Vc - routing not being selected in production order
Hi PP Gurus,
We are working on variant.
Steps followed -
1. KAMAT material created.
2. Variant created for KMAT material.
3. Maintained configurable profile.
4. Super BOM made in CS01 for KMAT.
5. Dependency maninted in BOM.
6. Maintained relationship between Kmat and variant in CS40.
7. Super routing created for KMAT.
8. Dependency maninted in Routing.
9. sales order created for variant.
10. MRP run taken
11. Planned orders created during MRP run.
12 BOM exploed as per dependency defined in BOM.
Problem - When we are converting planned order into production order system is giving error message saying that rounting does not exists.
Please guide me if any thing is missing in above mentioned process.
Regards,
Abhay
Hi,
1. Routing is created in CA01
2. OPL8 parameters for routing is
Applicaion = P , ALt task list Application = Blank
Selection ID = 01 , Routing selection = 3
Sequence exchange = 0 ,
Task list type = N
3. Error Message during conversion is
Popup opened saying No routing found mentioning material code, plant, qty and explosion date
3 tabs are also there 1. ref operation selection 2. Change selection 3. exit.
Similar Messages
-
Sequence Selection in Production Order
Hi All,
I am having following problem related to the sequence selected in production order...
In my scenario there are multiple sequences in a routing for a material.In the production Order Type I have made setting of manual selection of sequence while creation of production order.When I create production order the system ask for selection of the alternate sequence and after selecting the alternate sequence the system copies all the data related to that sequence <b>But</b> when I go and see the operation overview the system still displays the standard sequence. How can I correct this problem because when I am doing confirmation the system throws error message than the standard sequence 0 does not exist.
Please help me correct this problem.
Regards,
Anup DubeyHi,
As i have mentioned the system is asking me select alternate sequence it means that the tick is there.
Please lemme know why the system is displaying the standard sequenec in operation overview though all the details related to operation are of alternate sequence.
Regards,
Anup Dubey -
Route not determing automatically at sales order level for some sales order
Dear All ,
Route not determing automatically at sales order level for some sales orders.We are using automatic route determination without wt group,eventhough we have configured the required settings
I have checked all the forums but didn't find any solution for the same.
Looking for your inputs .
Thanks inadvance
Regards
VenkatHi
1. Copare the Routes which are Automatically determined and which are not automatically determined
2. Have you mainted this route to be RELEVANT FOR TRANSPORTATION without this check route will not get picked up.
SPRO > Logistic General > Shipping > Basic Shipping Function > Routes > Define Routes > Define Routes and stages > Select the Route and check for it's settings > CHECK MARK Relevant for Transport. Without this check the route will not get picked up as of my understanding.
Thanks
RB -
when is the next ios update and will it fix/address the issue with photos not being shown in chronological order?
All of us here are users just like you. We have no inside info of when Apple products or operating system updates/upgrades will be released. The next iOS may not even change the issue you have.
Cheers, Tom -
Assigned document to operation in routing isn't printed in production order
Hi experts,
I have assigned the document to the BOM and also to the operation in the routing.However this document is not printed when the production order is printed.This document can be seen at the routing,CA02, on the screen with all components, but it is not shown in the production order transaction CO02, at the routing.Is there something in customizing that has to be activated?
Thanks a lot .
Best regards,
Danijela ZivanovicHi experts,
I have assigned the document to the BOM and also to the operation in the routing.However this document is not printed when the production order is printed.This document can be seen at the routing,CA02, on the screen with all components, but it is not shown in the production order transaction CO02, at the routing.Is there something in customizing that has to be activated?
Thanks a lot .
Best regards,
Danijela Zivanovic -
Expired stock being picked for production order staging.
Hi all,
While picklists are being generated for production order staging, materials that are past their expiry date are being selected and allowed to be picked and confirmed. Is there a way that such expired materials can be excluded from picking?
Many thanks in advance.
Kevin.Hi,
As mentione dby Philippe, You can make use of batch search strategy to avoid picking of expired batches be it for production or Customer delivery.
