Variant with Dynamic Date Calculation

I have a variant that includes a dynamic date calculation.  I'm using the Current day -1 date calculation. Does the dynamic date calcuation use the time zone of the system or the time zone designated on the user id for the calcuation?

time zone of the system.. if you want to use the user time use Sy-timlo

Similar Messages

  • Activating dynamic date calculation in variant

    Per the link below, I used to be able to activate "dynamic date calculation" in variant.
    <link to blocked site removed by moderator>
    Our system has been upgraded to 6.0 and now we do not the same variant attribues screen where I can activate the "D" variable.  It brings me to program/screen SA38/281. 
    Any suggestion how I may activate the "D" dynamic date calculation variable in a variant?
    Edited by: Thomas Zloch on Oct 14, 2011 11:34 AM

    Actually I meant the relevant code of your custom report, you just provided me with the info of the standard variant screen.
    You can go to SE38, enter your custom report name, display the code, and paste the definition of that parameter. (It would be something like
    PARAMETERS: P_DATEHG TYPE XXX_TYPE.
    What I am interested in is to know which data type is being used, since this functionaliy will only apply to date type fields. So, bottom line: this field must definitely be a date, which makes me think that either something has changed in the custom report or after the upgrade to ECC 6.0 this data type might have changed as well.
    Best regards.
    Edited by: Jose Maria Otero on Oct 14, 2011 5:26 PM

  • Fiscal Calendar in Report Variant Dynamic Date Calculation

    We are switching from the standard calendar to a 4/4/5 calendar for our fiscal calendar. We have a number of batch reports that use dynamic date calculation in the variant to get Month-To-Date or Previous Month date ranges. Is there a way to convert these variants to use the new FiScal calendar instead of the regular calendar?

    thanks to answer , praveen.
    I know, VARI has name of FM , but not has Calendar ID.

  • Dynamic Date Calculation for Current Date - 1

    I am trying to create a variant with a dynamic date calculation attribute.
    I am following the instructions as they are posted to the web but I get an error message.
    I want to get all data EQ to the current date -1
    In the object for selection screen I enter a D for Selection Variable, for Name of Variable I enter an I to include specific values and the option EQ for current date +/- ??? days.  Then I enter 1- for the number of days.  I have tried to enter this many times and in many ways but it doesn't work.  I keep getting this message "lower limit of interval is greater than upper limit"

    Hi,
    Welcome to SDN.
    Selection-screen has four values -
    SIGN
    OPTION
    LOW
    HIGH
    Pass your date value in the option low for the screen.
    Sign you have already pass as I and option as EQ.
    Regard,
    Amit
    Reward all helpful replies.
    Can you paste your code here.
    Message was edited by:
            Amit Khare

  • Dynamic Date Calculation

    Hi all,
    Currently, i need to run a background PO report daily. As i only want today's PO data everytime the background job runs, i set the PO date dynamically using dynamic date calculation choosing current date, save it as a variant then schedule daily run.
    Howerver, for the next run day, the report was ok but subsequent running, the report is not the current date data.
    Any idea where i have miss out?
    Kindly assist and advise, points will be rewarded.
    Regards,
    Eric

    Hi,
    Thanks for your prompt reply.
    I am looking for ways to create a variant with changing date for daily run so that i do not have to daily modify the date.
    Regards,
    eric

  • Dynamic date calculator

    Hi all
    In Variants we can give dynamic date calculator to calculate date as we required. Does there is a option to add more selection option (ie if I have to add a selection last day of next month). Where I can do this
    Please comment
    With Regards
    Arun

    check the LSVAVF01 program for enchancement. or dynamic date selection you can select "  nth working day of current month " with calender option to select the last date of month.

  • How to use Dynamic date calculation in some transactions.

    Hello everyone.
    I have to create some dynamic variants using the dynamic date calculation. The problem is that in some transactions it´s not possible to use some variables that can round a value. For example: in transaction /SAPAPO/MC90, I need to fix 3 months in the horizon like this: From date: 01.01.2009  To date 31.03.2009. The current month is 01.01.2009. Next month the current month will be february, so the horizon would be 01.02.2009 to 30.04.2009.
    In 5.1 version, it´s impossible to fix the months, because the options that appear in the match code are:
    Current Date
    Current date +/- ??? days
    current date +/- ??? work days
    First day of current month
    nth working day of current month
    First day of next month
    First day of previous month
    Last day of previous month
    Last Day of the Current Month
    Does anybody knows how to do this? This is happening in other transactions to.
    Thanks a lot
    Regards
    Angela

    I am not sure where you are looking for..but here is what I can do it in MC90 Tcode:
    1. when you try to save the variant, in the variant screen check the two boxes under "Current date" field for Selection Variables attributes "L"
    2. Then click on Selection variables option and click on the "D" variable so that it turns to green
    3. Drop down in the first current date field, select "Current +/- ??? days. here if you want to start from today's date maintain 0 days
    4. In the second Current date field maintain 90 days in "Current +/- ??? days.
    5. save it
    please let me know if I misunderstod the issue

  • Defining Variant with Dynamic values

    I want to schedule a report say Me2N so that every day it will give me purchase orders created today. I am defining variant for it. How to define Document date in variant so that every day it takes currrent system date.

