_EXPL_MAT_V2" gives the standard consumption, means the one which was  planned but not actual.
    This is urgent for me, as I should know what are the materials ACTUALLY consumed to finish a good and also, from which PLANT those materials were supplied.
    Thanks in advance.

    Thanks for the immediate reply.
    But are they the actual consumed ones? The problem is, I am not finding the PLANT from which they are transferred.
    The field "Issuing Plant" is blank from STPO.
    And about MAST-WERKS for that SFG, I am finding the plant same as the one of FG. But I need the plant from which it was transferred.

  • Auto GR/IR for Semi Finished goods in Work in Progress stage.

    Dear All,
    What are account postings going to happen while issuing semi finished goods from from one process to other process by using Auto GR/IR.
    Regards,
    Venkat.

    Dear sapper2000,
    Work in progress:If my understanding is correct,then any unfinished product can be said as work in progress.
    Work in process or progress  are  partially completed goods, parts, or subassemblies that are no longer part of the raw
    materials inventory and not yet part of the finished products inventory.Check this link to explore more on this topic,
    http://wiki.sdn.sap.com/wiki/display/ERPFI/UnderstandingResultsAnalysisforWIP
    Regards
    Mangalraj.S

  • Batch No. in UD after RR for Semi-Finished Goods, 03 Inspection Type.

    Dear Experts
    I have an issue, in 03 inspect type for SFG after Results Recording,  in QA32  Usage Decision i cant find batch No, So Can anybody pls help me out in automatic assigning of batch No for this semi-finished goods.
    Thank you in Advance

    Thank u All
    Issue is solved, in order we need to assign batch No in goods recipt Tab.

  • Apple phone Support for the Ipad2, GOOD or BAD

    I recently had my Ipad2 lockup in safari and could not seem to resolve the problem on my own. I called Apple support and got their foreign speaking rep. who was very nice and almost fixed my problem but I needed a second WIFI spot to confirm it was  working. At this point I was satisfied with the service. I went to another location where I had access to a hard line phone and much faster WIFI so I could complete  the reset of the setup. When I called back I got a support tech that I think was a automobile mechanic because he had no clue about this issue. His only intrest in my problem was to ask me 20 questions so he could fill out his questionair and than proceed to tell me that my problem was software related and it would cost me $49.95 to answer my question. He reminded me I had not choosen The Apple Service contract. What was so frustrating was to have to wait 10 miniutes for a person, answer 20 questions which had nothing to do with the problem and than to be told that he would not answer my question and if I did not like it I could call Apple.The first rep. I spoke with had no problem answering my questions. If the problem had been mine I would have paid for the service contract but there is no way I'm going to pay Apple $50 to fix their problem. No doubt he does not work for Apple if he does they should fire him. The issue is a safari software problem and was resolved during the OS 5 upgrade. I purchased the Ipad2 9-19-2011. In closing I would like to thank the first support rep for her help and the second rep is the reason I try not to do business with people that can't speak good english and try their hardest to loose Apple customers. This bad rep. will ruin it for the rest. Has anyone else had problems like this?

    Hello Rameans
    My personal experience with Apple support has been generally good.
    However, I really think that if you had a bad support experience, you should send some feedback. Here is the form for support feedback: http://www.apple.com/support/feedback/

  • Initial Stock Posting for Semi Finished Goods

    Dear Friends,
    I have a small doubt in Initial Stock Posting.
    Is Initial Stock Posting for Semifinished Goods (HALB)?
    Or Initial Stock Posting available only for Finished Products?
    Please answer this.
    Regards,
    Rajesh L

    Hi,
    MB1C + 561 can be used for all of your goods from which you want to keep stock. So, raw materials, SFGs, FGs can be uploaded based on your business requirement.
    Your material masters should be extended to the suitable organisational levels (plant, SLoc, WH), so suitable material master views should exist at proper organisational levels.
    Regards,
    Csaba

  • Making a small change to an old project - How do I know what versions of Drivers and RIO etc was used for the last good build?

    If I want to make a small change to a legacy project of years ago, I want to limit my risk by using the exact same versions of LabVIEW, NI-RIO etc.  So I check out the project from the repo, but I don't know how to check what versions were used when the last know good build was made.  I don't want to introduce issues by mass-recompiling to the latest version.
    What is best practice in this case?  I could, before every repo commit, take a screenshot of MAX's software tree and save this in the project folder.
    Any ideas?  
    Solved!
    Go to Solution.

