VAT changed on MRP in some states /Chaged on Selling Price in some States
Hi All,
Client want to charge VAT on Selling Price and in some states on MRP.
I have created one Condition type ZMRP for the Material MRP price.
In the normal scenario VAT will be chaged on the Selling Price:
Selling Price Is the combined Value of
Price - discount= Net price
Selling Price = Net Price EDEcess+Hcess
Total value =Selling Price + VAT
I want to write a Code for the VAT condition type.
For Example:
If system found that the sales order is creatd for the The States Like Bihar,UP,MP,WB is then the VAT will be charged on the ZMRP price of the Matrial.
But my problem is that there is not any separate Condition type for the Selling Price bcos it will come automatically in the Pricing.
Please sugest the programe name and and logic to write the code so that I can fulfil client requirment.
Thaks In advance.
Regards
Venkat
Hi Laksmipathy,
As per the Client requirment ED,Cess and Hcess will m=not be charged on the MRP price.
Incase of VAT on selling price
MRP 110
Base 100
Dis 10% 10
Net 90
ED 10% 9
Base+ED 99
Cess 2% 0.2
Hcess 1% 0.1
BaseEDCESS+HCESS 101.1
VAT 5% 5.055
Total 106.155 (Price to stockist)
Incase of VAT on MRP price
MRP 110
Base 100
Dis 10% 10
Net 90
ED 10% 9
Base+ED 99
Cess 2% 0.2
Hcess 1% 0.1
BaseEDCESS+HCESS = 101.1
VAT will charged on the MRP with the Formula [ 110/110+5%(Rate of VAT) X100]=95.7
On this 95.5 Back ward Calculation of ( EDCessHCess) getting from the Base prices= 95.790.20.1=105(Price to stockist)
Please suggest how to can I do it.
Regards
Venkat
Similar Messages
-
Costing error while change the mrp data
Hi dears,
This is Rem process. when i try to change the material master MRP data ex. ( mrp type M1 to M0)
system not allow to change and show the error as
Product cost collector 000000750122 is still active (assigned to PrCtr 50601-025)
pls give some hints to clear
Any program is there to change the MRP data for the material master in production server directly
thanksDear ,
Did you try MASS or MM70 Transction ?
If you do not want to go for Deletion flag of PCC , you need to settle the REM qty .You need to do product cost for semi finished product and finsihed product in KKF6N and after that you have to do mark and release in CK24N .For standard cat Estimate create std Cost estimation(CK11n) and std cost Estimation Mark & release(CK24) .
1.Backflush (confirmation) the Planned order - MFBF. Results planned order will Reduced and GR,GI, activity cost will be posted. U need not convert the planned order to production order, Confirmation for planned order only.
2.To see Backflushed documents MF12
3.Then Goto KKF6n to see the Manufaturing cost.
4.Over head calculation - (Co42)
5. Variance calculation (KKS6)
6.Settlement(KK87)
Try and revert back
Regards
JH -
Why can't I change the names of my states in my symbol?
For some reason, Fireworks won't let me change the names of my states in my symbol.
I double click on the state name in the states panel, and nothing happens.
It works fine for normal "non-symbol" pages.
Can you normally change the names of states in symbols?
Any ideas why I am having difficulty doing so?Thank you SO much! Funny thing, I didn't even notice the tiny folder icon at the top of the info window until I saw it in the screen shot at the beginning of that article.
See, I have begun changing the icons of the folders of digital scrapbooking alphabets I have (screenshot below). Now it will be so much easier to scroll through my hundreds of alphas and choose one, because I can SEE them without going in and out of each folder.
A million thank yous!!!!! -
Change in MRP planning control parameters.
Hi gurus,
i have an issue regarding the control parameters for MRP.
Presently while planning run i am getting some purchase requisitions and some planned orders for externally procured items with create purchase requisition =2( pur req in opening period) with opening period =0.
Hence, we want all the materials( externally procured) to be getting the purchase requisitions without any planned orders at all as the MRP controller can reduce the time converting the planned orders into purcase requisitions.
Can we go for the change in control parameter for create purchase req =1(purchase requisitions).
Please let me know if it has any side effects ????
Thank you in advance.