You can use LS51 transaction to setup batch search strategy WM01 (at Warehouse level) or WM02 (Warehouse / movement type). Hope you maintain classification data for your materials (023 batch class) where you maintain expiry duration and productioninformation etc. In LS51, select the appropriate batch class and maintain batch parameters as released and sort the strategy by Shelf life expiration date.
Storage type startegy search (T334T) has to be maintained accordingly.
If this helps you kindly reward your points.
thanks and regards
Varadharajan -
Activity price not getting updated at Production order
Hi All,
I have made activity dependent planning at cost centre and calculated the activity rate. The activity rate is showing correctly for the cost centre in KP26, but while confirming the production order (CO11N) the the activity price is not getting updated in production order. But material price is getting properly updated at production order.
Plz help me in identifying the possible areas of mistakes.
Regards,
BKDHi,
Please check the Period for which you have created the ht activity price is same as the period in the conformation. In the workcenter in which you are confirming please check whether the activities are assigned to the work center.
Bye,
Ramesh -
Invoice Due Date is past due but not being selected for payment
We have 12.1.3.
An invoice has a due date of 7/19 in our system. We have run payments several times but it is not being selected. terms are net 30, terms date was 6/19, GL date is 6/28.
The invoice has been validated and accounted. Is there something i should be looking for to see why this won't get picked up?
Any help is appreciated.For this invoice to be picked up immediately in a Payment Process Profile you can change the payment terms to immediate.
Further, while running PPR u can select pay through date as 7/19 and select this invoice from the batch to pay.
There are multiple factors like PPR used, if discount is applied that might effect this.
Hope this might help. -
Spool file not being generated in production server
Hello
Our end users are using automatic payment program F110 to print multiple cheques.
The settings in SPAD are identical in Quality and Production Server,but some how
spool file is not being generated in production.
Test printing is fine in Quality server.
Printer being used is Epson LQ 300.Device type is EPESCP2.
We are using z custom page size ,and it is assigned to printer device Type as well
Would be very great if some can can comment on which settings to check,as SPAD setting is
same in both server ,yet no spool.Very Very urgent.
Iam not sure ,whose domain is it now-BASIS or ABAP.
Thanks a lot
NoumanIf there is a problem with the spool, the variant that is being in F110 parameters.
As you are saying the quality system is working fine, please compare both the variants in Production and Quality systems.
This should solve your situation. -
When using Auto Advance in the Grid or Loupe, when finished and press Enter the next photo is not being selected. I have to select the photo by clicking on it. Any suggestion as to why?
MikeI'm using Smart Collections in my workflow. The photod are in a Smart
Collection titled Title Missing. It checks each phot to see if there is a
title. If not it selects (highlights) the photo and waits for me to place a
title in the title box. When finished I press the "enter" key, then the
next photo is brought up (displayed) .
