Vendor delivery scheduling

We are using Sch agreements/ Sch lines for procuring direct materials. We are maintaining sch agreements/ source list so that during MRP run it generates sch lines for vendors. Now the question is what is the implication of Planned delivery period in Sch agreement/ Material master and where we can see the result?
In our case we are importing some of our parts from other countries where the transport time itself will vary from 3 to 6 months.We wish to use planned delivery time for this purpose.
For example if we give GR processing time in Sch agreement/ Matl master MRP will generate the delivery date that much time in advance and we can see in ME39. Similarly how we can view the planned delivery period's implication.
Regards,
R. Srinivasan

No reply for long time. Hence closing this thread.

Similar Messages

  • Vendor Delivery schedules

    Dear Experts,
                          We are generating delivery schedules thru MRP .The Schedule agreement doc type is LP.
    No JIT or FRC schedules is applicable as the delivery schedules are generated through MRP.
    now how can i release these delivery schedules to the vendor without workflow.Because vendor is not having SAP.Also client need details of the delivery schedules once sent to the vendor.
    Pls guide me in this matter.
    Regards,
    Anil.

    Hi
    You can take the print out by using transaction code ME9E and send it to the vendor if the message set up is there for message type LPET.
    Hope it helps.
    Thanks/Karthik

  • GR Proposed Quantity against delivery schedules in PO

    Hi All,
    Is there any configuration setting so that while doing Goods Receipt, the system proposed quantity should be against the different delivery schedules maintained in delivery schedules tab in PO.
    Regards,
    vamshi

    Hi,
    When we send a PO Delivery schedule, its the requiremet which we specify to the vendor but vendor needs to confirm on that, thats why the inboud delivery process is helpful there, because we can't control on baisis of PO what qty is being sent by vendor, delivery schedule is just an info to the vendor, but the ref doc for that is inbound delivery wherein it confirms the vendor is sending a particular qty on a particular date.
    The other option is to use scheduling agreement schedule lines, please look for options in your design.

  • Delivery schedules with outline purchase agreement

    Can somebody tell me how to automatically result delivery schedules with outline purchase agreement through MRP running?

    Priyanka.P thanks for your reply.
    The following is how I process:
    1.I use auto po indicator at VMR
    2. I tick Auto PO indicator and source list indicator at MMR
    3.I have made schedule agreement(type LP) and assign it in source list as fix vendor(1000) and with the MRP indicator 2(Record relevant to MRP Sched. lines generated automatically)with the proper validity periods in IDES.
    4. In MD03, I use the create schedule as 3
    5.There is Dependent reqmt.
      When I finish my MRP running I find a Purch.Req with Exception 30( Plan process according to schedule (08.11.07/08.11.06)) generated. however I hope a  vendor Delivery schedule.

  • Delivery schedule confirmed by vendor

    Hi experts,
    Business  scenario:  " For material planning purpose, The SAP PO would require delivery schedule confirmation from supplier to be used as a PO firm items when the PO is released. The PO items are critical since they will be used as material requirement planning to fullfill shop floor production"
    Can any one let me know what is BAPI   FM  Delivery Schedule Confirmation by vendor in MM module or any other suitable  method .
    Thank for advance,
    Rambabu.A
    Edited by: Rambabu Ata on Feb 5, 2012 9:56 PM

    In SAP, there is a functionality called "confirmation control" which we can use to control the confirmations and acknowledgement from vendors related to price, delivery date and quantity.
    You can setup the "confirmation control key" in PO as per your requirement whether you want to just record the acknowledgement or maintain inbound delivery or both.
    Go through this link to learn more
    [http://www.sap-img.com/materials/explain-about-the-po-confirmation-control-key-in-detail.htm][Confirmation control|http://www.sap-img.com/materials/explain-about-the-po-confirmation-control-key-in-detail.htm]

  • Zreports for vendor wise Delivery schedule release

    hi ,
    Can some one help me with codes for  the reports for the Delivery Schedule Release vendor wise. which shows vendor details , on titles, Schedule agreement Nos and then the material listed with the qty and targetted date.
    Kindly help
    regards
    Kim