Naveen.ADear Naveen,
There is no impact in doing so or changing the MRP control parameters.
Se the value 1 for pur.req and use planning mode 3 while running MRP.
Even make these parameters as default ,like enter the values and click on settings--->save.
Regards
Mangalraj.S -
My e-mail has changed, but I purchashed some songs in iTunes using my old e-mail address as my account name... so when I try to play the sonngs I bought and paid for - it keeps asking me to authorize my PC first, but I don't remember the password! And since the old e-mail address is no longer active, I can't even chenge the password- becasue it's sends the link to do so via e-mail! Even when I use the "ask personal questions" option to verify and it asks me for my date of birth, I put it in and it still won't acccept.
Hello there, loupar.
The following Knowledge Base article offers up just how to change your Apple ID for the App Store on your iOS device:
iOS: Sign in with a different Apple ID in the iTunes Store, App Store, and iBooks Store
http://support.apple.com/kb/ht1311
Thanks for reaching out to Apple Support Communities.
Cheers,
Pedro. -
When I import a CD to itunes, it splits the album in to multiple entries. I have changed the info on some but others just will not merge. Is there an easy way to do this and can I stop them from splitting in future? Thanks
Okay this is what fixed my problem. Some kind of error/glitch occured half-way through importing that third cd that prevented further imports from any other cd. Once I completely removed the half-imported cd album from my library I could further import cd's without any problems.
-
Trying to change the labels for some UI elements
hi,
Problem: I am trying to change the labels for some UI elements and transport the views from one server to another server.
the lables show changed in the source server but the changes dont reflect in the destination server
Kidly help me to slove this problemHi Sharad
The process is as explained:
1. Firstly, go to the respective view, and to the Label and then delete the Label Text as
mentioned in the attribute u2018TEXTu2019 of the Label in the view.
2. Next, Activate the View, if it asks for a change request, please assign it to a new TR.
3. Finally give the Label text again and then Save it and activate it.
4. Further transport the request to ECP and find the difference.
This especially happens when we frequently change the WD Component and embedd it entirely in the Transport.
I hope this information would be of a great help to all of us.
Ponts if helpful.
Regards
Roshan -
Change the MRP run fro Reorder Point to Forecast Based.
Dear Experts
My client is a battery manufacturing company, its Semi Finished product is Make-to-Stock and Finished Product is Make-to-Order. Initially the MRP was configured as reorder based and in Material master it was set as VM (Automatic reorder point plng ). But now we need to change the MRP form reorder point to Forecast Based. The rolling forecast of the coming 3 three months is given in Planned Independent requirement (MD61) as version u201800u2019 - REQUIREMENTS PLAN.
We have changed the MRP procedure in Material Master form VM to VV Forecast-based planning of the finished product but unable to get any result means no Automatic PR is getting generated, the we have changed all the materialsu2019 MRP procedure of that Particular BOM to have the required MRP and Automatic PR raise but still no expected result is coming.
I would request you to provide your expert opinion to execute the Forecast Based MRP, what else should I do achieve the Linking between the Rolling Forecast and MRP instead of Reorder point. Should I have to make changes in Material Master (Only on finished product, In house developed/manufactured Product, Raw material etc), any configuration change in MPR and PR . Looking forward for your specialist advice.
Regards
SonyI have provided the demand in MD61 and make stock level of the material in such a way that it should raise the PR for MRP run but it is not generating any PR. have checked that if I put value in the forecast tab of the material master manually then it is raising the PR but I need the system to pick the value form the demand that I provided in MD61. Is there any configuration related issue to get the values form the demand and generate PR accordingly. Please guide
Should I have to provide 'VV' at the first level of the Material at its master data or at each component of the BOM irrespective of
the components for Semi-Finished (In house production), Raw materials (Procure from the supplier). Please suggest... -
I have am IPhone 3GS. I put all my pics in folders and now I dont know how to pull the folders off my phone on my laptop . I want to change up and delete some of them, Can anyone help
You have to make the changes you want in the folders on your computer, then sync your new choices via iTunes. iPhone, iPad and iPod touch: Syncing photos via iTunes, http://support.apple.com/kb/HT4236
-
Hi All,
As there are VAT changes in UK do we know any news from SAP if they are releasing any patch to do this or is there a standard way of doing the config for this.