This is my complete workflow:
0.00 Start
0.01 Start
Condition: All new photos dragged here to start workflow
0.02 Pick Flag
Condition: Pick Flag is Flagged
0.03 Star Rating
Condition: Pick Flag is Flagged
Ratting is No Stars* *
1.00 Metadata Status
This step checks that the copyright, creator and copy writer have been
filled in
1.10 Copyright Missing
Condition Pick Flag is not Rejected
Copyright does not contain *
a.b.c.d.e.f.g.h.I.j.k.l.m.n.o.p.q,u,r,s,t,v,w,x,y,z*
1.20 Creator is Missing
Condition Pick Flag is not Rejected
Creator is not Michael L. Waddell
1.25 Location Missing
Condition Pick Flag is not Rejected
City doesn’t contain a.b.c.d.e.f.g.h.I.j.k.l.m.n.o.p.q,u,r,s,t,v,w,x,y,z
State doesn’t contain a.b.c.d.e.f.g.h.I.j.k.l.m.n.o.p.q,u,r,s,t,v,w,x,y,z
Country doesn’t contain *a.b.c.d.e.f.g.h.I.j.k.l.m.n.o.p.q,u,r,s,t,v,w,x,y,z
1.26 Title Missing
Condition Pick Flag is not Rejected
Title doesn’t contain *a.b.c.d.e.f.g.h.I.j.k.l.m.n.o.p.q,u,r,s,t,v,w,x,y,z *
1.30 Caption Missing
Condition Pick Flag is not Rejected
Caption is Empty
1.40 Keywords Missing
Condition Pick Flag is not Rejected
Keywords doesn’t not contain
a.b.c.d.e.f.g.h.I.j.k.l.m.n.o.p.q,u,r,s,t,v,w,x,y,z
1.50 Metadata Complete
Condition Picked Flag is not Rejected
Metadata is Up to Date
2.00 Rework
2.10 Rework Needed
Condition Has Adjustments is False
Label Color is Red
2.20 Rework Finished
Condition Has Adjustments is True
Label color is Yellow
3.00 Current Style
*For my Information *
3.10 Black & White
Condition Treatments is Black & White
3.20 Color
Conditions Treatments is Color
4.00 Best and Acceptable Review
4.01 Best
(To be posted on web sites and in the Gallery)
Conditions Rating is => 3 Stars
4.02 Acceptable
(Keep to work on at a latter time)
Conditions Rating is 2 Stars
5.50 Disposition
*Where the photos will be posted on Web
5.51 Deviant Art
Condition Job is Deviant Art
5.52 Photo’s by Michael
Condition Job is* PbM*
5.53 Photoshelter
Condition Job is Photoshelter
5.54 See Me**
Condition Job is See Me
5.55 NYIP
Condition Job is NYIP
5.56 Gallery
Condition Job is Gallery
6.00 Rejects
6.01 Rejects
Condition Pick Flag is Reject
After I complete one step, then I move onto the next. I depend on the Auto
Advance to move the photos along and to select the next photo. The "Pick
Flag is Reject is to allow me to reject a photo during the process and
not just at the beginning of the workflow.
I'm sorry for the confusion and the long reply. I figured that the problely
was something I missed. Please take a look at the workflowand if you see a
better way to improve, please let me know and if you have any ideas on why
the next photo is not being highlighted.
Mike -
Wrong routing selection in production order creation via MILL_OC
Hi,
We are using the order combination functionality (MILL_OC)
We have a product with alternative routings.
Situation is as follows:
- Create 2 plan orders for the same material
- Execute MILL_OC
When I execute the MILL_OC transaction I get the request to choose the routing. If I select routing with groupcounter 2 for both orders, the combined order is created with routing X /groupcounter 1.
I also tried using production versions but the situation remains
even by forcing to "use always production version" = setting in the material master, I still get routing 1.
It seems the combined order takes always the first routing, Any selection is not possible
Did I miss a setting/customizing or is it a bug?
Any help would be appriciated
Regards
JohanHi Ayoub,
All the 4 routings are valid from Oct.2014 to 31.12.9999.
The Order date is from Apr.2015.
I've made another test with 2 routings created with ECN and the order chose one without asking me what to choose. I don't know the criteria used in this functionallity.
Thanks,
Caio. -
BOM and routing selection during production order creation
I am having a material which is having only one BOM and one routing. Now for this material in the material master in the selection method indicator i have put as 3 as selection only by production version. But i have not maintained any production versions in the work scheduling view for checking purpose. now when I am creating a production order for this material manually through CO01 system is allowing to create production order. when is the selection is only by production version how system is allowing to create production order when there is no version is maintained.
Hi Kumar,
Looking into scenario as u have maintained,if you have define the selection id and not maintained the production version then it should ask for the production version and show the following
Since the production version is missing, you cannot execute the desired processing step.
As well as pls look into OPL8 ,what Production Version is maintained.
