Vendor in freight condtion of scheduling agreement

Hi,
I have problem, in scheduling agreement unable to see vendor field in ZFR1 condition or any other conditions,
above is possible in development server,quality server
above is possible in P.O. preparation by ME21N in development server, quality server and also production server.
Also checked SCREEN LAYOUT of scheduling agreement and also ME21N in all three sever compared the field selection and found no difference

Hi
You can see the vendor field of freight condition in scheduling agreement.
Check whether your custom freight condition is identical in control attributes in line with standard delivery cost condition like FRA1/FRB1 etc.
The condition cat. must be B.
warm regards
sairam akundi

Similar Messages

  • Vendor address not updated in Scheduling Agreement

    I have a peculiar problem where the vendor address is not being updated in all scheduling agreements. I have multiple SAs against a vendor. When i change the name of the vendor, the name changes only in one of the SA. All the remaining SA carry the old name of the vendor. I tested with another vendor on the test system and the names on all the agreements change as soon as I make the change in the vendor master.
    Does anyone have any explanation on why the system is behaving strangely?
    Thanks

    Hi,
    I am more surprised that the name changed automatically on the ones that DID change.
    I would not have expected this to update in this way. The main idea is that outline agrements can have different data to the master records because they are specific agreements and often relate to very specific data.
    If you wanted to change the address of a vendor it should NOT change the address of existinmg VSAs etc. automatically because the document is  a =fixed contract that is agreed between you and the vendor and should ONLY be changed manually.
    We had a similar question earlier today asking why the system does not change the short description on a contract when the short description on the material master changes. My reply was basically the same, it SHOULDN'T change it automatically because the agreement is a legal document and cannot be changed by just ONE of the parties involved.
    So I would be asking  why the one VSA changed automatically (and the ones in the test syste) not why the others didn't change.
    Just trying to lok at this from all angles.
    Steve B

  • Freight handling in scheduling agreement

    hi
    I have a transport scheduling agreement in which for every scedule line getting generated,fixed freight cost will be paid to transporter irrespective of Load
    So at what level freight c.typ to be mainted and how cost will be apportioned to inventory a/c
    Give me the config.details
    Thanks in advance
    Ratha

    Check with document type in the
    Spro--->MM>Scheduling agreemnt->Define document types.
    Check whether the doucment type is time dependent or time independent and the release indicator for the document type lpa.
    Remove the check box and try it out..
    If u ar facing some more problem rivert back to me and give the error meessage wht u ar getting so that i could help u in sorthing out the issue.
    Regards,
    Senthil

  • Change material freight group in scheduling agreement

    Hello,
    whenever we create a scheduling agreement (VA31/VA32), we can change the field  "Mat. freight grp" on the Shipping tab on item level.
    After the first delivery, this field grays out and we are not able to change it anymore. Is there a way to change the field after the first delivery?
    Thanks
    Anne

    Hi, Jürgen / Muthuraman
    What is the reason behind this?  Change of material group in material master and the new maerial group is not being updated in the existing contract/Schedule agreement?
    Appreciate if you can enlighten this in detail.  Thanks in advance.

  • Scheduling agreement - Direct delivery

    Hi,
    I am currently facing a challange where I have create a schedule agreement with a vendor who is providing raw materials directly to a subcontractor. My goal is to be able to do goods receipt using mvt 101 o and have the materials stored on a "Material provided to Subcontractor"-Storage loaction.
    I am not able to create a Source list in the Vendor MRP area, but only in the plant MRP Area
    I have done as follows:
    Create a MRP area type 03-Vendor with ref to the subcontractor vendor number
    Assigned the raw material to the MRP Area
    Create a Scheduling agreement with out ret to any storage locations
    When running MRP the schedule lines are created in plant MRP area ant NOT in the vendor MRP Area.
    Please let me know how to assign a vendor MRP area in the source list.
    Thanks again for your help.
    Anders

    Hello,
    I've got a similar problem except that I don't manage MRP area for this specific plant. I would like that at GR the goods are received directly at the subcontractor's site in the stock provided to vendor (101 O).
    For this :
    - I have created the Scheduling agreement  (LPA type) with delivery address flagged in item.
    - The source list is fixed to the vendor with Scheduling agreement number and item (and same start date and finish date as in the contract).
    - The material master has all information to let the schedule lines to be generated (lot size and planning calendar).
    =>  When I run the MRP it generates purchase requisitions instead of schedule lines, when the SC vendor is flagged in scheduling agreement.
    When the SC vendor is not flagged in scheduling agreement, it works perfectly.
    Is it a matter of customizing, or is there any other parameter to set ?
    Thanks a lot for your help,
    Regards,
    Anna.

