Vendor linking in PR created through MRP.

Dear Experts,
I have a issue with the vendor linking in the PR through MRP.
I have a material for which i have maintained the source list having only one vendor which is fixed with MRP indicator 1. Outline agreement is mentioned in the source list. Both having proper validity period.
Info record is maintained for the plant / material / pur.org / vendor combination.
Source list is ticked in the material master.
Now my concern is that, when MRP run taken system generated 2 PR's, one with vendor and one without.
Safety Stock is 3525 KG.
Lot size is WB
MRP Type is PD
Rounding value is 235 KG.
Base unit of measure is KG & order unit is EA. Conversion maitained is 1EA = 235 KG
Before taking MRP i was have a requirement of 2600 KGs.
So system generated 2 PR's. One PR for 2585 (Without vendor) & second for 940 (With vendor).
Delivery date for both PR is same i.e., 01/25/2012.
Kindly suggest.

Hi Mahesh,
First of all, the MRP indicator should be set to "2" - if you want MRP to generate schedule lines for the scheduling agreement.
If you set to "1", system will generate only PRs for the material.
Secondly, what is the requirement for 2600 KG for ? Is it Order Reservation coming from higher level BOM assembly?
If so, it would not have any vendor assigned to it.
Lets come back to what actually happened when you ran MRP:
System has planned for the safety stock quantity of 3525 KG which is a current requirement.
However, system found that there is a requirement of 2600 KG without vendor - it rounds off this to the nearest multiple of 235 KG ie it becomes 2585 KG for which it has generated 1st PR.
For the balance requirement - i.e (3525 - 2585) = 940 KG, system generates the 2nd PR and assigned the vendor from the source list.
Based on the planned delivery time for the material in the info-record, system has proposed the delivery dates for the PR.
Regards
Prabhu

Similar Messages

  • Search for pr created through mrp

    Dear friends,
    Pl explain me how can we search for the pr which is created through mrp in the doc overview of po creation screen?
    Thanx & Regards,

    Dear Mr. Pratap,
    You can see the list of PR generated through MRP by using ME5A, Put the MRP Controller and execute.
    Regards,
    Manish Jain

  • Listing PR created through MRP  alone

    Is their any way of differentiating the PR created through MRP and through ME51.
    My need is to list PR created through MRP alone.
    - David Boon

    Hello David,
    As Anand said, you can use the tcode ME5A to get this report, but for your requirement you need to select criteria from the dynamic selection list.
    - Go to ME5A
    - On the initial screen you will find one colur icon (Dynamic Selection), click on that
    -  you will get window where you have to double click on "Creation Indicator" which will pull one field on your selection screen.
    - In this screen you can give your criteria for PR creation selection  i.e. B for MRP, D for manual creation etc
    - Save the variant for future use.
    Hope this will help
    Regards
    Arif Mansuri

  • Auto Email Throgh SAP After Creating Schedule Line Through MRP Run

    Hello experts,
    is it possible to have email generation when scheduling lines are created through MRP run ? if yes kindly let me know the procedure.
    Regards,
    Durgesh

    Hello Raghavendra,
    For same requirement i did what you suggested but Can you please guide us what Business object needs to be used as start event for WF3100020 which we are activating. Because We are not able to activate the standard workflow.
    It will be better if you help us with steps.
    Thanks in advance.
    Regards,
    Yuvraj

  • Event not getting triggered for PR generated through MRP run

    Hi All,
    Could anyone let me know how to get a workflow triggered for the ReleaseStepCreated event (obj - bus2105) when the PR is created through MRP run. The MD02 control paramters have the value '1'.
    Interstingly the workflow triggers when the value is set to '2' or '3'.
    Thanks,
    Ameekar

    Thanks Aman,
    I checked field restrictions but there are none there. Actually i checked them for other object 'AOOMARA' which is being thrown as an exception when i am creating the PR through MRP run.
    Exception says -> field not maintained.
    So i guess, i need to maintain the field for Change Document but i am not sure how. COuld you please aid me with that.
    Thanks A lot !!

  • Purchase requisition through MRP

    Dear All,
    When we create requisitions from MRP, it shows the requisition is created by the description of the MRP controller and not the user ID, as would normally be expected in manually created requisitions (Tab-Item Level-Contact Person). The question is u2013 for MRP created reqs, is there a way to influence this and have those reqs show the user ID as well, just as the normal manually created requisitions? Right now description of MRP controller is displayed for Purchase requision created through MRP
    Your reply would be appreciated!!!!
    Thanks!!!!!
    Warm Regards!
    Sneha

    Hi Sneha,
                    As such when we trigger the MRP the purchase requsition created  will showing as status created by as per the MRP controller that you mentioned in MMR..
    But i don't thing that such config is there were we can get the user specific  status while triggering MRP .
    regards,
    Patil