Thanks,
Mohit
Edited by: Mohit Sharma on Feb 4, 2011 5:35 PM -
Selection Of BOM & Routing at the time of production order creation
Hi guys,
Please clarify how i can go about for the following mentioned scenario
I have one Master BOM(Finished Product Level) & alternative BOMs for that,similarly i have one Master Routing & alternate routings for the same finished product
At the time of production order creation is it possible for me to choose one of the BOMs & One of the routings of that particular finished product without creating a production version?
Awaiting for a quick response
VijaiHi vijai prasad shanmugam ,
In the material master MRP-4 view under the BOM selection you can maintain on what fatcors you want the BOM to be selected Viz. Selection by order quant.,Selection by explosion date.Selection by production version etc.
As far as the master recipe is concerned ........ I guess that if there are more than one valid master recipe maintained then SAP will prompt to select the one manually.........
But it the standard practice to maintain the production version ....... for the similar situation to the one that you have mentioned.
Please Let me know if I can help you in any way regarding this........
Please reward the points......... in you find the ans helpful.....
Thanks
Kaushik -
Routing selection in Production Order when using ECN in Routing
Hi experts,
I'm having some trouble with routing selection when using ECN in routing creation.
I tested a case where I have 3 routings without ECN, and the Order asked me which one of the 3 I want to use.
Then I created a routing with ECN. The order asked only one routing without ECN and the new routing with ECN.
Do you know if there is any relation about using the ECN in Routings and using at the same time Routings without ECN, when selecting the routing in production order?
Anybody can help?
Thank you,
Caio.Hi Ayoub,
All the 4 routings are valid from Oct.2014 to 31.12.9999.
The Order date is from Apr.2015.
I've made another test with 2 routings created with ECN and the order chose one without asking me what to choose. I don't know the criteria used in this functionallity.
Thanks,
Caio. -
Routing not getting copied from planned order to production order
Hi PP gurus,
I have created BOM & Routing for Fert material.Both are valid from 19.05.2008.
When am converting planned order to production order today i.e. 20.05.2008 am getting a pop up ''no task list maintained for the material''.
When i check in CA03 & CA02 for the same material , system gives pop up no task list maintained for the material .
In CA01 , for the same material it shows routing is available & asks to create for 2nd counter.
Pls. throw some light on this as am stucked .
Thanx in advance n your solutions will be rewarded.
Regards,
Nagraj VasmateHi,
This is in regards with your reply to this thread -
Hi Nagraj
You would have created this FERT material Routing in the same group counter of any other material. So while creating it will show the same group counter number of other material.
Delete the existing FERT routing and recreate the Routing for FERT with different group counter.
Now you convert from plan order to prod order. Then the system will allow.
Hope this is clear.
Regards
J . Saravan
I feel in my case it could be the reason why routings are not copied in production order, can you please explain this in details for me?
Maybe you are looking for
-
Can't see whats wrong? help
Hi i've made an applet that has 12 buttons on it, and when the user presses 4 buttons it is stored in an array called myList. Each time a button is pressed sequenceCheck method i created gets called. This has a list of the possible correct combinatio
-
My iMac is literally out of control....
Help! My iMac (Mac OSX 10.6.8, snow leopard, 2ghz intel core duo, 4 yrs old) has gone crazy. I can barely control it. Ive posted a video to youtube as its esier than explaining it. http://m.youtube.com/index?client=mv-google&desktop_uri=%2F&gl=US&rdm
-
Can't get the updated Verizon Messages app to work on wifi as the update claims it will
I received the update to the Verizon Messages app yesterday and when I opened it, it said the smartphone will now send and receive text messages over wifi when the cellular network is not available. I have been unable to make this work and I contact
-
Hi all; this is the process. 1. Servlet received / creates msg. 2. Servlet Enqueues Msg on JMS queue. 3. MDB dequeues. -- processes against DB -- composes respoonse. 4. mdb invokes servlet with response. servlet need not maintain state. State informa
-
Wow... I've researched so much about this topic. The story is, the ipad was on top on a car and it fell off while driving down the road. The driver realized what happened, but it was to late. Several 18 wheelers were behind him and it was TOAST!