If so can you please share the same with me i am new to Finance would appreciate if the help is as much detail as possible.
Many Thanks,
Kishore Yerra>
Karen Smith wrote:
however, why would I not just change the existing percentages on the AR side?
Because your old data won't make any sense. For example current VAT rate is 20%. You post an invoice where the net value is 100 GBP, so the tax will be 20 GBP and the gross 120 GBP. The percentage rate for the VAT won't be saved into the BSEG/BSET lines, only the tax code. If you change the percentage in the tax code (for example to 25%), and you have a look at this invoice, see that the gross value is 120 GBP and will think that the net is 90 GBP and the tax amount is 30 GBP, and if you look at the line items you won't understand...
So, don't change existing tax codes, create new ones! -
Why can't I change the content for some songs when I click the Get Info button?
Why can't I change the content for some songs when I click the Get Info button? The information on the song, artist, genre is grayed out and will not allow me to alter the information.
Hi htechadmin,
Revcevied your PM and noted all details, Many Thanks.
Getting this addressed by the team, either they will reply to you, here, or they shall email Or Call you.
Regards,
LP -
Schedule line quantity changed by MRP with in firm zone
Hi,
We have a schedule agreement with firm zone maintained and MRP binding indicator blank is maitained in additional data at item level. But we have seen schedule line quantity has been changed after MRP run. I dont understand how its possible....please help
Regrds,
RaghuIf the qty is not transmitted to the vendor using message transmission, system does not firm the qty with in planning time fence.
So pls chk your planning time fence as well.
Also pls chk the below link
http://help.sap.com/saphelp_46c/helpdata/en/f4/7d2a5b44af11d182b40000e829fbfe/content.htm
BR,
Krishna -
Hello,
While creating document we charge tax code in addition to the amount:
tax base amount 100
tax 16 %
total amount 116
We do tax return to the tax authorities at the collection status. When the customer pay 116 we transfer 16 to the tax authorities,
Now we face a case of VAT change from 16% to 17%. Therefore I sould collect 17 but in my system the document amount is 116 and not 117.
Is there a way to deal with VAT change?
Thanks,
BenFirst of all please elaborate what is the process that you are following for posting the document ?
In case of miscelleneous chages or addition charges you can always use FPE1 to post the document .
Cheers ,
Dewang -
Skydiver. After using separate apple ID's our two iPad minis still get things mixed up like Siri changes our names and some phone#'s
but I would like to be able to dowload content to the Ipad as well.
I'm afraid that you can't sync content to an iOS device via Home Sharing (you can only stream it to an iOS device via Home Sharing). -
hi !? I lost my Iphone 5 and enabled lost mode. But whoever has stolen it already knows my passcode. So is it possible to change my passcode in this state ?
If you enabled lost mode, that means the device did not show up in the tracking system when you logged into iCloud. If it is offline for any reason, there is nothing you can do to it remotely. You would have to wait until or if it ever does come back online.
At this point, I'd assume it is gone. If the person who has it knows your passcode to swipe to gain access to the contents, then your information is already compromised by now.
Maybe you are looking for
-
My imessages worked on minute and the next it would stop working so I updated to ios7. Now it does not work at all. Now I am unable to do any back up on this phone. What else can I try?
-
How do I get these numskulls to solve my problem?
I had called previously to settle the following problem but the tech hung up be for the problem. IT IS VERY IMPORTANT THIS PROBLEM IS SOLVE NOW! I have now been wating 30 minutes for them to establish a secure connection for a on-line chat. : Hello!
-
After upgrading to Yosemite, I had to upgrade iPhoto. Now when I try to open iPhoto I get the following message: The photo library needs to be upgraded to work with this version iPhoto. Your photo library will not be readable by previous versions of
-
I'm trying to update a catalog in InDesign CS4 and it can't find the Helvetica fonts that were used in the previous versions of the catalog. Is this font not included in the program? Does it have to be purchased separately? If I can't get it for CS4
-
Installation SSSLLLOOWWWW on new iMac
I bought a new iMac today and the first thing that I'm doing is installing Leopard, which was included in the box. First of all, the machine shut down during the consistency check. Not a restart, but completely shut itself off when it was about 4% co