  • Scheduling Agreement with print out

    Hello
    I created one Scheduling agreement for vendor A1 and created schedule lines .
    in header Data of this Scheduling agreement i have mentioned the Invoicing party is B1
    when i take the print out of Invoicing document the Vendor A1 disply , it is not taking the Invoicing party B1 i print out
    i have defined in Patrner in that who is supplier, order , and who is invoicing party
    that's$why iam search the header data of Scheduling agreement  in that i got invoicing party is B1 is there, still in print out i got wrong vendor no why?
    one thing is
    this B1 is not defined for perticular Purchasing org, i ahve searched in LFM1 table, is this the reason
    i have searched the out put determination for date 14.06.2007 here only partner is A1 is this a reason, shall we define the invoicing party in output determination
    totaly  i want the name of invoicing party in print out
    regards
    sapman

    Hi,
    the partner functions only store the data (i.e. addresses etc.) and make it available for the print program.
    You have to code the print program to get it to use the correct vendor for the addresses etc.
    The invoicing party address is not normally referenced on the scheduling agreement prints because this si the address that the payment is made to and the address that sends the invoice to you. Why woukld you print the vendors invoice address or name on the scheduling agreement? It is the OA (Ordering Address) that is relevant for the print of the scheduling agreement or schedules.
    So why would you print the invoicing vendor's details on a scheduling agreement print out?
    Steve B

  • Explode LUMF material in scheduling agreement

    Hi SAP experts,
    In short: Is it possible to have LUMF materials explode in a scheduling agreement?
    At our company we have a lot of projects. We are in the process of selecting an appropriate way to handle these in SAP. We came to the conclusion that a scheduling agreement could do what we want.
    Unfortunately we discovered a problem in our current configuration with respect to scheduling agreements and LUMF materials.
    When we add a LUMF material to a standard SD document, the LUMF material explodes in all the necessary materials.
    When we do the same in a scheduling agreement we get the error that the T 184 table does not contain a position type for ZLZM LUMF.
    Would it be possible to configure this? Could you give us a clue on how to make this possible?
    With kind regards,
    Nanne Sluis

    Thanks for your answers. I am not sure if we are talking about the same here. I get the feeling you are talking about scheduling agreements for vendors.
    I need sales scheduling agreement as described in http://help.sap.com/saphelp_erp2005/helpdata/en/33/4361299d7a11d194e200a0c9306794/frameset.htm
    We are currently using quanity contracts but they lack a delivery date and MRP relevance. In the SAP help it is in this case described that you need a scheduling agreement.
    Edited by: Nanne Sluis on Jan 22, 2008 2:47 PM

  • Returnable packaging in scheduling agreements and inbound deliveries

    Hi all,
    We are trying to make the following process work but are finding some problems.
    We have packaging materials of type LEIH which we want to include in a scheduling agreement.
    This we where able to do by using account assignment key "Z".
    By doing this our vendors can send us an ASN where the packaging is included in the ASN in the same way as a normal material.
    So we have a scheduling agreement that has the following 2 lines.
    Line 1 --> A material of type SEMI
    Line 2 --> A material of type LEIH
    For the LEIH material a packaging account has been created in SAP for the vendor.
    Based on the scheduling agreement we have created an inbound delivery with these 2 items (once process in working this inbound delivery will be created by the EDI message of the ASN).
    Line 1 --> Has in the inbound delivery movement type 101
    Line 2 --> Has in the inbound delivery movement type 501M for the packaging material.
    Up till here all is as expected. Now when we open this inbound delivery in transaction MIGO both the line items are shown and get movement type 101 instead of Line 1 movement 101 and Line 2 movement 50M. So we are not able to post the GR via Migo, manually changing the movement type can be done but this gives an error message stating that the movement type differs from the PO.
    If we post the GR via the inbound delivery then all works as it should but we would like a uniform way of posting GR for our users.
    Any idea how we can get in MIGO movement 501M assigned to the packaging material as it is mentioned in the inbound delivery?
    Regards,
    Peter

    Have you tried open item check. Below the dynamic check under risk category controls you ll find open item option. select it and system will also account for open deliveries in credit check. This might solve your problem.