  • Default Purchase Requisiiton Document type through MRP

    Hi,
    Where do we make the setting for default document type for purchase requisitions created through MRP?
    Regards
    Ramakanth

    Dear,
    You can create PR with default document type during MRP via MRP Group.
    Try below settings at OPPR
    1.External Procuremnt -> Scheduling /doc type-> assigh ur customized doc type (XXX)for "Stnd .purch.ord" field (MRP:doc.type purchase requisitions for standard purchase order.
    2.Assign the MRP group to planning material and run MRP & see the doc type of PR which ahs created.
    3.)SPRO- > MM-> Purchase Order- > Document type
    Please refer this thread also,
    https://forums.sdn.sap.com/click.jspa?searchID=18453087&messageID=6084596
    Regards
    Regards,
    R.Brahmankar

  • Object link is not created for batch  through BAPI_DOCUMENT_CREATE2

    Hi ,
    I am trying to create  document for batch object through program using bapi BAPI_DOCUMENT_CREATE2.
    In transaction CV01N while creating document  there is a provision to to link your material with Batch. I am able to create it through CV01N. But, While creating through program I am not able to create the object link. I am able to create link for material,vendor,PO.. but not for BATCH objects. The table where link objects values to be passed is OBJECTLINKS.
    I have tried all possible combination but unable to create a batch object link to a material through BAPI_DOCUMENT_CREATE2.
    Thanks,
    Sandeep

    Hi,
    Please explain detailly about FM BAPI_DOCUMENT_CREATE2
      Thanks
      Madhavi

  • Vendor determination for purchasing rquests created by MRP

    Hi all,
    Purchasing requests created by MRP comes with blank vendor. So vendor has to be identified by the user when converting request to the po. What has to be done in order to get MRP automaticly assigns related purchasing info record ?
    Thanks in advance.
    Hilal

    yes
    you can use ME05
    It is designed to generate source lists from info records and outline agreements etc.
    But test it thoroughly firat. I have always found it to be a bit too basic and it often results in some invalid entries especially start and end dates.
    Depending on the settings you use it can leave existing records as they are, remove them or make them invalid. This often "damages" the existing data if you already have a lot of source lists already created, so do try it out fully in a sandbox first.
    You also have the option of jumping directly from ceratin transactions such as Outline agreement create to generate the source list at the same time as you are generating the contracts etc.
    So take care, in many implementations I have worked on we went back to manual generation, often just after someone had ruined the data by using the wrong swettings in ME05.
    also
    When you are in the 'Generate Source List' Screen, select the related source list record you would like to fix the vendor and then press 'Shift+F9'.
    reward if usefull
    Message was edited by:
            Umakant Bhangale

  • Create Consignment PR through MRP run

    Hi,
    How to create Consignment PR through MRP run.
    Tx
    Uts

    Hi,
    In MRP2 View maintaint the Special procurement key as 10 --Consignment & Procurement type as 'F'
    Then maintain the Info record with net price & Taxcode for that material.
    Then if you run the MRP in MD02 system will create Consignment PR for that material.
    rgds
    Chidanand

  • Need query linking parent and child discrete jobs created through ascp planning

    Could you help me create a query that will show both the parent and child discrete jobs created through ascp run? I do not need entire query. I need to know the names of tables and understand the links or joins between tables. Then, I shall be able to write the sql on my own.
    Thanks

    Just use a format like this:
    http://<Server Name>:<port Number>/OpenDocument/opendoc/openDocument.jsp?sDocName=reportB&sType=wid&sRefresh=Y
    &lsMObjectName=[test1],[test2]
    Here in lsM[ObjectName] parameter [ObjectName] = the object name which you want to send data to ReportB
    I can give you a idea of creating hyperlink for jumping another report (Here ReportB)
    Just use  a formula like that in any cell:
    ="<a href=http://<Server Name>:<port Number>/OpenDocument/opendoc/openDocument.jsp?sDocName=reportB&sType=wid&sRefresh=Y&lsMObjectName=[test1],[test2]&sWIndow=New> Click here to view </a>
    Now from the property select Read cell content as "Hyperlink"...
    thats it......
    For more information please see the
    "OpenDocument" artile
    Hope you can  get help from this
    Edited by: Arif Arifuzzaman on Aug 20, 2009 7:24 AM

  • Auto PO through MRP

    I want to create PR & PO both automatically through MRP by the explosion of BOM.
    how can I do this?
    Pl detail in steps.
    Regards
    VS

    Hi VS,
    Auto PR creation through MRP is possible. While running the MRP system will generate planned order or Purchase requistion based on creation indicator. If u have a material type of both internal and external procurement type then u must select the creation indicator accordingly for PR generation.
    For Auto PO u need to maintain Auto PO both in Material master and Vendor master. The PR must have a unique source assigned to it. You need to maintain a source list for this. By running ME59 u can create PO from PR.
    Hope this helps.
    regards
    Anand.C

  • Secondary packing material procurement through MRP Run

    Hi
    Is it possible to procure Secondary packing material through MRP Run. Material type of Secondary packing material is VERP. In MRP view we defined MRP type as VB and reorder point also set.