    How to release directly from ME38 ?
    I tried in the path  delivery sche > Edit > generate Forc Sche
    but the msg below:
    Error generating release against scheduling agreement  (cause 2)
    Message no. 06857
    Diagnosis
    The function module for generating a scheduling agreement release (forecast delivery schedule or JIT delivery schedule) has run up against an error, causing processing to be terminated.
    In this case the cause of the error is 2.
    *System Response*
    The error may involve one of the following situations:
    1: The nature of the error cannot be specified precisely.
    2: The forecast delivery schedule or the JIT delivery schedule was generated but no message record could be generated.
    3: A document type for which the functions "Generate forecast delivery schedule" or "Generate JIT delivery schedule" are not defined may be involved.
    4: A material for which the function "Generate JIT delivery schedule" is not defined may be involved.
    5: A scheduling agreement that has not yet been released by all persons responsible may be involved.
    6: The factory calendar has not been maintained correctly.

  • Vendor delivery rating for scheduling agreements

    Dear All,
    I need to check vendor delivery rating for sch. agreements. Mc$6 is not usefull because of sch. lines it works fo Po's. please suggest me how to get this.
    Regards
    MSR

    Hi,
    Vendor delivery rating is calculated via the formula actual delivery date (in me38) -statistical deliver date( in me38)/ statistical delivery date.  points need to be maintained for ratio which is calculated in the above case in the path spro -materials management-purchasing -vendor evaluation-maintain purchase organisation data-points for automatic criteria
    after which execute the t code me63 for automatic valuation
    Regards
    Sandeep

  • ME2L Delivery Schedule Showing Fully Delivered Lines

    Hey,
    We are experiencing this issue on a SAP 4.7c system that we support.
    Our business are trying to generate a report, every month, that is sent to vendors, of all the purchase orders that the business are expecting them to fill. To do this the business user uses ME2L report per vendor, only selecting the Schedule Agreements documents, hitting the calendar button (Delivery Schedule), exporting the resulting output to Excel, using a formula to identify the lines which have a GR value less than the Scheduled Qty value and sending these onto the vendor as a notification to the that these are the orders that the business have marked as outstanding.
    The issue arose when the business cancelled lines on Scheduling Agreement 5500000073 by going into MD04 and deleting the requirement for vendor 5033760 and reassigned those requirements to a new Agreement 5500000053 for vendor 5000259.
    However when you run the process above the deleted lines still show up on the report and you believe this should not be the case and never was the case.
    What process to accurately identify on SAP, schedule line items, that have not being fully Goods Receipted and/or cancelled so they can be sent to the vendor?
    Many thanks for any help,
    Colm

    Hi Jurgen,
    Apologies for the delay, I was away on leave.
    We use selection parameters WE101 and that correctly brings us back only open orders on the selection screen, however when we click the Delivery Schedule button it displays lines that have been fully Goods Receipted.
    For example, if I have a PO with 3 lines, Lines 1 and 3 have been fully received and line 2 has only been partly received.
    I run ME2L with the selection parameter WE101 and the report only displays line 2. Which is correct.
    However when I click the delivery schedule button I will be shown the entire history of that line, including scheduled quantites that were fully goods receipted.
    What I would like to see is only lines where the scheduled quantity is greater than the goods receipted quantity.
    I hope this makes sense, thanks for your help,
    Regards,
    Colm

  • Schedule Line(Delivery Schedule) generation stopped

    Dear Experts,
    We are using Scheduling Agreeements to procure materials from Vendor.We are using MRP(type PD) to generate our requirements.We have noticed that ,for a Schedule Agreement- MRP generates Delivery Schedules accordingly,but if user will try to interven the process by entering a manual schedule line with some quantity,and Fix Indicator is getting fixed,after that MRP is not able to generate Schedule Lines,henceforth.
    We had done the same things earlier,but MRP was able to generate Schedule Lines even after manual intervention by user.We have not maintained Fix indicator in Source List also and the particular material and the Agreement both have been marked as MRP relevant against that Vendor in Source List.
    If we will remove the open delivery schedules having Fix indicator fixed ,after that we run MRP,then the Schedule Lines are getting generated,but for those Schedule Lines(Manual or thorough MRP) having Fixed Indicator fixed and have GRN transaction completed,we would not be able to delete those and also MRP will not be able to generate Delivery Schedules.Please advice what is the reason behind this and share the full concept of Fixed Indicator against the same?
    Regards,
    Soumick