    Hi,
    In the ME2N transaction code when you are saving the variant, you can set up the status of field. Here if you will scroll right you can see last three columnu2026SELECTION VARIABLE, OPTION AND NAME OF VARIABLE(input only using F4)
    Now in the third last column (SELECTION VARIABLE) press F4 and select the D(Dynamic date calculation) and after this click on last column from right side NAME OF VARIABLE and select the CURRENT DATE and save the varient.
    Now this variant will take the document date every day as a todayu2019s date.
    I hope it will help.
    Regards,
    Manish

  • D: Dynamic date calculation

    Hello,
    In BEx, when creating a variant, is it possible to use "Selection variable = D: Dynamic date calculation"?
    I have created a variable for 0calmonth and in the Variant Attributes screen, Selection variable field, the only option is T: Table Variable from TVARVC.
    BW version 3.5
    Thanks for any information you can provide.
    Mark

    Hi,
    have a look at the below link..  ( they have mentioned the steps of customer exit variable fassigning for reporting agent)
    https://websmp110.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700003598422003E
    Regards,
    Siva.

  • Enable "dynamic date calculation" variable type

    When saving reporting date/period in a report variant, we may use "dynamic date calculation" to specific date as selection parameter.  But the "Dynamic date calculation" is not visible in some ABAP reports - only "Table Variable from TVARVC"  type is available for selection. 
    For those reports that are missing that variable type, how can we enable the "Dynamic date calculation" variable type to be visible?

    Hi Paco:
    Yes, they are z-reports, both have the same almost everything, created by the same ABAPer, for the same application SD, just grouping the data differently.
    It seems a screen (#100?) is missing,  In the old version, it's screen 100 where to activate the "D" and "B" variable types.  Now it goes to screen 281.
    Stacy

  • How to use a queue with dynamic data

    When using a collector I have found that it significantly slows down my loop times. I am using LabView7.1 on a Dell PC with Windows XP.  If I use a queue with dynamic data do you think that will require less of my processor and allow for faster loop speeds?
    I have created a queue using dynamic data in one loop and I want to retrieve all available samples each iteration in a slower loop. If I use the flush queue I get a 1d array of dynamic data. What is the best way to convert the 1d array of dynamic data so that the array of dynamic data is consolidated back into a single dynamic data type? Any help would be much appreciated.

    Hi Dennis,
    You could for instance wire the array to an auto-indexed for loop. I attach an example. I assume you wish to concatenate the arrays a singel waveform.
    Hope it helps,
    Pelle S
    District Sales Manager
    National Instruments Sweden
    Attachments:
    Dynamic queue.vi ‏245 KB

  • JasperException, calling tag with dynamic data

    Hello
    I want to call a tag which I have written with dynamic data.
    I can call the tag like this, and it works fine
    <cm:getCalendar year = "2" week = "51" />But I don't want the input to be hard coded.
    Therefor I have tried to insert GET data to the tag like this
    <cm:getCalendar year = "<%= request.getParameter("year")%>
    " week = "<%= request.getParameter("week")%>" />Or like this
    <cm:getCalendar year = "%{#request.yearNr}" week = "%{#request.weekNr}" />The %{#request.yearNr} should be struts 2 specific I think.
    In both this cases I get this exception
    org.apache.jasper.JasperException: /calendar.jsp(25,0) According to TLD or
    attribute directive in tag file, attribute week does not accept any expressions
    Is there a way which I could insert data dynamic to my own tag?
    Here is the TLD file
    <taglib>
      <tlib-version>1.0</tlib-version>
      <jsp-version>1.2</jsp-version>
      <short-name></short-name>
      <tag>
           <name>getCalendar</name>
           <tag-class>taglib.PrintCalendar</tag-class>
           <body-content>JSP</body-content>
           <attribute>
                <name>year</name>
                <required>true/false</required>
           </attribute>
           <attribute>
                <name>week</name>
                <required>true/false</required>
           </attribute>
      </tag>
    </taglib>

    I change the tld to
    <taglib>
    <tlib-version>1.0</tlib-version>
    <jsp-version>1.2</jsp-version>
    <short-name></short-name>
    <tag>
    <name>getCalendar</name>
    <tag-class>taglib.PrintCalendar</tag-class>
    <body-content>JSP</body-content>
    <attribute>
    <name>year</name>
    <required>true/false</required>
    <rtexprvalue>true</rtexprvalue>
    </attribute>
    <attribute>
    <name>week</name>
    <required>true/false</required>
    <rtexprvalue>true</rtexprvalue>
    </attribute>
    </tag>
    </taglib>