    Hi
    the MRP run would create a procurement proposal if the stock has fallen below the re-order point. The procurement proposal needs to be a purchase requisition if procurement should start immediately (see Creation indicators for the MRP group). Further, you need to set the "automatic purchase order" indicator both on the material (purchasing view) and on the vendor. In the MRP run, the system also needs to be able to assign a vendor (i.e. through a source list). Then a purchase requisition is automatically converted into a purchase order on creation.
    Good luck
    Eivind

  • Schedule lines are not getting generated through MRP

    Hello Experts,
    While running MRP, we observed that the system is creating PR instead of schedule lines, although all the necessary prerequistes to generate schedule lines through MRP are maintained. For e.g.
    1. MRP Schedule line relevant indicator '2' is maintained in the Source List.
    2. Sch. Agreement dates and Source List validity dates are same.etc...
    Further after some analysis, we observed that if we change the source list validity from date to some back date then system is creating correct schedule lines.
    Example: Material M1; Planned delivery time 7 days; GR processing time 5 days; MRP Type PD; Lot Size WB;
    SA validity dates - 07.09.2011 to 31.12.2011
    Source List validity dates - 07.09.2011 to 31.12.2011
    If MRP run on 12.09.2011 and source list dates are retain same as mentioned above, system creates the PR.
    If MRP run on 12.09.2011 and source list dates changes to 05.09.2011 to 31.12.2011, system creates the schedule lines.
    Could you please let us know, why the system behave like this?

    Dear,
    Welcome to SDN,
    In transaction OMDT you have to enable the indicator create schedule lines
    In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
    Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
    If u run MRP properly u will get schedule lines automatically in ME38.
    Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.
    Regards,
    R.Brahmankar

  • 'Releasestepcreated' not getting triggered for PR generated through MRP run

    Hi,
    I have PR Release strategy workflow configured, working well when i try to create PR manually, triggers workflow.
    PR's created thorugh MRP run, triggers release strategy but not workflow.
    I checked the event trace 'releasestepcreated' event not triggered through MRP run.
    Please respond ASAP.
    Your inputs will be highly appreciated.

    Short Text 
    Workflow with multiple workitems 
    Long Text 
    Refering SAP notes that i came to know that workflow is not supported
    through MRP run (md03/md04).we are not using Planned orders.
    To trigger workflow for Purchase requisitions created by MRP run, we
    have developed a custom report to trigger workflow explicitly.
    1.MRP batch job runs every night. After MRP job,planned to schedule
    another job to trigger workflow for PR's created MRP run.
    2. Used FM 'SAP_WAPI_CREATE_EVENT' to trigger workflow.
    3. PR requires 5 levels of approvals based on release strategy
    configuration.
    4. The issue is PR 'XXX' created and waiting for approval in agent's
    inbox.When 2nd day MPR runs same PR 'XXX' effected, another
    workitem for the same PR in agent's inbox.
    We have multiple workitems for the same PR in agent's Inbox.
    If i execute one of the workitem,releases PR, multiple workitems are
    getting generated for 2nd level approval for the same PR.
    Please give your inputs to resolve this issue.

Maybe you are looking for

  • SSO PL/SQL Sample Application Error

    Hi, I've tried the PL/SQL SSO demo application located in the PDK October release. Symptom: The sample application shows the success page, even the user is not authenticated by the Login Server. Cause: There's a code line in the SAMPLE_SSO_PAPP packa

  • Looking to record 3 XLR Mics

    I've been doing my homework on bringing in three separate voice tracks into GB, since that allows for greater post-production flexibility. However, it looks like all the manufacturers are all about 2 mic inputs. Crap! Based on some snooping around he

  • PKCS#11 Read Access

    Hi, I have a simple question. Using the SunPKCS11 it is possible access to the public certificate (or other public objects) in the smartcard without the user PIN? Thank�s.

  • Can't Open Documents From Finder

    Sorry- the topic title is a little deceiving. I wasn't quite sure where this issue would go because really it's an issue I'm having with Word. Word doesn't seem to want to open ANY documents. Every time I try, it stops responding and I have to Force

  • Bridge CS6 keeps 'quitting unexpectedly'.

    Hi All, since installing PS6 I have not been able to use Bridge as it 'quits unexectedly'. I have clicked the 'send to apple' tab but had no response. Any suggestions how to amend this? Thanks in advance.