  • Change vendor in freight condition after GR

    Dear All,
    Is it possible to change vendor in freight condtion aftr making GR. Please confirm
    Rgd
    Madhavan

    HI,
    It is possible to change the freight after GR done and MIRO is not done.
    For this in the freight cond type.use cond type FRB1 or copy this and create ur own cond type.
    Then in control data,VENDOR IN GRGIVE VALUE 2 & SAVE.
    When doing migo u can give the new vendor for freight during GR or if u had forgot to change the vendor reverse the GR and then change the vendor.
    This is possible only when u have not done MIRO.
    Other wise in MIRO in details TAB u can enter the new freight vendor in Invoicing party.

  • About scheduling agreement

    Hi,
    Can anoybody tell me that what is the difference between scheduling agreement with release document and scheduling agreement w/o release document?
    what are the benefits of the scheduling agreement with release document?
    Thanks
    Ashish

    Hi Ashish,
    Release nothing but creating output messages which we will send to vendor ( just like purchase order output message like printouts), by automatically ( without release, document type LP) or depending upon certain criteria i.e with release, document type LPA.
    If you ar using scheduling agreements without release documentation ( document type LP), the message is generated directly. i.e the movement you save the schedule lines the system creates the delivery schedule and sends to the vendor
    If you are using scheduling agreements with release documentation ( document type LPA), you must explicitly generate SA releases ( FRC or JIT)
    The schedule lines of a scheduling agreement release contain finalized information for the vendor regarding quantities and delivery dates. The schedule lines are recorded with the aid of the release documentation and can thus be displayed and verified at any time. The release documentation enables you to see which schedules you transmitted to the vendor during the last two weeks, for example, and check the correctness of goods receipts against the relevant schedule lines.
    In the case of with release (delivery schedules) the output messages are controlled by creation profile.
    Creation profile
    1.     it aggregates the release (i.e. scheduled) dates and quantities
    2.     It generates an SA release in accordance with the creation strategy and the entries on the initial screen for SA release creation.
    3.     The releases (delivery schedules) are transmitted as messages to the vendor
    The advantage of with release is you can create forecast delivery schedule (FRC) and Just in time delivery schedule ( JIT)
    Forecast (FRC) delivery schedule
    Provides the vendor with longer-term data regarding the quantities needed of a material and when delivery is required. In such schedules, the timing of delivery is usually expressed in terms of calendar months or weeks. Note: approximately equivalent EDI terms for the ”forecast delivery schedule” are: ”planning schedule with release capability” (ANSI 830) ”delivery schedule (message)” (EDIFACT DELFOR), and ”delivery instruction” (ODETTE DELINS).
    •       Just-in-Time (JIT) delivery schedule
    Provides the vendor with data on required quantities and desired delivery dates/times covering the near future.In such schedules, the timing of delivery is usually expressed in terms of specific days or even times of the day. Note: equivalent EDI terms for the ”JIT delivery schedule” are: ”Shipping schedule”: (ANSI 862) and ”Delivery just in time message” (EDIFACT DELJIT).
    Thanks
    Janardhana

  • MRP is not generating any schedule line in my vendor's scheduling agreement

    Hello all,
    My question is: why the MRP is not generating any new line in my vendor's scheduling agreement?
    This is the scenario:
    I have created a vendor's scheduling agreement with transaction ME31L
    I have created a customer's scheduling agreement with transaction VA31 and those characteristics:
    - Forecast scheduling lines
    - JIT scheduling lines
    - MRP to DS type assigned to type C: Requirements according to forecast delivery/Deliveries according to JIT
    I have run MRP with transaction MD01
    MRP is generating some purchasing requistions, not purchase orders because we have set up a release strategy which requires 2 approvals, but those purchasing requests are not generating any new line in the vendor's scheduling agreement.
    Any idea why it could be? Please do not hesitate to ask for further explanations. Thank you

    Hi,
    Check if stock is available for the material in that plant.
    Also check the requirement date for the material and compare it with the planning horizon for that plant.
    Check your material master MRP view.
    Create source list(for material and plant in question) with MRP indicator 2.
    Thanks and Regards,
    Maheshwari

  • How to check LIV made for a partner vendor in Schedule agreement or P.O.?

    I have defined partner vendor in schedule agreement and made LIV for a different vendor during MIRO. I need to check this in system. What is the procedure for viewing LIV made for a partner vendor with all these details like LIV no, Amount,partner Vendor and Condition type,etc.