    The report is a great idea!  I store both a max technical report and a project.NCE (HW config export) with each of my projects for this exact reason.  Those files have sure come in handy!
    Also- its a good idea to make an image of the target as accepted and archive it somewhere.  ESPECIALLY for PXI based systems from NI.  (When the customer comes back for a "duplicate" just send the image with the PO and the system arrives fully configured)
    Jeff

  • Confirmation of Finish Goods Non Valuated for MTO

    Hello SAPper Friends,
    I was doing a Make to Order production with Strategy 20. When I was doing the confirmation with at least four operations, in the first operation was fine, movement type 261 was posted for the components and also in the last operation I have successfully confirmed the production order for the Finish Goods. However when I checked in CO03 - Display Production  Order > Goto > Documented Goods Movements, the Finish Goods has a goods movement = 4 - Goods REceipt for Production, Movement Type = 101 with D/C indicator = S with the Amount in LC = 0.00.
    It was only now that I have taken notice of this. How can I check cost of the production order if these is no cost provided by te confirmation? Please assist me to have this validated.
    Many Thanks,
    Nap

    Hello Mario,
    Thank you very much for your assistance. Btw, I have informed already the client of the strategy 20 that will answer their problem regarding the MTO, i was not aware of the product costing. I have checked that there is a strategy group 25 that might be resulting with a cost for the production of the Finish Goods.
    I need to check on this, again.
    Many Thanks,
    Nap

  • Finished Goods valued at Future Standard price at the time of Delivery .

    Hi,
    My client requires the Finished Goods to be valued at Future Standard price at the time of delivery from Production order. This is required because in case there are frequent changes in the material prices, i can mark my material several times.. and change the future standard price.
    I have checked and found that it is always valued at Current standard price only.. and not at the future standard price.
    1) i have tested by changing the costing variant in OPL1 ( Planned costing variant for Production orders).. such that the valuation variant picks up the Future price... it seems it will work only for the Raw materials and SFG's consumed in the Production order and not for the Finished goods.
    2. Define valuation variant for Goods received option in the IMG - It seems it is relevant only when your FG is valued at Moving average price only.. so not relevant for my case.
    My question :
    Can i value my Finished goods at future standard price ( i.e Marked standard cost estimate ) at the time of receiving goods from Production order ? If yes how ?
    Thanks in advance for your answers.
    Njoy
    Siva

    Hi Siva
    It is very much possible, but you need to use exit... I think exit COPCP002 should be the relevant....
    Usually, this is used to valuate the GR in case of Valuated sales order stock... I guess this should work in MTS also...
    The reason why I feel it should be possble, is that if you read SAP text for the IMG Step Define Goods Received Valuation for Order Delivery, it says at the end
    For materials with price control S, on the other hand, the credit posting is always made at standard price.
    If you deliver to stock at a price that is not the standard price, the system will report an output price variance in variance calculation
    Hence, it should be very much possible to achieve what you want.. Only thing is it will hit a PPV and that you need to find relevant exit if the one abov does not work
    Regards
    Ajay M

Maybe you are looking for

  • Upload/Download from unix - give easy exammple for tab delimited .TXT file

    Hello experts, I have 2 requirements. 1. I want to upload a tab delimited .txt file from local PC to UNIX server. 2. I want to Read same file, then some process and get result to the same location. (output file name should be diffrent) How i can fulf

  • Adobe Premiere running slow

    I've migrated from an 08 MacPro, running 10.6.8 with 6 Gb of RAM onto a MacMini i7 running 10.8.3 with 8GB of RAM.  Benchmark, the processor is supposed to be about 2.5 times faster than the MacPro.  Obviously I have more and faster RAM. I'm running

  • Invalid credentials report LMS

    Hi there, I want to know if there is a way to show invalid attempts to access to my different equipements on LMS. For example, Show an alarm each time someone tries to access to a switch with an invalid credentials. Thank you in advance

  • IsKeyCodeValid.exe - Application Error

    Greetings, I am trying to install Crystal Reports Viewer 2011 evaluation and when I try to put in the key, I am getting: <br> <br> <br> isKeyCodeValid.exe - Application Error<br> The instruction at "0x00a846c7" referenced memory at "0x5d636f84". The

  • Accessing different Master Servers with one CLI installation

    Hi All, upon installation of the SPS Command Line Interface, one is asked to name the target master server, which is then written to some config.properties file. How can such a CLI installation be used to access different master servers? Ideally usin