  • How to call javascript function with dynamic data in display tag

    Hi,
    Iam new to pagination concept. Iam using display tag to display rows in jsp by strtus.
    I have a problem when calling the javascript function using ahref in attribute in display tag.
    <bean:define name="form1" property="EditDetails.List" id="ListDisplay"/>
    <display:table name="pageScope.ListDisplay" cellpadding="0" cellspacing="1" pagesize="10" partialList="false" size="listSize" requestURI="">
    <display:column property="poNo" href='javascript:searchEditDetails("./submitOrder.do? actionID=getMISLoadEdit&poNumberSel=<%=((com.po.bean.EditDetails)poListDisplay).getNo()%>&statusIdSelected=<%=((com.po.bean.EditDetails)ListDisplay).getStatusId()%>")'
    title="Number"/>                         
    <display:column property="strDate"title="Date" />
    <display:column property="orderValue"title="Order Value(INR)"/>
    <display:column property="stringRequestedDeliveryDate"title="Suggested Delivery Date"/>
    <display:column property="statusDescription" title="Status" />
    </display:table>
    The above code display the data in row format is working fine when I click the No It thow javascript error and its not redirecting to the other page.
    When I try this with ordinary struts its working fine the code is:
    <logic:iterate id="polist" name="Form1" property="EditDetails.List" indexId="i" type="com.bean.EditDetails">
    <tr>
    <td ><a href="javascript:searchEditDetails("./submitOrder.do?actionID=getMISLoadEdit&NumberSel=<%=((com.bean.EditDetails)polist).getNo()%>&statusIdSelected=<%=((com.bean.EditDetails)polist).getStatusId()%>")"><html:hidden name="polist" property="No" write="true" /></a>     </td>
    <td><html:hidden name="polist" property="strDate" write="true" /></td>
    <td><html:hidden name="polist" property="orderValue" write="true" /></td>
    <td><html:hidden name="polist" property="stringRequestedDeliveryDate" write="true" />     </td>
    <td><html:hidden name="polist" property="statusDescription" write="true" /></td>
    </tr>
    </logic:iterate>
    Please help me how to call javascript with dynamic data.
    Thanks in advance

    The ADF Mobile Container Utilities API may be used from JavaScript or Java.
    Application Container APIs - 11g Release 2 (11.1.2.4.0)

  • Connect an 1-D array of cluster of 3 elements with dynamic data

    hi everybody.
    I am trying to wire an 1-D array which consists of a cluster of 3 elements with dynamic data. The error that appears says that I'm trying to "connect two terminals of different types". Actually, what I want to do is write to a file the FFT data produced by the Spectral Measurements vi. In order to write to a file, I am using the Write to Measurement File vi, but I don't know if this is the right way to do this. Has anyone any idea about this problem, because I'm out of ideas....
    Thanks a lot!!

    ok! This works really good! thanks a lot! now i'm facing an other problem...The output file does not contain the right data. I want to collect the FFT (frequency vs. amplitude) of a time signal and it gives me the record length and the sampling rate instead.
    For example, if I use a sampling rate of 300 ksamples/sec and a record length of 1000 sampling points, the file to be created has one column containing the record length e.g.
    0
    1
    2
    3
    498
    499
    and on more column containing almost zero values and the value of the sample rate. Do you have any idea why this is happening?
    Thank you!!

  • SSRS 05 snapshot with dynamic date parameter

    I want to use snapshot for a SSRS 05 report due to high volume of report data. This report uses 2 date parameter which will keep changing every month ( mmyyyy) format. I read many blogs but it seems I can not have snapshot report in dynamic date situation.
    Can someone please suggest if there is any workaround to use snapshot with dynamic date parameter . The report server version is 2005.
    Gaur

    Hi Gaur,
    In Reporting Services, the snapshot is a report that contains layout information and data that is retrieved at a specific point in time. There’s a couple of requirements in order to use a snapshot:
    Stored credentials for the data source. 
    Defaults for all Parameters.
    Based on my research, we can use snapshot with dynamic date parameter. When we select 'Render this report from a report execution snapshot’ with a schedule and Apply in Execution tab, a snapshot is created and subsequently refreshed on a schedule. When we
    render the report at a time, the report would be rendered with the latest snapshot layout information and data, then use the current parameter value to filter the snapshot report data. In this way, the current data would be different from the snapshot report
    based on the current parameter values, but we can still use snapshot with dynamic date parameter.
    If there are any other questions, please feel free to ask.
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

Maybe you are looking for