    It looks we encountered very similar problem,one item line in our Scheduling Agreeements can't be driven by MRP MD02/MD41,but if we add another same line item under this SA, this new line can be driven by MD02,and generated delivery schedule line.
    I don't know why. Please give me some light! Thanks!

  • *MRP unable to create Delivery Schedule Lines in MM Scheduling Agreement*

    Hi Experts,
    I need your help...
    The issue is, in-spit of maintaining Source List with an u201CScheduling Agreement with item No.u201D & u201CSource List Usage in MRPu201D as 2 (Record relevant to MRP. Sched. lines generated automatically), MRP run does not generate Schedule Lines, instead PRs are created.
    Please help me to understand such behavior and fix the issue as the requirement is to generate Schedule Lines only.
    Thanks,
    Pratap

    Hello
    Please check
    1) Source List maintained properly in terms of Material # ; plant # ; proper POrg ; Schd Agr # and line item# ; proper validity date & MRP relevant indicator
    2) Please also check Quata arrangement if you are using. whether % is maintained correctly against the vendor
    3) MD03 , Delivery schedules- should be 3
    4) check your planning horizon whether it is NETCH or not
    5) check material master -MRP2 view, Procurement type is F- external procurement, schedule margin key if you are using
    if everything above is set, then I feel it should work
    Also please verify-
    lot size, safety stock and the corresponding prod volume for MRP input v/s the stock available in MMBE
    example.
    MD04, we can see the open del lines.
    if SS = 50 , prod volume is 150
    1) if MMBE shows 200 then it wont generate any schedule.
    2) if MMBE is 180 and your lotsize is 40, then after MD03, you will have a schedule line of 40 (provided if everything is set properly)
    Please ensure there are NO open delivery lines . if you find such in MD04, then please close open delivery lines
    in calculation of MRP, system considers such open delivery lines are going to receive and no additional schedule line generated even after MRP run
    thanks

  • The delivery schedule lines don't get created automatically on MRP run.

    Hi All,
    The delivery schedule lines don't get created automatically on MRP run for subcontracting material.  I have maintained source list as follow eg.
    Valid from | Valid to | Vendor | Porg | PPI | Agreement | Item | Fix | MRP | MRP area
    02.11.2009 | 31.12.2999| XYZ | XY01|     |AA0000XYZE |10 | X |2 | ABC
    Could you please help me about this issue
    Thanks in advance.

    Hi Amit,
    Please ensure the value of Special procurement key in the MRP2 view for the material. It should be maintained as 30 - subcontracting.
    Thanks and Regards,

  • MRP is not generating any schedule line in my vendor's scheduling agreement

    Hello all,
    My question is: why the MRP is not generating any new line in my vendor's scheduling agreement?
    This is the scenario:
    I have created a vendor's scheduling agreement with transaction ME31L
    I have created a customer's scheduling agreement with transaction VA31 and those characteristics:
    - Forecast scheduling lines
    - JIT scheduling lines
    - MRP to DS type assigned to type C: Requirements according to forecast delivery/Deliveries according to JIT
    I have run MRP with transaction MD01
    MRP is generating some purchasing requistions, not purchase orders because we have set up a release strategy which requires 2 approvals, but those purchasing requests are not generating any new line in the vendor's scheduling agreement.
    Any idea why it could be? Please do not hesitate to ask for further explanations. Thank you

    Hi,
    Check if stock is available for the material in that plant.
    Also check the requirement date for the material and compare it with the planning horizon for that plant.
    Check your material master MRP view.
    Create source list(for material and plant in question) with MRP indicator 2.
    Thanks and Regards,
    Maheshwari