    Hi,
    Check this to see if helps: Re: MM LIV-Report
    Thanks,
    Gordon

  • Email Scheduling agreements to external vendors

    Hi,
    How do i send email to vendor about after MRP runs changes of Scheduling agreements?
    I know how to send PO as email?
    Do i have use SAP standard program and form to send the changes of Scheduling agreements by email to Vendor?
    Appreciates everyone response.
    Regards,
    Siva

    Hi Greetings
    The following setting are required.
    1) Creation of Message output type with Application EL (Purch. SchAgrRelease)
    OLME --> Materials Management --> Purchasing --> Messages --> Output control --> Message types --> Define Message Types for Scheduling Agreement Release/Expediter
    2) Setting up Fine Tune control Print operation 5. Scheduling Agreement Delivery Schedule
    OLME --> Materials Management --> Purchasing --> Messages --> Output control --> Message types --> Define Message Types for Scheduling Agreement Release/Expediter --> Fine-Tuned Control: Forecast Delivery Schedule/Expediter
    3) Assigning the output type to the  Message Determ. Schema: Forecast Delivery Schedule/Expediter
    OLME --> Materials Management --> Purchasing --> Messages --> Output control --> Message types --> Message Determination Schemas --> Define Message Schema for Scheduling Agreement Release/Expediter
    4) Maintaining the condition record with despatch time "4- Send immediatly "in Transaction MN10.
    Gobinathan G

  • Freight value in PO and Scheduling agreement

    Hi,
    The freight value getting added with material cost when we do GR against PO, but not getting added with material cost when we do GR against Scheduling agreement.
    What is the reason, and how to correct it ? (we required it to get added with material cost)
    Regards,
    Sattuj

    Hi,
    Can you please tell me how you maintained freight condition in scheduling agrrements? Did you add them in supplementary pricing procedure... if yes could you do a MIRO for planned delivery costs ?
    i am using standard LPA doc type and it does not allow time-independant conditions.. so without removing the "time-d" tick on the doc type.. is there a way taht we can maintain other consiions other than price on scheduling agreement line items ?
    regards

  • Restrict ME39 Schedulling Agreement display by Vendor?

    Hello Gurus,
    I need to restrict certain user to view PO/Scheduling agreements for only a specific vendor in ME23N/ME39. I don't have much of a security background but from what I've seen there is no authorization object for Vendor.
    I thought of doing this by creating a custom transaction to call ME23/ME39. Allow those users access to the custom transaction only. Then use a user exit to check if the PO is for that specific vendor. The problem with this aproach is that I think I can only use user exit 4 (EXIT_SAPMM06E_004). But that user exit is called for ME23 not ME39. I couldn't find a user exit that would get triggered before I get to the second screen for ME39.
    I could make copies of the programs and make the change direction to the code but I didn't want to do that because of future upgrade implications.
    If anyone has any bright ideas (security or ABAP) on how to acheive this please share.
    TIA

    Hi
    If the standard authorization objects are not good for you, u can create a custom one and assign it to user profile.
    So u need to find out only a right place where u can check the new authorization object.
    I don't know trx ME39, but it's based on the same program of PO (ME23, ME23N) so u can check the user-exit for PO by CMOD trx
    Max

Maybe you are looking for

  • Reg: Error While Excueting the WebI Reports

    Hi Experts , I have created a webi report ,  using the universe. therewith  it fetch the data from the SAP-BW System ,before  all the reports developed using webi works fine. Its works good in BW. But reports shows the error as follows in WebI. Error

  • Cannot open nef files of nikon d800 in my cs5 photoshop and cannot download the update

    How can I update a compatible update to photoshop cs5 to open nef fies taken by nikon d800

  • Screen value not assign in field symbol

    Hi gurus,          I create a field symbol for module pool programming for assigning screen value. I create a tab in main screen and three subscreen for tab.  in first screen values perfectly asign in field symbol but second subscreen FS1,FS2,FS3 val

  • Data usage numbers are out of control!

    I have read some other post that make me believe there is a problem on Verizon's side in terms of data. My husband and I both have iPhone 5c and we are currently on the 20gb plan. Even though we both do the same things on our phones and generally use

  • Help with arrays & counting characters in arrays

    I am trying to figure out how to count how many times each characters appears in the array (but I have to do all the counts at once). I am supposed to store the counts in an int[] array of 27 elements (26 letters & an extra count for everything else)