  • Scheduling agreement, unnecessary delivery schedule lines

    Hello
    We use Scheduling agreements for purchasing spare parts. The MRP run checks the warehouse requirements and creates delivery schedule line to scheduling agreement.
    Now the MRP run creates unnecessary delivery schedule lines to scheduling agreement if the earlier created delivery schedule line's delivery date has been changed manually.
    For example,
    Today the MRP run finds requirement for one article  and creates the delivery schedule line, where delivery date is 2.9.2008 (determined from articles basic data).
    The Vendor confirms the delivery date as 3.10.2008 and the purchaser changes manually  (transaction ME38) the delivery date to delivery schedule line accordingly and prints the created message.
    The next MRP run creates new delivery schedule line, where delivery date is again 2.9.2008.
    now there are two open delivery schedule lines for this article with delivery dates 3.10.2008 and 2.9.2008.
    Why the MRP run does not notice the existing delivery schedule line with the new delivery date 3.10.2008?
    we have changed delivery dates manually several years and this has never happened before.
    could you please help me to resolve this.
    Thanks in advance,
    Srikanth

    In addition to the above post,
    as you changed the date manually from 2nd to 3rd....
    so there are was no report for 2nd generated ulitmately...and if generated it was changed...right...
    so when you again run the mrp...the system will generate one more pr for the same article....
    this ultimately happens because of the set del dates in the MMR as i told above..
    Hope it helps..
    Regards
    Priyanka.P

  • MRP creating multiple delivery schedule lines in PR

    Hi,
    We have activated MRP (type PD) where Purchase requiesition is auto created by system for requirement quantity. We require to optimize delivery schedule in such a way that entire PR quantity is broken into various delivery schedule based on planned delivery time and requirement.  Scenario can be further explained with following example.
    Material Requirement for a month is say 1,25,000 units
    Closing Stock say 25,000 units
    PR Generated by system for 1,00,000 units. The entire quantity is schdulled with only one delivery schedule line as per planned delivery time. 
    The requirement is to generate multiple delivery schedule lines automatically in Purchase requisition based on planned delivery time so that Purchase orders can be placed with system generated delivery schedule lines.
    How can it be achieved ?
    Regards,
    Nirav Kinkhabwala

    Dear
    Are you dealing with Single vendor  where you want Multiple Schedule Line item through single PR  which should be generated through MRP run ??
    What you will have to do is to set up the Outline Agreement or Info Record for your vendor and material and then create the source record for this vendor- material relationship and make sure that this source record is set as MRP relevant. Once MRP is run, the vendor is automatically defaulted to your PRs. If in your material master, you have defined the same purchasing group for various material numbers, then with Transaction ME59, it is feasible that you can combine various PRs of the same purchasing group by flagging onto the 'Per Purchasing Group' indicator checkbox. Make a trial test and let me know how it goes.
    Or you can use Qouta arrabgement in that case for different vendor .Please refer : Multiple Requisition  line itme for Quota arrangement
    Just check and revert
    regards
    JH
    Edited by: Jiaul Haque on Dec 25, 2010 1:52 PM

  • Delivery schedule print out and number

    Dear Expert
    Our client need to implement the scheduling agreement in the company , but the requirement as follows their are two dept one is for vendor dealing and our is meant for requirement generation , so scheduling agreement is generated by one dept and delivery schedule will be generated by other , is it possible to  generate different for delivery schedule?/it not how can we configure the system as such when we release the delivery schedule on the basis of FRC release procedure then only print out should be generated for the deliverry schedule and print out should only consider those line item of delivery schedule which are release no other , i.e if for e.g for 1st month the delivery schedule is generated against the PR 's for different line item of Scheduling agreement , then only  those item wil be consider which are release as per the FRC , then for the next delivery schedule only those item to be consider in the print out which are release 2nd time. how can we map this scenario in the system
    Regards
    farhan

    Dear Expert
    can we customize system as such that we cannot  maintained delivery schedule before the  release of the  SA
    Regards
    farhan

Maybe you are looking for